Earthworks Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: Sept 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
register. verify whether the development falls on
land listed on the contaminated land
register.
Haulage activity and amenity No acceptable outcome provided. RO7
PO7 Haul routes from trucks used to transport
Haulage of material to and from a site fill/spoil and material to and from the site
ensures— will only use major roads as required.
(a) minimal disturbance to neighbouring Alternatively, if there is no major road route
properties and properties along the to the site, haul trucks will use minor roads
haulage route; and with the shortest, most direct
(b) Council’s road infrastructure including route that will have the least amount of
pavements is not adversely affected. environmental impact. This will be clearly
documented in the Construction
Management Plan.
Extent of earthworks AO8 RO8
PO8 All earthworks, including cut and fill batters, All earthworks will be contained within the
The layout of the development provides retaining walls and the like are contained subject site. Any minor earthworks
adequate, clearly defined and easily within the subject site. undertaken external to the site will only be
accessible— undertaken after all approvals and/or
(a) on-site vehicle parking and consent is obtained from Council and
manoeuvring areas; and neighbouring property owners.
(b) loading and manoeuvring areas for
delivery and service vehicles.
Sloping sites AO9 RO9
PO9 Cut or fill is less than 1.5 metres in depth The proposal complies.
On sloping sites development follows the relative to the natural ground level.
natural landform wherever practical and
excavation or filling is minimal.
Infrastructure protection No acceptable outcome provided. R10
PO10 Prior to construction the contractor will
Earthworks and vehicular access do not confirm the correct locations of all existing
adversely impact on the capacity, services whether indicated or not on the
operations and maintenance of existing plans. The construction of the proposed
infrastructure. development will ensure the protection of
all existing services or public utilities.
1
Solution: Acceptable Solution Page 3 of 4
A/S Alternative Solution D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\ESA\Working\Appendices\20169 - NSC Earthworks Code 2020.docx
N/A Not applicable to this proposal Job: 20169
Rev: 0
Site Address: 101-105 Eumundi Noosa Road, Noosaville 30/11/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.