|Sunshine Coast Checklist - Applications Involving Land Regional Council Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 41.1 Form1 PartA 4.1.1 Ensure that the form is fully completed and is a current version. 1.1.2. In the case of an MCU or Op Works below the high-water mark, owner’s consent is recur ) 1.1.2.1 If there are multiple owners, the consent of each owner is required. oR 1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by signatory) or Company Seat required. 1.2 Form’ Part B-R Supporting Information 4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. 1.4.2.1. Ensure that each of Forms B-R which are attached are fully completed. 2. IDAS ASSESSMENT CHECKLIST ‘ 2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals 2.2. Ensure correct parts of Form 1 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) [4 i] E*] 3. ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) 4. FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant detaits along with owners consent if not current owner of land as shown on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. 5. PLANS 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompany the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. 6. SUPPORTING INFORMATION VF 6.1. Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration Ly and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. / aS 6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping - 7, FEE 7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees, W accompanies the application or has been paid. e Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. e Land Development Lot Reconfiguration applications and Operational Work not including Landscaping Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. NSC g:\landuse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 34 pages
Page 2
[ae eielen gala) bes (ela) 03-07-2008 Sunshine Coast Regional Council P.O. Box 141 Tewantin. QLD 4565 Attention: Daniel Smith - Land Use Dear Sir, Re: 2007/2174 — Proposed 5 Apartment Development - 43-45 Elanda St. Sunshine Beach On behalf of my client Oak Investment Holdings PTY LTD, please find enclosed the Operational works application for the proposed 5 Apartment Development at Elanda Street, Sunshine Beach. This application consists of the following documents. Completed idas Form | — Part A Completed idas Form 1 —~ Part E Completed idas Form | - Assessment Checklist Our client's cheque for the amount of $6,015.00 being application fee. lan Gorton Design drawing numbered 0710.202 OPW indicating required off street car parking. Contour Consulting Engineers Operational works plans 5083-OPW sheets | - 8 EDAW Landscaping Drawings | trust this constitutes a full and properly made application and request that Council proceed with assessment of same ASAP. Please do not hesitate to contact the writer should there be any queries. Yours Sincerely, lan Gorton far. Sorter: Design pb (G0; S447 53s4 wa 126°. NOOsia 4e2ds OLS 456° mob, C400 20 33 ad 4. OF Sunsmire Beack Road Noosa Junctioe ‘an @rangortondesigt com au
Page 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
ae MS,
a
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
“Applica nt details (The Apphcant is the person responsible for making the application and aged not be the owner of the land, The Applicant is responsible for ansunng the
‘for maton provided on the IDAS Appkcetion Ferm is cemect This informet on is iced upon by the Assersment Manager and any referta! agencies when assessing and
’deuicing this app’ coun. By lodging this app %ction the App'icani ncurt th ob: gations and respons tees prescnbed by the IPA. Any davclopment permit or pre“tr nary
‘euproval that mey by issued as 3 consequerice of tins app'ice’.on wid he sued fo the Apptcant)
Company/organisation name (if applicable) joaK INVESTMENT HOLDINGS PTY LTD
Individual appticant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)
Title MR Firstname |ANDREW ‘| Last name [DUTHIE
Postal address |cr- IAN GORTON DESIGN - PO. BOX 1261, NOOSA HEADS. QLD 4567
Contact telephone number 107 5447 5394 Mobile phone number 0400 22 33 94
Facsimile number @mail address [email protected]
ete i sae nres _ ene nt ae em fl
»
‘Details of ' the premises fie iha caret on whch ihe development is proposed - refer to the advice at the end ofthe form) _ j
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
[ : Name of each local government area in which the mobile and temporary ERA is proposed to operate.
| 4
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.}
() [21 Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(ii) [2] Street address /tot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)
Street Address Lot on plan description
Unt | Seat Plan type and Local government area (e.g. Logan,
No. | No. Street Name and official suburb/ocaity name | Post Code | Lot No. Plan Number Caims)
1 43-45 | ELANDA STREET, SUNSHINE BEACH. QLO 4567 399& | RP48112 SUNSHINE COAST REGIONAL COUNCIL
400
AND/ OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates
(Nota: place each set of coordinates in a separate row) Zone Datum Local government area
< asting’ | Northing’ | Latitude | Longitude | Feterence - _ (applicable)
1 [~ oGpa94
f~ woeses
F- Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Name of water body, watercourse or aquifer (If known)
{1
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on pian description for strategic port land Port Authority for the lot
[1
Table F Complete if the premises are in tidal water
Name of local goverment for the tidal area (if appicable) Name of port authority for the tidal area (if appicable)
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include fand both above and below water)
Total area of premises
1,468.00 [K}m [hectares (Tick applicable unit)
‘Existing use use use of th the 2 premises . . ce
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc. ,
{1 [vacaNTLAND
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water efc.)?
{x} [x] No oO Yes - Ensure the type, location and dimensions of each easement ato included in plans, submitted with the epplication
Proposaldetails "SS ae emt ;
cme nem ete oe —- te me ce
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture)
5 UNIT APARTMENT BUILDING
7. Does the poposal include new buildings or operational work (including any services) on the premises?
(No DX] Yes - Ensure the nature. location and dimensions of the proposed works are included in plans, submitted with the application
Resource entitlement ; fe appscabhe: - further information 3 prowdcd wy the advice sectian at the end of the form i
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
Involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
x] No - Go 0 Q9 | Yes - Complete Table G - provide details for each evidence required on a seperate row. if applicable, Evidence of resource
allocation or entitlement must be submitted with the application You do not need to answer Q9 - go fo the next section.
‘Owner's cc consent [if ap [eppicatie) - = further infoera 1s prexiaed i n te adinoe Secton al the end ofthe f form ee vt pe bi isle) enn
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coasta/ Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide delails for each owner on a separate row, or on an attachment to this form if applicable
Premises Owner's name/s Details of the premises owned . Date consent
Table H and postal address (street address or fot on plan description) Owner's signature was obtained
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. if the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the |PA website .
‘Attachments and supporting information (Come: 2te Tables - Use a separate row far each type of attachment or F normal jon including information required
“under this Pari} Please ensure aff documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, ere securely attached fo this Part of the Form. i
me tee abr te mes
Description of attachment or information
Table } (e.g, Part C of Form 1, owner's consent, evidence of resource
allocation/entitement, plens, drawings, reparts)
1 Part E of Form 1
2 Covering letter 03-07-08
Title (if appicable) Date Method of delivery to
(0.9. General Authority, James StreefTraffic Report) assessment manager
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
3 {an Gorton Design drawing 0710 .202 OPW AUG 2007
4 EDAW landscape drawings 0851 2755.01 -L-001, L-LE-002, [03-Jul-2008
L-PP-401, L-DT-901, L-DT-902,
L-DT-903
§ Contour Consulting Engineers Op Works §083-OPW1, 5083-OPW2, May 08
drawings §083-OPW3, 5083-OPW4,
5083-OP5, 5083-OPW6,
§083-OP7, 5083-OPW8,
6 [Cheque for application fee 01-07-2008 | |
Portable Long § Service Leave (PLSL} levy (Ape! : ‘ : _.
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the folowing apply: { ( Tick box if apntcabte
LJ the application seeks a preliminary approval only;
Z the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: and clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[ all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated) The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. {s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
{]_ No - End of Part A
[X] Yes - Answer 012 below
12. Has the PLSL levy been paid?
No - (NOTE: An application can be fodged prior fo payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by
the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit @
Notification and Payment Form to QLeave.)
oO Yes - Complete Table J aid submit, with the application, the “yellow” (Local Gavemment's (Council) / Private Certifier’s) copy of the receipted Qleave Form
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. , Receiving officer's Reference
Fee (8)| Eo, 7 | Date received iy \o e name CP» Arseny numbers | OS (1 (6
pow "NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER nm
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of Hive an senate
| engagement Name BSA Cottification number / Building classification’s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
Description of the work Gleave Project Number [Amount paid ($)} Date paid | forsahted by | Name of ofioa who sighted the
manager
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parilament, This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Advice for completing Part A
General advice
e Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
* If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Details of the premises
. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land! is also defined to include the estate in, on, over or under the land.
. Details of the land are not required if the application involves a mabile and temporary Environmentally Relevant Activity only. Instead complete
Tabie A.
. The premises may be identified in a number of ways -—
e Street address and lot on plan are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
. The definition of ‘water body’ and ‘watercourse! can vary from Act to Act.
. StrategicPortLandis within a local govemment area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis dectared under the Transport infrastructure Act 1994. For further information go to |IDAS Guide 11 (Development on
strategic port and) and the Queensland Transport (Ports) website.
° “Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a fecal government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
. Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a}{ii) states an application cannot be taken to be properly made without the required evidence.
. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
. For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
je Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
. Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport infrastructure Act 1994.
° Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome af the application.
. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the fand (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
. Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
i. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Page 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is coltected on certain building and construction work carried out inQueensland. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction industryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.ald.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.qid.gov.au )
Page 8
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Building &/or operational works assessable
against a planning scheme
et ee erosions + amen
—
‘Nature of the works j
1. Nature of work that requires assessment against a planning scheme:
(D1 Building work - Complete Table A Operational work - Complete Table 8
Table B
(i) Whatis the nature of the operational work?
(J Roadworks ( Stormwater (C] Water infrastructure (-] Sewerage infrastructure
(J Landscaping (CD Earthworks [[] Drainage Works L] Signage
(Z Clearing vegetation under the planning scheme Other - Specify below
Landscaping, Carparking & Access, Frontage Works, Stormwater Drainage & Detention and Infiltration System, Road
Widening & Kerb & Channel, Erosion & Sediment Control.
(ii) What type of approval is being sought? (NOTE: if you heve indicated muttipie operational works in question (i) above and your answers to this
question woutd be different for different operational work, it may be more appropriate lo provide these details in an attachment to this form)
Development Permit (J Preliminary approval CJ Both (specify nelow!
(ii) Is the operational work necessary to facilitate the.creation of new lots (i.e. subdivision)?
No —_[[] Yes - Specify the number of lots being created
{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
aol
(J No Yes - Complete Table Ba)
Table Bia) List of approval references Date approved Date approval lapses (if known)
1 MCU - Multiple Housing Type 4 - Conventional 15 May 2008 4 years from date of approval
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 0.00
cree "
Mandatory Information : oO j
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement Method of lodgement
ications W applicabl - Toca -
Pans, andspeoticatons if applicable, showing the nature and location of the proposed works (including the Confirmed | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Page 9
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008 Advice for completing Part E General advice « Part A must also be compieted for all IDAS development applications. le The applicant is responsible for answering ail questions fully and correctly, unless following a response there is a statement to go directly to another question. a1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
Assessment Checklist
IDAS Development Application Form 1 is the approved form for all development applications under the integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 4 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sectlons.of the IDAS Assessment Checkilst, as identified in the Table below, must be **
completed for all development applications except those proposed on land in an urban development area, or for building work
° requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www.ulda.qld.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local govemment or log onto the DIP website www. dlip.ald.gov.au u for help
checklist
Does the application seek approval to materially change use of the premises?
ifyes - complete Section 2 of this checklist C1Yes |{]No
Does the application seek approval to reconfigure a lot? Ces | [No
it yea - complete Section 3 of this checklist end Part F of DAS Application Form 1. Assessment is by the focal government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist —] Yes {No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |px]No
if yes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist DYes |[%]No
Does the application seek approval to carry out building work requiring assessment against a local goverment planning
scheme? CYes |[x]No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
If yes - go to Appendix 1 of this chacklist for adivice on building referrals. Complete Part B of IDAS Application Form 1. OYes |kJNo
Assessment is by a huilding certifier
SECTIO N 4 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE
141A Is any part of the proposal intended to be cared out on a Queensland Heritage place under the Queensland Heritage Act 1992?
Croco Tn
4
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.18 Does the proposal involve development. other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a oh Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Go to Q1.2 | Yes - (Complete Form t, Part C;) This application requires assessment by ihe relevant local government against the IDAS
Code in the Queensland Heritage Reguiaticn 2003. !f the development involves building work and the focal
goverment is nol the Assessment Manager for the application. the local government has jurisdiction as Concurrence
Agency.
Se sonal Ca ee ue mat wey
ILD RIVER AREA _
1.2 Does. the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
ee OY Yes
IPA so
sete
=
‘
ay
S
a
=
3
=
é 0 wabie 2 tem 1? IP Regulahon scneduie 1 tate 3 item > jwiks ver area} Water Art 200°
vers Act 2U95 secuan 424
ENVIRONMENTALLY RELEVANT ACTIVITY; wiLD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoats {[] Yes
WITHIN THE LIMITS OF A PORT " 1
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
NO - Go f0 01.5
C1 Yes
IP Reguigtnn someud
15 Does any part of the premises adjoin a dedared fish habitat area a under the Fisheries Act 1994?
No - Go fo Q1.6
O Yes - if answers fo questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Reguldtin, subecine 2 tabs 2 shea 26
at
(COMMUNITY INFRASTRUCTURE _|
1.6 mi part of the premises designated for community infrastructure?
N
10 - Go to Q1.7
CD Yes
IE Regulates seterhte 9 tabie 3 lor :
WASTE WATER MANAGEMENT ~~ _ _ ee 7
17 cot the proposal involve the establishment or expansion of a waste water disposal system?
No -£ndof Section 1 (] Yes
IP Reg 23
nm schentule
‘SECTION 4 « Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME a 7 }
41 Is any of the proposed operational work assessable under a planning scheme?
(11 No - Go to 04.2 Yes - (Completa Form 1, Part E) Answer Qs4.1.7 - 4.1.7 below.
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist Version 21.3, 9 May 2008
‘STATE-CONTROLLED ROAD ~ . oO - ~ ‘
4.1.1 ls any part of the premises located in part ol a future State-controlled road, or within 100m of a State-controlled road?
[K] No
LJ Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
LJ No -Gotoa4.12
| Yes - This application must be seferred io the Department of Main Reads (DMR) as Concurrence Agency.
ou ae So erm erm repent mia ten 4
‘ACID SULFATE SOLS —
41.2 _ {s any of the operational work proposed in ina local goverment area listed ‘in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
1 No -Goto04.1.3 Yes
41 nurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Caspentaria, Cook, Cooloota, Dougtas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Jehnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
[Xx] No
(Yes
"EASEMENTS AND SUBST. ATIONS ,
4.1.3 |s any of the proposed operational work for filling or excavation?
1 No -Gotoa414
Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
(1 Yes -6oto004.1.4
[Xx] No - Answer both (a) and (b) below
{a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
No
LI Yes
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
No [] Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
Rogidatins s Dede 2 bagie Duem tupal JP Reg
SOMDike 2 late Totem kb?
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoa4.i5 (] Yes
PF
aytitatennd Sel
PUBLIC PASSENGER R TRANSPORT “ : ~ ]
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No- Go fo 04.1.6 LD Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
fectig? fabs, gers
RAILWAY SAFETY AND EFFICIENCY _ . : - : 4
wenn ees . vm ee ween E
446 Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No- Go fo 04.1.7 Oo Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
1 Reg ste a |
2 tabts 3 ip 1
Page 13
INTEGRATED PLANNING ACT 1997 IAS Assessment Checks, V Version 21. 3, 9 May 2008
KOALA CONSERVATION — . |
4.1.7 {s any part of the premises in a koala conservation area or koala sustainability area?
[X] No -Gotoas2 [7] Yes
iF Ree ron aeraduim 2
dam 19
‘WILD RIVER AREA - - Although fegislation provides f for assessment of operat ‘onal works for residential, commercial ‘and industrial
‘development for the purposes of the Wid Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
‘code to that type of development,
‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER |
AREA '
42 Is any of the proposed ‘operational work associated with reconfiguring a lot and the reconfiguration is ‘also assessable?
PK] No -Gotoos3 (_] Yes
J item 2 IP Rng ie 1, Hed iter No)
ge does nol cuneatly covlar, apjpcabie movisions fin residential indusi..at or canungrued develooment aside 5 dess
darken
‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 4
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[K] No -Gotoas4
C1 Yes
tetita 2. denn 4 wegetaior
ivegel dite. earngwid wer area; Veyotaliin Misa
JIE apd Te
¢ don id ikeale
20A vegetation
{TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Gotoa4.5 [_] Yes - Answer (a) and (b) below
GBA seeded Treet
45 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 0 Yes - (Complete Form 1. Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRA. If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
tabla 4 fem?
an waht!
ert
46 ls any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No -Gotoa47 (_] Yes - Answer (a) and (6) below
J3GA rand tye
47 Is any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000. for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No - Goto Q48 0 Yes
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
No -Gotoa49 [[] Yes - Answer both (a) and (b} below
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
van
ve a a a a
Ce eee Fl tk Rete A
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [x] No OO Yes
(i) To increase the storage capacity of a referable dam by more than 10% [—] No O Yes
{f yes to either or both (i) or (ii) above - {Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). !f NRWis not the Assessment Manager for the application. the agency has jurisdiction as
Concurrence Agency.
4
IBA shot a By fe, dean, 7)
B ychehie ©
TIDAL WORK; WILD RIVER AREA
4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?
ix [x] No -Gotoa4it [_] Yes - Answer (@) and {b) below
ie & pait 1 table 4 tem 5: iF Rey je 2 tubie2 doms (2 '4 aed 17 JP Requiaton schedule 1. part 3 mabe 4 items 44 ond 5
Wetec hon apa Managemen Act 196 idAkd rue: area!
¢ Peaastat
‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
No -Gotoasi2 [[] Yes
lo} peat % table 4, Hong 4A ants
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[XK] No -Gotoae13 [7] Yes
‘DECLARED FISH HABITAT AREA; WILD RIVER AREA i
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto Q4.14
LI Yes
netic 3 fotua 2 iterr 25 IF
‘REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILO RIVER AREA |
4.14 ls any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Gotogat5 [_] Yes
4d
WILD RIVER AREA |
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gofooa16 [_] Yes
IPA sy io & past 1 tabie 4 tein 10 IP Requtate
sechedide 2 tabie 2. tem 34, Mild Rivers Act 2635 sovticns 42 439A
STATE-CONTROLLED ROAD }
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No - Eng of sections [_] Yes
atin @ ype F
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form.
Page 16
= o® OS + T4746 T v v T v v t 1 “~s, ELANDA STREET >» xr, | = i= ab lw Evel LEVEL 1 PLAN - GARAGE & LOWER UNIT 1 & 202 / SCALE1:100 @A2 - ao in Prefers ont oom om Omen y Sea RST eRSeR See | Guntroeranumedararcnanmitiom S APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING Pi. as shown AUG 2007 AG iano oleate QUESRELENO 4367 ‘Guking Add 175 & Basncterd Gulting Ragudation #990 fan arrevated) & te CDC a ea ea conpts boreeemeteteysot Tear ours can came 3 7 Se mete ee Frere mrS Caneel denn cataumnen re nent 43-45 ELANDA STREET SUNSHINE BEACH LEVEL 1 PLAN CARPARKING 0710 202 OPW @) pi =i=) iGn
Page 17
SCHEDULE OF DRAWINGS
OPERATIONAL WORKS ai
5 APARATMENT DEVELOPMENT
ELANDA STREET
SUNSHINE BEACH
OAK INVESTMENT HOLDINGS P/’Lt
a Nie ~~ { NE EON A A KIN oS ( BES ;
“\ Oe SKK QO’ OSM K YY) USAR DS
ra yn. | ee PX : Z \ J J 4 Jf -
a = \ WS NAY 4A WN > J “4 \y dh
y/
? x
4 \
A
7 fe ss \Y eo ae XY yx |i
Xe oY KO - YY aN Ae Z hc i} |
Pe LE ( wD ly TI AAAS” ———
wa 4 x ee WP |S ok e / / | | ry C ——
Bs Ze “> % é \ XL [ aad L ;
[fo iz
a
ieee t
——_| —= ones
SS | |
Sr Ny See]
= S is
— | I
4 eZ
ee ee a nied ——— ae — acidemia’
CONTOUR || 5 4PARTMENT DEVELOPMENT Lk [ae Pesroceren — tT cme ax | LOCALITY PLAN AND DRAWING SCHEDULE
Consulting €ngineers <.| AT 43-45 €LANDA ST, SUNSHINE BEACH ane awe
Pe ae F ede E } Sans FOR OAK INVESTMENT HOLDINGS P/L Date: gn
Ser a Ce ee a rr
eee
Page 18
NEW KERB & CHANNEL ———
REFER SHEET 5 FOR DETAILS
NEW ROAD WIDENING
EXISTING RETAINING WALL
TOP APPROX. RL 456
eee
x
REFER SHEET 5 FOR DETAILS “
SFORDETAILS \.
4
4
( -—— DENOTES APPROX LOCATION OF
| TREES TO BE RETAINED, CONFIRM
| Bae Ge WITH LANDSCAPE DRAWINGS
NEW 1.5m WIDE CONCRETE ———
FOOT PATH REFER SHEET 5 i)
FOR DETAILS a F POOL
|_-—+_ SECTION OF DRIVEWAY POSITIONED
UNDER BUILDING ALIGNMENT
POOL
to 7 ‘ seh EXISTING SHED
ina) | “
oe | J
SS 4
no i /
(=) | [za ¥
z= fe | ‘
= = 5 :
— 8 $
lw =
54
POOL
iM 71 ~~ STORM WATER DETENTION
eo We ans < => BASIN AND LEVEL SPREADER
I i i = REFER SHEET 8 FOR DETAILS
| I} 4 ' heen
rl , : Z
i d at + = x
= 1 x _— PROVIDE EASEMENT OVER
= ane Y = REMAINING SEWER IN ACCORDANCE
NY \ \ \ WITH MCU CONDITION 35
capes aD ss = ee ‘ a a \ ~~
\ = / \ \ a =
| Rr A aa Set se \ ( ROOF WATER TANKS) | \ Teast al eae
NEW 5.5m WIDE CROSS OVER ————") = = \ . JY O 0 Ont ISTING
\ \ TF MANHOLE IN ACCORDANCE WITH MCU
ma { i CONDITION 34
( aaa eS SSS Se nn ee SSS ee eee aie
| | |
1| \ | |
1] \ \ |
\| \ \ {__._ NEW INTERNAL CONCRETE DRIVEWAY L— TANK CAPACITY 24,000L (16WCx1500L) :
CONTOUR |
Consulting Engineers 2:3
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
REFER SHEET 6 FOR DETAILS REFER PLUMBING DRAWINGS
SITE PLAN
SCALE 1
Rev | Date | COMMENT BY | CHKD
Drawn
Checked.
Datum:
PLAN DETAILS.
Designed:
PLAN TITLE
SITE PLAN
BPL
RM
AWS
Page 19
PROPOSED TEMPORARY CONSTRUCTION —>
BATTER 1v TO 1.5h INACCORDANCE WITH |
GEOTECHNICAL REPORT
-—— PROPOSED BUILDING RETAINING STRUCTURE
fy REFER FUTURE STRUCTURAL ENGINEERING ||
as DRAWINGS ||
| / |
a — = ae fe
/ DENOTES TEMPORARY SEDIMENT FENCE
/ E FINAL EXTENT TO BE REVIEWED AND
/ : / DETERMINED ON SITE
/ he
a ty ALL HEIGHT 1.8m
/— DENOTES APPROX LOCATION OF
| 2 / TREES TO BE RETAINED, CONFIRM
a oe WITH LANDSCAPE DRAWINGS
a f
a
| | o
8 | | S
| 2
| || &§ .
EL \ CUT FILL
uw
uu |
a
& ~
n | S al
<x f
a b
= | | ! Y —_—_———
= | PAD LEVEL 48.40 | PAD LEVEL 48.40 7
: | ( ROCK FILTER DAM WITH OVER-TOPPING CREST
| LOCATED AT CENTER LINE OF LEVEL SPREADER
| » +7 ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
| | \
| | 7?
| \ 5 CONSTRUCT LEVEL SPREADER
| | | NY f DURING INITIAL EARTHWORKS STAGE
| REFER SHEET 8 FOR DETAILS
| pe
a | -*
| \
\ ra \ | EXCAVATE DETENTION BASIN DURING INITIAL
\ | Ties | EARTHWORKS STAGE
\ | \ WALL HRIGHT:14mn\ | LINE SIDES WITH GEOFABRIC AND LOOSE PLACED
| STONE PITCHING AS REQUIRED
| ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
|
{ \
|
\ |
— 1 7 Ti: J / |
,_\ SS ee ee ooo
\ \ |
\ L_p
Hy; \ \ ee \— DENOTES TEMPORARY SEDIMENT FENCE
jy) 6 \ aa SITE PLAN FINAL EXTENT TO BE REVIEWED AND
HH} = \ | SCALE 1:200 DETERMINED ON SIT!
Ty] \ \
|
| |!
pore 1 eee ee eee __ PROPOSED BUILDING RETAINING STRUCTURE
PROPOSED TEMPORARY CONSTRUCTION — V REFER FUTURE STRUCTURAL ENGINEERING
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH DRAWINGS
STREET GEOTECHNICAL REPORT WING
PROPOSED BUILDING OUTLINE /| _ EXCAVATE DETENTION BASIN DURING INITIAL
—————————— a oy EARTHWORKS STAGE . app RBERE
| J LINE SIDES WITH GEOFABRIC AND LOOSE PLACED ROCK FILTER DAM WITH OVER-TOPPING CREST
| 7 STONE PITCHING AS RE -— LOCATED AT CENTER LINE OF LEVEL SPREADER
pa oes PAD LEVEL 48 40 y ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
FILL
, —= aa
SECTION A ce a /
SCALE 1.200 a 3
/ a
| £m g
eee
CONTOUR :
Consulting Engineers ?:
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
PLAN DETAILS.
Designed: BPL
Drawn, RM
Checked: AWS
Datum: AHO
Date MAY 08
Rev | paTe
COMMENT BY | CHKD
PLAN TITLE
EARTH WORKS, SEDIMENT AND
EROSION CONTROL PLAN
@ or 3977 G 07 5493 0888 G oimin@ContourCE com.au
A Re |
pun ne S083 - OPWZ xcvsun B SHEET
2 or @
Page 20
SEDIMENT & EROSION CONTROL
PROGRAM
” 030 400 _ 200
© BERM (300mm MIN HEIGHT) STORMWATER
MW,
RUN-OFF FROM PAD
DIRECTED TO SEDIMENT TRAP 42 - RUN-OFF
nm
1:6 TURF STRIP (1.0m WIDE). BALANCE OF
EXPOSED SURFACE TO BE TOPSOILED
AND GRASS SEEDED
GEOTEXTILE FABRIC
BIDUM U34 OR SIMILAR
UNBOUND PAVEMENT MATERIAL (GRAVEL) TO
GRADING 'B', TABLE 9 OF QUEENSLAND TRANSPORT
SPECIFICATION MRSS11.04 - EXCLUDE MATERIAL
FINER THAN AS SIEVE 2.36mm
CUT-OFF DRAIN DETAILS
VV eee
NOT TO SCALE
TEMPORARY CONSTRUCTION ENTRY / EXIT
NOT TO SCALE
GEOTEXTILE FABRIC TO TURF STRIP SURROUND
BE SECURELY POSITIONED
UNDER GRATED LID AS
SHOWN. \
FSL
ALLOTMENT
Aon FORM U-SHAPED CREST TO ENSURE EIT
caine OVER-TOPPING AT CENTRE OF DAM
GROUND LEVEL - | NOMINAL 400mm HEIGHT
-
— ree
LOOSE PLACE ROCK PITCHING i . PIT PROTECTION
(NOMINAL STONE DIAMETER TO BE APPROX’ 150mm) NOMINAL 250mm DEPTH NOT TO SCALE
TEMPORARY ROCK FILTER DAM - TYPICAL SECTION
NOT TO SCALE
nba EARTHWORKS NOTES
SPILL THRU WEIR NEE ret OPERATIONAL BEFORE COMENH
3.0m MAX (IF REQUIRED) F42 GEOFABRIC NOR
a “ = FABRIC (TO AS 1304)
'
600 | 300 ¥ 200
' {EVEL t i
600 | 1
STEEL PICKETS
mm INTO
SEDIMENT FENCE
NOT TO SCALE Se
EARTH WORKS, SEDIMENT AND
EROSION CONTROL DETAILS
COMMENT
Rev | DATE PLAN DETAILS
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
Designed: BPL
Drawn: RM
Checked: AWS
Datum:
CONTOUR |
Consulting Engineers :;
OP me Fe eG Pee net
pun ne S083 - OPW4 xcvscon B sueer 4 of ©
Page 21
V 4630
DENOTES EXISTING — ans s
\ o
=
SURFACE LEVEL \ JOIN NEATLY TO EXISTING EXISTING ROAD | e o i Se URS ONCRETE 3
| | KERB & CHANNEL CENTRELINE os & jes 3
|| | LEVEL TyPIcaL \ | + ae + | &
j EXISTING CONCRETE a
I | — FOOTPATH SSS
| | -DATUMS1O) ee
ROADWORKS NOTES | i 30.000
a a = JOIN NEATLY TO EXISTING
1 THE , ONTRACTO 7 Esra SH THE LE ON NE &L BIEL “a DENOTES EXTENT OF oe L FOOTPATH
Rear coe, RI VA E UTILITY SERVICES PRIOR TO COMMENCEMEN’ NEW PAVEMENT SEAL 1 \
THE PLANS. T! | | 30 000 )
| | 1
2 E FAVE BEE BEA ON 1 | | J & - NEW 1.5m WIDE a
D SURVEY DA’ HESE CALCULATED Vv
ACTUAL GROUND LEVEL | ii 1 a ee | CONCRETE FOOTPATH 3
3. ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH Ww / 8 | S
REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE | a |
PRINCIPAL'S APPOINTED SURVEYOR | A ¢ ———————— —
4 IBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH | = ' | a,
THE PROCEDURES OUTLINED IN ARRB SR41 - ASTRUCTURAL DESIGN || |
GUIDE FOR FLEXIBLE RESIDENTIAL STREET PA a | DATUM51.0_ _ Fat SCALA neraenay pave reg ge eye payee ey
5, ALL KERBING SHALL CONFORM TO NOOSA SHIRE COUNCIL'S | = | __-+— NEW SEMI-MOUNTABLE 20.000 AC
ee ee erat acne lad TKR & CHANNEL SAW CUT EXISTING PAVEMENT SUB, SOIL DRAINAGE IN
: JUEENSLAND MANUAL OF UNIFOR S | Se | |2 i AND JOIN NEATLY & SMOOTHLY ACCORDANCE WITH
7. PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE | ; | 5 | NSC STD DWG
[HERE DIRECTED.
8. JT OF ROAD AND DRAINAGE WORKS IS AVAILABLE TO CONTRACTOR | 20.000 | | 4760
INTOUR ENGINEERS DIGITAL MODEL : | 8 +— NEW 1.5m WIDE CONCRETE FOOTPATH |
1 2 | REFER ARCHITECTS PLANS 2360 a
| 8 | FOR SET OUT q— = 7 ee NEW 1.5m WIDE a
s 3 CONCRETE FOOTPATH &
| | ' > g a
NOTE EXISTING CENTRE LINE =~, | aes
EXTENT OF CONNECTION TO BE DETERMINED ON SITE DURING | ——__
CONSTRUCTION BY ENGINEER & COUNCILS FIELD OFFICER } -DATUMSIO | -
10.000
= | CHANNELIN ACCORDANCE
i i
- | WITH NSC STD DWG No. 9001
TOTAL SEAL OVERLAP = 300mm RAWCU TESTING I] oe °
(SMOOTH TRANSITION TO PAVEMENT EXISTING EDGE OF BITUMEN —
EXISTING BITUMEN) | !
10.000
£ 4610
$b =
_EXISTING PAVEMENT | NEW PAVEMENT | | EXISTING CONCRETE a
: g FOOTPATH a,
INDICATIVE SAW-CUT DETAIL ; 2% oe ao
oS OO Omnma= >——
SCALE 1:50 | x + | — NEW5.5m WIDE DATUMS1O Sa ee SS =
' 1 - VER 0.000 \ -
x GROSS OVE EXISTING DRIVE OVER
30mm ASPHALTIC eC I | | \ KERB AND CHANNEL
CONCRETE SURFACING ' ‘
{Fst || | \ ELANDA STREET CROSS SECTIONS
ye | | ' SCALE 1:100
0.338 L
| 0.0001 |]
100mm THICK BASE COURSE MATERIAL (TYPE 2.2) - CBR 60 MIN (SOAKED) ON \| | | JOIN NEATLY TO ||| \ ~~ JOIN NEATLY TO EXISTING
100mm THICK SUB-BASE COURSE MATERIAL (TYPE 2.4) - CBR 45 MIN (SOAKED) ON I | EXISTING KERB & | || FOOTPATH
% 100mm THICK LOWER SUB-BASE COURSE MATERIAL (TYPE 2.5) - CBR 15 MIN (SOAKED) | | CHANNEL \ \
| ~
\ |
ASPHALTIC CONCRETE I
PAVEMENT DESIGN (INDICATIVE) | en See re COREE
SCALE 150 | \ae~ LOOTEATH CAUTION - EXISTING SERVICES
|| VA THE CONTRACTOR IS TO DETERMINE THE EXACT LOCATION OF
NOTE a RTS pee VER KERB
FINAL PAVEMENT DEPTH TO BE CONFIRMED FOLLOWING ee : ae _ eS EL
SITE SOIL TESTS UNDERTAKEN IN THE EXCAVATED ROAD eae cree eet AN
BOX BY THE GEOTECHNICAL CONSULTANT LAYOUT PLAN ie dal SCALE 1-20
SCALE 1:200
EXTERNAL ROAD AND
FOOTPATH WORKS PLAN
CONTOUR .
Consulting Engineers ?;
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST. SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L j
; EE. Tanne 5083+ OPE — reson B Soe
@ ores 977 G® 07 5493 6888 GD acmin@CormourC= com au
@* ra J Downs 4556. Queensiand
Page 22
2
z=
2 PAVEMENT NOTES
x
&
= UNIT2
2
& FFL4B60
=
- XQ
Lu
oo =
ie
— nl
|
(a \
z \
= i
ot LEGEND
EWER LINE
| STORM WATER LINE.
|
4 \ et
\ 8 aX 2 3 Nia 3 al3 NG 12 8
{| =] & 2 8 ; ! g i CONSTRUCTION DOWEL JOINT REFER DETAIL
NEW 5.5m WIDE - = x = KERB IANO CHANNEL | & = \
CROSS OVER
[| = t=
| | | tS
HI peor er i STORMWATER BASIN AND LEVEL
| : hi ~ NING WALL REFER FUTURE 4 L_ FILL RETAINING WALL REFER FUTURE SPREADER REF! FOR DETAILS |
CTURAL ENGINEERING PLANS SITE PLAN STRUCTURAL ENGINEERING PLANS
SCALE 1:200 PAVEMENT DETAILS
A y CBR (soaked) MIN COMPACTION
CURVE IN ACCORDANCE Bec SO
WITH NSC STD 9020
A
ELANDA J
STREET OMMERCIAL & SERVICE
iz BEEN DESIGNED
Za
BARRIER KERB
= [- AND CHANNEL
GARAGE ENTRY | a |
ae te —a - 4 -—sr7 | FALL VARIES
= a| |; | 1in33 TO 1in100
2 TITIES == AWA
Soin Eh. wat oe
—— + + 2 | —— —+
—— ———— TYPICAL CROSS SECTION
DRIVEWAY LONG SECTION
SCALE 1:200
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
CONTOUR .
Consulting Engineers :
@ 07 4939777 G® 07 5403 6888 CD acmin@ContourC= com au
@” ex Mgt d
SCALE 1:200
| DATE | COMME! Se PUAN TITLE
eae ae en : 2 INTERNAL DRIVEWAY AND
STORMWATER PLAN
sheet 6 oF @
J rove 5083 -OPW6 xcvson B
Page 23
PROP BDY
LEVEL SPREADER
SL43.60
300W x 450D TRENCH FILLED
WITH 40-800 WASHED GRAVEL
CONCRETE — 2000 WRAPPED IN GEOTEXTILE FILTER
DISSIPATER WITH 1000 AGG PIPE
SW PIPE s
— ie 8g | SL43.65
sua3.60 [>I
Se
I |
WIER WITH DISSIPATER —] 11 1— Level sPREADER
REFER DETAIL in | s.4360
| “Vy |
\)
TURF \
BASE Hy a
| 1 \
ss \
= Hy to
s m7 1
= tind LW
Co \ _A
nu!
Se) \ i |
_—______
z/ a |e |
= )
a) \ 0 |
ROCK RETAINING i a LEVEL SPREADER
WALL <1m G it | | — st43.60
\
SL 43.47 ma 4 |
concreTE Y f]} JP CO
DISSIPATER ie
Ee \
o
gwPIPE, | .— 188] SL43.70 \
= \
|
ne | | | \2
Go \ | 2
ow ' |
Ze | %
co Se a
~~ fs
\ J
PROP BDY
7 el
DETENTION BASIN DESIGN
THE DETENTION BASIN AND LEVEL SPREADER HAVE
BEEN DETAILED IN ACCORDANCE WITH DUKE
ENVIRONMENTAL REPORT No. AAQ7731SMP
TO COMPLY WITH MCU CONDITION 28, 29 & 30
|
STORM WATER DETENTION BASIN &
LEVEL SPREADER DETAIL PLAN
SCALE 1:100
CONTOUR
Consulting Engineers
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
<=
EXISTING TREES
TO BE RETAINED
DENTENTION BASIN
} | 2.0m x 11.0m \
Ni |
iit. rt LeveL vanes —
\ $143.55-43.40
~ \ ;— LEVEL SPREADER
—— \
Q100 RDA \ $143.60
ROCK RETAINING WALL <1m Q2RL 43.89 =
ra
Oo
a
| A .
BASIN BASE -
SL43.65-43.6
300W x 450D TRENCH FILLED
WITH 40-800 WASHED GRAVEL
SECTION WRAPPED IN GEOTEXTILE
FILTER WITH 1000 AGG PIPE
SCALE 1:50A3
CONCRETE
— 2250 PIPE
DISSIPATER ar |
CONCRETE =
APRON SL43.60 rT fa iron
m
CLEAR WIER OPENING ale mil | |
n
‘om s fo} ao fe]
YS a B| 0)
FY a |
5 1 |
ROCK RETAINING ——~ 3b
WALL <1m$L44.11 i 3 |
” (eA
CONCRETE —
WIER SL44.0
WIER DETAIL PLAN
SCALE 1:50
CONCRETE
WIER SL44.0 — CONCRETE
DISSIPATER leeiceces
$$; LEVEL SPREADER
CONCRETE $143.60
APRON SL43.60
' 1 1 !
Ties nm
2250 PIPE —
PLAN DETAILS,
Designed
Drawn:
Checked
Datum:
Date
SECTION
SCALE 1:50 A3
PUAN TITLE
DETENTION BASIN PLAN AND DETAILS
pun ne S083 - OPWE xcvsun B
SHEET
Bo ®@
Page 24
PROVIDE SAW CUT TO SLAB
WITHIN 3 HOURS MAXIMUM
OF INITIAL CONCRETE SET, peep
Not
R= 4
CUT 100 FROM EVERY SECOND J Xu
TRANSVERSE WIRE INDUCED CRACK
CENTRALLY UNDER JOINT.
SAW JOINT (SJ)
SCALE 1:20
6mm x 110mm SQUARE HOT DIP GALVANISED
"DANLEY* DIAMOND DOWELS AT 600 CRS,
INSTALLED IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATIONS.
— an
NON COMPRESSABLE XS FORMED CONSTRUCTION JOINT
“DANLEY" DIAMOND DOWEL
SLEEVES AT 600 CRS.
CONSTRUCTION JOINT (CJ)
(DIAMOND DOWEL)
SCALE 1:20
CONTOU
Consulting Engineers 5
€2 117 061 680
50 50 -— APPROVED SEALANT.
5 APARTMENT DEVELOPMENT Ta ae a
AT 43-45 ELANDA ST, SUNSHINE BEACH
TE KOR OAK INVESTMENT HOLDINGS P/L
SL82 MESH, 50 TOP COVER. N16 TRIMMER BAR
SLAB JOINTS AS SHOWN ON PLAN. EDGE THICKENING
\ TO PERIMETER
2 ~ j RC aS
“t “e 75, 3
2 %
Test Tt |___ CBR 15 (TYPE 2.5)
COMPACTED SUBGRADE 500 __|100
min
TYICAL PAVEMENT DETAIL
SCALE 1:20
PROPOSED APPROVED v
PAVEMENT stag FLEXABLE
SEALANT OVER
\ \ |
ABUTTING PAVEMENT, INLET
PIT OR OTHER STRUCTURE
Me, FOAM BOARD
TYICAL PAVEMENT DETAIL
SCALE 1:20
4
610
BARRIER KERB
AND CHANNEL
SCALE 1:20
Rev | pate | COMMENT
ala|e
g
518) R
B | 180608 | ISSUE FOR NSC APPROVAL
A Se Reverse @ Thee plan Copyoght Other than fer fie purposes of and subsect 1 the conditions prescr Led urea he Copyrgh Act nopertoftmey Many brary
- . _ Bw meere ba mprodies stared ina robes! sysam oF Kersmited aiout Be pro: weisa pemnission of Contour Conmulirg EAgreens
(be used for constuction schout pro! amen appeal
STORMWATER DRAINS
GENERAL
General: Provide stormwater drains to connect dawnpipes, surtane drains, subso#
drains and drainage pits to the outlat point oF point of connection.
Downpipa connactions: Turn up branch pipelines with bands to meet the downpipe,
finishing 50 mm (nominal) above finished ground or pavement evel. Sed jotts
between dawnpipes and drains.
Tolerances: Comply with the Pipeline tolerances tabie, Thase tolerances are conditional
on falls to outlets being maintained and no part of a pipeline being at less than the
designated gradient.
Pipe Materials
Stormwater pipe to be F.R.C. or U.P.V.C. class SH in accordance with AS3500 3
Connection to kerb to be gaivanisad RHS in accordanoa with AS1074 with minimum
cvating mass of 500g'eq.m
Identification
Lay a detectable strip or plastic tape in the trench after pipelaying, tasting and inital
backfiling.
Pipe undertay
Genetal: Bed piping on 9 continuous underlay of bedding material, atleast 75 mm
thick after compaction. Grade the underlay evenly to tha gratient of the prpalin.
Chases: If necessary, form chases to prevent projections such as sockets and flangas
from beering on the trench bottom or undertay.
Pipa surounds
General: Place the material in the pipe surround in layers 200 mm loose thickness,
‘and compact without damaging or displacing the piping.
Anchar blocks
Itnecessary, provide anchor blocks which restrain lateral and axial movement of the
pipelines at junctions and changes of gt ade or drection.
Encasemert
Ganeral: If necessary, encase the pipeline in concrete at least 150 mm shove and
batow the pipe, and 150 mm each side or the width of the french, whichever is the
greater, Concrete; Grado N20 AS 1378.
SUBSOIL DRAINS
Genera
Provide subsoil drains to intercept groundwater seepage and provent water buk-up
behind walls and under floors and pavomants. Connect subsoil drains tb suta0e
drains of to the stormwater drainage system 2s applicable,
Pipe Size & Class
100mm minimum diamater in accordance with AS2430. 1
Pipe dopth
Provide the following minimum clear depths, measured tb the crown of the pipe,
‘where the pipe passes below the following element:
= {00 mm botow formation level of the pavement, karb or channel.
- 100 mm below the average gradient of the bottom of footings.
- 450 mm below the finished surtace of unpaved ground,
Jointing
At junctions of subsoil pipes provide toos, couplings or adaplors to AS 2438.1,
Trench width Minimum 450 mm.
Pipe undertay
General: Grade the tench floor evenly to the gradient of the pipolra. tthe tench
floor is rock, correct any kregularities: i
Chases: If nocassary, form chases to prevent projections such ms sockets and flanges
trom bearing on the trench bottom or underlay.
Pipe surrounds
Goneral: Place tha material in tha plpa steround in layers 200 mm loose thickness,
and compact without damaging or displacing tha piping
Depth of overt.
= To the underside of the bases of overlying structures such an pavements, slabs
and channals,
= To within 150 mum of the finished surface of unpaved ar landscaped areas.
Fiiter fabric
General: Provide polymeric fabric for mad from plastic yarn composed of at last 85
by waight propylene, ethylene, amide or vinyledenechloride, and containing stabilisers
oF inhibitors which provide resistance to deterioration due tb ut aviolet ight
Marking: To AS 3706.
Protection: Provide heavy duty protective covering. Store clear of the ground ard out
of direct suntight. Ouring instailation do not expose the filter fabric (0 sunlight for
more than 14 days, Fittr socks
Provide polyester permeable socks capable of retaining particles of 0.25 mm sizo.
Securely fit or Joln the sock st each joint
PITs
Finish to exposed surtaoas
Genera: Provide a smooth, samtass tinish, using stae! rowdled render or concrete
cast in staal forms,
Corners: Cove or splay internal comars.
Metal access covers and grates
Standard: To AS 3096.
Cover levels: Top of cover or grata, inchuting tame:
- In paved areas: Flush with tha pang surface.
- Inlandscaped zeas: 25 mm above finished sutace.
PUN TITLE
INTERNAL DRIVEWAY AND
STORMWATER DETAILS
panne: S083 - OPT reson 8 sheet. 7 oF @
Page 25
AURORA APARTMENTS - SUNSHINE BEACH
LANDSCAPE DOCUMENTATION
Drawing Register
DRAWING No. DRAWING TITLE REVISION No.
|cover SHEET . { OP1
LEGEND SPECIFICATIONS & SCHEDULE oP1
oo PLANTING PLAN “+ opt
U-DT-904 , JORTALS ee ef OP
L-oT-9027 _ foetans” ot
L-DT-903 DETALS . —_. erry
KEY PLAN
AGROPA
0851 2755.01 - L-001
ISSUE: OP1 - OPERATIONAL WORKS ISSUE
DATE: 02.07.2008
EDAW | /.25° °¢
Page 26
LEGEND
EXISTING TREE TO BE RETANED
GC) PROPOSED LARGE TREE
© PROPOSED SMALL TREES
©) Proroseo sieve
femora
SHE PROPOSED FEATURE SRE
36 SPECIMEN GRASSES.
GOULOERS.
GRAVEL ACCESS PATH
NATURAL MARY RIVER GOLD" ROCK
L TURF
LJ
CE] seme wen
—F1I—— FENCE REFER 10 ARCHITECTS DETAIL AND SPEQIFICATION
—TE— TIMBER EDGE REFER TODETAL
SW STORMWATER LINE. REFER
TO ENGINEERS PLANS,
GENERAL NOTES,
1 Al service locahons shoun are mndicatve onty Refer toto enrgnours stewing for more
dela Confer serves iocaions on se porto any conanicton,
2 Relerio Engmieers drawngs for frvshed sutace levels unie ss show on Lontscane Crawngs
1 Ai setouton ste tobe by bulder and cortrmed by lancacape eric proto ay conan tion
4 For bghting roles ta Blecincal Consultants and Elacinas! Engnours Orowngs
5 Altreas witun/ actasert to vetnsi sights are to b& 56! out on ste porto netation ancl
‘approved by the supenrtendert and trafic engniecr
6 Final farting keahon and rumbera sutyect 10 inal vervicos ketions
7 Alwots and hordscape (concrete fodpats and daveway surfaces) architects specication and
deal
8 Al geales and ston wate pls tat pestonn a slommwake furchon onate ae lobe notated by
the cwi/ bukser conkacior lo angneers rpecicauon «il aestholc nica sachs arto be
_Apfroved by ibe consuing angneers ond mutase by he tudor Liycad to be apgrovedty
landacope achascl ncoqqunsion wih ste ergoeer
TECHNICAL SPECIFICATION
12
13
ry
18
10
1.40
1
wz
GENERAL
AX work tobe camied out by sukably qualited tradesman wit expenance In Landscape Construction works, All ptantn g works ard to be carned out by » GALI registered landscape contractor.
WEED ERADICATION
Herbicide: Eradicate weeds using environmentally acceptable methods, such as a non-residual @yphorate herbicide in any ofits ragittared formulae, at te recommended maxirrum rate,
ENBANKMENT STABILISATION
Stublise ambenkmants 4:3. with an appr dable bre rai A polymer mesh netting oF approved
CULTIVATION
Greak up the subsoil to # dapth of 150mm.
TOPSOL,
‘Supply and instal S00mm topsoil depth to all planting beds and 100mm topsoil depth to wB turfaraas, Imported topeol thal be ftom wn approved supphor centitying specified composition. Topsoil shail be
inorpreted as sail which arganic matter, Plantlife, iv hoe of matter such m6 stones over 25mm in chameter, clay Amps, weeds and weed propaguies Uwe roots, sticks, rubbish, matariats
toxic to plant growth and the hke, complying with AS 4419. Toprol mix end nutients levots ara to be optimised for usa with the native species hown on fhe drawings
FERTILISER
Fertilse al plants with organic based slow roleese fertirser, Rolease period it to m rrinimum 6 weeks. Fertlixe bstfwith Nirophothe Blue T.€. ate rain of 1kg/20m2 over preparadturtbase, Top crews wrt with
Nitram at the rate of 1kgOm2 at the and of the maitenance period
TURF
‘Tur species chal be'A' grade Wintergreen turt, The turf shall have 90-05% af the species type specified. The remaining percentage may conkaln grass species ether than the specified ype, No broad leaf xpwcies
are ecceptable, Upon placement ef topsoll bring surface to smooth even grades, fee fom mounds and holows such that he whole surface drains in accordance wit the hrished decign levels
Protect newly turfod arens against tetfic unt turfs established. Whan turfls established mow at regular ntervals to maintain an average height of 30mm, Remove waeds that emerge in the turfed sens
TREE SUPPLY
Selection, instattabon and maintenance of all raos will bo ofthe highest quality. All tees wil ba obtained fom # QALI regi suppber with an Austral Approved Quality ‘0 System. Trees
will contorm wih Natspec Guidelines for Growing Trees by Rass Clack. Tree wit confom tothe requirements of PLANTING’. Traes are to be single tunked with a vigoraus central leader and heathy Branching
eructure,
PLANTING
Supply plants in weed:-tee conteners of the required size. Open rocted stock ix not to be supplied. AI plant ase ta be healthy andvigoraus. Root bound, diseased and pocr stock will not be accepted,
MULCHING
Provide 25mm graded hoop pine mutch fom an ec credited mutch supplier. Place mulch ta the required depth, clear of plant stems, and rako to an evan surface tuch wih the surrounding finished levels, Spread
tard roll mutch sothat after vetting, oF ater rang, it ix smooth and evenly graded betwaan design wrtace fevats oped towards the bace of plant stems in plantxton beds, and nat closer tothe stem tran 80 rm.
Muich depth tobe 75mm,
STAKES AND TES
Provide stakes and bes #3 required to suppod and protect Tees.
25L bees - tno 25 x 25 ¥ 1800mm havewood stakes
451 tree - 2no 26x 26 » 1600mm hardwood steies
OOL tee - 2na. 6 x 80 x 1900mm hardwood stakes,
Stakes to be ambeddad 600mm mto the ground
ROCKWORK
Provide rounded sandstona boulders ranging from 300 - 700mm in charmeter to edgos
frock ehannels andto feature rock walls thown on tha drawings and deta
Provide 50mm - 150mm rounded washedriver gravel tx the base of al rock channels
8 indicated on the drawings and detais.
A.A3CONCRETE PATH
14
ANS,
1800mm wide concrete path to Architect's dataid and spocificsbon.
SAMPLES
Provide representative samples of all materials to be used in the landscape works {soll mulch and swale rockwork) «minimum of 16 working days pror ta their incorporation kilo the works. All plant matanialis to
be svmtsble fer mtpecton and approval pros to calvary to sta
ESTABLISHMENT
‘The planting establishment period commences st the date of practice} complatin for a pariod of 1 Sweeks, Throughout ths planing sstabkshment panad, carry out muintanance work inclickng, watering, mowing
weeding, rubbish removal, fomiung, pest and deaace contot turing staking and tying. ceplaning, cukivetng, pruning, hedge elppna, emrating, ronstetement of mutch, renovaing. np resting, and Kewprg he
sa nest and ty.
LANDSCAPE ARCHITECT
EDAW AELOM
MASTER PLANT SCHEDULE ys | oo. fp Le a -_ —
| wiltveete einer
CODE BOTANICAL NAME |COMMON NAME SIZ eT TS oe en
TREES & PLAMS ramones
ARC cun Archonlophoanix Gunninghamiana Bangalow palm 1S 2.5m 4m trunk heights! 2B ws
IBAN int Bank sia integrifolia |Coast Banksia 200L. 3. a. BRE,
ICUP ana Cupaniopsis anacardioides Tuckeroo: 200L 2
ELE eum Elaeocarpus eumundit Eumundi Quandong 200L, 4 TOENT
IMAC tan Macaranga tanarius IMacaranga 200L, 4
PAN tec Pandanus tectorivs Pandanus a une ee trunk 4
RAN fit Randia fitzalanit a 7 Zé ‘ oO 2 Ay
WAT flo Waterhousia floribunda , .
MIDDLESTORY - SMALL TO MEDIUM TREES & SHRUBS KEY PLAN,
ACM hem Acmens hemilanpra Broad Leaf Lilly Pilly 45.
ACM smi JAcmena smithii Lilly Pilly 45L
TALP cae inia caerulea Native Ginger 200mm
ALP zer zerumbert variegala 200mm
COR rub, Cardyline terminalis rubre 200mm:
CYA coo (Cyathea cooper! “454.
DOR exc Doryanthes excelse (Giant Lilly 300mm
RHA exc Rhapis excelsa Lady Palm 45L —_
SY Z leu Syzygium Jeuhmanil Riberry 45L,
SY2 cas ‘Syzygium "Cascade" S$. leuhmanit x S. wilsonii 45L
ISYZ pan Syzyium paniculatum minor S. australe 451.
ee ee ee ee ee pee pes
UNDERSTOREY SMALL SHRUBS, GRASSES & GROUNDCOVERS
AGA att Agave attenuata Centurt Plant, 300mm,
IDIA sta [Dianella stampede Flax Lilly 440mm
DIA jes Dianella caerulea “Little Jess” Form of D, caerulea 140mm
FES gla Festuca glauca Blue Mountain Grass 140mm,
1X0 coo ixora coccinea Jungle Flame 200mm
LIR eve Liriope “Evergreen Giant” Evergreen Giant 140mm
LOM lon Lomandra fongifolia Long-Leaf Matt Rush 140mm
ISPA mon [Spathiphyllum “Mona Lisa” 200mm.
1B jul Tibuochina “Jules” 140mm,
NOTES:
4 Ensure Crowns of all grasses
vk
(bianeiia, Lomandra etc) are kept clear of ail mutch.
SHEET OETAILS
aoe [ren joe foe
BROJECT
AURORA APARTMENTS
SUNSHINE BEACH
TRE
LEGEND
SPECIFICATION & SCHEDULE
DRAWING INFORMATION
Deny Drow [Ome en | rechad
c 1100
sx a fo2a7 2008.
Prqcciti Drang fo Ty88
0851 2755.01 L-LE-002
Page 27
LANDSCAPE ARCHITECT
EDAW AEC OM
FATUN ILD, we
aDROTAE aE
WRCOaTOORE CLD me NEE GIST
EASITING TREE THE RETANING WA LTO ENISITNG TREE es
REMOVED ARCHITECTS
SPECIFICATION mcm en AM
nem arenas ne
1 PAN toc CUENT
2 ARG cun
23 SPA mon
4 ARC cun
SYZems 5 SYZeas 36 SPAmon
SYZpan 43 SPA mon
KEY PLAN,
1 MAC tan
782 FES gs
11 LOM Jon NOTES
16 XO coc
1 ACM ham
4 EltAaum
‘38 ALP
M DApe NATURAL wary cou on
8 ARC cun
RIVER ROCK \
67 TB jl
\
N
\ EXISITNG TREE.
17 Ajax WATERY EATURE
b é
ty z 4 SYZ tu
o & POOL FENGE 10 AROHTECTS
te SPECIFICATION
wn
Ss 2 tab FES gla
2 a a AGAan ! \
4 3 DOR exe
2 FES ga \ he
Ww \ \ 2 ACM hem
\ \ 4 LOM Jon
2B DIA
is \ 3 ARG cun
60 TIBi)
2 PAN ne 19: Loltion
\ 6 LOM lon
18 Oks \ Py b
COR 75 ALP cae
145 ALA zer SHEET DETAILS
5 \ \ _—
7 Dips
\ es =
13 718 pl \ 1 ACM emi eon = oo (4)
~ “ve 13 COR nb
31 ALP tw \ }
67 DiAjes ocetacate tan mi aomrg
146 OtAjet
‘AMENOMENT / ISSUE REGISTER
2 CUP ana saa” [Ova npeor ose four
[opr __[reAnOwAc WOR peor
f
2 COR rub
| @ ALPcae
i
DR VEWAY TO.
ARCHITECTS
SPEGFICATION
1 BAN int
18 ARP zor
I
Loa un we
PROJECT
l AURORA APARTMENTS
143 LOM lon
6 LIReve
SUNSHINE BEACH
3 CYAco0
63 ALP zac
i CYA cao L. ARG cun
6 SYZcas 3 WAT fo:
1 BAN int
THLE
PLANTING PLAN
ORAVING INFORMATION
Dear Tee [De See «| Cree
SK a 1207 2008 i 1
Figecitio ‘Treang NO es
0851 275501 L-PP-401 OP1
——————— lO
Page 28
- HIND STAKES AS SPECIFIED MN 2No
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN GX INTO
GROUND
SQmm WIDE GREEN RECYCLED TIEAS.
{ TYPICAL TREE PLANTING IN GARDEN BED.
SCAETD
SCALE 10
SPECFID
100mm LAYER OF MULGH AS SPECIFIED
KEEP MULCH CLEAR FROM TRUNK OF
TREE MJLCHTO BE FLUSH NTH
‘SURROUNDING MULCH LEVELSIN
GARDEN BED
GACKFILL TREE PIT WITH MOOFIED STE
TOPSOIL AS SPECIFIED FORM
RETENTION TOPSOIL 1OETENDMN
OUmm DEEP THROUGH GARDEN FED
#8 SPECIFEO
$50rrem QUL TIVATED SUBGRAKE
EXCAVATE EACH TREE PIT TOALLOW
FOR MIN {md OF SITE TOPSOIL TOBE
WSTALLED TREE PIT MUST BE MNIOD
LARGER THAN ROOT BALL ONAL
‘sis
CULTIVATE SUBGRADE TOMN 10cm
DEPTH
‘SUBGRADE AS PROFILED bY CML
CONTRACTOR
SPADE CUT EDGE 10 TREE PITS
WHERE SPECIFIED REFERTO
‘SURF ACE FINISHES PLAN
TURF AS SPECIFIED MIN 10mm
TOPSOIL TO TURF AREAS AS
SPEGFIED
GACKFILL TREE PUT WITHMOOFIED =
SITE TOPSOIL. AS SPECIRED FORM
SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSDML TO
EXTEND MIN 00mm OEEP THROUGH
GARDEN BED AS SPEGFED.
Tom p-——~ — ~ HIND STAKES AS SPECIFIED MN 2Nu
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN 600m INTO
GROUND
0mm WADE GREEN RECYCLED TE AS.
SPEGFIED
00mm LAYER OF MULCH AS
SPEQIFIED KEEP MULCH CLEAR FROM
TRUNK OF TREE MULCHTO EE FLUSH
WITH SURROUNDING MULCH LEVA SIN
GARDEN GED
—— KERB BY CIML CONTRACTOR
EXCAVATE EACH TREE Pf TOALLOW
FOR MIN 1m3 OF SITE TOPSOL TOBE
STALLED TREE PIT MAST BE MN 100
LARGER THAN ROOT BALL ONAL
‘SIDES
CULTIVATE SUBGRADE TO MN 150mm
DEPTH
SUBGRADE A3 PROFILED BY QML.
CONTRACTOR
TYPICAL TREE IN TURF
2 SCALE 12
400nm LAYER OF MULCH AS SPECIFIED.
KEEP MULCH CLEAR FROM STEM OF PLANT.
MULCH TO BE FLUSH WITH SURROUNDING
MULCH LEVELS IN GARDEN BED.
PLANT AS SPECIFIED - REFER TO PLANTING
PLANS, PREPARE PLANTING HOLE 100mm
DEEPER AND 100mm WIDER THAN
POT BACKFILL WITH PLANTING MIX
AS SPECIFIED ENSURING SOIL IS
LEVEL AROUND BASE OF PLANT.
100mm MULCH DISH ORAIN TO
BASE OF EACH PLANT
300 DEEP TOPSOIL AS SPECIFIED
SUBGRADE AS PROFILED BY CMIL
CONTRACTOR
180 DEEP CULTIVATED SUBGRADE AS
SPECIFIED
aa GROUND PLANTING - TYPICAL DETAIL
FOOTPATH AND SUB SLAFACE
AGGREGATE BY CIVIL CONTRACTOR
OR AS SPECIFIED REFER TO
‘SURE ACE FINSHES PLAN
HD STARES AS SPECIFIED MIN ZN
PER TREE ENSURE STANES ARE
FIRMLY SECURED MINSOQqm iNTO
GROUND
‘0mm WIDE GREEN RECYCLED NE AS
BACKFILL TREE XT WTHMOOFIED.
SITE TOPSOIL AS SPECIFIED FORM
‘SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSOL TO
EXTEND MIN g0Umm DEEP THROUGH
GARDEN BED AS SPECFED.
SPECIFIED
100mm LAYER OF MILCH AS
SPECIFIED KEEP MULCH CLEARFROM
TRUNK OF TREE MULCH TO BEFLUGH
WATH SURROUNDING MULCH LEVELSIN
GARDEN BED.
ERG BY GML CONTRACTOR
EXCAVATE EAGH TREE PIT TOA.LOW
FOR MN 1nid OF SITE TOPSON, TO BE.
INSTALLED TREE PIT MUST GE MN 300
LARGER THAN ROOT BALL ON AL
SIDES
CULTIVATE SUBGRADE TOMN 150mm
DEPTH
SUBGRADE AS PROFILED BY CML
CONTRACTOR:
(3 yas TREE ADJACENT PAVEMENT
SCALES D
LANDSCAPE ARCHITECT
EDAW 4ECOM
var evuey
PLATLA ae UE
SUPORTE cease
ARCO NO GLO 2 syesecoeT
KEY PLAN,
NOTES
"SHEET DETAILS
onal sea kam evi aor
‘Yenay a8 eng lera or atsprovoc reer
Ul Bioenstone areve wakimetrea eens her 96 OR
AMENDMENT / 1SSUE REGISTER
pemene [U riot ad ue
—
PROJECT
AURORA APARTMENTS
SUNSHINE BEACH
THLE
DETAILS
DRAWING INFORMATION
Dass Crane a Sc Coacind
sk [" [rors As sHOwn
‘Pract Ns [erormno to Ise
0851 2755.01 L-DT-901
Page 29
SS enerr-rrapaes |
LANOSCAPE ARCHITECT
EDAW AEC OM
PLANTING AS $PEQFIED
ums esr
Parmnned enue
aro ae seme
wreconnot apo susars COST
TRERNOne 617608 05
Fioaame 64780 est a
eneeacooetpcer sons aa
ons
ASK ToS ewe
47.4 45 x DOU HD STALES AT 1/20 CENTRES PLATE CLOSER TOGETHER
ON I|GHT RACH CLIENT
19 «Sem MWY TIMBER E0GE W4TH 45.45.600mm LONG ____. t t 4 f
TIMBER EDGE. SIZE AS SPECIFIED NAL AVEDTOSTNES HWW TIMBER STAKES LOCATED AT MAQMUM ISD OCS ; tf ‘
" PLAGE ADDITIONAL STAKES ON CURVED CORKERS TO f on . Sy \
MANTAN EVEN CURVE. . :
AS SPEGIRED JOAN TIMBER EDGE WITH 19x <4o0rm LCS HY
JOINER GALVANISED NAIL FIXED TOEDGNG:
, . KEY PLAN,
= TU AS SPECIFIED
MULCH AS SPEQRIED:
_ TURF AREA AS SPECIFIED
75 x 15 « 450 JOINER TIMBER NAL FIXEO 10 EDGE TIMBER JOINER
TIMBER TO BE FINISHED 25mm BELOW TOP OF EDGE TIMGER PLANTING AREAS AS SPEGIFIED:
GBI
CLL 2 NOTES,
“fs
4 fe
iif
4 Oe tihg
SAW CUT AT REGULAR INTERVALS TO OUTSIDE CURVE OF TIMAER EDGE <
TO ACHEVE TIGHT RAN YZ
TIMBER EDGE - TYPICAL PLAN TIMBER GARDEN EDGE - TYPICAL SECTION
SCALE 110 2 SCR ENO
SHEET DETAILS
Donat xeate ton res race
Veaty a4 Benmore pas Dc oranicxr,
AiOlwacrs me nadmasien wisi crmwae 1s
AMENDMENT / ISSUE REGISTER
PROJECT —
AURORA APARTMENTS
SUNSHINE BEACH
TITLE
DETAILS
DRAWING INFORMATION
Oo Tren [Dea [Sea | crechou
Se Te )o207 2008 | AS SHOWN}
Progect No Craven No
0851 2755.01 L-DT-902
Page 30
LANDSCAPE ARCHITECT
EDAW AEC OM
ves
AUTON ADD
PLANTING TO PROPERTY — Suaronene
BOUNDARY AS SPEQFIED | MAACO NOE OLD te
his ln
TASRIONE 617447 48
FACEMLE OTROS
PLANTING IN MULCH WITHBOLLOERS
TO BE PLACED IN NATURAL OUTCROPS,
TO ACHIEVE A NATURALISTIC EFFECT
‘AS SPECIFED gy 74 QO “>
4 rAOER
Nt ‘
ROCK RETAINING WALL TO ENGNEERS DETENTION BASIN TO ENGINEERS REFER PLANTING PLAN FOR SPEGES
DETAIL AND SPECIFIGATION DETAL AND SPEGFICATION WIH TURE LOCATIONS, TYPES AND QUANTITIES ~
SURFACE TREATMENT
TURF SURFACE TREATMENT KEY PLAN
TO LEVEL SPREADER TO
ENGINGER’S DETAL &
A ‘SPEQFICATION
oom. oo i M
' 3 fo We
SWAR PAF o oR
|. fees VLE
FEW" a Ve
Wee Ne WZ
Ravin, . = WNP c NOTES
EA LAN ak
Key y | in Mf f
1 \ ith AMY
S VZWG
S WSN it fe
©) 2 UOT K )
bully n / . F = om
YP BO ARO At a LIA A LE RR A RCA Ua ae. qe pita
°
{ SECTION A - DETENTION BASIN |
SCAEIZ |
SHEET OETAILS
a us
oe rr
con teseron oa emg
iisntirs wre smeneser nna eoercee
“AMENDMENT / ISSUE REGISTER
ine [cre [ae
rm __ fornaTrain WORE a
— fe
PROJECT
AURORA APARTMENTS
SUNSHINE BEACH
TILE,
DETAILS
RAVING INFORMATION
Deng Crane: om ‘Scale Cheched
Sh | L 0207 1005 | AS SHOWA
Prqect ho Trawng No
Ta
0851 2755.01 [L-DT-903 OP1
—
Page 31
Sunshine Coast [AND USE SECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Materia! Change of Use - Code/Impact Consistent : 521 Inconsistent : 521 Assessment under Superseded Planning Scheme . 521 Modification to a Development Permit 521 Extension of a Currency Period §21 Operational Works - Landscaping 1 G2? 5 521 Bidg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour . §22 ADVERTISING Purchase Advertised Applications 523 JETTIES . : . Jetty Application Fee - 524 Jetty Bond ‘ . : _ 51 : , (Category 4) BONDS ’ Performance Bond 51 . (Category 9) SIGNS ’ Registration Fee : 222 SEARCH FEE . : . : Search of Land Use Section file. 112 Liquor Licensing Request oo : 113 TOTAL $ (wI25 NAME: Aweis A Dott. 2 : ADDRESS: = ¢f- a ~Gerton Deno fo be (2b! Joosa HEAAS Ys FILENO: O€]iue & : DATE: 8/7 & _ RECEIPTNO: — fou y. SC Signature of TP Officer: > a - AUTHORITY NO: . Nw] reoe/n ee)
Page 32
Sunshine Coast Regional Council PO Box 141, Tewantin, Q 4565 ABN 37 876 973 913 WATER & SEWERAGE WORKS PAY-IN SHEET / TAX INVOICE 2007/2008 Please present to Cashier when making payment csr er Receipt Type JOB DESCRIPTION Water/Sewerage Plan Examination Oe 2007/08 - $80 (W) $105 (S) per lot NIA | ABZO__ | 585 Gan2008.423.714) Water/Sewerage Field Inspection 2007/08 $70 (W) $95 (S) per lot N/A 586 (32/12008.423.715) Live Sewer Inspection (2007/08 $160.00) N/A 586 (32/12008.423.715) CCTV Inspection (2007/08 $5.00/lineat m) N/A 588 (32/12008.423.716) Checking as-constructed data (2007/08 $135) N/A 586 (32/12008.423.715) Sewerage SCADA YES 595 (15001.267.917) Water Connections, Relocation of Meters 2007/08 20mm $995, other sizes by quotation) N/A 30/616/16000.423.783 Water Meter Testing (2007/08 $142 for 20 & 25mm) N/A 589 (32/16000.423.785) PRIVATE WORKS & OTHERS _ ee Water Cut-ins (receipt type 30) N/A W4793.901.784 Sewerage Cut-ins, HCB cut-ins (receipt type 30) N/A W4395.901.782 | Sewer manholes — Pre-quoted Works N/A W5261.901.889 Sewer as-constructed plan (2007/08 -$8 incl of 73¢ GST) | YES 116 (31/15000.423.781) Lock & Weir Key (2007/08 $55/$110 incl of GST) YES 214 (10119.215.723) Name — _ — Date Paid: Address Total GST $ OQ 30 - Receipt No: File/s Total incl. GST § ‘CADocuments and Settings\amoore\Local Settings\ Temporary internet Files\OLKIEAWS Payment Schedule green - memo fax templates doc Cashier - please return form to W&S Section
Page 33
Page 1 of 2 Ann Moore From: Ann Moore Sent: Monday, 23 June 2008 3:25 PM To: ‘Gerard Smith’ Subject: RE: Op Works Costs - 43-45 Elanda Street, Sunshine Beach Gerard The following is your quote for Operational Works Application: PLAN EXAM 3.2.1. Minimum Fee $685 3.2.3 External Works $345 3.3.2 Earthworks $355 3.4 Sediment & Erosion $115 Pavement Design $200 3.7 As Constructed Drawings $175 hea) S INSPECTIONS 4.1.1 External Works $760 4.1.2 Internal Works $825 Landscaping . (Land Use Section) $1625 Sewer (Conditions 33-36 of 07/2174) Minimum Fee $930 Mike Froude - Manager Water and Sewerage suggests that the sewerage works be by Council at applicants expense. The cost would be approx. Ann Moore Administration Officer Land Development Section Sunshine Coast Regional Council - Tewantin Office PO Box 141 TEWANTIN QLD 4565 Ph: 5449 5261 Email:[email protected] aeons Original Message----- From: Gerard Smith [mailto:[email protected]] Sent: Friday, 20 June 2008 3:54 PM To: Ann Moore Subject: Op Works Costs - 43-45 Elanda Street, Sunshine Beach Warning: Email may contain offensive content. You are advised not to view email or attachments unless sent from a known and trusted source. Hi Ann, As requested, please find attached the Op. Works drawings from Contour Engineer's to assist 23/06/2008
Page 34
Page 2 of 2 in your assessment of the costs in obtaining the Development Permit for Operational Works for the proposed 5 Unit Development located at 43-45 Elanda Street, Sunshine Beach. Could you please provide a breakdown of the itemised costs associated in obtaining the Development Permit for Op. Works. Thanks Ann. Regards, Gerard len celesrea) B= Sea PO Box 1261 Noosa Heads QLD 4567 4/36 Sunshine Beach Road. Noosa Junction Telephone 5447 5394 [email protected] www.iangortondesign.com.au This transmission is for the intended addressee only and is confidential information. If you have received this transmission in error, please delete it and notify the sender. 23/06/2008
Page 35
S UNS h ne Co AST | DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier: Please Retum to Admin Officer, Development)
Regional Council __ _ | _
|» APPLICATION AND GENERAL FEES » A _| RECEIPT TYPE | BONDS - Bond Refund Details, |
ApplicationFees SS 540 Payee Name:
Road / Drainage Plan Exam 341 Address:
Road / Drainage Field Inspection 542
Legal Document Examination $43
Sealing Fee - Survey Plans, Legal Documents 544
Sale of Documents, Policy Lists, Misc 545 CALCULATIONS _
Bonding Admin Fee (Contributions, uncompleted works) 546 Lot Calculation
Closed Circuit TV Inspection 588
Pre-lodgement Meeting Fee 549 :
| CONTRIBUTIONS __ _| RECEIPT. TYPE | Plan Examination Calculation
Developer Contribution — Landscaping a 550 : .
Developer Contribution - Road Other than PSP §53
554
Developer Contribution ~ Drainage Other than PSP
Developer Contribution - Pathway Other than PSP
685 Inspection Calculation
Developer Contrib. - in Liew Off St Parking (PSP13 Car parking) | CTS
Developer Contribution - Other Parks and Community | ROADWORKS CO NTRIBUTIONS |
Cc:
ICS — Community Land (Not currently active) atchment:
ICS - Public Transport
ICS — Sewerage (PSP Rural) Road/Section:
ICS — Sewerage (PSP Coastal)
ICS - Sewerage — South Peregian (PSP Maroochy) [APPLICATION DETAILS _
ICS - Water Supply (PSP) fPayeeName:
ICS - Sport and Recreation Land (PSP Parks) : Address:
ICS ~ Drainage (PSP Noosaville Master & Ward Street)
ICS — Road (CMRNICP) If BA not entered then use 594
ICS — Pathway (PSP)
Development Location:
Total of Fees Paid (Excluding Bonds)
Date: | File Numbers or Reference:
Security Deposits/Performance/MaintenancelUncompleted Works Bond | 54 (Cat)
Date application properly made:
Total of Fees Paid (Including Bonds) “Receipt N Receipt Date:
eceipt No:
P:fLand Development/FEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
Used in these records
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.