GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
10 OYSTER RESTORATION PROJECT - ACCEPTANCE OF DRAFT RESOURCE
ALLOCATION AUTHORITY CONDITIONS
DOCUMENT INFORM AT ION
Author Environmental Officer, Cherie O’Sullivan
Planning & Infrastructure Department
Index ECM/ Project & Contract/ Noosa River Management/ Oyster Reef
Restoration Project
Attachments 1. Plans
2. Background Detail
3. Draft Resource Allocation Authority pending Council approval
(All three Attachments provided separately to this agenda (63 pages); 2 x hard copies available in
Councillors’ Room)
EXECUTIVE SUMMARY
Oyster reefs provide important diversity to fish habitats for their health. Noosa River previously
boasted extensive oyster reefs throughout its system, and these coincided with reports of very
successful fisheries.
Following awareness of the functional extinction of oyster reefs from Noosa River through over
harvesting and dredging, there has recently been support for a project to restore the oyster reefs
through the system.
The Nature Conservancy in conjunction with the Thomas Foundation, The Noosa Biosphere and
the University of the Sunshine Coast have undertaken extensive background studies to deliver
such a project to benefit the Noosa River. Reports on the project have previously been presented
to Council in Ordinary Meetings held on 22 October 2015 Item 7, Page 8 and 20 November 2014,
Item 1, Page 3.
As the works will be proposed on public land and in areas such as Declared Fish Habitat Areas,
and Tidal Areas, State government policies only provide for public entities, such as Noosa
Council, to be the applicant for approvals needed to allow for delivery of such restoration
activities.
Given the changes to the substrate in the bed of Noosa River required to allow oysters to recruit,
compared to the early 1900’s, it is necessary for human intervention to provide oyster reef
restoration units. These units will facilitate the restoration of oyster spat in a vertical profile
elevated above the river bed in a manner that can facilitate natural restoration processes.
Installation of oyster reef restoration units at the most appropriate sites requires a Resource
Allocation Authority (RAA) from the Department of Agriculture, Forestry and Fisheries (DAFF).
Given that oyster reef restoration is a novel concept in Queensland, the policies of the State
Government have not yet been established to easily allow for this to occur. DAFF is proposing a
number of conditions to facilitate their approval of the beneficial project. The conditions of note
include signage, monitoring and indemnification to the State for any damage to persons or
properties on the State land as a result of the works.
Given that Noosa Council’s only involvement is to facilitate development approval for the project,
there is a possibility for all costs associated with such indemnification to be passed on to the
other project partners. Noosa Council staff are currently seeking advice from its insurers
regarding the costs of such liabilities.
Page 68 of 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.