2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Key non-infrastructure and further planning tasks supporting each action and the time frames in which each task is to be
 completed are outlined below.


 Action 1. Deliver and maintain a safe and connected network


                                                                                           Short       Medium
                                                                                In
     Task                                                                                  Term        Term          Ongoing
                                                                                progress
                                                                                           (by 2026)   (by 2031)

     1.1 Implement the prioritised bike riding and walking network plans
     developed as part of the NCWSIP.                                             ✓                                    ✓
     1.2 Develop a detailed Trails Masterplan and Implementation Plan


                                                                                  ✓
     that expands on Tourism Noosa's Noosa Trail Masterplan 2020. A
     coast to hinterland trail will be investigated as part of this plan. The
     master plan will identify upgrades to existing trails, potential new
     trails and an implementation plan.

     1.3 Identify priority locations for the construction of safe pedestrian
     and bike crossings for all abilities, including bridges and
                                                                                T            ✓
                                                     AF
     underpasses.

     1.4 Investigate new and innovative safe design solutions for
     pedestrian/ cyclist priority crossings at intersections (eg raised
     priority pedestrian /cycle crossing, roundabout treatments), and pilot
     treatments which are safe and meet Noosa design principles.
                                                                                  ✓
                                      R

     1.5 Continue to review and improve bike riding and walking asset


                                                                                  ✓                                    ✓
     management systems and programs by working closely with
     the community and promoting community members to report
     maintenance issues to Council that enables maintenance issues to
                        D


     be quickly resolved.

     1.6 Work with and seek funding from TMR and other agencies to
     deliver projects identified as part of the NCWSIP, as well as Priority
     Cycle Network (PCN) projects. Relevant NCWSIP outcomes are to
     be provided to TMR for inclusion in their network planning.
                                                                                  ✓                                    ✓
                                                                                  ✓
     1.7 As part of the broader Transport Strategy implementation,
     investigate additional funding, including new revenue streams, to
     increase Council spend on delivering the NCWSIP.
 Table 7: Action 1. Deliver and maintain a safe and connected network




22
Log in to download the original file

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan(PDF, 27MB).pdf · 28.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.