ADAMS+SPARKES Town Planning Report
Attached to the e-mail Multiple Housing Type 2 Duplex & Operational Works - IDAS Forms, Cover letter & Report - MCU17/0076 & OPW17/0224.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ESC GENERAL IMPLEMENTATION SEQUENCE SEDIMENT & EROSION CONTROL NOTES: VEGETATION MANAGEMENT FILTER TUBE DAM NOTES
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS BEFORE SITE ESTABLISHMENT. 1. VEGETATION PROTECTION ORDERS ON THE SITE SHALL BE OBSERVED AT ALL TIMES. MATERIALS
2. IF REQUIRED, HOLD A “PRE-START” MEETING WITH THE SUPERINTENDENT AND COUNCIL REPRESENTATIVES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION 1. FILTER TUBE: MANUFACTURED FROM A NON-WOVEN GEOTEXTILE REINFORCED WITH A
PRIOR TO COMMENCEMENT OF WORKS 2. ALL REASONABLE AND PRACTICABLE EFFORTS MUST BE TAKEN TO MINIMISE THE REMOVAL OR DISTURBANCE
· AVOID STRIPPING & EXCAVATING UNTIL NECESSARY. UV-STABILISED, WOVEN FABRIC OR POLY-PROPELENE MESH. THE GEOTEXTILE FABRIC
3. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE LOCAL AUTHORITY AND SUPERINTENDENT IF IT · CONSTRUCTION OF AN ENTRY/EXIT POINT TO THE SITE SHOULD BE MANAGED SO THAT OF TREES, SHRUBS AND PARTICULARLY GROUND COVER ON THE SITE PRIOR TO, AND DURING
SHOULD BE EITHER POLYESTER OR POLY-PROPELENE. PROPERTIES (AS3706) MINIMUM
WISHES TO AMEND THE APPROVED ESC PLAN TO SUIT THEIR CONSTRUCTION METHODOLOGY. IN THESE SEDIMENT IS NOT TRACKED OFF THE SITE. LAND-DISTURBING DEVELOPMENT. WIDE STRIP TENSILE STRENGTH OF 20kN/m IN BOTH DIRECTIONS; PORE SIZE EOS LESS
CIRCUMSTANCES THE CONTRACTOR SHALL PREPARE A SUPPLEMENTARY ESC PLAN AND OBTAIN APPROVAL
FROM THE LOCAL AUTHORITY AND THE SUPERINTENDENT.
BULK EARTHWORKS 3. WHERE SOME CLEARING IS INEVITABLE, IT SHOULD BE DELAYED AS LONG AS PRACTICABLE AND STAGED THAN 160MICRONS, O95 LESS THAN 90MICRONS, MINIMUM MASS OF 300GSM (MINIMUM
· TOPSOIL SHOULD BE STOCKPILED ON SITE FOR LATER USE. 'BIDIM' A44 OR EQUIVALENT.
4. IF NOT SPECIFICALLY NOMINATED ON PLANS, STAGING OF EROSION AND SEDIMENT CONTROL MEASURES WHERE POSSIBLE TO MINIMISE THE EROSION POTENTIAL.
· WHERE PRACTICABLE MAINTAIN VEGETATION IN A HEALTHY STATE DURING THE 2. RIBBED PIPE (USED WITH EARTH BANKS) RIBBED, PVC OR SIMILAR PIPE.
ARE TO BE CONFIRMED WITH SUPERINTENDENT PRIOR TO CONSTRUCTION.
CONSTRUCTION PROCESS. 4. NO CLEARING SHALL BE UNDERTAKEN UNLESS PRECEDED OR ACCOMPANIED BY INSTALLATION OF 3. EARTH EMBANKMENT ; NON-DISPERSIVE, (EMERSON'S AGGREGATE CLASS 6,7 OR 8)
5. STABILISE AND DELINEATE CONSTRUCTION ACCESS ROUTES AND ENTRY / EXIT POINTS
· WHEN UP SLOPE WATER IS DIVERTED AROUND A WORK SITE IT IDEALLY SHOULD BE ADEQUATE RUN-OFF AND SEDIMENT CONTROL MEASURES. CLEAN EARTH FILL, FREE OF ORGANIC DEBRIS AND WITH SUFFICIENT CLAY CONTENT
6. INSTALL OTHER VEGETATION PROTECTION MEASURES
DISCHARGED AS SHEET FLOW THROUGH AN UNDISTURBED AREA. TO PREVENT THE FLOW THROUGH OF WATER.
7. ESTABLISH TEMPORARY DRAINAGE MEASURES INCLUDING DIVERSION DRAINS, BUNDS, AND ENERGY 5. CONSIDERATION SHOULD BE GIVEN TO THE FENCING-OFF, OR OTHERWISE CLEAR MARKING OF VEGETATION
DISSIPATERS TO DIVERT CLEAN WATER AROUND DISTURBED AREAS CONSTRUCTION OPERATIONS THAT IS NOT TO BE DISTURBED AT ANY GIVEN STAGE OF THE PROPOSED WORKS (INCLUDING ALONG
8. UNDERTAKE MINIMUM CLEARING REQUIRED TO ALLOW ESTABLISHMENT OF ESC MEASURES · THIS PLAN SUGGESTS MINIMUM SEDIMENT & EROSION PROTECTION. THE INSTALLATION
9. GRADE THE SITE AND CONSTRUCT DEVELOPMENT WORKS ACCESS/ENTRY TRACKS).
CONTRACTOR SHALL TAKE ANY OTHER MEASURES AS NECESSARY IN CONSULTATION 4. REFER TO APPROVED PLANS FOR LOCATION, EXTENT AND DETAILS. IF THERE ARE
10. SITE CLEARING, ESC MEASURES, REVEGETATION AND OTHER ASSOCIATED LANDSCAPE WORKS. WITH THE SUPERVISING ENGINEER. 6. WHERE REHABILITATION OF VEGETATION IS REQUIRED, SIMILAR INDIGENOUS SPECIES SHALL BE USED QUESTIONS OR PROBLEMS WITH THE LOCATION, EXTENT OR METHOD OF INSTALLATION,
DISTURBED AREAS SHOULD BE STABILISED AS SOON AS POSSIBLE. · ADHERE TO STORMWATER INLET PROTECTION DIAGRAM ON I.P.W.E.A.Q STD DWG CONTACT THE ENGINEER OR RESPONSIBLE ON-SITE OFFICER FOR FOR ASSISTANCE.
WHERE POSSIBLE.
11. UNDERTAKE ONGOING MAINTENANCE, REPAIR AND MODIFICATIONS TO ESC AND TEMPORARY DRAINAGE D-0041. 5. CONSTRUCT A SUITABLE WATER RETAINING DAM/TANK OUT OF MATERIAL SPECIFIED
MEASURES AS REQUIRED DURING THE PERIOD OF SITE WORKS AND DISTURBANCE. · PLACE 12mm THICK PLATE OVER MANHOLES UNTIL CI FRAMES & LID ARRIVE. THIS IS TO WITHIN THE APPROVED PLANS.
12. ALL TEMPORARY ESC MEASURES ARE TO BE MAINTAINED UNTIL SATISFACTORY STABILISATION OF SITE OR KEEP SEDIMENT OUT OF DRAINAGE SYSTEM. 6. WHILE CONSTRUCTING THE DAM, INSTALL AND ANCHOR THE SPECIFIED NUMBER OF
COMPLETION OF AN “OFF MAINTENANCE” INSPECTION BY COUNCIL AND PRIOR TO FORMAL ACCEPTANCE · SAND BAGS ARE TO BE PLACED AT 45° TO THE ROAD AS SPECIFIED: ESC QUALITY ASSURANCE RIBBED PIPE SECTIONS THROUGH THE EMBANKMENT.
“OFF MAINTENANCE” BY COUNCIL IF REQUIRED. (a) ROAD GRADE (0.5% TO 5%) - 25m MAX. CENTRES 1. THIS PROGRAM SHALL BE READ IN CONJUNCTION WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. 7. ENSURE THE INLETS TO EACH FILTER TUBE ARE SET AT APPROPRIATE HEIGHT ABOVE
(b) ROAD GRADE (5% TO 10%) - 15m MAX. CENTRES 2. THE EROSION AND SEDIMENT CONTROL WORKS SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCAL THE ADJACENT GROUND LEVEL TO MINIMISE THE RISK OF SEDIMENT BLOCKAGE.
ESC GENERAL NOTES (c) ROAD GRADE (10 TO 15%)
(d) ROAD GRADE (15 TO 20%)
-
-
10m MAX. CENTRES
5m MAX. CENTRES
AUTHORITIES EROSION AND SEDIMENT CONTROL STANDARDS AND THE “SOIL EROSION AND SEDIMENT
CONTROL - ENGINEERING GUIDELINES FOR QUEENSLAND (CURRENT EDITIONS)”.
8. FOR EARTH EMBANKMENT, FIRMLY HAND-TAMP THE EARTH UNDER AND AROUND THE
RIBBED PIPE/S IN LIFTS NOT EXCEEDING 100mm. ENSURE THAT ALL FILL MATERIAL IS
1. IMMEDIATELY FOLLOWING SETTING OUT OF THE WORKS, BUT PRIOR TO COMMENCEMENT OF ANY CLEARING · ERODIBLE MATERIAL MISTAKENLY PLACED WITHIN THE ROAD RESERVE (INCLUDING 3. THE CONTRACTOR SHALL TAKE ALL REASONABLE AND PRACTICABLE MEASURES TO: FIRMLY COMPACTED.
OR EARTHWORKS, THE CONTRACTOR AND SITE SUPERINTENDENT SHALL WALK THE SITE TO NOMINATE THE ACCIDENTAL SPILLAGE & TRACKING OF SUCH MATERIALS ONTO THE ROAD) THAT · ALLOW STORMWATER TO PASS THROUGH THE SITE IN A CONTROLLED MANNER AND AT NON EROSIVE 9. SUITABLY CONNECT FILTER TUBES TO THE DOWNS-SLOPE END OF THE PROTRUDING
LOCATIONS AND TYPES OF SEDIMENT AND EROSION CONTROL MEASURES TO BE ADOPTED. THESE CANNOT BE PREVENTED THROUGH REASONABLE MEANS, MUST BE: FLOW VELOCITIES; CONNECTOR PIPES. ENSURE ALL CONNECTIONS ARE WATER TIGHT.
MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY CLEARING OR EARTHWORKS AND MAINTAINED UNTIL (a) REMOVED IMMEDIATELY IF RAINFALL IS IMMINENT OR OCCURRING · MINIMISE SOIL EROSION FROM WATER AND WIND;
THE WORKS ARE COMPLETED AND NO LONGER POSE AN EROSION HAZARD, UNLESS OTHERWISE APPROVED (b) REMOVED PRIOR TO THE END OF THE DAY'S WORK IF RAINFALL IS NOT · MINIMISE ADVERSE EFFECTS OF SEDIMENT RUN-OFF; MAINTENANCE
BY THE SUPERINTENDENT. EXPECTED. · MINIMISE OR PREVENT ENVIRONMENTAL HARM ASSOCIATED WITH DISCHARGES FROM THE SITE (EG. 10. INSPECT THE DAM/TANK AND FILTER TUBES REGULARLY AND AT LEAST DAILY DURING
2. IMMEDIATELY FOLLOWING SETTING OUT OF THE WORKS, BUT PRIOR TO COMMENCEMENT OF ANY CLEARING · SAND BAGS ARE TO BE PLACED AT 45° TO THE ROAD AS SPECIFIED. THE EFFECTS OF SEDIMENTATION ON THE ENVIRONMENTAL VALUES OF RECEIVING WATERS); AND DE-WATERING OPERATIONS. MAKE REPAIRS AS NEEDED TO THE FABRIC.
OR EARTHWORKS, THE CONTRACTOR AND SITE SUPERINTENDENT SHALL WALK THE SITE TO IDENTIFY AND · MATERIALS SHOULD BE SWEPT FROM THE ROAD. NOT WASHED DOWN THE GUTTER. · ENSURE THAT THE VALUE AND USE OF RESIDENTIAL PROPERTIES ADJACENT TO THE DEVELOPMENT 11. INSPECT THE FILTER TUBES FOR OBVIOUS LEAKS RESULTING FROM HOLES, TEARS OR
MARK TREES WHICH ARE TO BE PRESERVED. NOT WITHSTANDING THE ABOVE,THE CONTRACTOR SHALL TAKE · ALL SOLID WASTE SHOULD BE STORED ON SITE IN SUCH A MANNER THAT IT IS (SUCH AS DRAINAGE AND ROADS) ARE NOT DIMINISHED AS A RESULT OF THE MIGRATION OF SEDIMENT JOINT FAILURE IN THE FABRIC.
ALL REASONABLE PRECAUTIONS TO MINIMISE DISTURBANCE TO EXISTING VEGETATION AND GROUND PREVENTED FROM LEAVING THE SITE EITHER BY THE ACTION OF WIND OR WATER. FROM THE DEVELOPMENT. 12. REPAIR OR REPLACE ANY FILTER TUBE AS NECESSARY TO MAINTAIN THE DESIRED
COVER OUTSIDE THE MINIMUM AREAS REQUIRED TO COMPLETE THE WORKS AND SHALL BE RESPONSIBLE · SMALLER MATERIALS, SUCH AS LITTER, SHOULD BE CONTAINED IN COVERED BINS. 4. THE CONTRACTOR SHALL APPOINT AN APPROPRIATELY EXPERIENCED PERSON TO BE MADE RESPONSIBLE OPERATIONAL PERFORMANCE. IN SOME CIRCUMSTANCES FLOW RATE THROUGH THE
FOR RECTIFICATION, AT ITS OWN COST, OF ANY DISTURBANCE BEYOND THOSE AREAS. FOR IMPLEMENTATION OF THE ESC. FILTER TUBES CAN BE TEMPORARILY IMPROVED BY BRUSHING THE BAG WITH A
3. PROVIDE ROCK CHECK DAMS AT 3m (MAXIMUM) DOWNSTREAM OF ALL OUTLETS AND AT 20m (MAXIMUM)
STOCKPILES 5. ALL ESC MEASURES SHALL BE INSPECTED: STIFF-BRISTLE BROOM.
CENTRES ALONG OPEN CHANNELS AND AROUND FIELD INLETS. · STOCKPILES ARE NOT TO BE STORED ON THE FOOTPATH OR THE ROAD RESERVE, UNLESS · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) 13. REPLACE ANY FILTER TUBE IF SEDIMENT BLOCKAGE OF THE FABRIC DECREASES FLOW
APPROVED BY COUNCIL. · AT LEAST WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE) RATE TO AN UNACCEPTABLE LEVEL, OR THE FILTER TUBE CONTAINS EXCESSIVE
4. PROVIDE GULLY GRATE INLET SEDIMENT TRAPS AT ALL GULLY PITS. · WITHIN 24 HOURS OF EXPECTED RAINFALL
· ALL STOCKPILES & BUILDING MATERIAL SHOULD BE LOCATED WITHIN THE SEDIMENT SEDIMENT.
5. PROVIDE SILT FENCING ALONG DOWNSTREAM PROPERTY LINE AS DIRECTED BY SUPERINTENDENT. CONTROL ZONE. · WITHIN 12 HOURS OF RAINFALL OCCURRING
6. ADDITIONAL CONTROL DEVICES TO BE PLACED WHERE DIRECTED BY THE SITE SUPERINTENDENT . · TO MINIMISE EROSION & THE LOSS OF SAND & SOIL, STOCKPILES SHOULD NOT BE 6. MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING SCHEDULE:
· OTHER ESC MEASURES ARE TO BE IMPLEMENTED WHEN SETTLED SEDIMENT VOLUME EXCEEDS 25% OF
REMOVAL
7. ALTERNATIVE DESIGNS TO BE APPROVED BY SUPERINTENDENT PRIOR TO CONSTRUCTION. LOCATED WITHIN AN OVERLAND FLOW PATH.
THE CAPACITY OF THE ESC MEASURE. MEASURES ARE TO BE IN PLACE BY THE END OF EACH DAY AND 14. REMOVE ALL MATERIALS AND DISPOSE OF THEM IN A SUITABLE MANNER THAT WILL NOT
8. WASH DOWN/RUMBLE AREA TO BE CONSTRUCTED WITH PROVISIONS RESTRICTING ALL SILT AND TRAFFICKED
· INSTALL DIVERSION CATCH DRAINS UPSTREAM OF, AND SILT FENCE DOWNSTREAM OF
PRIOR TO ANY RAIN EVENT. CAUSE AN ONGOING EROSION OR POLLUTION HAZARD.
STOCKPILES.
DEBRIS FROM ENTERING THE STORMWATER SYSTEM.
· STOCKPILES ARE TO BE LOCATED AWAY FROM EROSION HAZARD AREAS SUCH AS 7. ADEQUATE SUPPLIES OF EMERGENCY MAINTENANCE MATERIALS, INCLUDING (BUT NOT LIMITED TO) TIE WIRE,
9. NO WORK OR STOCKPILING OF MATERIALS TO BE PLACED OUTSIDE SITE OF WORK BOUNDARY. DRAINAGE LINES AND STEEP SLOPES. STAKES, FILTER CLOTH, WIRE MESH AND CLEAN GRAVEL SHOULD BE AVAILABLE ON-SITE, DURING THE FULL
10. APPROPRIATE EROSION AND SEDIMENT CONTROLS TO BE USED TO PROTECT STOCKPILES AND MAINTAINED · STOCKPILES ARE TO BE PROTECTED FROM EROSION BY THE WIND, PROTECTION DURATION OF CONSTRUCTION.
THROUGH OUT CONSTRUCTION. MEASURES ARE TO BE AGREED WITH THE SUPERINTENDENT PRIOR TO FORMATION OF 8. DISTURBED AREAS ARE TO BE SEEDED WITHIN 3 DAYS OF COMPLETION OF WORKS. TURFING OF SWALES AND
11. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE DUE CARE OF NATURAL VEGETATION. NO CLEARING IS TO ANY STOCKPILE. CHANNELS IS REQUIRED WITHIN 3 DAYS OF COMPLETION OF TRIMMING. GRASS SEEDING & HYDROMULCHING
BE UNDERTAKEN WITHOUT PRIOR APPROVAL FROM THE SUPERINTENDENT. SEDIMENT FENCE IS REQUIRED TO ACHIEVE 80% COVER WITHIN 30 DAYS OF THE COMPLETION OF EARTHWORKS.
9. SUPPLEMENTARY ESC MEASURES IF REQUIRED, ARE TO BE IMPLEMENTED AS DIRECTED BY THE
12. TO AVOID DISTURBANCE TO EXISTING TREES, EARTHWORKS WILL BE MODIFIED AS DIRECTED ON-SITE BY THE · INSTALL SEDIMENT FENCE(S) ALONG THE LOW SIDE OF THE SITE & IDEALLY ALONG A LINE
SUPERINTENDENT.
SUPERINTENDENT. OF CONSTANT LAND LEVEL TO PREVENT THE CONCENTRATION OF STORMWATER RUNOFF.
13. THE LOCATION OF EROSION AND SEDIMENTATION CONTROLS WILL BE DETERMINED ON SITE BY THE IN AREAS WHERE IT IS EITHER UNDESIRABLE OR IMPRACTICAL TO BURY THE LOWER EDGE
SUPERINTENDENT. OF THE SEDIMENT FENCE, THE LOWER 200MM (MIN) PORTION OF THE FABRIC SHOULD BE
14. ACCESS TRACKS THROUGH THE SITE WILL BE LIMITED TO THOSE DETERMINED BY THE SUPERINTENDENT PLACED ON THE GROUND UP SLOPE OF THE FENCE & BURIED UNDER A 100MM (MIN) LAYER
AND THE CONTRACTOR PRIOR TO ANY WORK COMMENCING. OF AGGREGATE REFER I.P.W.E.A.Q. STD DWG D-0040.
15. THE CONTRACTOR SHALL AT ALL TIMES WITHIN ALLOTMENTS AND PARKLANDS MINIMISE THE DISTURBANCE FIELD INLET GULLIES
OF THE EXISTING VEGETATION INCLUDING GRASS COVER, AND IF REQUESTED SHALL ROPE OFF OR · SEDIMENT CONTROLS FOR STORMWATER INLETS LOCATED WITHIN THE PROPERTY
SIMILARLY PROTECT ANY AREAS DIRECTED BY THE SUPERINTENDENT. BOUNDARIES MAY CONSIST OF GEOTEXTILE FABRIC PLACED EITHER DIRECTLY OVER THE
GRATED INLET OR AROUND THE INLET SUPPORT BY A TIMBER FRAME. FIELD INLET
16. PLANS ARE MINIMUM REQUIREMENTS AND ARE TO BE USED AS A GUIDE ONLY. EXACT MEASURES USED
PROTECTION IS NECESSARY WHERE INLETS DRAIN AREAS OF BARE & UNPROTECTED SOIL.
SHALL BE DETERMINED ON SITE IN CONJUNCTION WITH PROGRAM OF CONTRACTORS WORKS etc.
DURING STORMS, PONDING SHOULD BE ALLOWED TO OCCUR AROUND THE STORMWATER
17. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND INLET TO ASSIST IN THE SETTLING OUT OF SEDIMENTS. REFER I.P.W.E.A.Q D-0041.
STOCKPILES AT A SUFFICIENT LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE
TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT DUST MOVEMENT. PAVEMENT INLET GULLY
· A ROADSIDE INLET BARRIER IS TO BE INSTALLED, SO THAT IT SHOULD NOT BE ALLOWED TO
FULLY BLOCK THE INLET STRUCTURE. ON A HILLSIDE, SEDIMENT BARRIERS MAY CONSIST
OF A TEMPORARY DAM CONSTRUCTED FROM SAND & GRAVEL BAGS AT LEAST 4 METERS
UP SLOPE FROM THE GULLY INLET.
NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP TURFING
AND IMPLEMENT A SUITABLE EROSION AND SEDIMENT CONTROL · ALL DISTURBED AREAS ARE TO BE TURFED, AS SPECIFIED, WITHIN SEVEN DAYS OF FINAL
PROGRAM IN ACCORDANCE WITH THE CURRENT INTERNATIONAL TRIMMING. BATTER SLOPES STEEPER THAN 1in4 ARE TO BE HYDROMULCHED.
EROSION CONTROL ASSOCIATION (IECA) GUIDELINES AND · AFTER FINAL TRIMMING OF FOOTPATHS PROVIDE TWO STRIPS OF TURF 0.8m WIDE TO
STANDARD DETAILS AND TO ENSURE THEY HAVE AN ADEQUATE BACK OF KERB & CHANNEL AS SPECIFIED.
SET OF EROSION AND SEDIMENT CONTROL PLANS ONSITE AT ALL MAINTENANCE
TIMES DURING CONSTRUCTION. · SEDIMENT FENCES SHOULD BE REPLACED IF THE FABRIC IS RIPPED OR OTHERWISE
DAMAGED. THE MAINTENANCE OF THE SEDIMENT FENCES INCLUDING THE REMOVAL OF
SEDIMENT DEPOSITED UP SLOPE OF THE FENCE & RETRENCHING THE FABRIC WHEN THE
FENCE IS 25% FULL.
· FOLLOWING STORM EVENTS, THE ROAD RESERVE & ALL SEDIMENT BARRIERS SHOULD BE
INSPECTED & ANY EXCESSIVE SEDIMENT RESIDUE SHOULD BE APPROPRIATELY REMOVED.
· THE CONTRACTOR SHALL MAINTAIN ALL SEDIMENT CONTROL DEVICES FOR THE FULL
EXTENT OF THE DEFECTS LIABILITY PERIOD.
CONSTRUCTION NOTE:
ALL PROPOSED WORKS ARE TO BE CONSTRUCTED IN
CONJUNCTION WITH GENERAL NOTES ON DRG No.
C001 WHICH IS TO BE REQUESTED AND VIEWED
PRIOR TO COMMENCEMENT OF CONSTRUCTION IF
NOT SUPPLIED.
PRELIMINARY
NORTH POINT: ARCHITECT: CLIENT: SCALE BARS: PROJECT: DRAWING TITLE:
PROPOSED DEVELOPMENT EROSION & SEDIMENT 7508
ICON BUILDING THE PROPERTY
25 EDWARD STREET, CONTROL NOTES JOB No.
DESIGN CLINIC
Unit 5B/85 Hudson Road
Albion, QLD 4010
NOOSAVILLE, QLD, 4566.
01 PRELIMINARY ISSUE 13.06.17 IE
ABN 82 115 498 023
E-mail: [email protected] Phone: 3857 7868
Fax: 3262 7359 DESIGNED: APPROVED: RPEQ No.
C120 01
C COPYRIGHT of this engineering design and plan is the property of INERTIA ENGINEERING Pty Ltd DWG. No. REVISION
REV DESCRIPTION DATE DRAWN APPROVED IERNST
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.