Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix B - Stormwater Management Report

of 12

Page text read automatically using OCR, there may be inaccuracies

1. INTRODUCTION
Auxilium Consulting Pty Ltd (Auxilium) has been engaged to prepare a Stormwater Management
Report to accompany a development application for a residential subdivision located at 25 Tulip
Street, Cooroy.

This report investigates the stormwater management considerations for the existing and proposed
development site and assesses how the run-off from the site is to be managed in accordance with
Noosa Council requirements for stormwater drainage.


2. SITE DETAILS

2.1. Existing Site Description and Drainage Regime
The existing Site is located at 25 Tulip Street, described as Lot 58 on Plan RP32777, and contains an
existing dwelling and shed with an area of 1,529 m2. The Site is a residential setting with a large
proportion of permeable areas.




FIGURE 1 SITE LOCALITY PLAN (NOOSA COUNCIL INTRAMAPS, 2025)

The Site slopes away from the road frontage towards the rear of the property. An unmapped channel
conveys flows to the east and eventually into the Lake Macdonald catchment system.

Roof run-off from the existing dwelling is discharged to the rear of the Site as overland flows to the
existing channel. Road surface flows are excluded from the Site’s catchment with the kerb and
channel and crossover.

Log in to download the original (Appendix B - Stormwater Management Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.