Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Key performance indicators
Table 16 identifies the key performance indicators that will be used to assess the performance of the NCWSIP and how
frequently the reviews will be completed.

It is proposed that a review of the strategy and its implementation be undertaken within five years and a major update completed
by 2031.



    Key performance                                                                                                                 Review
                                                   Measurement
    indicator                                                                                                                       time-frame

    INFRASTRUCTURE

    Cycle network growth                          Kilometres of new or upgraded cycleways(1)                                        Annually

    Walk network growth                           Kilometres of new or upgraded footpaths (1)                                       Annually

    Completion of Principal Cycle
    Network (PCN) Priority A routes
                                                                               T
                                                  20kms of PCN Priority A routes completed every five years (1)                     Every five years
                                                          AF
    New or improved mid-trip and end-
                                                  Additional number of assets along walk and cycle pathways (1)                     Annually
    of-trip facilities

    PARTICIPATION

                                                  Increase in cyclist volumes by type (eg gender, age, e-wheeling user) on
    Cyclist participation growth                                                                                                    Annually
                                         R

                                                  pathways and on cycleways. (2)

    Walking participation growth                  Increase in pedestrian volumes by type (eg gender, age) on pathways (2)           Annually

    Increased journey to work bike                Increase in people bike riding to work (2016 ABS data indicates that 0.9% of
                        D


                                                                                                                                    Every four years
    riding mode share                             people cycled to work in Noosa Shire) (3)

    Increased journey to work walking             Increase in people walking to work (2016 ABS data indicates that 3.4% of
                                                                                                                                    Every four years
    mode share                                    people walked to work in Noosa Shire) (3)

    Increased school student
                                                  Reduce the number of vehicles entering school precincts and preferred transport
    participation in walking and bike                                                                                               Annually
                                                  modes identified in parent surveys. (4)
    riding events and programs


                                                  Increase in number of programs to encourage bike riding and walking held in
    Increased encouragement
                                                  Noosa(4)                                                                          Annually
    programs and attendance
                                                  Increased attendance at encouragement programs held in Noosa (4)

Table 17: Key performance indicators
\
(1) Data source: Council asset database
(2) Data source: Count data
(3) Data source: Australian Bureau of Statistics Journey to Work data
(4) Database to be developed




                                                                                                                                                       45
Log in to download the original file

2021-07-06 S&O Agenda - Item 11 - Attachment 2 - Noosa Cycling and Walking Strategy and Implementation Plan(PDF, 27MB).pdf · 28.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.