Original source · versioned page text
Appendix B - Stormwater Management Report
XREFS :— X—BASE.dwg ; X-SURVEY.dwg ALL ROOFWATER TO DISCHARGE OVER TANK INLET MESH PROTECTION COVER OVER INLET INTO TANK Last Modified :— Oct 27, 2025 - 2:02pm CAD FILES J [email protected] DATE:23.10.25 poo n---- nnn H \ PROPOSED #100 ORIFICE 2 | | | AT 1.82m OF TANK PROPOSED $50 ORIFICE 1 DISCHARGE TO PROPOSED AT BASE OF TANK STORMWATER DRAINAGE t—| SYSTEM (REFER PLAN) pase Ut é at z x a at 4 a , 4 4 ; o 4 ¢ a 4 a 24 < ¢ a 4 4 4 7 9 q “ < STORMWATER DETENTION TANK DETAIL-3kL F Associated Job Nos] Survey Data Scales CLIENT 25 TULIP STREET, COOROY QLD 4563 COUNCIL E tore J. & C. TROMPF ; AHD AUXILIUM ° a 3 Detum aan TANK DETAIL NOOSA SHIRE COUNCIL C Auxiliary Drg Nos] Horiz. | MGA2020 | 9 02 Oh 0.6m ASSOCIATED CONSULTANTS Grid ZONEQ6 k ‘ ‘ NAN 8 Height | pr gg. 399 Scale 110 @A1 © ABN 84 639 195 092 BREN PLANNING STATUS Job No] = A [ISSUE FOR REVEW 23.10.25 Datum : PIKK|. ST JARO. BAULEKA SIGNATURE ISSUE FOR USE Contract_No, - a Signatory: - RPEQ Full Name, Eng. Area and RPEQ No. or Survey | SURVEYPLAN | Dimensions shown in metres MAROOCHYDORE BC, QLD 4558 RPEQ #20693 DRAWN DESIGNED DATE i | Revisions/Descriptions = Full Name and Position Title Date Books | yx __ except where shown otherwise +61 423 415 419 cPEng TN MN 23.10.25 Drawing No. C905 7 A VU. Series Number °
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix B - Stormwater Management Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.