Council archive · source document
Decision Notice [As Published] · 152009.1511
2009/1511
Plan / Document No. Issue. Plan / Document Name Date
Ref: 98-708AC - Plan of Proposed Reconfiguration 21 September
of Lots 21 & 22 SP 161930 - 2009
prepared by Max Watterson &
Associated
2. Existing easement Emt A SP161390 shall be amended to be in accordance with the
approved plan.
3. Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Council in respect of the lots being reconfigured shall be paid
prior to endorsement of the Plan of Survey.
4. Pursuant to Section 3.5.21(2)(a) of the Integrated Planning Act 1997, the relevant period is
two (2) years from the day this permit takes effect during which time all conditions must have
been complied with, and the Plan of Survey lodged with the Council for endorsement.
5. The Plan of Survey for Council endorsement shall be submitted to Council in the correct
form with the fees prescribed in Council's adopted fee schedule.
6. Any damage caused to any public utility during the course of construction works associated
with this permit shall be repaired to Council’s standards and at no cost to Council.
7. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
8. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Effluent Disposal
9. Prior to Council endorsing the Plan of Survey, certifications shall be submitted to Council to
certify that all the components of any existing effluent disposal system on the proposed new
lots are located entirely within the lot they are serving.
Power Supply
10. A separate electricity service shall be provided to each the proposed allotments if not
already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
shall be wholly at the applicant’s expense and shall not entail a financial encumbrance on
future purchasers of the proposed lots.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.