Original source · versioned page text
2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan
The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnKey performance indicators
Table 16 identifies the key performance indicators that will be used to assess the performance of the NCWSIP and how
frequently the reviews will be completed.
It is proposed that a review of the strategy and its implementation be undertaken within five years and a major update completed
by 2031.
Key performance Review
Measurement
indicator time-frame
INFRASTRUCTURE
Cycle network growth Kilometres of new or upgraded cycleways(1) Annually
Walk network growth Kilometres of new or upgraded footpaths (1) Annually
Completion of Principal Cycle
Network (PCN) Priority A routes
T
20kms of PCN Priority A routes completed every five years (1) Every five years
AF
New or improved mid-trip and end-
Additional number of assets along walk and cycle pathways (1) Annually
of-trip facilities
PARTICIPATION
Increase in cyclist volumes by type (eg gender, age, e-wheeling user) on
Cyclist participation growth Annually
R
pathways and on cycleways. (2)
Walking participation growth Increase in pedestrian volumes by type (eg gender, age) on pathways (2) Annually
Increased journey to work bike Increase in people bike riding to work (2016 ABS data indicates that 0.9% of
D
Every four years
riding mode share people cycled to work in Noosa Shire) (3)
Increased journey to work walking Increase in people walking to work (2016 ABS data indicates that 3.4% of
Every four years
mode share people walked to work in Noosa Shire) (3)
Increased school student
Reduce the number of vehicles entering school precincts and preferred transport
participation in walking and bike Annually
modes identified in parent surveys. (4)
riding events and programs
Increase in number of programs to encourage bike riding and walking held in
Increased encouragement
Noosa(4) Annually
programs and attendance
Increased attendance at encouragement programs held in Noosa (4)
Table 17: Key performance indicators
\
(1) Data source: Council asset database
(2) Data source: Count data
(3) Data source: Australian Bureau of Statistics Journey to Work data
(4) Database to be developed
45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.