2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan
The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Services & Organisation Committee Agenda
6 July 2021
Item 11 - Attachment 2
Noosa Cycling and Walking
Strategy and Implementation Plan
2020 - 2040
More people riding a bike and walking for health,
T
transport, tourism and the environment
AF
Draft For Council Endorsement
R
D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 47 sections
Section 2
T
AF
© Noosa Council 2021
R
www.noosa.qld.gov.au
D
General enquiries: 8.30 am - 5.00 pm Monday to Friday (excluding public holidays)
By telephone: (07) 5329 6500 (including after hours emergencies)
By email: [email protected]
Fax: (07) 5329 6501
Street Address: 9 Pelican Street, TEWANTIN
Postal address: PO Box 141, TEWANTIN QLD 4565
Acknowledgments
Council wishes to thank all interested stakeholders who have provided their time and energy to help guide the development of this Strategy.
Disclaimer
Information contained in this document is based on available information at the time of writing. All figures and diagrams are indicative only and should be
referred to as such. This is a strategic document which deals with technical matters in a summary way only. Council or its officers accept no responsibility for any
loss occasioned to any person acting or refraining from acting in reliance upon any material contained in this document
Consultation Revision 3
Section 3
Contents
From the Mayor 5 Challenges for our
community 16
Our vision 6 Barriers to walking 16
Barriers to bike riding 16
Our objectives 7
Outcomes 7 Existing bike riding and
Objectives 7 walking infrastructure 17
Background 8 Delivering the strategy 19
Strategy alignment 8
Community engagement 9
T
Actions
Planning the bike riding and
19
AF
Key survey findings 9
walking network 26
Understanding our Network planning
Bike riding network plan
26
26
community 10 Walking network plan 30
R
Who is the strategy for? 10 Trails network 34
Noosa Shire demographics and existing travel Project types 35
behaviour 11 Prioritisation 35
D
Benefits for our community 12 Implementing the strategy 36
Available funding estimates 36
Economic benefits 13 5-year implementation plan 38
10-year implementation plan 40
Opportunities for our
community 14 Monitoring and evaluation 42
Behaviour change 14 Monitoring 42
Increasing participation 14 Key performance indicators 43
E-bikes and e-scooters 15
Tourism and events 15 Glossary and reference
Climate
Short bike riding and walking trips
15
15
material 44
Glossary 44
Reference material 45
3
Section 4
4
D
R
AF
T
Po (ite - ‘= ae > ; 5
5 1 1 1 1 9 2788 46 25 10 31 a
5 1 1 1 1 10 2922 44 33 24 17 *
5 1 1 1 1 11 3057 43 6 6 0 e
5 1 1 1 1 12 3116 51 4 4 0 a ae
in aS fot “ea DY : y Te Cas RE an SLY Pt ge
| oy — , Se care : sg Ne ig Me ae A ahaa
> Re or pe fe es ae a
€ . ee ee A ee PES Ne ge 7: ri) te
| r ee et . tae el eS ‘ i alone F Pat PRR ie f oe | EA H as
m4 ' 7 ~ 2s. es Pani Peg ee in a as na - ve % ie ae tt RL Shee be ae
ay ie wae 3 62 Se pS Oe yg a Ser ae ORE igh aye IO gb ttt ly EO EG Be oe
a # ee Vee. | (PMS Nec anys” Some Seen ay aie mr ene Re leas
: A . _ 4 ee \ ! Ream Rae Mau aco ae PRE: Bie - rh Has She eee
<7 } S Ps oy. er - oe ee i] 4 e’ 4¥ & d a * 9 a ee, oa ey Ch ae 1A Pee a
: aa SS ee + / _ eas > pret ! CU A aga 4 e ey nate Reme Rike Oe ee
WA OVW Vinee SA Sp ok =, ene Mae a
| Be tiawe < aoe en Meee ee ee UBL Mae oe te: Yo, “44 a
|| ie heen) \ 7. ie iy +2 > SE Se NI 2.9! TRO en tare ke.
tae A ai ez hes aes ps ee as ne ee No Aged of PR eee Rs 1k age Op:
se ; am el ~ gs ae WSL Gee ne ‘ an
Oe oe ee: - at Ede Ea eee ST Came ee peter tig 2 ee et oo Ps
4 ae A : 7 se he ee e : Sera Cg CES
te.) | = ithe [ez ns ie he ee aes pF eed we 4 meine: “gr
; ae Fil Ba leRe*” a3 yk OF A eR ak 4 neue N Ne . pia
oe f oi OP < Ls i se _ a Pa - ae t ee
| Pr 4 et AN z rae : os pia eae Meas FA a e ™ FBG E :
_— f. ) oS: ; 4 2 = ? i 7 Ss) y y a < i. VN / 7 : ~ Ces
La i | Te e. & oo — , ~~ e oS .- e “ : oa a ye On pe ae [pate 7 ; aren tes , Bl Ee
; | 2 = >. ‘ ‘tO ' s y -2 >) Fae = Py AS WE ip ee ees ae.
ey 5 Wile ——" aie cee (Sak HG Wa ee
bP 7 te > eae Elis a oe ee MK A te
- ‘ Se eo eee i ee
— . | ed ek 5 ‘ e —~ > the “? 2: <j ao ra r bat 3 Pe or a eit cm ALT ie 2 5
; ae? Fe > = ga Ape ale nei mee ee ip aK /
: ' a ¥ 2 a4 ge a ee FM RMT Ce ets ete —=
i) 2 i | SZ Al iw 7 RMN NS Cray see
i 1 5 ‘s ace Pate ES aN Pe “1 eee
4 7 5 1 1 1 35 4 786 1081 47 17 30 Ea
5 1 1 1 35 5 1460 1068 25 26 89 4
5 1 1 1 35 6 1592 1079 11 18 54 6
5 1 1 1 35 7 1706 1077 44 13 33 —_
5 1 1 1 35 8 2533 1092 2 3 34 ;
5 1 1 1 35 9 2607 1059 224 34 0 Sec
5 1 1 1 35 10 2882 1059 130 32 15 Rae
5 1 1 1 35 11 3030 1057 33 33 16 1
5 1 1 1 35 12 3093 1059 59 23 19 Ree
5 1 1 1 35 13 3207 1053 13 49 29 Sa
4 1 1 1 36 0 67 1097 3330 65 -1
5 1 1 1 36 1 67 1112 12 28 0 ;
5 1 1 1 36 2 209 1107 226 54 61 Wal.
5 1 1 1 36 3 651 1100 9 42 53 |
5 1 1 1 36 4 721 1104 243 50 22 SABA
5 1 1 1 36 5 991 1109 101 34 0 ieee
5 1 1 1 36 6 1354 1097 5 18 34 Pat
5 1 1 1 36 7 1517 1085 62 81 15 oe
5 1 1 1 36 8 1680 1100 66 42 45 ee
5 1 1 1 36 9 1940 1103 2 4 43 if
5 1 1 1 36 10 2546 1105 23 14 0 Z
5 1 1 1 36 11 2782 1102 6 17 0 ts
5 1 1 1 36 12 2805 1093 42 34 31 ae
5 1 1 1 36 13 2872 1093 255 45 34 ee
5 1 1 1 36 14 3176 1091 73 42 7 eb
4 1 1 1 37 0 61 1125 3290 43 -1
5 1 1 1 37 1 61 1151 5 17 90 j
5 1 1 1 37 2 201 1147 36 17 40 Bt
5 1 1 1 37 3 368 1145 24 21 37 ie
5 1 1 1 37 4 762 1149 59 7 21 te
5 1 1 1 37 5 857 1143 74 20 42 So
5 1 1 1 37 6 960 1141 112 18 16 ee
5 1 1 1 37 7 1083 1142 18 19 14 |
5 1 1 1 37 8 1166 1140 17 21 26 Se
5 1 1 1 37 9 1252 1142 18 15 9 ee
5 1 1 1 37 10 1383 1152 9 8 52 5
5 1 1 1 37 11 1473 1147 3 2 2 2
5 1 1 1 37 12 1499 1132 31 40 25 ll
5 1 1 1 37 13 1563 1145 11 13 26 i)
5 1 1 1 37 14 1700 1141 20 22 0 Ele
5 1 1 1 37 15 1948 1148 2 5 0 /
5 1 1 1 37 16 2242 1155 2 6 0 ,
5 1 1 1 37 17 2446 1147 3 6 0 c
5 1 1 1 37 18 2592 1130 2 2 13 :
5 1 1 1 37 19 2806 1131 79 17 38 a
5 1 1 1 37 20 3048 1127 29 27 18 ae
5 1 1 1 37 21 3096 1126 255 26 0 paneer
4 1 1 1 38 0 56 1150 3322 49 -1
5 1 1 1 38 1 56 1178 5 8 0 :
5 1 1 1 38 2 204 1156 34 30 7 Bi
5 1 1 1 38 3 338 1158 65 27 38 |
5 1 1 1 38 4 941 1153 95 37 44 ae
5 1 1 1 38 5 1046 1154 130 34 10 ee
5 1 1 1 38 6 1296 1181 4 7 26 |)
5 1 1 1 38 7 1455 1157 180 33 30 ee
5 1 1 1 38 8 1658 1160 79 27 25 re
5 1 1 1 38 9 1968 1156 22 43 65 uf
5 1 1 1 38 10 2636 1172 6 5 0 :
5 1 1 1 38 11 2810 1167 29 20 46 we
5 1 1 1 38 12 2857 1159 35 27 29 SY
5 1 1 1 38 13 3076 1159 116 25 0 nattee
4 1 1 1 39 0 138 1213 3365 41 -1
5 1 1 1 39 1 138 1239 6 6 31 A
5 1 1 1 39 2 461 1243 6 11 0 -
5 1 1 1 39 3 565 1250 2 4 0 -
5 1 1 1 39 4 1443 1226 21 28 65 ry
5 1 1 1 39 5 1581 1234 11 10 10 ~
5 1 1 1 39 6 1996 1233 4 4 13 +
5 1 1 1 39 7 2405 1238 23 10 32 on
5 1 1 1 39 8 2497 1226 44 9 14 Nt
5 1 1 1 39 9 2576 1218 18 28 13 BS
5 1 1 1 39 10 2703 1226 2 3 50 4
5 1 1 1 39 11 3050 1219 66 25 16 PRS
5 1 1 1 39 12 3181 1219 38 14 41 ay
5 1 1 1 39 13 3245 1213 34 35 44 AW
5 1 1 1 39 14 3350 1234 3 1 0 -
5 1 1 1 39 15 3421 1219 14 16 47 J
5 1 1 1 39 16 3454 1219 49 11 43 LES”
4 1 1 1 40 0 159 1219 3298 74 -1
5 1 1 1 40 1 159 1252 8 16 53 :
5 1 1 1 40 2 244 1272 57 21 18 ra
5 1 1 1 40 3 473 1219 39 58 48 7
5 1 1 1 40 4 1066 1252 13 12 9 *
5 1 1 1 40 5 1497 1263 4 11 45 i
5 1 1 1 40 6 1615 1238 86 41 38 ae
5 1 1 1 40 7 2000 1246 68 28 24 ae
5 1 1 1 40 8 2485 1228 12 26 2 fo
5 1 1 1 40 9 2562 1245 44 19 12 esr
5 1 1 1 40 10 2977 1222 96 55 23 DP
5 1 1 1 40 11 3077 1238 29 43 0 SS
5 1 1 1 40 12 3228 1224 29 39 30 he
5 1 1 1 40 13 3422 1219 35 33 70 J
4 1 1 1 41 0 491 1257 2961 56 -1
5 1 1 1 41 1 491 1285 3 4 81 A
5 1 1 1 41 2 811 1289 46 9 47 a
5 1 1 1 41 3 1359 1277 12 11 78 .
5 1 1 1 41 4 1596 1275 50 20 32 -%
5 1 1 1 41 5 2023 1266 28 35 26 Te
5 1 1 1 41 6 2251 1280 16 12 0 iy
5 1 1 1 41 7 2690 1269 33 24 40 aK
5 1 1 1 41 8 2988 1275 17 15 54 >
5 1 1 1 41 9 3043 1261 42 34 33 Ce
5 1 1 1 41 10 3122 1258 49 41 77 AB
5 1 1 1 41 11 3231 1257 28 56 23 ae
5 1 1 1 41 12 3380 1279 17 9 0 e
5 1 1 1 41 13 3449 1286 3 2 5 5
4 1 1 1 42 0 71 1281 3245 54 -1
5 1 1 1 42 1 71 1308 5 23 24 i
5 1 1 1 42 2 184 1309 4 5 92 ‘
5 1 1 1 42 3 553 1289 24 41 0 Pa
5 1 1 1 42 4 783 1300 42 11 39 ce
5 1 1 1 42 5 891 1315 70 20 66 =
5 1 1 1 42 6 1359 1306 4 2 3 :
5 1 1 1 42 7 1850 1308 2 2 49 {
5 1 1 1 42 8 1907 1308 1 3 0 \
5 1 1 1 42 9 2036 1286 18 35 38 BN
5 1 1 1 42 10 2123 1300 6 2 71 3
5 1 1 1 42 11 2247 1298 8 24 34 7
5 1 1 1 42 12 2316 1302 10 19 34 els
5 1 1 1 42 13 2416 1312 4 2 0 :
5 1 1 1 42 14 2491 1308 46 19 0 —s
5 1 1 1 42 15 2563 1296 21 34 38 Z
5 1 1 1 42 16 2616 1293 4 6 20 ;
5 1 1 1 42 17 2839 1312 8 2 69 —
5 1 1 1 42 18 2985 1292 2 2 0 ”
5 1 1 1 42 19 3016 1288 88 23 40 Fe
5 1 1 1 42 20 3113 1281 101 51 23 RN}
5 1 1 1 42 21 3227 1284 47 32 32 LO
4 1 1 1 43 0 17 1315 3196 38 -1
5 1 1 1 43 1 17 1334 86 19 38 =
5 1 1 1 43 2 1853 1323 3 5 41 ‘
5 1 1 1 43 3 2052 1316 16 32 43 We
5 1 1 1 43 4 2117 1323 2 2 12 ;
5 1 1 1 43 5 2252 1321 26 14 22 sd
5 1 1 1 43 6 2374 1325 12 11 37 a
5 1 1 1 43 7 2436 1319 82 19 24 Ee?
5 1 1 1 43 8 2594 1332 20 7 10 a0
5 1 1 1 43 9 3047 1334 4 1 3 —
5 1 1 1 43 10 3103 1315 110 21 52 Ws
4 1 1 1 44 0 72 1275 3436 102 -1
5 1 1 1 44 1 145 1353 7 24 16 |
5 1 1 1 44 2 902 1351 14 19 65 x
5 1 1 1 44 3 2216 1339 82 14 21 Se.
5 1 1 1 44 4 2326 1275 105 92 45 ay
5 1 1 1 44 5 2383 1334 115 31 23 Puss
5 1 1 1 44 6 2515 1348 61 11 0 AOR
5 1 1 1 44 7 2585 1337 57 3 0 ews
5 1 1 1 44 8 2715 1335 136 27 24 RN
5 1 1 1 44 9 2869 1337 177 17 0 ee
5 1 1 1 44 10 3185 1330 76 31 26 tS
5 1 1 1 44 11 3281 1341 69 6 13 Se
4 1 1 1 45 0 0 1340 3508 73 -1
5 1 1 1 45 1 0 1386 78 27 71 SSS
5 1 1 1 45 2 111 1355 104 50 0 rs!
5 1 1 1 45 3 235 1395 9 8 0 E
5 1 1 1 45 4 317 1396 7 10 52 5
5 1 1 1 45 5 425 1396 14 9 0 *
5 1 1 1 45 6 801 1391 9 8 0 &
5 1 1 1 45 7 884 1372 81 26 27 st
5 1 1 1 45 8 1172 1358 9 9 0 ’
5 1 1 1 45 9 1499 1391 19 9 10 p
5 1 1 1 45 10 1824 1381 3 3 0 :
5 1 1 1 45 11 2150 1376 46 10 44 =
5 1 1 1 45 12 2409 1362 33 16 35 ee
5 1 1 1 45 13 2450 1363 73 32 13 se
5 1 1 1 45 14 2661 1340 102 33 3 yobs
5 1 1 1 45 15 2874 1362 24 29 51 fp
5 1 1 1 45 16 2946 1358 152 35 33 Pa
5 1 1 1 45 17 3132 1376 15 13 38 es
5 1 1 1 45 18 3165 1341 44 62 32 “ye
5 1 1 1 45 19 3236 1358 123 35 26 aS
4 1 1 1 46 0 62 1374 3446 73 -1
5 1 1 1 46 1 62 1407 130 22 35 =
5 1 1 1 46 2 287 1408 59 36 46 ee
5 1 1 1 46 3 387 1409 35 24 30 ~~
5 1 1 1 46 4 786 1400 23 47 25 i
5 1 1 1 46 5 817 1421 13 22 1 f
5 1 1 1 46 6 930 1418 11 9 21 vs
5 1 1 1 46 7 968 1397 29 26 0 N
5 1 1 1 46 8 1429 1420 7 6 17 a
5 1 1 1 46 9 1569 1392 7 21 74 J
5 1 1 1 46 10 1853 1416 6 9 0 ;
5 1 1 1 46 11 2074 1400 64 32 23 be
5 1 1 1 46 12 2271 1418 5 5 0 s
5 1 1 1 46 13 2365 1379 35 61 1 >
5 1 1 1 46 14 2417 1422 3 4 0 e
5 1 1 1 46 15 2479 1416 13 4 0 §
5 1 1 1 46 16 2578 1384 54 33 41 =
5 1 1 1 46 17 2853 1390 144 34 73 Ys
5 1 1 1 46 18 3036 1374 135 57 47 Wer
5 1 1 1 46 19 3214 1388 71 32 18 Eevee
5 1 1 1 46 20 3307 1381 89 45 40 te
5 1 1 1 46 21 3412 1391 96 35 4 SN
4 1 1 1 47 0 12 1414 3408 98 -1
5 1 1 1 47 1 12 1425 247 87 21 na
5 1 1 1 47 2 295 1443 79 37 13 eid
5 1 1 1 47 3 787 1445 186 20 0 _—_*
5 1 1 1 47 4 1398 1434 30 19 24 ’
5 1 1 1 47 5 1822 1454 2 4 72 |
5 1 1 1 47 6 2216 1437 44 6 46 =
5 1 1 1 47 7 2541 1414 41 80 23 es
5 1 1 1 47 8 2946 1429 111 10 46 =
5 1 1 1 47 9 3062 1427 234 24 9 See)
4 1 1 1 48 0 55 1455 3358 45 -1
5 1 1 1 48 1 55 1493 8 7 0 )
5 1 1 1 48 2 168 1491 22 6 51 =>
5 1 1 1 48 3 259 1491 6 3 22 my
5 1 1 1 48 4 310 1479 1 12 22 ~
5 1 1 1 48 5 487 1473 6 5 46 7
5 1 1 1 48 6 784 1474 1 3 0 y
5 1 1 1 48 7 972 1468 58 26 20 a
5 1 1 1 48 8 1880 1484 1 3 0 :
5 1 1 1 48 9 2119 1463 18 26 0 .
5 1 1 1 48 10 2178 1455 21 30 65 =a
5 1 1 1 48 11 2542 1461 50 16 33 as
5 1 1 1 48 12 2925 1461 13 10 66 =
5 1 1 1 48 13 2994 1456 17 5 0 aS
5 1 1 1 48 14 3035 1456 118 27 32 Ns
5 1 1 1 48 15 3206 1466 2 4 0 4
5 1 1 1 48 16 3264 1464 18 8 18 RY
4 1 1 1 49 0 0 1461 3457 73 -1
5 1 1 1 49 1 0 1496 39 38 35 ea
5 1 1 1 49 2 418 1507 15 7 27 a
5 1 1 1 49 3 485 1474 99 54 37 Px
5 1 1 1 49 4 652 1506 46 19 77 —
5 1 1 1 49 5 739 1461 74 64 49 Ya
5 1 1 1 49 6 977 1484 29 12 10 .
5 1 1 1 49 7 1159 1492 31 11 0 e
5 1 1 1 49 8 1378 1492 143 24 6 le
5 1 1 1 49 9 2135 1488 151 23 36 eee.
5 1 1 1 49 10 2493 1470 124 55 24 Be
5 1 1 1 49 11 2635 1496 61 20 9 ks
5 1 1 1 49 12 2953 1471 173 43 35 as
5 1 1 1 49 13 3290 1494 57 14 11 Lr.
4 1 1 1 50 0 19 1506 3450 48 -1
5 1 1 1 50 1 19 1528 10 11 36 '
5 1 1 1 50 2 144 1544 18 10 0 *
5 1 1 1 50 3 459 1543 9 4 0 .
5 1 1 1 50 4 596 1520 95 30 10 ~—
5 1 1 1 50 5 765 1516 13 35 14 /
5 1 1 1 50 6 1212 1523 7 6 23 .
5 1 1 1 50 7 1724 1534 2 2 44 dias
5 1 1 1 50 8 2148 1514 6 27 0 ,
5 1 1 1 50 9 2517 1517 34 24 25 ee
5 1 1 1 50 10 2645 1512 5 5 28 ES
5 1 1 1 50 11 2995 1506 70 30 17 eee
5 1 1 1 50 12 3096 1510 56 23 27 Oe
5 1 1 1 50 13 3298 1507 7 10 1 y
5 1 1 1 50 14 3401 1515 68 12 46 SS.
4 1 1 1 51 0 17 1520 3125 54 -1
5 1 1 1 51 1 17 1560 11 13 0 “
5 1 1 1 51 2 133 1528 24 41 3 ~~
5 1 1 1 51 3 596 1553 66 18 16 TAS
5 1 1 1 51 4 739 1552 26 17 0 oh
5 1 1 1 51 5 856 1544 12 18 7 -
5 1 1 1 51 6 951 1549 7 7 45 °
5 1 1 1 51 7 1288 1528 60 40 25 ro
5 1 1 1 51 8 2180 1548 44 6 21 Fe
5 1 1 1 51 9 2455 1539 91 17 17 eae
5 1 1 1 51 10 2568 1540 8 23 38 5
5 1 1 1 51 11 2598 1543 16 17 12 OE
5 1 1 1 51 12 2647 1541 64 11 19 ie
5 1 1 1 51 13 2978 1531 105 20 49 =
5 1 1 1 51 14 3115 1520 27 54 55 Za
4 1 1 1 52 0 32 1548 3426 76 -1
5 1 1 1 52 1 32 1595 78 4 23 i
5 1 1 1 52 2 745 1557 126 44 30 oe
5 1 1 1 52 3 1027 1574 17 4 0 .
5 1 1 1 52 4 2158 1559 78 31 34 gg
5 1 1 1 52 5 2289 1544 70 60 38 ee
5 1 1 1 52 6 2358 1548 252 52 28 Oe
5 1 1 1 52 7 2638 1559 31 27 2 Foe
5 1 1 1 52 8 2857 1551 325 34 42 Ba
5 1 1 1 52 9 3400 1551 58 30 74 WS
4 1 1 1 53 0 137 1570 3306 72 -1
5 1 1 1 53 1 137 1601 160 31 0 _<—a
5 1 1 1 53 2 715 1624 7 5 47 pa
5 1 1 1 53 3 961 1598 75 28 0 =
5 1 1 1 53 4 1423 1597 4 4 49 ;
5 1 1 1 53 5 1543 1610 5 2 0 .
5 1 1 1 53 6 1739 1600 3 1 50 _
5 1 1 1 53 7 2144 1570 54 72 34 2
5 1 1 1 53 8 2256 1589 106 27 10 Cee
5 1 1 1 53 9 2460 1585 94 26 17 SS
5 1 1 1 53 10 2578 1584 144 45 21 re
5 1 1 1 53 11 2737 1591 24 23 18 me.
5 1 1 1 53 12 2881 1585 67 22 47 Me
5 1 1 1 53 13 2959 1579 227 35 0 ZEAL
5 1 1 1 53 14 3368 1577 40 57 62 iN
5 1 1 1 53 15 3426 1593 17 22 60 \
4 1 1 1 54 0 261 1607 3158 39 -1
5 1 1 1 54 1 261 1619 7 27 0 mh
5 1 1 1 54 2 1599 1623 19 7 57 ~
5 1 1 1 54 3 2100 1621 2 3 38 4
5 1 1 1 54 4 2293 1607 14 26 39 Ss
5 1 1 1 54 5 2543 1616 12 10 13 x3,
5 1 1 1 54 6 2628 1619 7 4 23 vad
5 1 1 1 54 7 2688 1612 41 8 15 ree
5 1 1 1 54 8 2919 1615 2 3 53 J
5 1 1 1 54 9 2965 1615 26 6 26 ——
5 1 1 1 54 10 3092 1611 74 12 35 BBR
5 1 1 1 54 11 3318 1611 18 6 21 —
5 1 1 1 54 12 3389 1612 30 9 73 WY
4 1 1 1 55 0 416 1625 2752 67 -1
5 1 1 1 55 1 416 1667 71 25 25 as
5 1 1 1 55 2 751 1675 4 2 16 i
5 1 1 1 55 3 802 1673 1 3 74 |
5 1 1 1 55 4 862 1673 3 2 0 :
5 1 1 1 55 5 1344 1672 4 3 44 >
5 1 1 1 55 6 1921 1654 2 3 0 :
5 1 1 1 55 7 2061 1662 8 9 30 nei
5 1 1 1 55 8 2461 1638 50 53 0 «
5 1 1 1 55 9 2553 1625 109 59 29 aes
5 1 1 1 55 10 2703 1664 15 19 70 4
5 1 1 1 55 11 2759 1648 4 7 0 F
5 1 1 1 55 12 2977 1649 146 23 26 SET
4 1 1 1 56 0 57 1667 3082 50 -1
5 1 1 1 56 1 57 1704 12 11 56 ”
5 1 1 1 56 2 290 1667 177 50 13 eS
5 1 1 1 56 3 579 1704 17 8 0 SS
5 1 1 1 56 4 790 1687 10 8 12 ;
5 1 1 1 56 5 1409 1699 5 1 13 ;
5 1 1 1 56 6 1692 1680 18 10 55 5
5 1 1 1 56 7 2149 1677 7 2 7 :
5 1 1 1 56 8 2454 1680 57 21 15 Soh
5 1 1 1 56 9 2575 1674 132 28 20 Be
5 1 1 1 56 10 2967 1672 33 24 95 A
5 1 1 1 56 11 3085 1670 83 29 20 TAN
4 1 1 1 57 0 42 1694 3131 67 -1
5 1 1 1 57 1 42 1716 21 26 5 ae
5 1 1 1 57 2 91 1700 43 46 30 OE
5 1 1 1 57 3 209 1703 89 58 4 iii
5 1 1 1 57 4 376 1711 32 24 39 =
5 1 1 1 57 5 810 1717 13 8 5 .
5 1 1 1 57 6 1212 1722 9 10 29 4
5 1 1 1 57 7 1353 1704 114 33 26 a
5 1 1 1 57 8 1812 1714 3 3 35 :
5 1 1 1 57 9 2037 1711 30 17 29 .
5 1 1 1 57 10 2150 1705 56 24 37 =
5 1 1 1 57 11 2304 1720 37 9 89 ~
5 1 1 1 57 12 2554 1727 3 2 6 Re
5 1 1 1 57 13 2605 1706 21 24 6 :
5 1 1 1 57 14 2789 1722 5 3 0 :
5 1 1 1 57 15 3069 1697 52 28 35 aN
4 1 1 1 58 0 0 1722 3203 45 -1
5 1 1 1 58 1 0 1747 22 20 74 =
5 1 1 1 58 2 212 1739 43 20 31 fi
5 1 1 1 58 3 302 1751 24 14 4 ee,
5 1 1 1 58 4 816 1729 20 32 3 y
5 1 1 1 58 5 1356 1749 3 2 0 :
5 1 1 1 58 6 1453 1738 5 20 0 t
5 1 1 1 58 7 1699 1736 8 6 62 °
5 1 1 1 58 8 2048 1740 31 5 15 Brees
5 1 1 1 58 9 2217 1742 65 11 20 ee
5 1 1 1 58 10 2436 1724 68 28 16 ee
5 1 1 1 58 11 2538 1722 104 33 25 es
5 1 1 1 58 12 2983 1731 81 12 17 Z—
5 1 1 1 58 13 3065 1716 38 45 17 \\
5 1 1 1 58 14 3122 1726 81 31 12 hn
4 1 1 1 59 0 123 1772 3079 44 -1
5 1 1 1 59 1 123 1790 76 26 38 oe
5 1 1 1 59 2 285 1785 15 29 41 2.
5 1 1 1 59 3 412 1793 13 11 39 et
5 1 1 1 59 4 459 1801 27 6 8 VE
5 1 1 1 59 5 653 1796 12 9 86 =
5 1 1 1 59 6 760 1791 15 24 24 4
5 1 1 1 59 7 1347 1783 3 4 11 y
5 1 1 1 59 8 1441 1793 9 20 0 }
5 1 1 1 59 9 1711 1796 18 19 0 “
5 1 1 1 59 10 2046 1787 2 3 0 ;
5 1 1 1 59 11 2441 1795 4 4 0 y
5 1 1 1 59 12 2488 1774 54 28 49 we
5 1 1 1 59 13 2588 1773 41 28 21 WS
5 1 1 1 59 14 2671 1776 42 15 41 =
5 1 1 1 59 15 2824 1777 9 4 14 =
5 1 1 1 59 16 3018 1791 3 1 66 f
5 1 1 1 59 17 3075 1772 22 24 78 =
5 1 1 1 59 18 3119 1772 17 44 19 4
5 1 1 1 59 19 3201 1786 1 3 84 )
4 1 1 1 60 0 0 1799 3195 55 -1
5 1 1 1 60 1 0 1833 15 8 73 3
5 1 1 1 60 2 189 1817 86 17 32 ——
5 1 1 1 60 3 516 1821 14 15 66 7
5 1 1 1 60 4 588 1821 17 13 48 =
5 1 1 1 60 5 1311 1799 38 55 49 =
5 1 1 1 60 6 1783 1810 42 18 24 ee
5 1 1 1 60 7 2180 1817 2 3 7 :
5 1 1 1 60 8 2328 1815 3 1 0 ,
5 1 1 1 60 9 2444 1800 136 28 23 flees
5 1 1 1 60 10 2588 1807 23 14 27 a
5 1 1 1 60 11 2840 1799 3 3 0 SS
5 1 1 1 60 12 2927 1799 157 25 0 —=SeE
5 1 1 1 60 13 3160 1807 1 4 83 |
4 1 1 1 61 0 92 1810 3056 80 -1
5 1 1 1 61 1 92 1816 11 43 45 ~<
5 1 1 1 61 2 305 1848 6 4 0 ,
5 1 1 1 61 3 652 1814 25 51 0 Hy
5 1 1 1 61 4 1264 1840 8 2 0 .
5 1 1 1 61 5 1286 1812 72 78 31 r=
5 1 1 1 61 6 1507 1841 4 2 77 ‘
5 1 1 1 61 7 1792 1833 7 7 0 \
5 1 1 1 61 8 2242 1828 20 10 0 e
5 1 1 1 61 9 2366 1828 41 10 60 >.
5 1 1 1 61 10 2479 1810 92 44 25 Sa
5 1 1 1 61 11 2574 1814 37 29 10 FS
5 1 1 1 61 12 2724 1829 22 7 28 5
5 1 1 1 61 13 2844 1816 11 11 26 .
5 1 1 1 61 14 2950 1815 198 32 28 SSM
4 1 1 1 62 0 21 1830 3137 46 -1
5 1 1 1 62 1 21 1863 3 3 0 -
5 1 1 1 62 2 294 1847 29 28 35 ey
5 1 1 1 62 3 523 1846 24 28 17 om
5 1 1 1 62 4 681 1867 8 7 8 %
5 1 1 1 62 5 1653 1843 8 29 0 _—
5 1 1 1 62 6 1877 1848 2 2 87 \
5 1 1 1 62 7 1981 1842 2 2 13 :
5 1 1 1 62 8 2125 1843 3 2 48 ‘
5 1 1 1 62 9 2281 1840 40 23 37 SANE
5 1 1 1 62 10 2342 1837 65 15 0 Leg
5 1 1 1 62 11 2466 1835 27 20 20 mS
5 1 1 1 62 12 2505 1837 28 23 49 —S
5 1 1 1 62 13 2559 1836 31 26 22 ee
5 1 1 1 62 14 2610 1830 9 35 20 rs
5 1 1 1 62 15 2695 1835 27 41 29 We
5 1 1 1 62 16 2790 1838 7 3 4 #
5 1 1 1 62 17 2969 1834 85 22 45 SF
5 1 1 1 62 18 3133 1830 18 36 0 |!
4 1 1 1 63 0 223 1857 2867 33 -1
5 1 1 1 63 1 223 1879 24 5 31 —
5 1 1 1 63 2 382 1874 21 13 18 eli
5 1 1 1 63 3 597 1884 74 6 58 ae
5 1 1 1 63 4 1544 1872 32 7 0 _
5 1 1 1 63 5 1788 1876 3 5 14 ;
5 1 1 1 63 6 2242 1862 91 20 26 Roe
5 1 1 1 63 7 2397 1867 73 6 13 Ce
5 1 1 1 63 8 2487 1858 126 25 21 See
5 1 1 1 63 9 2694 1873 4 5 2 ;
5 1 1 1 63 10 2994 1861 18 15 61 A
5 1 1 1 63 11 3088 1857 2 4 33 |
4 1 1 1 64 0 0 1839 2749 83 -1
5 1 1 1 64 1 0 1914 30 8 0 —
5 1 1 1 64 2 105 1891 8 5 35 -
5 1 1 1 64 3 435 1883 29 19 0 m
5 1 1 1 64 4 568 1881 29 16 23 |
5 1 1 1 64 5 665 1877 29 28 69 “
5 1 1 1 64 6 888 1903 45 14 32 “ei
5 1 1 1 64 7 1340 1875 26 14 39 oy
5 1 1 1 64 8 1528 1902 5 11 33 7;
5 1 1 1 64 9 1678 1869 37 53 12 ee
5 1 1 1 64 10 1991 1883 111 19 0 \
5 1 1 1 64 11 2125 1884 58 24 29 lym
5 1 1 1 64 12 2275 1881 103 26 44 BS
5 1 1 1 64 13 2401 1839 150 77 0 Cnt
5 1 1 1 64 14 2597 1882 93 12 16 Suse
4 1 1 1 65 0 32 1898 2790 45 -1
5 1 1 1 65 1 177 1932 5 7 30 aa
5 1 1 1 65 2 372 1924 14 12 35 i
5 1 1 1 65 3 683 1908 18 30 11 =
5 1 1 1 65 4 1596 1902 154 27 22 i
5 1 1 1 65 5 2381 1906 176 20 38 Sa
5 1 1 1 65 6 2705 1906 63 19 33 eee
4 1 1 1 66 0 7 1919 2814 51 -1
5 1 1 1 66 1 7 1940 3 3 55 :
5 1 1 1 66 2 140 1947 11 19 45 ¢
5 1 1 1 66 3 251 1937 26 17 23 a
5 1 1 1 66 4 573 1951 20 9 10 ee
5 1 1 1 66 5 681 1928 22 42 0 ST
5 1 1 1 66 6 870 1934 113 29 18 et.
5 1 1 1 66 7 1111 1931 6 27 92 )
5 1 1 1 66 8 1222 1925 33 43 53 my
5 1 1 1 66 9 1522 1938 95 17 42 sg
5 1 1 1 66 10 1689 1929 4 8 0 ,
5 1 1 1 66 11 2388 1924 96 26 20 OMNI
5 1 1 1 66 12 2513 1923 41 10 13 SA
5 1 1 1 66 13 2606 1915 54 46 30 ay
5 1 1 1 66 14 2660 1919 161 29 17 OST
4 1 1 1 67 0 1 1937 2858 54 -1
5 1 1 1 67 1 103 1969 60 22 18 OS
5 1 1 1 67 2 400 1967 7 10 21 y
5 1 1 1 67 3 781 1973 8 18 74 ‘
5 1 1 1 67 4 908 1963 91 21 38 ‘ae
5 1 1 1 67 5 1099 1960 11 18 51 J
5 1 1 1 67 6 1221 1937 11 43 0 \.
5 1 1 1 67 7 1440 1960 92 24 0 “
5 1 1 1 67 8 1567 1937 46 42 1 4y
5 1 1 1 67 9 1786 1958 2 2 28 :
5 1 1 1 67 10 1907 1970 62 8 31 es
5 1 1 1 67 11 2236 1955 39 17 43 Se
5 1 1 1 67 12 2497 1951 3 2 50 4
5 1 1 1 67 13 2706 1950 36 18 20 eS
4 1 1 1 68 0 28 1969 2724 88 -1
5 1 1 1 68 1 28 2003 152 54 35 ane
5 1 1 1 68 2 450 1981 50 58 34 Vi
5 1 1 1 68 3 677 2021 17 6 36 7
5 1 1 1 68 4 828 1998 145 41 18 Pe
5 1 1 1 68 5 1343 1996 38 44 42 =
5 1 1 1 68 6 1393 1979 66 65 6 Sa
5 1 1 1 68 7 1577 1969 54 84 8 e
5 1 1 1 68 8 1781 2002 4 4 24 ey
5 1 1 1 68 9 2124 1983 82 57 19 Pt)
5 1 1 1 68 10 2660 1985 32 20 0 oar
4 1 1 1 69 0 9 2021 2405 60 -1
5 1 1 1 69 1 18 2033 21 40 42 a
5 1 1 1 69 2 87 2037 66 28 39 em
5 1 1 1 69 3 448 2035 42 46 61 A
5 1 1 1 69 4 527 2047 27 15 21 =
5 1 1 1 69 5 619 2052 2 2 39 1
5 1 1 1 69 6 722 2056 9 16 0 S
5 1 1 1 69 7 799 2040 24 22 71 >
5 1 1 1 69 8 886 2037 73 30 0 voy
5 1 1 1 69 9 1309 2021 67 59 14 »*
5 1 1 1 69 10 1468 2033 11 31 0 f
5 1 1 1 69 11 1587 2054 5 4 0 ,
5 1 1 1 69 12 2045 2030 2 4 2 ae
5 1 1 1 69 13 2183 2046 2 4 0 ;
5 1 1 1 69 14 2354 2035 60 18 26 ee
4 1 1 1 70 0 2 2043 2836 62 -1
5 1 1 1 70 1 2 2065 47 31 0 -
5 1 1 1 70 2 41 2059 31 41 40 /)
5 1 1 1 70 3 229 2073 100 32 41 ca
5 1 1 1 70 4 362 2059 19 34 20 7,
5 1 1 1 70 5 719 2043 63 59 21 pS
5 1 1 1 70 6 802 2067 19 29 35 5
5 1 1 1 70 7 850 2068 15 31 15 7.
5 1 1 1 70 8 1219 2062 3 4 0 S
5 1 1 1 70 9 1408 2062 14 6 0 ?
5 1 1 1 70 10 1587 2060 3 3 42 z
5 1 1 1 70 11 1784 2059 2 3 0 ;
5 1 1 1 70 12 2064 2052 32 35 47 ee
5 1 1 1 70 13 2105 2053 13 34 58 3
5 1 1 1 70 14 2348 2057 32 21 36 re
5 1 1 1 70 15 2784 2061 34 26 28 ee
4 1 1 1 71 0 13 2084 2826 47 -1
5 1 1 1 71 1 294 2108 33 5 0 oe
ae — ND a ee ; Pee ear Sera ee"
_ ~ Seale en — 5 a Cee 4 $ ee Res aS aa cs See oF, 2g :
Na 7 t, . mo “ a Ry ‘ — . » me > vie p
S we ee SS: 2 a Fah SENS ek sien Bi oe = Sh. =
— vy) co \ \ aE _ ie ee : Pe ae T Pa ed . ‘ 4 ae o -_ es = ;
Beas A LE j —- Z 7 , RRR ars Re coe A Slee s : : : me e tae Ne .
ae jv oe a= ) ar a
SS AY ae Siac eas th eee ay A es
: p Tare 4 a ; Sl Sapo: ey Serer
x ae : :Section 5
From the Mayor
We want to see more people riding a bike and walking to “It is Council’s intention to prioritise the
the shops, school and in our scenic and attractive coastal delivery of active transport projects when it
and hinterland areas. The Noosa Cycling and Walking
Strategy and Implementation Plan (NCWSIP) provides us
considers the annual budget. This will include
with the direction to make this happen. It proposes a plan investigation into alternative funding streams.”
to not only build safe infrastructure where it is most needed,
but also looks at implementing programs to encourage The NCWSIP defines and prioritises a list of projects for
people to use it. Council to deliver. The capital works plan proposed is based
on historic expenditure on walking and cycling by Council.
The NCWSIP sets out Council’s direction and commitment It is our intention to review this expenditure as part of our
to the vision of “More people riding a bike and walking for annual budget review, with the aim to find more money to
health, transport, tourism and the environment”. Our goal is spend in this area and consider other funding streams. We
to make riding a bike and walking so convenient and safe will also continue to find ways to partner with agencies such
that it is the preferred mode of transport for our residents
and visitors.
Actions such as providing convenient bike parking, safe
T
as the State and Federal Governments to co-fund the plan.
We are committed to creating a safe and connected active
transport network for Noosa residents and visitors.
AF
road crossings and planting canopy trees along our paths Our headline projects from the implementation plan include:
can make our infrastructure more inviting and attractive.
Our plan aims to embrace evolving trends such as e-bikes, • Noosa Parade upgrade: scheduled to start early 2022
which have the potential to overcome barriers for many • Garth Prowd Bridge shared path widening: scheduled
users such as hilly terrain, climate and fitness levels. to start early 2022
R
The implementation of our vision enables commitment to • Noosa Drive off-road path
existing Council strategies and plans such as the Noosa • Maple Street Cooroy new shared path and on-road
Transport Strategy, the Noosa Environment Strategy, cycle lane
D
Noosa's Social Strategy and the Sport and Active
• Sunshine Beach Road bikeway
Recreation Plan.
• Hilton Esplanade upgrade
There are so many reasons to encourage more people to
• Trails Masterplan and Implementation Plan
ride a bike and/or walk such as:
• $250,000 per annum expenditure on hinterland and
• improving travel choice for our residents and visitors to local links.
our activity centres, villages, schools and tourism hubs
We had an overwhelming response to our community
• building a healthier community
consultation, with over 260 residents providing feedback
• reducing greenhouse gas emissions by reducing the or completing the survey. A summary of the results can be
use of private motor vehicles found at yoursay.noosa.qld.gov.au
• supporting and contributing to the local economy by
improving economic vitality of our centres and enticing
more cycling events to attract tourism.
5
Section 6
Our vision
“More people riding a bike and
walking for health, transport,
tourism and the environment”
T
AF
R
D
6
Section 7
Objectives
Outcomes
Council aims to achieve the following outcomes as a result of implementing our vision:
• Improve travel choice for our residents and visitors to our activity centres, villages, schools and tourism hubs.
• Reduce greenhouse gas emissions by reducing the use of private motor vehicles
• Build a healthier community .
• Support and contribute to the local economy by improving economic vitality of our centres and enticing more cycling events
to attract tourism.
Objectives
T
The Noosa Cycling and Walking Strategy and Implementation Plan (NCWSIP) vision is supported by objectives which provide
direction on how the vision will be achieved.
AF
Encouraging people to ride a bike or walk requires a comprehensive strategy addressing both infrastructure and non-
infrastructure actions. Our objectives for the strategy are shown in Table 1.
1. Implement a connected, safe, attractive, and inclusive active transport network that reflects
Noosa’s village feel and scale.
R
Infrastructure 2. Provide safe and connected infrastructure to schools and continue to support active travel to
schools.
3. Make riding a bike or walking so easy and attractive that it is the preferred mode of travel for
D
locals and visitors.
4. Embrace suitable changes in technology.
5. Encourage and promote bicycle riding and walking so it becomes an everyday normal activity
Participation for all.
6. Continue to promote Noosa’s infrastructure and events appreciating Noosa’s natural
environment, and become a world-renowned bike riding and walking tourism destination.
7. Implement infrastructure priorities to increase active transport within the bike and walking
Delivery path network.
8. Deliver value for money outcomes and demonstrate the benefits to the community.
Table 1: Objectives for achieving the vision
7
Section 8
8
D
R
AF
T
; ie SGN aes tes a
ne
; / os : a
: E XN
o a 4 c | P N
a = ‘ “ \
ets | Edis hh gs a / >
oo es . . y ) , 4
ae P “ . | cae 2 ’
“er | ~ \ f or a
pany . : ree : Va a 7 - |
,° Le eet / &
o eo —<—<—~ ET ——< |
“ : ,% ~< ; os Bi i
if ce P = : If aA \ lr 4 y f
J » oy Y % Vi/\ f
- 4 » . \ y J
; st Fe PY J | y
{—- ee eo Sf \ agli eS
- _— Coc ‘ f Pv el
|. a ey Neer \ conan AF
Ee = - pay Q / RE a \ Re - ‘ y oa
eee ll + Var eao 7 :
* TR L WN 4 > ree yo
A ‘ Kes * Sa . y Te : — Janssen’
4 Ta NE 2 4 er ( Ea Rs
© ’ ‘«. - a ON = Fe has ee Ra ee
Se yo , ae ae
< . > “ “ ee Sp ene a ers yeaa” SOS
ae Wy Gk Sa > a? Sen Ore (eee te Fe > hl =
‘ 7 “san] i Re S Fe : MP ree iets Reet en AS i ..
reat ' a= yy mt CaN - > Be) ws ey 4 Os es Hi Sin, ea or i
es ee > ~»S ; a ge sete | ere = WEEE ®. A ic
aaa SD ee aS to. 3 apse 5 eo S| ee pe ee ,
--¢seeN a (Bees Sa ie i 8,
Pe ta eae! f Biden SR <; =x Ay es] RAO ee: ee
5 1 1 1 37 2 131 1595 25 29 1 ail
5 1 1 1 37 3 184 1600 31 51 4 Ae
5 1 1 1 37 4 812 1625 7 7 0 Y
5 1 1 1 37 5 829 1600 25 15 44 Mag
5 1 1 1 37 6 881 1611 57 35 0 iaah
5 1 1 1 37 7 952 1615 10 15 0 F
5 1 1 1 37 8 971 1570 100 75 3 ah
5 1 1 1 37 9 1172 1619 53 18 59 &
5 1 1 1 37 10 1233 1619 15 31 8 .
5 1 1 1 37 11 1307 1619 9 7 57 a
5 1 1 1 37 12 1491 1640 3 3 22 a
5 1 1 1 37 13 1617 1633 6 7 0 ;
5 1 1 1 37 14 1662 1617 15 30 22 ba
5 1 1 1 37 15 1727 1633 6 19 36 t
5 1 1 1 37 16 1822 1611 38 44 12 oa
5 1 1 1 37 17 1924 1631 5 6 0 :
5 1 1 1 37 18 1939 1618 27 35 0 e
5 1 1 1 37 19 2013 1621 23 7 44 x4
5 1 1 1 37 20 2254 1612 4 3 4 ¢
5 1 1 1 37 21 2302 1583 118 77 23 Rtg
5 1 1 1 37 22 2430 1592 31 63 42 BS
4 1 1 1 38 0 12 1631 2455 68 -1
5 1 1 1 38 1 12 1649 70 42 24 soe.
5 1 1 1 38 2 104 1663 29 28 38 ay
5 1 1 1 38 3 245 1676 17 23 0 P
5 1 1 1 38 4 923 1641 34 34 30 oss
5 1 1 1 38 5 1195 1655 35 26 34 Bey.
5 1 1 1 38 6 1376 1666 2 2 0 ;
5 1 1 1 38 7 1524 1642 88 40 0 agg
5 1 1 1 38 8 1627 1631 31 57 11 I
5 1 1 1 38 9 1670 1646 67 42 34 ot
5 1 1 1 38 10 1782 1646 78 51 11 Ad
5 1 1 1 38 11 1892 1663 4 2 18 ar
5 1 1 1 38 12 2257 1646 66 37 30 fa
5 1 1 1 38 13 2347 1646 25 11 11 kids
5 1 1 1 38 14 2433 1644 20 34 25 ™
4 1 1 1 39 0 4 1670 2459 61 -1
5 1 1 1 39 1 4 1702 10 21 0 ;
5 1 1 1 39 2 52 1676 24 48 32 Kl
5 1 1 1 39 3 97 1718 2 2 0 .
5 1 1 1 39 4 118 1691 7 21 0 '
5 1 1 1 39 5 158 1687 12 44 0 Fr
5 1 1 1 39 6 236 1708 3 3 41 .
5 1 1 1 39 7 324 1716 3 4 0 ‘
5 1 1 1 39 8 837 1696 24 23 22 a
5 1 1 1 39 9 924 1690 21 7 35 aad
5 1 1 1 39 10 1202 1691 15 35 0 :
5 1 1 1 39 11 1245 1677 19 35 32 *%
5 1 1 1 39 12 1462 1723 13 4 18 j
5 1 1 1 39 13 1489 1695 52 33 40 my,
5 1 1 1 39 14 1558 1670 114 56 25 Vhs
5 1 1 1 39 15 1733 1694 9 35 0 !
5 1 1 1 39 16 1776 1695 6 11 41 Ns
5 1 1 1 39 17 1794 1697 8 7 26 4)
5 1 1 1 39 18 1873 1687 10 29 0 L
5 1 1 1 39 19 1950 1699 18 24 22 5?
5 1 1 1 39 20 2014 1687 8 32 64 4
5 1 1 1 39 21 2174 1673 18 53 66 r
5 1 1 1 39 22 2236 1689 33 41 33 4
5 1 1 1 39 23 2439 1710 24 11 68 >
4 1 1 1 40 0 23 1715 2427 35 -1
5 1 1 1 40 1 86 1730 45 15 36 a
5 1 1 1 40 2 129 1714 33 35 14 eet
5 1 1 1 40 3 836 1733 7 8 0 f
5 1 1 1 40 4 944 1737 95 8 10 ania
5 1 1 1 40 5 1171 1721 6 18 0 t
5 1 1 1 40 6 1235 1736 4 6 13 .
5 1 1 1 40 7 1491 1739 6 3 0 .
5 1 1 1 40 8 1599 1715 20 34 41 fy
5 1 1 1 40 9 1662 1729 43 16 6 mes
5 1 1 1 40 10 1839 1739 8 5 0 -
5 1 1 1 40 11 1963 1722 61 22 20 med
5 1 1 1 40 12 2133 1736 16 4 0 -
5 1 1 1 40 13 2270 1728 21 11 0 ~~
5 1 1 1 40 14 2431 1722 19 28 0 .
4 1 1 1 41 0 44 1732 2412 90 -1
5 1 1 1 41 1 44 1743 4 6 0 F
5 1 1 1 41 2 115 1736 80 42 11 hice!
5 1 1 1 41 3 893 1749 10 7 42 i
5 1 1 1 41 4 1036 1745 22 31 20 ,
5 1 1 1 41 5 1064 1747 19 28 50 a
5 1 1 1 41 6 1149 1751 87 36 26 2
5 1 1 1 41 7 1435 1746 65 40 51 mw.
5 1 1 1 41 8 1547 1768 4 5 10 s
5 1 1 1 41 9 1608 1744 77 43 58 VX
5 1 1 1 41 10 1706 1733 45 89 27 ai
5 1 1 1 41 11 1844 1745 54 20 30 te.
5 1 1 1 41 12 2022 1732 96 57 12 RE!
5 1 1 1 41 13 2219 1744 237 47 34 ee
4 1 1 1 42 0 74 1777 2389 35 -1
5 1 1 1 42 1 74 1781 49 14 36 a
5 1 1 1 42 2 163 1788 9 18 78 |
5 1 1 1 42 3 479 1787 28 22 0 i
5 1 1 1 42 4 807 1792 22 17 0 -
5 1 1 1 42 5 1175 1777 29 33 10 ss
5 1 1 1 42 6 1490 1784 12 17 35 7
5 1 1 1 42 7 1594 1786 34 14 28 Ba
5 1 1 1 42 8 1713 1801 5 5 82 |
5 1 1 1 42 9 1880 1777 92 26 10 a
5 1 1 1 42 10 2218 1783 13 9 38 ge
5 1 1 1 42 11 2260 1782 128 30 16 I
5 1 1 1 42 12 2420 1786 59 22 20 as
4 1 1 1 43 0 115 1785 2364 67 -1
5 1 1 1 43 1 115 1791 29 51 23 oe
5 1 1 1 43 2 161 1787 54 65 32 va)
5 1 1 1 43 3 334 1785 21 43 41 ¢
5 1 1 1 43 4 503 1808 14 7 43 i
5 1 1 1 43 5 792 1803 11 43 4 Fe
5 1 1 1 43 6 997 1827 22 5 82 x
5 1 1 1 43 7 1097 1787 40 60 13 —<—
5 1 1 1 43 8 1225 1804 52 37 26 >,
5 1 1 1 43 9 1434 1795 132 41 8 [a
5 1 1 1 43 10 1584 1809 66 36 22 a
5 1 1 1 43 11 1991 1820 4 3 32 —
5 1 1 1 43 12 2032 1802 45 29 32 ey
5 1 1 1 43 13 2195 1816 65 13 27 a
5 1 1 1 43 14 2289 1793 134 49 26 <A
5 1 1 1 43 15 2439 1816 40 31 37 a
4 1 1 1 44 0 115 1828 2363 53 -1
5 1 1 1 44 1 115 1841 51 33 21 Wy
5 1 1 1 44 2 180 1828 45 53 48 HA
5 1 1 1 44 3 797 1842 6 5 46 :
5 1 1 1 44 4 1029 1842 142 33 44 =o
5 1 1 1 44 5 1562 1864 15 8 43 a
5 1 1 1 44 6 1650 1845 27 16 22 EY
5 1 1 1 44 7 1693 1857 35 17 1 =
5 1 1 1 44 8 2287 1842 191 33 22 ee
4 1 1 1 45 0 30 1865 2383 64 -1
5 1 1 1 45 1 30 1902 4 4 45 .
5 1 1 1 45 2 208 1881 26 19 42 oA
5 1 1 1 45 3 760 1884 16 26 0 -
5 1 1 1 45 4 994 1887 69 27 36 —
5 1 1 1 45 5 1242 1883 5 19 36 |
5 1 1 1 45 6 1357 1903 12 4 35 ea
5 1 1 1 45 7 1453 1865 32 16 0 -
5 1 1 1 45 8 1505 1900 15 11 19 me
5 1 1 1 45 9 1576 1869 30 60 0 s
ay ‘ J . § ae ET
Agee an wo q = SL ey —s i
y Res Ni °4 $7 - a Pe) \" Jug ae ~ ee :
; wie POS Phare 4 PS ae ae
s ae ee r . “"¥ Ws eS eG \ S & oN = ‘ WL sass egies
—- * J = i ate . es es fy AS ‘ pe ie
ie ie f, a i ‘y ae ms:
AS r- . 8 , Bsns 2 . 9 va
J LZ ie es) 2 es AB esa
“i “) p_ 7, ° mn aa ee Bt SS ee ;
4
5 1 1 1 55 2 460 2199 51 27 66 Zi
5 1 1 1 55 3 1212 2198 12 8 0 F
5 1 1 1 55 4 1434 2197 35 25 52 SS
5 1 1 1 55 5 1528 2183 64 53 0 %,
5 1 1 1 55 6 1659 2199 94 31 20 oo}
5 1 1 1 55 7 1792 2191 40 53 38 ™
5 1 1 1 55 8 1868 2194 42 48 37 a
5 1 1 1 55 9 1971 2198 36 22 38 et
5 1 1 1 55 10 2202 2196 64 29 4 aii
5 1 1 1 55 11 2456 2215 17 3 32 a
4 1 1 1 56 0 1066 2221 1235 32 -1
5 1 1 1 56 1 1066 2234 13 5 92 ~
5 1 1 1 56 2 1433 2225 115 26 25 Sa
5 1 1 1 56 3 1579 2225 229 28 21 DERE
5 1 1 1 56 4 1804 2215 62 49 36 SR
5 1 1 1 56 5 1871 2223 66 26 31 See
5 1 1 1 56 6 2118 2221 183 31 23 ae
4 1 1 1 57 0 2 2209 2319 74 -1
5 1 1 1 57 1 2 2220 40 59 37 a
5 1 1 1 57 2 81 2209 20 45 45 }
5 1 1 1 57 3 508 2212 15 61 10 ,
5 1 1 1 57 4 795 2278 4 5 41 ;
5 1 1 1 57 5 1170 2249 5 7 30 F
5 1 1 1 57 6 1354 2248 59 31 32 We
5 1 1 1 57 7 1447 2243 51 38 29 By
5 1 1 1 57 8 1533 2215 99 64 13 a
5 1 1 1 57 9 1711 2231 52 52 12 7
5 1 1 1 57 10 1791 2248 43 34 25 os
5 1 1 1 57 11 1879 2232 70 51 15 ean
5 1 1 1 57 12 1970 2247 47 28 0 Se
5 1 1 1 57 13 2144 2240 67 42 39 eae
5 1 1 1 57 14 2220 2249 59 29 1 leva
4 1 1 1 58 0 477 2258 1760 63 -1
5 1 1 1 58 1 477 2287 14 19 33 44
5 1 1 1 58 2 501 2283 7 42 33 \
5 1 1 1 58 3 798 2295 2 2 1 ;
5 1 1 1 58 4 1424 2281 70 30 43 Mord
5 1 1 1 58 5 1510 2275 18 18 44 a
5 1 1 1 58 6 1559 2258 40 62 47 «ath
5 1 1 1 58 7 1625 2280 86 29 30 ‘Ae
5 1 1 1 58 8 1714 2282 17 17 0 I
5 1 1 1 58 9 1748 2270 17 40 0 ‘
5 1 1 1 58 10 1790 2282 54 39 29 Ves
5 1 1 1 58 11 1905 2274 25 17 26 aa
5 1 1 1 58 12 2063 2306 3 3 0 r
5 1 1 1 58 13 2130 2280 80 34 3 ae
5 1 1 1 58 14 2227 2282 10 18 0 .
4 1 1 1 59 0 1 2288 2206 65 -1
5 1 1 1 59 1 1 2317 4 9 39 t
5 1 1 1 59 2 477 2292 24 36 14 Ah
5 1 1 1 59 3 729 2300 28 53 45 ON
5 1 1 1 59 4 790 2309 10 7 0 -
5 1 1 1 59 5 971 2320 6 5 54 >
5 1 1 1 59 6 1353 2319 5 5 0 \
5 1 1 1 59 7 1384 2298 73 40 56 ayy
5 1 1 1 59 8 1473 2322 3 2 1 ay
5 1 1 1 59 9 1633 2307 2 5 0 .
5 1 1 1 59 10 1649 2304 48 27 23 a
5 1 1 1 59 11 1722 2313 2 2 41 ‘
5 1 1 1 59 12 1739 2288 12 37 0 F
5 1 1 1 59 13 1808 2310 45 17 16 St
5 1 1 1 59 14 1959 2320 5 4 32 oe
5 1 1 1 59 15 2032 2307 20 29 50 a
5 1 1 1 59 16 2114 2305 33 22 37 oe
5 1 1 1 59 17 2171 2300 36 26 30 a
4 1 1 1 60 0 477 2307 1658 70 -1
5 1 1 1 60 1 477 2331 10 27 44 4
5 1 1 1 60 2 1360 2330 9 24 11 +
5 1 1 1 60 3 1381 2307 754 70 4 EQNS
4 1 1 1 61 0 1103 2349 953 36 -1
5 1 1 1 61 1 1103 2363 2 4 43 :
5 1 1 1 61 2 1400 2355 49 30 0 EM\
5 1 1 1 61 3 1500 2358 30 17 38 Ae
5 1 1 1 61 4 1611 2360 3 3 0 awe!
5 1 1 1 61 5 1809 2361 60 23 26 yah
5 1 1 1 61 6 1951 2355 24 30 0 -
5 1 1 1 61 7 2022 2349 34 34 27 oe
4 1 1 1 62 0 1085 2369 1156 68 -1
5 1 1 1 62 1 1085 2369 17 46 38 y
5 1 1 1 62 2 1388 2383 23 6 8 PP
5 1 1 1 62 3 1446 2370 109 33 43 SN
5 1 1 1 62 4 1558 2390 27 29 35 \e
5 1 1 1 62 5 1650 2379 36 54 18 ae
5 1 1 1 62 6 1924 2395 5 9 85 \
5 1 1 1 62 7 2002 2397 12 13 0 e
5 1 1 1 62 8 2044 2383 61 54 6 a
5 1 1 1 62 9 2109 2387 3 23 0 e
5 1 1 1 62 10 2127 2381 18 33 4 be
5 1 1 1 62 11 2201 2389 40 25 35 cag
4 1 1 1 63 0 704 2411 1502 32 -1
5 1 1 1 63 1 704 2415 2 3 9 ;
5 1 1 1 63 2 1578 2416 85 20 5 Vee
5 1 1 1 63 3 1824 2419 36 22 41 ae
5 1 1 1 63 4 1963 2410 202 33 21 SS
5 1 1 1 63 5 2223 2419 32 15 28 ie:
4 1 1 1 64 0 1416 2436 840 31 -1
5 1 1 1 64 1 1416 2448 10 15 79 4
5 1 1 1 64 2 1494 2442 19 17 17 nS
5 1 1 1 64 3 1577 2444 58 22 46 ak
5 1 1 1 64 4 1648 2436 5 9 0 ‘
5 1 1 1 64 5 1984 2439 55 21 31 SR
5 1 1 1 64 6 2122 2438 40 19 32 Shy
5 1 1 1 64 7 2211 2436 45 31 39 ae
4 1 1 1 65 0 1446 2495 912 53 -1
5 1 1 1 65 1 1446 2500 56 40 36 Rh
5 1 1 1 65 2 1577 2495 57 53 40 Se
5 1 1 1 65 3 1740 2503 172 44 54 MEAS
5 1 1 1 65 4 2002 2501 163 40 33 ARI
5 1 1 1 65 5 2185 2505 120 38 19 a
4 1 1 1 66 0 1381 2587 924 30 -1
5 1 1 1 66 1 1381 2602 3 4 14 |
5 1 1 1 66 2 1403 2592 38 21 49 BRR
5 1 1 1 66 3 1462 2591 27 26 45 a
5 1 1 1 66 4 1596 2596 6 4 10 AO
5 1 1 1 66 5 1656 2596 74 19 42 ONO
5 1 1 1 66 6 1775 2588 40 27 14 ee
5 1 1 1 66 7 1882 2594 59 22 36 EY
5 1 1 1 66 8 2023 2590 67 27 3 Sn
5 1 1 1 66 9 2120 2599 14 18 3 \
5 1 1 1 66 10 2195 2594 40 19 38 Se
4 1 1 1 67 0 1360 2586 941 72 -1
5 1 1 1 67 1 1360 2618 13 20 51 »
5 1 1 1 67 2 1424 2611 67 30 58 AE
5 1 1 1 67 3 1581 2603 54 49 27 7
5 1 1 1 67 4 1678 2631 42 7 8 8
5 1 1 1 67 5 1751 2586 249 68 27 RSD
5 1 1 1 67 6 2015 2589 143 69 11 ee
5 1 1 1 67 7 2249 2603 87 51 21 a
4 1 1 1 68 0 1365 2638 971 60 -1
5 1 1 1 68 1 1365 2661 34 16 27 +
5 1 1 1 68 2 1467 2641 10 38 14 rf
5 1 1 1 68 3 1543 2651 36 30 0 “.
5 1 1 1 68 4 1593 2646 31 33 19 Se
5 1 1 1 68 5 1716 2663 12 5 0 ee
5 1 1 1 68 6 1841 2651 37 35 13 a
5 1 1 1 68 7 1915 2638 41 60 15 PY
5 1 1 1 68 8 1982 2649 101 30 40 aS
5 1 1 1 68 9 2068 2641 48 47 40 Vn
5 1 1 1 68 10 2106 2653 57 31 20 Sy
5 1 1 1 68 11 2239 2664 2 2 2 ;
5 1 1 1 68 12 2334 2667 2 4 17 :
4 1 1 1 69 0 1020 2676 1363 60 -1
5 1 1 1 69 1 1020 2682 5 4 54 A
5 1 1 1 69 2 1603 2679 20 48 0 |
5 1 1 1 69 3 1652 2694 2 2 44 OA
5 1 1 1 69 4 1815 2676 118 60 23 SACS
5 1 1 1 69 5 2057 2680 10 26 36 ar)
5 1 1 1 69 6 2077 2679 209 38 32 Sa
5 1 1 1 69 7 2350 2684 33 13 18 oT
4 1 1 1 70 0 1265 2713 1123 40 -1
5 1 1 1 70 1 1289 2714 17 29 0 Ys
5 1 1 1 70 2 1412 2721 25 19 25 ea
5 1 1 1 70 3 1511 2715 56 36 12 TAA
5 1 1 1 70 4 1604 2717 13 19 26 i
5 1 1 1 70 5 1718 2713 44 39 11 NG
5 1 1 1 70 6 1862 2720 5 9 0 h
5 1 1 1 70 7 1890 2716 83 37 43 ‘ee
5 1 1 1 70 8 1990 2718 27 21 27 Ce
5 1 1 1 70 9 2109 2716 12 9 19 ie
5 1 1 1 70 10 2382 2713 6 6 54 .
4 1 1 1 71 0 789 2739 1234 55 -1
5 1 1 1 71 1 789 2754 86 37 43 De
5 1 1 1 71 2 957 2769 5 7 0 :
5 1 1 1 71 3 1425 2757 100 23 32 BN
5 1 1 1 71 4 1643 2769 33 17 28 ss
5 1 1 1 71 5 1695 2746 35 48 0 w
5 1 1 1 71 6 1772 2767 9 4 0 “
5 1 1 1 71 7 1864 2756 10 27 21 ey
5 1 1 1 71 8 1943 2773 6 8 1 a
5 1 1 1 71 9 1961 2739 62 53 34 AML
4 1 1 1 72 0 1009 2770 1361 92 -1
5 1 1 1 72 1 1009 2812 17 9 0 e
5 1 1 1 72 2 1288 2789 134 34 32 ee
5 1 1 1 72 3 1459 2774 57 74 52 a
5 1 1 1 72 4 1533 2773 44 45 19 A
5 1 1 1 72 5 1606 2802 13 12 28 }
5 1 1 1 72 6 1631 2787 24 47 0 i
he LN eS N se
: waa ORY i Pe a ta = e%
~ OTS gs SO FESR ie San
\ Tia > ae. ale ‘ RT
eR ee epee ‘
a EERE aN “ er
&X aut 38) ae “\ Me! re en
OU RS Ca |
fn, an 4 oh. I me side NE os
; * \ ARES re Ss ae a es
aa weet” Wa eS TS PS ee ‘
~ aa + z SRR Sa ma, Stee ee
» AR hi he i a ae
. 1) eS of RS ROLY tS SENSE k . :
RM AR 4 oa =
F Ne Br ae P SRS | \ |
“SSS we! ae , y
S we TAR }
Sree a
oo 5 ES Seana Ms a
Se ee aaSection 9
Background
The NCWSIP presents the vision, objectives, strategies and
actions for increasing bike riding and walking in Noosa over
the next 20 years (to 2040). It updates the Noosa Cycling
and Walking Strategy 2004-2016.
The strategy will guide Noosa Council’s (Council) planning,
development and promotion of its bike riding and walking
networks in the future. The plan covers both the active
transport network for those commuting by bike or foot and
connections to the bushland trail network for those wanting
to enjoy the great outdoors.
"It's about getting people
T
AF
out of cars, onto bikes,
onto footpaths and getting
to where we need to go in
R
a safe and enjoyable way."
Councillor Brian Stockwell
D
Strategy alignment
Community feedback and adoption of Council’s strategy
documents, demonstrate a strong agenda for sustainable
transport outcomes, to reduce dependency on private
motor vehicles, and increase bike riding, walking and public
transport use. Increased community participation in bike
riding and walking activities support the objectives of the
following Council strategies.
Figure 1: Supporting strategies
9
Section 10
Community engagement
Council has undertaken considerable community Key survey findings
engagement on bike riding and walking through the
Noosa Transport Strategy and the Noosa Sport and Active
Recreation Plan. Key stakeholders were also involved
in Tourism Noosa’s development of the Noosa Trail
Masterplan. The community feedback received through
these processes were a starting point for the NCWSIP.
Additional engagement with the community was important
in establishing this strategy with representatives from
sporting and bicycle groups, local businesses and the
broader community invited to form a Project Reference The top five barriers identified for bike riding and walking in
Group (PRG). This group guided the direction of the the Shire were:
NCWSIP at key stages of the strategy development.
The strategy was also guided by an internal Council
Project Control Group consisting of Council officers and
T Bike riding barriers Walking barriers
AF
Councillors. • I am concerned about
Background
being hit by a motor
Document
The community were invited to provide feedbackReview
on the • there are no suitable
vehicle
draft NCWSIP between 19 March and 16 April 2021, paths between the
spanning a total of 28 days. Residents were given four • there are no suitable places I would like to go
options on how to submit feedback including an online paths between the
• I am concerned about
survey or community feedback form through the Your Say places I would like to
being hit by a motor
R
Noosa website, email and post. go
vehicle
• I do not feel safe
• I experience no barriers
Overall, 260 people participated in the engagement via the crossing roads
D
following channels: • I do not feel safe
• the routes to where I
crossing roads
would like go are too
hilly • the car is more
convenient.
• the car is more
convenient.
Table 2: Barriers to bike riding and walking
Over 24% of respondents indicated that they experience
no barriers that prevent or deter them from walking for
transport and recreation around Noosa Shire.
The information gathered from this process provided local Respondents supported the direction of the NCWSIP.
insights and helped to identify additional missing links Actions identified by the community to encourage more bike
and route refinements, which have been adopted in the riding and walking across the Shire included:
Implementation Plan. Feedback also defined barriers to
• more off-road paths and bike ways
bike riding and walking, reiterating those already identified
in the NCWSIP. A summary of the 260 responses can be • more separated bike riding paths
found on the NCWSIP page at yoursay.noosa.qld.gov.au • better connections between paths and shops.
10
Section 11
Feedback
'We feel blessed that we live in such a beautiful, natural and accessible
environment but would love to have more bike paths so we could feel safer when
riding our bikes.'
Survey respondent
"Thank You for asking our opinion. I think the area has great facilities, my only
comment is that it is very difficult to cross the roads around Eumundi-Noosa
Road, eg. the Bunnings roundabout or top of Rene Street or near Madills."
Survey respondent
T
AF
R
D
Figure 2: Feedback trends
"There are a lot of really good bike paths in the Noosa area, but often these run
out and put you on the road, or they don't exist where you might want to go."
Survey respondent
"I would really like Council to use rates to develop direct route shared walking/
cycling paths for those of us who do not want to walk or ride on the busy roads."
Survey respondent
11
Section 12
Understanding our community
Who is the strategy for?
The NCWSIP aims to provide bike riding and walking networks that meet the needs of all ages and abilities. There are a variety
of network users in Noosa with specific needs, as identified in Table 2.
• Age and skill levels vary - school children, people with a disability, seniors, parents with prams.
• At higher risk of injury.
• Travel to a variety of destinations such as schools, shopping centres and community facilities.
Vulnerable
• Prefer safe routes that are direct but are also as flat as possible, trip length is usually short.
users
• May require wider paths to accommodate users of mobility scooters, wheelchairs and other
mobility devices.
•
•
T
Likely to require frequent resting locations with seating, shade/shelter and drinking fountains.
Travel for health, fun and relaxation.
AF
Recreational • Prefer to travel along scenic routes with points of interest (eg coastal stretches and hinterland
and tourist trails).
users • Trip length may vary greatly depending on the level of experience of the users.
• Drinking fountains, rest stops and way-finding signage are important for these users.
• Typically travel for fun but may also make utility trips (eg work and shopping trips).
Rollerbladers,
R
• Travel at higher speeds than walkers but slower than cyclists.
scooters and • Most often travel in the late afternoon and on weekends.
skateboarders • Prefer routes that are level and smooth.
D
• Professional athletes, sporting club members and runners/joggers.
• Typically training for sporting events and may train in groups.
Sport users • Usually walk/run/cycle at higher speeds.
• Prefer uncongested routes and potentially those with challenging topography.
• Travel to a variety of destinations such as work, shopping centres and public transport stops.
Commuter/ • Trip length is usually short, typically up to 2km for walkers and under 10km for cyclists.
day to day • Prefer routes that are direct but are also as flat as possible.
users • Routes that provide continuous connections to key destinations are critical.
• Destinations vary from work and shopping centres to public transport stops. These motorised
devices allow users to travel much further distances and address barriers such as topography
Micro-mobility/ and fitness levels.
e-wheeling • Skill levels vary from novice to experienced.
devices • E-scooters can be ridden on the footpath and on local streets. However, they are not to be
ridden on main streets/roads. E-bikes can ride on both.
Table 3: User groups and typical characteristics
12
Section 13
Noosa Shire's demographics and existing travel behaviour
Population
The largest age group
approximately
55,800
of residents is 55-64
years, making up over
1
16% of the population.
residents
40%
of Noosa's
29%
population live in
3
the hinterland
The Noosa hinterland covers 90% of the
of Noosa bike shire.
riders are female Travelling to work The majority of
which is higher than the
Queensland average of 24%
and Australian average of
T trips originate
from the built-up
areas of
AF
25%. More women riding is Tewantin,
one indicator of a safe, <1% 3.4% Noosaville, and
2
active transport network. Noosa Heads.4
How
people 12% of all car
R
trips in Noosa
travel are <2km and
around 10.6% 85.2% 3.9% 20% are <4km. 5
Noosa
D
6
Why we travel around Noosa Where residents
24.7% Shopping 9% Education bike ride and walk
18% Running Walking, running/jogging,
23.2% Work
errands bushwalking and bike riding
all fall into the top 10
24.8% Recreation 0.4% Other
recreation activities
8
for
Queenslanders.
Average time spent
travelling by mode 7
23 min 22 min 36 min
Source: (1) .idcommunity 2019, Community Profile: Noosa Shire Council Area, 2019, Regional Development Australia Sunshine Coast Region, viewed 8 February 2021, < https://profile.id.com.au/rda-
sunshine-coast/about?WebID=100>.
(2) Bicycle Network 2019, Super Tuesday Bike Count 2019, Bicycle Network, Melbourne, Vic
(3) Australian Bureau of Statistics, Data Source 2016, Australian Bureau of Statistics, A.C.T., <https://www.abs.gov.au/>.
(4, 5, 6, 7) Department of Transport and Main Roads 2018, Queensland Household Travel Survey, 2018, Queensland Government, Brisbane, Qld
(8) Hinds, A, Gordon, J & Crouch, L 2016, Queensland Sport, Exercise and Recreation Survey Adults 2015, Department of National Parks, Sport and Racing, Brisbane, QLD
13
Section 14
Benefits for our community
of Noosa's
30%
Reduced traffic congestion
and parking issues carbon
Using active travel can help achieve emissions are
1
Noosa's transport strategy vision where from vehicles
Noosa Shire enjoys an efficient, free Walking and bike riding are a net zero emissions
flowing, innovative transport system activity. Simply replacing one 10km car trip per
that enhances resident and visitor week could save between 54kg and 104kg of CO 2
experiences, and results in emissions per year!
sustainable environmental outcomes.
Residents and workers of Noosa
Active travel is great for the
Shire are able to go about their
everyday business without having to environment
be reliant on private vehicles. More people walking and riding
bikes will help to reduce
T
greenhouse gas emissions and
noise pollution, improve air
quality.
AF
Riding to work Building a healthier
Riding to work can help increase your community
productivity and is one of the most time- Residents in Noosa
efficient ways to fit exercise into your
day. A 5km to 10km ride to work will
R
2
only take 15 to 30 minutes on average.
46% 34%
Community
D
Overweight Don't get
or Obese enough
Walking and riding a bike are fun
exercise
and social activities. Getting out
Walking and riding are easy ways
and about by foot or bike helps
to increase your daily exercise and
build a greater sense of community
3 wellbeing, while reducing your risk
and encourages social interaction. 4
of developing a serious illness.
Walking and riding to school
Walking and riding to school can help
develop self-confidence and
independence in children and improve The number of students walking
their levels of physical activity. It also and riding to school has
benefits the community by reducing significantly dropped from 8 in 10
5
peak time congestion. in the 1970s, to only 2 in 10 2020.
Source: (1) Zero Emissions Noosa n.d., Sustainable Transport, Zero Emission Noosa, Qld, viewed 8 February 2021, <https://www.zeroemissionsnoosa.com.au/electric-vehicles>.
(2) Bicycle Network 2019, Ride 2 Work, Bicycle Network, Melbourne, Vic, viewed 6 February 2021, <https://www.bicyclenetwork.com.au/rides-and-events/ride2work/>.
(3) Queensland Government 2017, Queensland Cycling Strategy, Queensland Government, Brisbane, Qld, viewed 6 February 2021, <https://blog.tmr.qld.gov.au/cycling/infographics/>.
(4) Queensland Department of Health 2016, Queensland survey analytics system, (QSAS), Obesity and Physical Activity in Queensland - Noosa LGA detailed data for 2015-16, Queensland
Government, Brisbane, Qld, viewed 8 February 2021, <https://www.data.qld.gov.au/dataset/self-reported-health-status-srhs-survey-series/resource/36fe8213-86c5-43f5-b745-b719108ed793>.
(5) Bicycle Network 2019, Ride 2 School, Bicycle Network, Melbourne, Vic, viewed 8 February 2021, <https://s23705.pcdn.co/wp-content/uploads/2017/12/2017-Ride2School-Infographic->.FA-
nobleed-v01.pdf
14
Section 15
Economic benefits
Events contributing Supporting our local economy
to the local Over the next 10 years construction of new and
upgraded walking and bike riding infrastructure projects
economy
are estimated at
$22.68m
Noosa's cycling events
including major events such
as the Noosa Triathlon,
contribute over $22m per year
to the local economy. 1
40%
of visitors to Noosa
T
engaged and spent over $1.5m
since 2018 in outdoor/nature based
activities. 2
AF
Cost-effective
You can make a
Riding a bike or walking around
town is a great way to save difference
money.
If bikes and e-bikes became
The cost of buying and maintaining
22% of all transport trips in all
R
a bike is around 1% of the cost of
3 cities worldwide, greenhouse
buying and maintaining a car!
gas emissions and energy use
would be reduced to 47% by
5
2050.
D
Riding your bike 10km to and from work each day, will
save
approximately $1,700
per year in transport costs (including running costs and
4
depreciation).
On average, every $1 spent on cycling
infrastructure returns almost $5 to
Queensland in health benefits, reduced
6
traffic congestion and other benefits.
Source: (1, 2) Tourism Noosa visitation data (Sept 2020)
(3, 4) Department of Transport and Main Roads, 2016, Queensland Cycle Infrastructure Investment Strategy 2016-26 and Business Case, Queensland Government, Brisbane, QLD, viewed 8
February 2021, < https://www.qld.gov.au/transport/public/bicycle-riding/benefits-of-riding>.
(5) Mason, J, Fulton, L & McDonald, Z 2015, A Global High Shift Cycling Scenario, Institute for Transportation & Development Policy, U.S.A,, viewed 8 February 2021, <https://itdpdotorg.wpengine.
com/wp-content/uploads/2015/11/A-Global-High-Shift-Cycling-Scenario_Nov-2015.pdf>.
(6) Department of Transport and Main Roads, Queensland Cycling Strategy, Infographics, Queensland Government, Brisbane, Qld, viewed 8 February 2021, <https://blog.tmr.qld.gov.au/cycling/
infographics/>.
15
Section 16
Opportunities for our community
There are many opportunities to grow the number of bike Increasing participation
riders and walkers in our community.
Around 60% of the population is typically categorised as
Behaviour change “interested but concerned” when it comes to bike riding (refer
to Figure 3). There is a significant opportunity to increase the
A holistic approach is required to get "more people riding a number of people that may ride their bike if the issues that
bike and walking for health, transport and tourism". Provision concern them can be addressed. One of the primary concerns
of infrastructure can be supported by interventions which identified is fear of traffic and mixing with motor vehicles. The
"nudge" people to change their behaviour. There is no single NCWSIP aims to address the concerns of these potential bike
solution that will shift bike riding behaviour or encourage riders.
people to walk, rather a series of targeted initiatives such as
building bike riding skills and confidence, shifting the negative Based on Queensland research, the most significant
connotations surrounding Lycra-clad road cyclists, and opportunity to encourage bike riding is to promote recreation
investing in infrastructure and policy development.
Programs which aim to nudge travel behaviour can provide
T or commuting trips, and to provide safe and comfortable
infrastructure which is separated from traffic.
AF
high benefits compared to the cost of expensive infrastructure.
Activities which encourage and promote people walking and
riding a bike have been found to make a difference to mode
shift away from the car in many locations. Non-infrastructure
solutions targeting behaviour change and education can
complement the proposed infrastructure solutions in Noosa.
R
Four essentials of an active travel friendly
community 2
Figure 4: Community attitudes to cycling
D
Encouraging more people to bike ride and walk across the
Shire requires four key components to ensure lasting change.
Go Noosa, Top: Noosaville State School students participate in cycle skills sessions
1
Figure 3: Key criteria for lasting change Bottom: St Teresa's Catholic College students participate in bike maintenance
workshops
Source: (1) Department of Transport and Main Roads 2018, Bicycle riding encouragement guide, 2018, Queensland Government, Brisbane, QLD
(2) Gellar, R 2006, Four Types of Cyclists, Portland Bureau of Transportation, Portland, Oregon
16
Section 17
E-bikes and e-scooters Short walking and bike riding trips
The emergence of new technologies and devices make Our compact village centres make walking and cycling trips a
active travel more attractive to a wider proportion of the viable choice. Cycling 5kms is an easy 20 minute ride, whilst
community. E-bikes and e-scooters can address barriers such walking 400m to the local shop only takes five minutes. Our
as topography, ability and distance. Share schemes have the hinterland townships are also at a scale suitable for walking
potential to increase user participation of e-mobility modes, and riding bikes. Figure 4 illustrates the typically adopted active
with improvements in technology now available to address transport catchments for walking and cycling trips.
issues with dockless models and helmets.
Tourism and events
Many visitors already come to Noosa to enjoy its natural assets
and participate in walk and cycle related events, as do the
local residents. We can encourage more people to participate
and encourage tourists to cycle and walk more from their
accommodation.
Climate
T
AF
Our warm temperate climate makes it comfortable for walking
and cycling in winter and at night. Providing shade and lighting
on our pathways can make it even more attractive. Provision
of appropriate native canopy trees along our paths and streets
can reduce the heat island effect linked to climate change.
R
D
1
Figure 5: Active transport catchments for walking and bike riding trips
Source: (1) City of Ipswich 2016, iGO Active Transport Action Plan: Summary Report, City of Ipswich, Ipswich, Qld
17
Section 18
Challenges for our community
Barriers to walking Barriers to bike riding
Addressing barriers to walking can ensure more people feel It is important to understand the barriers that people
safe and enticed to walk more. The Queensland Walking considering riding may face. Some barriers may be universal,
Strategy identified the following key barriers: others may be local to the Noosa community. Common
barriers to encouraging more people to bike ride are:
Actions that would
Personal barriers Access and ability Safety and personal
encourage walking
• lack of pedestrian • safe pedestrian
crossings or underpasses crossings and
on busy roads in high underpasses in key
•
visitation locations
not feeling safe when •
locations
smooth and even-
T •
•
don’t have a bike
no bike accessories
•
•
fear of traffic
fear of hostility
AF
walking alone surfaced paths • limited access to paths
• intimidated by cyclists
• rely on car before, during • more connected paths • bike security issues
• risk of embarrassment
or after work • greater separation from • need to carry things
• too much effort
• weather not suitable, lack traffic • travel distance
of shade • not confident enough
• more shade along • weather conditions
• prefer/habit of using other routes • no one to ride with
R
• hilly topography
transport modes • more seating and • it’s for ‘other’ people
• lack of personal fitness
• not enough time places to stop and rest • just don’t think about it.
• lack of bike riding skills.
• have physical or mental • more walking trails
D
conditions that prevent in natural areas near
walking. home.
1
Table 4: Barriers to walking Table 5: Barriers to bike riding 2
Source: (1) Department of Transport and Main Roads 2019, Market Facts, 2019: Queensland Walking Survey analysis report summary), Queensland Government, Brisbane, Qld
(2) Department of Transport and Main Roads 2018, Bicycle riding encouragement guide, 2018, Queensland Government, Brisbane, Qld
18
Section 19
Existing bike riding and walking infrastructure
We want to build on our existing bike riding and walking paths to create a
connected and safe network.
240km
of sealed pathways
153km dedicated on-road
cycle routes
Most of the existing network is in the urbanised coastal
area. Our hinterland network is predominantly located in
T
and around the townships.
160km
AF
of recreational trails
Walking and riding trails are provided for users of
all abilities and vary from a 1km easy walk/ride,
R
to a 62km circuit which includes a 22km long
section of steep climbs and descents.
914m
D
Off-road
recreational
criterium cycling track
facilities
The dedicated cycling track provides
Including a BMX track at Cooroy, Persimmon
users with safe recreation and training
Park, Peregian Beach, Sunshine Beach and
opportunities at the Girraween Sports
Tewantin skateparks, and Wooroi mountain
Complex in Noosa Heads.
bike trails.
Existing walking paths Existing cycling routes
<1.2m 1.2m to >2.5m Informal Formal
>2.5m wide
wide 2.5m wide wide on-road cycle
shared path
provisions lanes
32% 49% 19% 32% 49% 19%
19
Section 20
20
D
R
AF
T
. PION ks y , | ves
« 2 sh SAEs d = », | / . mn = r | \
‘ yp | f aw Me
| eee ea : )
| al oy : ys \N 3 a
—_ ap ’ a Re
| ) t\ o/h |
\ Ny 7 \ 3 We
— y b 7 a? > : z )
| ) a | ~~ } =n
= ae
) ) yay} oo re, di
7 a .
li aa A
| WHY
ns
| J * P . b = “a
| | ><
a
“ F — ‘
We
! o
SeSection 21
Delivering the strategy
Actions
Delivering better connected and higher quality bike riding and walking networks can result in significant and broad-ranging
benefits for the community.
The following actions have been identified to support the vision and objectives (outlined on page 7):
Deliver and maintain a safe and connected network
Addressing Objectives 1, 2, 3, 7 and 8
The provision of a safe and connected bike riding and walking network is the top priority for Council to
Action 1 increase bike riding and walking participation in Noosa. This includes completing missing links in the
network with a focus on recreation, education and commuter trips, and providing connections to the Noosa
trail network, mountain biking tracks, and competitive cycling opportunities.
Action 2
Provide supporting facilities
T
Addressing Objectives 1, 3, 4 and 7
AF
Our walking and bike riding networks need to be attractive and comfortable to encourage more users.
Providing supporting facilities such as way-finding signage, shade, shelter, bicycle parking, drinking
fountains and seating allow for an enjoyable and convenient trip.
Encourage increased participation
Addressing Objectives 4, 5, 6, 7 and 8
Action 3 The delivery of travel behaviour change and education programs can be a cost-effective and proven
R
method of inducing more people to walk and ride bikes. Targeted programs can encourage people to
walk and ride more often for more trip purposes, particularly when improved infrastructure is provided.
D
Plan for walk and cycle friendly communities
Addressing Objectives 1, 2, 3 and 8
Action 4 Active transport planning needs to be integrated into all levels of planning and delivery within Council and
in planning new developments to achieve the NCWSIP vision and objectives.
Embrace emerging technologies
Addressing Objectives 3 and 4
Action 5 There are emerging technologies and devices such as electric micro-mobility devices (e-bikes, e-scooter,
e-skateboards etc.) that are making a difference to how people use active transport. These environmentally
friendly technologies can make them attractive to more diverse community groups.
Table 6: Actions
21
Section 22
Key non-infrastructure and further planning tasks supporting each action and the time frames in which each task is to be
completed are outlined below.
Action 1. Deliver and maintain a safe and connected network
Short Medium
In
Task Term Term Ongoing
progress
(by 2026) (by 2031)
1.1 Implement the prioritised bike riding and walking network plans
developed as part of the NCWSIP. ✓ ✓
1.2 Develop a detailed Trails Masterplan and Implementation Plan
✓
that expands on Tourism Noosa's Noosa Trail Masterplan 2020. A
coast to hinterland trail will be investigated as part of this plan. The
master plan will identify upgrades to existing trails, potential new
trails and an implementation plan.
1.3 Identify priority locations for the construction of safe pedestrian
and bike crossings for all abilities, including bridges and
T ✓
AF
underpasses.
1.4 Investigate new and innovative safe design solutions for
pedestrian/ cyclist priority crossings at intersections (eg raised
priority pedestrian /cycle crossing, roundabout treatments), and pilot
treatments which are safe and meet Noosa design principles.
✓
R
1.5 Continue to review and improve bike riding and walking asset
✓ ✓
management systems and programs by working closely with
the community and promoting community members to report
maintenance issues to Council that enables maintenance issues to
D
be quickly resolved.
1.6 Work with and seek funding from TMR and other agencies to
deliver projects identified as part of the NCWSIP, as well as Priority
Cycle Network (PCN) projects. Relevant NCWSIP outcomes are to
be provided to TMR for inclusion in their network planning.
✓ ✓
✓
1.7 As part of the broader Transport Strategy implementation,
investigate additional funding, including new revenue streams, to
increase Council spend on delivering the NCWSIP.
Table 7: Action 1. Deliver and maintain a safe and connected network
22
Section 23
Action 2. Provide supporting facilities
Short Medium
In
Task Term (by Term (by Ongoing
progress
2026) 2031)
2.1 Implement a prioritised program for the installation of new bicycle
parking racks at key destinations. Key destinations include community
facilities, recreation hubs, tourist attractors and major, district, local and
neighbourhood Centres.
✓ ✓
2.2 In conjunction with the recreation strategy, investigate and identify
multiple use sites (sports grounds, schools, parks and playgrounds)
✓ ✓
suitable for development of beginner and novice cycling infrastructure.
Infrastructure may include learn to ride facilities, closed circuit loops,
skills parks and pump tracks.
Seek external funding for delivery of these works through avenues such
as the State Government's Activate program.
2.3 Investigate opportunities to enhance or add end-of-trip facilities
in key centres and tourist hubs. Implement a prioritised program for
upgrading of existing public facilities (eg public toilets with showers)
and the construction of new end-of-trip facilities, including electric
T ✓
AF
charging stations. Investigate opportunities to partner or incentivise
private sector to develop end-of-trip facilities for their workforce at key
locations.
2.4 To contribute to reaching Council's Zero Emissions Target, audit
existing end-of-trip facilities at Council workplaces and provide or
improve facilities where appropriate. Facilities could include bike ✓
R
parking, showers, lockers, irons/ironing boards etc.
2.5 Investigate high demand routes and other locations (eg
intersections) where further lighting would be beneficial, and develop
✓ ✓
D
a lighting improvement program that identifies priorities based on
nighttime demand, personal safety and road safety.
2.6 Identify and provide mid-journey facility (eg drinking fountains and
rest areas) requirements for each bike riding/walking route hierarchy
category in keeping with Noosa design principles. Facilities should be
provided as part of all new bike riding and walking projects.
✓ ✓
✓ ✓
2.7 Prepare and implement way-finding signage plans for new bike
riding and walking routes in accordance with the Noosa Signage Guide.
Way-finding on existing routes to be audited and updated as required.
2.8 Assess shade/shelter coverage along key routes and prioritise
✓ ✓
works to improve user comfort by increasing shade/shelter to reduce
impact of heat. Utilise native species which provide ample canopy tree
coverage of paths and streets, whilst retaining sufficient space for safe
pedestrian thoroughfare.
✓
2.9 In conjunction with the Trails Masterplan and Implementation Plan,
identify and schedule end-of- trip facility requirements (eg toilets,
lockers, trail maps and drinking fountains) for trail hubs.
Table 8: Action 2. Provide supporting facilities
23
Section 24
Action 3. Encourage increased participation
Short Medium
In
Task Term (by Term (by Ongoing
progress
2026) 2031)
3.1 *Investigate and deliver best-practice travel behaviour change programs to
key target markets. ✓ ✓
3.2 *Continue to deliver Walk and Ride to School programs (as per the Noosa
Transport Strategy) to help foster a bike riding and walking culture. ✓ ✓
3.3 *Leverage existing events such as National Walk2School Day, Ride2School
Day, Bike Week and 10,000 Steps program to deliver semi-structured
promotion to all schools. This could also include targeted provision of secure
bicycle parking and/or end-of-trip facilities.
✓ ✓
3.4 *Work with Noosa Tourism to promote:
✓ ✓
• Bike riding and walking as the preferred mode of travel around Noosa for
•
visitors.
T
Nature based and adventure tourism on the trail network (in conjunction
AF
with the Bushland Trail Network Development Plan).
3.5 *Work with local groups (eg weekend recreational bike riding groups,
✓ ✓
women’s groups, Heart Foundation Walking Groups, parkrun, bike retailers) to
promote and encourage walking and bike riding including developing a program
of events with activities such as bike buddy programs, cycle recycle days or
R
bike swaps, community challenges, e-bike/e-scooter trials.
✓ ✓
3.6 *Leverage existing bike riding and walking events, and attract additional
ones to promote increased participation. Engage with state, national and
D
international events which will help promote nature-based tourism in Noosa.
✓ ✓
3.7 *Implement a Ride to Work program for Council staff and encourage other
employers or business associations to implement their own programs, such as,
bike buddies.
3.8 *Promote and market new infrastructure projects to ensure the benefits of
investments are realised and become popular travel choices for the community. ✓ ✓
✓ ✓
3.9 *Deliver training workshops to encourage people to ride a bike (eg bike
maintenance workshops, women over 50 rides, women only riding workshops,
community rides, introduction to e-bikes and e-scooters programs).
3.10 *Promote the importance of bike riding and walking in reducing transport
greenhouse gas emissions. ✓ ✓
*Tasks to be delivered in conjunction with the Noosa Transport Strategy
Table 9: Action 3. Encourage increased participation
24
Section 25
Action 4. Plan for riding and walking friendly communities
Short Medium
In
Task Term (by Term (by Ongoing
progress
2026) 2031)
✓ ✓
4.1 Ensure bike riding and walking infrastructure are designed to meet
industry standards, reflect Noosa Design principles and the Noosa
Plan 2020 requirements, including access for all abilities.
✓ ✓
4.2 Ensure new developments meet the provisions of the Noosa Plan
2020 that promote best practice active transport principles to increase
the number of walking and bike riding friendly developments.
4.3 Ensure end-of-trip facility requirements identified in the Noosa Plan
and NCWSIP are up to date (eg investigate potential for commercial
and residential buildings to include charging stations for private
e-scooters and e-bikes).
✓ ✓
4.4 Ensure on and off-road bike riding and walking infrastructure (eg
on-road cycle lanes, shared paths, footpaths) is incorporated into all
T ✓ ✓
AF
Council projects and maintenance routines where relevant.
✓
4.5 Update the Noosa Plan 2020 to incorporate NCWSIP active
transport network plan overlays and use the NCWSIP to inform
preparation of the Local Government Infrastructure Plan (LGIP).
R
Table 10: Action 4. Plan for riding and walking friendly communities
D
Visual representation of a cycle street
25
Section 26
Action 5. Embrace Emerging Technologies
Short Medium
In
Task Term (by Term (by Ongoing
progress
2026) 2031)
5.1 Develop policy position on shared e-scooters and other e-wheeling
devices that takes into account:
• user safety (eg increased potential for conflict on shared paths,
✓
high speed differential between e-scooter riders and walkers)
• potential to achieve mode shifts away from private cars
• legislation requirements (eg speed limits, minimum age
requirements, suitable riding locations)
• land required to accommodate supporting facilities (eg charging
stations).
5.2 Investigate the role of a Noosa e-bike sharing scheme, considering
T
issues such as:
• partnering with local supplier
✓
• docking arrangements (eg docking stations vs. dock-less bikes)
AF
• charging options
• regular safety/maintenance checks
• visitor awareness of mandatory helmet requirements
• the potential to achieve mode shift away from the private car.
Subject to the outcomes of initial investigations, commence a trial(s).
R
✓ ✓
5.3 Continue to invest in the ‘Go Noosa’ app to encourage bike riding
and walking. The network routes, bicycle hire, trail hubs, end-of-trip
facilities and mid-trip facilities could also be incorporated.
D
Table11: Action 5. Embrace emerging technologies
26
Section 27
D
R
AF
T
27
Sy > <a a — a - ee ne
Z —” —ee e ee : 4
P — ee Fe —— - aa a oe
oe - -
= a er
~ = ee - —— ae . ;
f z a a ee al aia
cc — ey
= . = —— \ —
ee
ars = a _— a bs
R, V4 j _ aa ——- =— = —
*) —— at — : on cart" se a
t , ir = —_ — SS ' ‘ am
; = ——_ — -
| ; a i
; q — ——— ee : * pa
; Vi ; } - | — SS “1 a
a , x ey a = a ca a ——— — —
, | y —— = ——S=2.e .
. xh & me nd Fy i = SS —
my AROS Se Hivd)) 7 a
\ i 2 . ‘ af . an at ——— = — ———
h tise a oh ae Fie ‘ee a fi See
A “ia ap ' Shae / : ee i
f 4 J . . : ? —- ———= fit ri
a ‘Yi iy - 77 - ——— 4) i
x a4 \ ire 7 a
«a a { 7 7 7 -A
Zs TA BCU _ < |
ton. Bs 5 TA} 1 AS
BP: ae 9, 4 . £
les SE Ty tr oo
SU ROU Scien | we {
eS “es i cl 7” ’
SUER a 7. ar |
7% j , es iy b a , > i i _—
. r) AN vat) t i . i| \\\ ‘ TT *
5 <= : _ ri ‘ » - Hk v) = weer A ;
ost Cs Sala | S <r ae
. Pie P Pe - - a. : é
. a I %. —= a ~ > = r
3 Va Se > 8 Oe ERB | .
a* .: R ae ~ a a = 4. * re 5": . : ; ;
ar ee petal Oy . ‘a. ~ ———— t : * % ’
ig Se i ae i ae A 5: ” & oo: : f
at Sy ¢ wi ’ j , er % - Soar ‘7 eo “ r ; ory , . . ~ a : ;
s Le Li ey ee ® i 2 ee A ‘ r" P ae “ p : 5 1 1 1 48 19 1562 2052 79 22 9 A
5 1 1 1 48 20 1730 2027 20 14 33 =574
5 1 1 1 48 21 1941 2026 7 21 9 1
4 1 1 1 49 0 98 2065 1539 64 -1
5 1 1 1 49 1 98 2086 27 40 6 ss
5 1 1 1 49 2 160 2092 21 33 28 ea
5 1 1 1 49 3 204 2088 13 37 0 L
5 1 1 1 49 4 208 2095 23 24 18 7
5 1 1 1 49 5 538 2082 63 40 14 eos
he? ie oe er - ‘| : c Pal
Sts A) oe = | a AR A aes A - Bi! uy ; i f
i ae Gk eats a Aa 7 |
Dae a QQN Sd Be Ng fe = tate ey.3 , is
Ler i ‘ oy SY . : ol } x cm - Fm »* 4 x /
3) Sacks 4 U } th \ - Bee! Jy. Fae: wa ware 4 ¢ me as . _ , ‘ ,
SONA “A eee ee Ay hg ee, ey 7 t
> ~ es “ays LE eg Sieh” PE Na y aa , } a et a my ‘| i
. ; BS 5 \a } ee He Oe aoe D 4 . J i. a
Kae ‘Rae f. NE A fae ae | She ay fe 4
‘ ~ A ody, e ra) y ” = 2 ae FL em “ , ¥ r > , ’ q
RRA SY PAR Ne ~]I
| 5 2 (~ hare aS wa ye qe tee 7 a, >
ee MSGS ce Aka ae ?
re ax 2° et So ra es \ 5 gure ~ iF uy)
“ PBL he a oe 5 4 Pkt ee Sk / ae,
4 oy, ty fan : ye ard \ : 1 x te a ag
| “> . > i r Ps 4 ety 5 L 5 1 1 1 66 13 1388 2624 23 29 26 be
5 1 1 1 66 14 1470 2622 18 35 41 te
5 1 1 1 66 15 1493 2626 10 27 6 \
5 1 1 1 66 16 1580 2634 19 17 40 we
5 1 1 1 66 17 1656 2616 19 21 10 Sy
5 1 1 1 66 18 1811 2617 20 21 36 *
4 1 1 1 67 0 142 2639 1696 56 -1
5 1 1 1 67 1 142 2664 6 10 24 7
5 1 1 1 67 2 222 2668 32 27 63 Jar’
5 1 1 1 67 3 586 2658 18 11 20 Oy
5 1 1 1 67 4 658 2674 7 17 0 -
5 1 1 1 67 5 697 2648 67 47 43 Sales
5 1 1 1 67 6 832 2659 50 14 44 eB
5 1 1 1 67 7 957 2659 28 27 0 Y
5 1 1 1 67 8 1068 2657 9 9 22 a
5 1 1 1 67 9 1191 2654 48 25 76 os
5 1 1 1 67 10 1288 2645 25 34 0 K
5 1 1 1 67 11 1352 2639 54 46 47 Hoy
5 1 1 1 67 12 1500 2638 26 38 23 an
5 1 1 1 67 13 1644 2649 5 18 26 q
5 1 1 1 67 14 1700 2661 3 5 32 i
5 1 1 1 67 15 1810 2650 28 9 41 ms
4 1 1 1 68 0 1 2738 2275 99 -1
5 1 1 1 68 1 1 2787 123 36 31 TOME
5 1 1 1 68 2 151 2780 214 45 13 MOIR
5 1 1 1 68 3 627 2740 95 84 13 oe
5 1 1 1 68 4 735 2758 124 79 20 pe
5 1 1 1 68 5 909 2766 163 49 20 aie:
5 1 1 1 68 6 1087 2738 607 75 0 Ee
5 1 1 1 68 7 2269 2791 7 7 76 |
4 1 1 1 69 0 97 2789 1768 63 -1
5 1 1 1 69 1 97 2828 26 22 23 on
5 1 1 1 69 2 217 2834 8 13 0 “
5 1 1 1 69 3 318 2845 5 3 0 :
5 1 1 1 69 4 472 2796 29 48 27 ie
5 1 1 1 69 5 581 2823 61 13 25 ra
5 1 1 1 69 6 678 2795 77 54 26 Biot
5 1 1 1 69 7 752 2789 57 63 44 ny
5 1 1 1 69 8 913 2812 21 21 26 Oe
5 1 1 1 69 9 962 2807 16 25 0 S
5 1 1 1 69 10 987 2794 96 48 17 “ec.
5 1 1 1 69 11 1117 2809 4 9 91 \
5 1 1 1 69 12 1158 2794 25 35 23 x
5 1 1 1 69 13 1207 2805 19 37 36 SS
5 1 1 1 69 14 1246 2819 38 19 5 vol
5 1 1 1 69 15 1389 2789 12 44 37 NM
5 1 1 1 69 16 1442 2812 3 13 45 ;
5 1 1 1 69 17 1547 2815 6 6 31 A
5 1 1 1 69 18 1634 2802 40 19 51 Wy.
5 1 1 1 69 19 1781 2810 24 19 26 a
5 1 1 1 69 20 1820 2796 19 27 24 2
5 1 1 1 69 21 1852 2795 13 29 50 ad
4 1 1 1 70 0 72 2812 2127 99 -1
5 1 1 1 70 1 72 2873 7 8 0 .
5 1 1 1 70 2 85 2835 99 76 40 wait.
5 1 1 1 70 3 248 2841 12 27 0 r
5 1 1 1 70 4 323 2846 22 29 28 ‘e's
5 1 1 1 70 5 511 2857 3 7 9 ,
5 1 1 1 70 6 565 2840 50 47 33 ve
5 1 1 1 70 7 734 2838 68 37 7 oe
5 1 1 1 70 8 908 2826 36 49 43 1
5 1 1 1 70 9 1004 2834 71 30 6 Sh)
5 1 1 1 70 10 1079 2837 66 33 26 a
5 1 1 1 70 11 1292 2812 53 54 33 Ra
5 1 1 1 70 12 1409 2835 30 18 0 _
5 1 1 1 70 13 1532 2812 44 82 31 io
5 1 1 1 70 14 1709 2843 6 6 47 oe
5 1 1 1 70 15 1837 2835 7 7 0 ,
5 1 1 1 70 16 2186 2834 13 21 59 >
4 1 1 1 71 0 42 2816 2118 128 -1
5 1 1 1 71 1 42 2884 230 47 22 DM
5 1 1 1 71 2 427 2871 265 73 32 se
5 1 1 1 71 3 768 2866 200 73 6 Se,
5 1 1 1 71 4 1001 2865 485 53 20 ca
5 1 1 1 71 5 2139 2816 21 92 0 :
4 1 1 1 72 0 57 2892 1819 105 -1
5 1 1 1 72 1 57 2941 12 42 47 r
5 1 1 1 72 2 154 2892 187 97 50 ECS,
5 1 1 1 72 3 364 2926 39 71 38 4
5 1 1 1 72 4 429 2925 16 46 17 a
5 1 1 1 72 5 521 2933 66 48 35 i!
5 1 1 1 72 6 597 2941 55 42 61 ny
5 1 1 1 72 7 696 2945 31 9 19 iy)
5 1 1 1 72 8 761 2924 55 46 11 (ra)
5 1 1 1 72 9 831 2926 29 42 26 a
5 1 1 1 72 10 878 2940 122 34 43 we
5 1 1 1 72 11 1227 2931 55 26 10 ‘vail
5 1 1 1 72 12 1344 2935 20 33 0 t
5 1 1 1 72 13 1429 2927 82 33 6 ae
5 1 1 1 72 14 1650 2937 15 18 32 7
5 1 1 1 72 15 1832 2929 44 32 2 .
4 1 1 1 73 0 18 2960 2336 122 -1
5 1 1 1 73 1 18 2996 104 86 0 Lae
5 1 1 1 73 2 241 2968 431 93 0 ORI
5 1 1 1 73 3 691 2962 241 81 9 oF)
5 1 1 1 73 4 958 2968 114 93 24 Sc
5 1 1 1 73 5 1118 2975 177 70 0 oe
5 1 1 1 73 6 1334 2974 41 30 23 ai
5 1 1 1 73 7 1408 2986 121 9 8 eat
5 1 1 1 73 8 2346 2964 8 8 22 :
4 1 1 1 74 0 9 3015 2348 104 -1
5 1 1 1 74 1 9 3047 104 72 32 TY
5 1 1 1 74 2 181 3036 93 62 51 ate
5 1 1 1 74 3 370 3017 309 87 5 RS
5 1 1 1 74 4 698 3036 62 51 30 AR)
5 1 1 1 74 5 801 3036 87 49 10 5.
5 1 1 1 74 6 1010 3015 642 72 29 eae
5 1 1 1 74 7 1433 3011 56 112 28 oe
5 1 1 1 74 8 1489 3015 163 72 34 ee
5 1 1 1 74 9 1729 3023 9 8 51 |
5 1 1 1 74 10 1935 3058 2 2 0 .
5 1 1 1 74 11 2352 3059 5 3 70 |
4 1 1 1 75 0 37 3052 2255 127 -1
5 1 1 1 75 1 138 3089 107 56 32 ie
5 1 1 1 75 2 387 3075 178 74 17 ENE
5 1 1 1 75 3 789 3071 131 72 10 es,
5 1 1 1 75 4 1315 3052 300 127 12 oa
5 1 1 1 75 5 1642 3092 10 14 0 ,
5 1 1 1 75 6 2260 3052 32 51 7 oe
4 1 1 1 76 0 36 3117 1291 68 -1
5 1 1 1 76 1 36 3153 13 17 10 6
5 1 1 1 76 2 61 3137 35 48 34 hy
5 1 1 1 76 3 195 3150 3 4 37 ;
5 1 1 1 76 4 252 3142 29 28 33 NF
5 1 1 1 76 5 445 3128 13 50 45 te
5 1 1 1 76 6 621 3122 24 37 40 mr
5 1 1 1 76 7 833 3132 30 6 38 we
5 1 1 1 76 8 962 3160 7 4 0 -
5 1 1 1 76 9 1003 3117 121 45 26 Seed
5 1 1 1 76 10 1178 3142 14 17 30 ‘
5 1 1 1 76 11 1236 3134 25 32 20 a
5 1 1 1 76 12 1281 3114 29 56 28 ee
4 1 1 1 77 0 14 3097 2257 131 -1
5 1 1 1 77 1 14 3178 97 36 0 Se
5 1 1 1 77 2 141 3169 32 63 3 .
5 1 1 1 77 3 199 3182 111 44 40 Pe
5 1 1 1 77 4 313 3173 234 55 17 aes,
5 1 1 1 77 5 682 3133 95 91 36 Cat
5 1 1 1 77 6 929 3171 43 32 27 bh
5 1 1 1 77 7 1003 3162 121 36 13 SF
5 1 1 1 77 8 1202 3136 147 63 16 ere
5 1 1 1 77 9 1525 3097 76 112 24 A
5 1 1 1 77 10 1830 3128 21 54 34 j
4 1 1 1 78 0 23 3181 2359 97 -1
5 1 1 1 78 1 23 3210 133 49 33 Nt
5 1 1 1 78 2 227 3223 78 55 30 May
5 1 1 1 78 3 542 3208 137 45 43 SEY
5 1 1 1 78 4 715 3208 94 56 22 >,
5 1 1 1 78 5 853 3208 2 4 24 Gk
5 1 1 1 78 6 921 3206 58 44 0 Arena
5 1 1 1 78 7 1069 3205 3 2 37 ies
5 1 1 1 78 8 1271 3186 169 45 21 aes
5 1 1 1 78 9 1458 3181 90 80 23 ey
5 1 1 1 78 10 2095 3187 15 42 0
;
<a ’ ’ i _ ar a6 ; .
ye art ‘ ‘ y ’ 4 e § q ei ye ee PP he ‘ 7 4 1 1 1 81 0 3 3294 1693 43 -1
5 1 1 1 81 1 3 3296 28 40 0 *'
5 1 1 1 81 2 56 3296 44 40 37 aap
5 1 1 1 81 3 211 3319 8 14 83 4
5 1 1 1 81 4 448 3305 7 11 27 ¢
5 1 1 1 81 5 521 3294 43 43 0 M+,
5 1 1 1 81 6 661 3308 30 16 23 7
5 1 1 1 81 7 853 3295 115 25 14 Me
5 1 1 1 81 8 1054 3301 4 7 6 ’
5 1 1 1 81 9 1343 3295 127 27 12 ae.
5 1 1 1 81 10 1555 3296 28 20 0 *,
4 1 1 1 82 0 49 3279 2191 107 -1
5 1 1 1 82 1 49 3336 100 30 48 UR
5 1 1 1 82 2 429 3321 98 46 12 Ame
5 1 1 1 82 3 618 3317 125 53 22 BA
5 1 1 1 82 4 764 3300 84 86 23 pak
5 1 1 1 82 5 897 3309 96 49 42 “ge
5 1 1 1 82 6 1034 3321 36 42 28 ey
5 1 1 1 82 7 1359 3317 199 42 11 i
5 1 1 1 82 8 2103 3279 137 59 44 ie
4 1 1 1 83 0 128 3331 2185 95 -1
5 1 1 1 83 1 128 3368 21 58 59 5
5 1 1 1 83 2 284 3387 20 20 8 Oe
5 1 1 1 83 3 352 3376 11 17 18 +
5 1 1 1 83 4 386 3386 19 13 35 hs
5 1 1 1 83 5 457 3394 28 9 5 >a
5 1 1 1 83 6 488 3371 20 40 0 iM
5 1 1 1 83 7 532 3375 35 39 15 Pia
5 1 1 1 83 8 606 3376 8 7 44 3
5 1 1 1 83 9 629 3373 49 34 0 o.)
5 1 1 1 83 10 696 3374 23 27 5 *
5 1 1 1 83 11 777 3345 44 65 44 led
5 1 1 1 83 12 881 3369 20 41 42 ry
5 1 1 1 83 13 900 3392 7 12 43 i
5 1 1 1 83 14 971 3361 22 34 28 oN
5 1 1 1 83 15 1025 3354 58 25 25 Py
5 1 1 1 83 16 1370 3352 38 49 31 Ne
5 1 1 1 83 17 1430 3331 18 69 20 be
5 1 1 1 83 18 1558 3370 14 20 45 >
5 1 1 1 83 19 1796 3352 2 4 49 '
5 1 1 1 83 20 2288 3343 25 21 57 »
4 1 1 1 84 0 11 3377 2267 103 -1
5 1 1 1 84 1 11 3411 234 64 23 eK
5 1 1 1 84 2 671 3396 170 59 13 UNS
5 1 1 1 84 3 858 3401 113 42 16 aC
5 1 1 1 84 4 1040 3396 83 53 34 aaa
5 1 1 1 84 5 1361 3377 270 103 0 BORE}
5 1 1 1 84 6 2272 3377 55 37 17 ve
4 1 1 1 85 0 38 3416 2225 64 -1
5 1 1 1 85 1 38 3471 18 9 27 ‘4
5 1 1 1 85 2 123 3470 9 7 53 ‘
5 1 1 1 85 3 272 3458 5 7 3 .
5 1 1 1 85 4 296 3445 123 23 0 Sry
5 1 1 1 85 5 528 3446 28 34 45 LS
5 1 1 1 85 6 723 3445 7 9 27 ins
5 1 1 1 85 7 748 3443 14 14 0 T
5 1 1 1 85 8 822 3445 90 19 5 eT
5 1 1 1 85 9 929 3438 35 9 38 he,
5 1 1 1 85 10 1054 3443 27 27 43 Noy
5 1 1 1 85 11 1132 3454 12 13 51 ie
5 1 1 1 85 12 1215 3439 56 31 10 og
5 1 1 1 85 13 1424 3433 88 19 32 ne,
5 1 1 1 85 14 1613 3435 53 32 26 (0
5 1 1 1 85 15 1681 3432 48 23 7 a
5 1 1 1 85 16 2235 3416 28 35 22 is
4 1 1 1 86 0 9 3420 2323 88 -1
5 1 1 1 86 1 9 3478 76 30 27 Poe.
5 1 1 1 86 2 215 3479 34 29 0 BS
5 1 1 1 86 3 268 3483 169 25 5 Sas
5 1 1 1 86 4 480 3416 93 92 29 ROS
5 1 1 1 86 5 633 3416 93 92 9 eae
5 1 1 1 86 6 899 3484 7 9 10 aie
5 1 1 1 86 7 1089 3469 272 39 19 Eng
5 1 1 1 86 8 1377 3420 340 88 9 SYS
5 1 1 1 86 9 2123 3438 209 70 18 VRSection 28
Planning the bike riding and walking network
Network planning Hierarchy Description/ Function
The bike riding and walking network plans provide the Principal transport
“blueprints” to identify how routes across Noosa are Routes connecting higher order destinations such
intended to function and link together. These plans have as town centres, employment hubs, public transport,
been developed considering: major sport and recreation facilities, major tourist
• Key characteristics of typical bike riding and walking attractors and adjacent local government areas.
user groups, including vulnerable, families, commuters Asset management plan hierarchy level 1.
and recreation/sports users. Principal recreation
• Distances people are typically willing to walk to reach Scenic, high quality recreation routes of regional
certain types of destinations. For example, up to significance such as along the Noosa River route and
~400m to access local facilities and up to ~1,200m to the coastal pathway.
access regional facilities and the time it takes people
to cycle a typical trip distance (e.g. 2km: ~6mins, 3km:
~9mins, 5km: ~15mins). These travel times could be
T Asset management plan hierarchy level 1.
Secondary transport
Routes connecting lower order destinations such as
AF
vastly improved if using an e-bike, which results in local centres, schools, district sport and recreation
larger areas being potentially accessible by bike. parks.
• Improving access to the 16 centres identified in Noosa Asset management plan hierarchy level 2.
Plan 2020 including Noosa Junction, Cooroy, Tewantin
and Pomona, as well as other major attractors such
Secondary recreation
as sport and recreation facilities, community facilities, Longer distance routes targeted at confident/sports
R
schools and tourist destinations. cyclists for training and recreation.
• Achieving the bike riding and walking related Asset management plan hierarchy level 2.
objectives identified in the Noosa Plan 2020 and Local
D
Plan codes.
Local
• Improving connectivity to existing bike riding and Routes connecting local destinations such as
walking trails and trail heads. neighbourhood/residential centres, parks and
community facilities. These are also used for
recreational purposes.
Asset management plan hierarchy level 3/4.
Bike riding network plan
Trail
Lower order recreation routes used by mountain
Hierarchy
bike riders (and often bush-walkers/hikers). They are
A bike riding route hierarchy was developed to assist typically gravel or sand tracks.
in defining standards and desirable management
characteristics across the network. Table 11 presents the
bike riding network hierarchy categories and definitions. Trail connector
Routes which connect to trail heads, could require
low standard infrastructure (eg a gravel track).
Table 12: Bike riding hierarchy
28
Section 29
Bike riding network plan
Figure 5 provides an overview of the proposed Bike riding network plan and Figures 6 and 7 present more detailed plans for
each key centre. More detailed plans can be viewed on Council's website or yoursay.noosa.qld.gov.au.
N
↑
T
AF
R
D
Figure 6: Proposed bike riding network plan
29
Section 30
Bike riding network plan - key hinterland centres
N
↑
Kin Kin Boreen Point
T
AF
R
D
Pomona Cooran
Cooroy
Figure 7: Proposed bike riding network plan - key hinterland centres
30
Section 31
Bike riding network plan - key coastal centres
N
↑
Tewantin Noosa Heads
T
AF
R
D
Noosaville
Peregian Beach Sunshine Beach
Figure 8: Proposed bike riding network plan - key coastal centres
31
Section 32
Walking network plan
Hierarchy Description/ Function
Hierarchy
Pedestrian transport corridor
A walking route hierarchy was developed to assist Routes connecting higher order destinations such
in defining standards and desirable management as major and district centres, employment hubs,
characteristics across the network. Table 12 presents the public transport stations, major sport and recreation
proposed walking network hierarchy definitions. facilities, major tourist attractors and schools.
Asset management plan hierarchy level 1.
Pedestrian recreation corridor
Scenic, high quality walking routes of regional
significance such as the Noosa Heads boardwalk and
the coastal pathway.
Asset management plan hierarchy level 1.
Pedestrian access street
T High quality routes immediately surrounding major
pedestrian generators such as centres, schools and
public transport stations. These routes form feeder
AF
routes to/from residential areas.
Asset management plan hierarchy level 2.
Pedestrian activity street
Main street locations where pedestrian comfort and
amenity is priority. Streets where the ‘place’ takes
R
precedent over ‘movement’, where people are
encouraged to stay and enjoy.
Asset management plan hierarchy level 1.
D
Local
Routes connecting local land uses/destinations such
as local parks and community facilities. These routes
also facilitate intra-neighbourhood trips and are short-
cuts.
Asset management plan hierarchy level 3/4.
Trail
Lower order recreation routes used by bush-walkers
and hikers (and often mountain bike riders). They are
typically gravel or sand tracks.
Trail connector
Routes which connect to trail heads, and could
require minimal infrastructure (eg gravel track).
Table 13: Walking hierarchy
32
Section 33
Walking network plan
Figure 8 provides an overview of the Walking network plan and Figures 9 and 10 present the more detailed plans for each key
centre. More detailed plans can be viewed on Council's website or yoursay.noosa.qld.gov.au.
N
↑
T
AF
R
D
Figure 9: Proposed walking network plan
33
Section 34
Walking Network Plan - Key Hinterland Centres
N
↑
Kin Kin Boreen Point
T
AF
R
D
Pomona Cooran
Cooroy
Figure 10: Proposed walking network plan - key hinterland centres
34
Section 35
Walking Network Plan - Key Coastal Centres
N
↑
Tewantin Noosa Heads
T
AF
R
D
Noosaville
Peregian Beach Sunshine Beach
Figure 11: Proposed walking network plan - key coastal centres
35
Section 36
Trails network Council is progressing its trail network planning with a
detailed audit of the existing trail network to be completed
In April 2020, Tourism Noosa prepared the Noosa Trail in the 2020-2021 financial year. Trail infrastructure projects
Network Masterplan. Key recommendations of this plan such as a Cooran to Pomona connection scored low in the
include: NCWSIP but will be investigated as part of the trail network
in the coming years.
• Rationalise, redevelop and realign the trail network to
better deliver the type and quality of experience now Improving connectivity to the existing trail network is a key
sought by the growing and diverse recreational trail consideration for the NCWSIP.
user market.
The Noosa Trail Network is shown in Figure 11.
• Connect current fragmented trail areas and hubs within
the region, to build a more cohesive and consistent
overall trail experience.
T
AF
R
D
Figure 12: Noosa Trail Network
36
Section 37
Project types
Noosa has a network of 240kms of sealed paths and 153kms of cycle routes, however, to create a connected and safe network
more infrastructure is required. A total of 453 infrastructure projects have been recommended for implementation. Of these, 173
involve upgrades to existing facilities (approximately 99km) with the other 280 being new facility projects (approximately 208km).
Figure 12 summarises the 453 projects into their project types.
T
AF
Figure 12: Infrastructure type Figure 13: Number of projects by network type
Prioritisation
A set of scoring criteria were developed in consultation with the PRG to prioritise the 453 projects. The projects were individually
R
scored against each of the criteria, with the total score for all criteria used to determine its priority. The scoring criteria and
associated weightings are provided in Figure 14.
D
Figure 13: Assessment criteria
37
Section 38
Implementing the strategy
Based on the project prioritisation criteria of “Getting more Available funding estimates
people riding a bike or walking” and “achieving value for
money”, most of the projects which scored highly in the The available funding for bike riding and walking projects
prioritisation process were located in the coastal areas was estimated as $1.45 million per annum (pa) over the next
where population densities are higher and there are more 10 years. This total equates to what has been forecast by
destinations such as centres, schools, sport and recreation Council in the 2023 to 2030 annual expenditure on pathway
facilities and activity centres. This outcome is reflected in the and boardwalk upgrades and expansions.
proposed 5 and 10-year implementation plans.
There may be opportunities to seek additional funding
In addition to the projects selected through the prioritisation from various sources to complete future projects in the
process, the PRG saw the opportunity to deliver low cost, implementation plan sooner. For example, Noosa Council
high impact infrastructure, such as temporary bike lanes and has been successful in attracting Cycle Network Local
short length missing link projects to achieve our vision. A Government Grants from the State Government in the past.
funding stream dedicated to the delivery of low cost/missing
link projects (under $100k) throughout the Shire has been
included in the proposed 5 and 10 year implementation plans
T
Such funds would supplement the $1.45 million pa assumed
to be available and allow for future projects to be delivered
sooner. It's Council’s intention to prioritise the delivery of
AF
at a value of $250k per year. A total of 22 low cost projects active transport projects when it considers the annual budget.
have been identified as local and hinterland links. This will include investigation into alternative funding streams.
In line with objective 8, deliver value for money outcomes,
Council will strive to reduce the cost of walking and bike riding
infrastructure projects by further investigating cost- effective
options during design.
R
By implementing cost effective projects, such as pop up bike
lanes, Noosa will see the vision for more people walking and
D
riding a bike realised more quickly.
38
Section 39
5-year implementation plan
Table 14 lists the projects in the 5-year implementation
plan. A total of 29 projects including 19 low cost/missing link
projects have been identified. The estimated cost of these
projects totals $14.6 million and includes grant funding.
The Garth Prowd Bridge and Noosa Parade projects will
provide a high-standard bike riding and walking connection
between Noosaville and Noosa Heads, two of Noosa’s
largest and busiest centres. These connections are
expected to be a key catalyst for the growth of bike riding
and walking.
10-year implementation plan
Table 15 lists the projects in the 10-year implementation
plan. A total of 12 projects including 6 low cost/missing
link projects have been identified. The estimated cost to
Council for these projects totals $8.1 million, with $750k for
additional low cost missing link projects.
T
AF
The Noosa Drive projects will connect to the upgraded
facilities proposed along Noosa Parade as part of the
5-year implementation plan. Combined with the Sunshine
Beach Road project, connectivity between Noosaville,
Noosa Heads and Noosa Junction will be significantly
R
improved, particularly for cyclists. Currently, high vehicular
traffic and pedestrian volumes combined with limited bike
riding facilities in sections is likely to discourage many
people from riding along Noosa Parade and Sunshine
D
Beach Road.
Future projects
For further information on projects not shown within the 5
and 10-year implementation plans, please refer to yoursay.
noosa.qld.gov.au
39
Section 40
5-year implementation plan
Project Road / Path Length
Suburb Start Point End Point
ID Description (m)
256 Garth Prowd Bridge Noosa Heads West side of Bridge East side of Bridge 72
254 Noosa Parade Noosa Heads Munna Point Bridge Garth Prowd Bridge 1,223
TBC - 127,
Tewantin Bypass Stage 1 Tewantin Cooroy Noosa Road Wentworth Street 875
131, 174A
93 Maple Street Cooroy Overlander Avenue Bruce Highway Overpass 145
83 Maple Street Cooroy Marara Street 60m east of Lowermill Road 132
251 Noosa Parade Noosa Heads Dolphin Crescent West Munna Point Bridge 357
250A Noosa Parade Noosa Heads Weyba Road Dolphin Crescent West 652
239 Hilton Esplanade Noosaville Memorial Avenue Hilton Terrace 690
Sidoni Street, Doonella
177 Tewantin Poinciana Avenue Lake Street 559
Street, Memorial Avenue
212 Shorehaven Park link Noosaville Walter Hay Drive South end of Seacove Court 182
Hinterland and local links (low cost, high impact)
LC4 Stan Topper Park link Pomona North Stan Topper Park pathway Memorial Avenue 20
382
LC2
318LC
Tinaroo Place off-road path
Bluebell Court link
Flagship Court
Tewantin
Noosaville
Castaways Beach
TNorth of no. 5 Tinaroo Place
South end of Bluebell Court
Flagship Court link
Existing Heritage Park path
Bushlands Drive
Driftwood Drive
47
55
70
AF
LC5 Tewantin Road Cooroy Olivine Street Miva Street 110
359LC Plover Street Peregian Beach Piper Street Jacana Street 50
LC1 Wylah Street, Swan Street Noosaville Koel Street 30m north of Wylah Street 85
385 Monterey Estate link Tewantin Bus Stop at 52 Furness Drive Monterey Estate entry 101
180LC Blakesley Street Tewantin Diyan Street Sidoni Street 90
LC7 Corona Street Sunshine Beach East of 4 Corona Street Ray Street 155
R
6 Lake Flat Road Boreen Point Laguna Street Boreen Field Park 89
69LC Kauri Street Cooroy No. 18 Kauri Street Lake MacDonald Drive 220
LC3 Oceania Crescent Sunshine Beach Pacific Avenue 60m north Pacific Avenue 80
167 Goodchap Street Noosaville 92m South of Hilton Terrace/ 45m South of Hilton Terrace / 45
D
Ernest Street Roundabout Ernest Street Roundabout
84A Mary River Road Cooroy Lowermill Road 11 Mary River Road 105
147 Honeyeater Avenue, Skylark Noosaville Wedgetail Lane East end of Skylark Court 139
Court
51 Easement south of no. 15 Pomona Factory Street Cooroora Creek Park 140
Factory Street
246LC Edward Street Noosaville Mary Street Gympie Terrace 185
LC6 William Street Tewantin John Street Jacaranda Place 120
270LC Grant Street Noosa Heads Noosa Drive Banksia Avenue 210
Existing way-finding, mid-trip (Including tree
planting for shade) and end-of-trip facility Shire wide - - -
improvements
Existing network lighting improvements Shire wide - - -
Total 6,295
Table 14: Noosa bike riding and walking network | 5-year implementation plan*
A. Funded by Noosa Council and the Federal Government under the Bridges Renewal Program.
B. Council and TMR co-funded project (50-50) under the Cycle Network Local Government Grants Program.
C. Funded through TMR's Road Stimulus Package.
D. Funded through Council's Hinterland Playground Project
E. May be eligible for grants from the State Government covering up to 50% of project costs.
Section 41
Proposed works Year 1 Year 2 Year 3 Year 4 Year 5 Total
Upgraded 4.5m shared path $500,000A $3,000,000A $3,500,000A
Complete corridor upgrade $2,695,000B $2,695,000B $5,390,000B
New on road 2m lane
$1,000,000C $1,000,000C
New/upgraded 3m shared path
New 3m shared path $110,000 $110,000
New on-road 2m lane
$316,000D $316,000D
Upgraded 3m shared path
Upgraded 3m shared path $605,000E $605,000E
Upgraded 3m shared path $555,000E $555,000E $1,110,000E
Shared street $340,000E $340,000E
Widened cycle lanes in sections
and new 2m footpath along $250,000E $250,000E
Memorial Avenue missing links
New 2m shared path $120,000 $120,000
$1,250,000
New 2m shared path
New 2m shared path
New 1.5m shared path
New 2.5m shared path
$250,000
T
AF
New 3m shared path
New 2.5m shared path
New 1.5m shared path
New 1.5m shared path $250,000
New 2m shared path
New 1.5m shared path
R
New 3m shared path
New 1.5m shared path
New 1.5m shared path $250,000
New 2.5m shared path
D
New 3m shared path
New 1.5m shared path
$250,000
New 2m shared path
New 1.5m shared path
New 2m shared path $250,000
New 1.5m shared path
$50,000 $20,000 $20,000 $20,000 $20,000 $130,000
$100,000 $100,000 $100,000 $100,000 $100,000 $500,000
$5,021,000 $6,065,000 $1,530,000 $1,265,000 $740,000 $14,621,000
*This draft implementation plan is subject to change as a result of grant
allocations, council budget processes and emergent works.
Noosa Cycling and Walking Strategy 2020 | Page 41
Section 42
10-year implementation plan
Project Road / Path Length
Suburb Start Point End Point
ID Description (m)
163 Eumundi Noosa Road Noosaville Eenie Creek Road Walter Hay Drive 440
293 Sunshine Beach Road Noosa Heads Noosa Drive Cooyar Street 564
Lions Park Noosa Heads
269 Noosa Heads Lions Car Park Sunshine Beach Road 1,002
link
East side of Garth Prowd
257 Noosa Parade Noosa Heads Lions Car Park access 221
Bridge
Noosa Drive/ Noosa
259 Noosa Heads Lions Car Park access Hastings Street 267
Parade precinct
153 Rene Street Noosaville No. 68 Rene Street No. 100 Rene Street 268
154 Rene Street Noosaville Eumundi Noosa Road Production Street 931
Hinterland and local links (low cost, high impact)
187 Butler Street Tewantin Crank Street 110m north of Crank Street 116
T
244B Thomas Street Noosaville Mary Street Gibson Road 100
387 Carruthers Park Cooroy Carruthers St Blue Wren Place 140
Misc Unallocated hinterland
and local links
AF
LC11 McKinnon Drive link Tewantin McKinnon Drive Dilgar Place cul-de-sac 160
LC13 Leslie Drive Service Road Noosa Heads 29 Leslie Drive 70m South of Leslie Drive 82
intersection
LC15 Peregian Trail connector Peregian Beach Peregian Breeze Drive Woodland Drive 1325
LC19 Nancy Cato Park link Noosaville Bust Stop: 301764 Dolphin Crescent 61
LC10 Lewis Street link Noosaville Existing pathway on Lewis Existing pathway on 122
R
Street McKenna Court
LC18 Seaview link Sunshine Beach 26 Seaview Terrace Arakoon Crescent 74
Misc Unallocated hinterland
and local links
D
Unallocated hinterland and local links (low Shire wide - - -
cost, high impact projects)
Existing way-finding, mid-trip (Including
tree planting for shade) and end-of-trip Shire wide - - -
facility improvements
Total 4,324
Table 15: Noosa bike riding and walking network | 10-year implementation plan*
A. Funded by Noosa Council and the Federal Government under the Bridges Renewal Program.
B. Council and TMR co-funded project (50-50) under the Cycle Network Local Government Grants Program.
C. Funded through TMR's Road Stimulus Package.
D. Funded through Council's Hinterland Playground Project
E. May be eligible for grants from the State Government covering up to 50% of project costs.
Section 43
Works summary Year 6 Year 7 Year 8 Year 9 Year 10 Total
Northbound on-road lane
$530,000 $530,000
widened to 1.5m
New 3m separated cycle path $215,000E $215,000E
~4.5m elevated shared path $2,437,500E $2,437,500E $4,875,000E
Upgrade on-road 1.5m lane
$287,000E $287,000E
Upgraded 3m shared path
Upgraded 3m shared path,
$525,000E $525,000C
improved crossing facilities
New 2m shared path $175,000 $175,000
New on-road 1.5m lane $105,000 $105,000
$1,250,000
New 2m shared path
T
New 2.5m shared path
New 2m shared path $250,000
AF
New 2m shared path
New 1.5m shared path
$250,000
New trail
New 2.5m shared path
New 1.5m shared path
R
Upgraded track $250,000
D
-
$250,000 $250,000
- $20,000 $20,000 $20,000 $20,000 $20,000 $100,000
$1,015,000 $2,707,500 $2,707,500 $1,082,000 $550,000 $8,062,000
*This draft implementation plan is subject to change as a result of grant
allocations, council budget processes and emergent works.
Noosa Cycling and Walking Strategy 2020 | Page 43
Section 44
Monitoring and evaluation
Monitoring
Continued monitoring and review of bike riding and walking outcomes in Noosa is important to understand the success of the
NCWSIP and if any modifications are required.
Accurate data is required to establish a baseline for network usage and the success of initiatives. Table 15 identifies the tasks
required to effectively monitor participation levels. Once baseline data is established, targets should be developed to measure
the success of the NCWSIP.
Short Medium
In
Task Term (by Term (by Ongoing
progress
2026) 2031)
1. Continue to monitor existing count sites and install new counters
on strategic off-road and on-road active transport routes to track
participation levels.
T✓ ✓
AF
2. Investigate and implement ways to regularly and cost-effectively
collate resident and visitor travel behaviour information. ✓ ✓
3. Utilise data collected in above tasks to prepare baseline data
and inform the development of targets to track active transport
✓
R
participation and NCWSIP implementation. This data should be
made publicly accessible.
4. Review and track active transport performance indicators.
Analyse data collected to inform:
D
• Why people travel the way they do and potential ways to
increase active transport mode share (eg targeted marketing
and programs aimed at overcoming concerns with bike riding or
•
walking).
Understanding of usage patterns (eg high use routes, roads
or road sections being avoided and how upgrades affect
✓ ✓
participation levels) to inform construction of new/upgraded
infrastructure.
• Refinement of the prioritisation of works identified in the
NCWSIP.
Table 16: Monitoring participation levels
44
Section 45
Key performance indicators
Table 16 identifies the key performance indicators that will be used to assess the performance of the NCWSIP and how
frequently the reviews will be completed.
It is proposed that a review of the strategy and its implementation be undertaken within five years and a major update completed
by 2031.
Key performance Review
Measurement
indicator time-frame
INFRASTRUCTURE
Cycle network growth Kilometres of new or upgraded cycleways(1) Annually
Walk network growth Kilometres of new or upgraded footpaths (1) Annually
Completion of Principal Cycle
Network (PCN) Priority A routes
T
20kms of PCN Priority A routes completed every five years (1) Every five years
AF
New or improved mid-trip and end-
Additional number of assets along walk and cycle pathways (1) Annually
of-trip facilities
PARTICIPATION
Increase in cyclist volumes by type (eg gender, age, e-wheeling user) on
Cyclist participation growth Annually
R
pathways and on cycleways. (2)
Walking participation growth Increase in pedestrian volumes by type (eg gender, age) on pathways (2) Annually
Increased journey to work bike Increase in people bike riding to work (2016 ABS data indicates that 0.9% of
D
Every four years
riding mode share people cycled to work in Noosa Shire) (3)
Increased journey to work walking Increase in people walking to work (2016 ABS data indicates that 3.4% of
Every four years
mode share people walked to work in Noosa Shire) (3)
Increased school student
Reduce the number of vehicles entering school precincts and preferred transport
participation in walking and bike Annually
modes identified in parent surveys. (4)
riding events and programs
Increase in number of programs to encourage bike riding and walking held in
Increased encouragement
Noosa(4) Annually
programs and attendance
Increased attendance at encouragement programs held in Noosa (4)
Table 17: Key performance indicators
\
(1) Data source: Council asset database
(2) Data source: Count data
(3) Data source: Australian Bureau of Statistics Journey to Work data
(4) Database to be developed
45
Section 46
Glossary and reference material
Glossary
Active transport (AT) The mix of walking and cycling, integrated with public transport, used as a mode of travel for
commuting, recreation or utility purposes, instead of private motorised vehicles and taxis. Active
transport promotes individual and community health and wellbeing. Can also include skating and
scootering.
Bicycle/bike A vehicle with two or more wheels that is built to be propelled by human power through a belt,
chain or gears.
Bicycle awareness zone A bicycle facility which is on the road carriageway and defined using a yellow bicycle symbol to
(BAZ) indicate bicycle riders may be in the area but does not provide exclusive space for bicycle riders.
Bicycle lane An exclusive space for cyclists on the road carriageway, defined by white lines on either side, a
white painted bicycle symbol and regulatory signage.
Noosa Council.
T
Council
Cycle street Cycle streets (also called Safe Active Streets or Bicycle Boulevards in other jurisdictions) are local
access roads that form part of the principal cycle network. Cycle streets can also be considered
AF
as bicycle paths with limited vehicle access. Cycle Streets are designed as a mixed traffic
environment and encourage bicycle riders to use the centre of the road. When approaching or
opposing motor vehicles, drivers must use the rough textured edges of the carriageway.
Cyclist/bicycle/bike rider A person who is riding a bicycle.
Cycleway A bicycle facility such as a shared path, bicycle only path or separated cycle track.
R
End-of-trip facilities Facilities located at the end of a journey that can encourage people to cycle or walk such as
showers, lockers and toilets, as well as short or longer-term secure bicycle parking.
E-wheeling or e-mobility Emerging active transport device where the "e" stands for electric. The most popular forms are
D
electric bikes (e-bikes) and electric scooters (e-scooters) but can also include e-skateboards,
electric pedal assisted bikes (pedelecs) and seated e-scooters.
Footpath A path which is off-road, generally in the road verge, which is provided for pedestrians. Note that
in Queensland, bicycle riders are permitted to use the footpath.
HPR Highest Priority Route.
LGA Local Government Area.
Micro-mobility Another term used to describe e-wheeling or e-mobility. Typically small, lightweight electric
powered vehicles operating at speeds typically below 25km/h.
Mid-trip facilities Facilities that support users whilst undertaking their journey such as drinking fountains, rest spots,
seating, shade, shelter and lighting.
NCWSIP Noosa Cycling and Walking Strategy and Implementation Plan.
Off-road bicycle facility A bicycle facility is said to be off-road when it is located in the verge (ie road related area parallel
to the road carriageway); through parks or reserves; or within a public transport corridor or other
public or private land not open to motor vehicle traffic.
On-road bicycle facility A bicycle facility is said to be on-road when it forms part of the road carriageway such as a bicycle
lane or a shoulder shared with parked vehicles.
Pedestrian Any person walking including a person: driving a motorised wheelchair, a non-motorised
wheelchair, a wheeled recreational device or wheeled toy.
46
Section 47
PCN Principal Cycle Network, defined by TMR.
PRG Project Reference Group
Raised priority crossing Where pathway users are given priority across a road using regulatory GIVE WAY or STOP signs
and line marking, it is referred to as a priority crossing. Where these facilities are constructed on a
raised platform to increase visibility and reduce vehicle speeds, it is referred to as a raised priority
crossing.
Separated cycle track A bicycle facility for cyclists only which is physically separated from motor vehicles either in the
road verge (off-road) or on the road carriageway (on-road).
Separated path A path which is off-road and has separated space for pedestrians and cyclists, usually defined
through line-marking and signage.
Shared path A path which is off-road and is shared space with pedestrians and cyclists. The minimum width for
a shared path is 2.5m.
TMR Department of Transport and Main Roads.
Reference Material
T
AF
The Noosa Cycling and Walking Strategy and Implementation Plan is a summary document supported by the following working
papers:
• Working Paper 1 - Background analysis
• Working Paper 2 - Strategy and network plan development
• Working Paper 3 - Implementation plan and development
R
D
47
Section 48
D
R
AF
T
TIONNOD [_@_