Council archive · source document
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published] · 142008.1168
PROPOSED TEMPORARY CONSTRUCTION —>
BATTER 1v TO 1.5h INACCORDANCE WITH |
GEOTECHNICAL REPORT
-—— PROPOSED BUILDING RETAINING STRUCTURE
fy REFER FUTURE STRUCTURAL ENGINEERING ||
as DRAWINGS ||
| / |
a — = ae fe
/ DENOTES TEMPORARY SEDIMENT FENCE
/ E FINAL EXTENT TO BE REVIEWED AND
/ : / DETERMINED ON SITE
/ he
a ty ALL HEIGHT 1.8m
/— DENOTES APPROX LOCATION OF
| 2 / TREES TO BE RETAINED, CONFIRM
a oe WITH LANDSCAPE DRAWINGS
a f
a
| | o
8 | | S
| 2
| || &§ .
EL \ CUT FILL
uw
uu |
a
& ~
n | S al
<x f
a b
= | | ! Y —_—_———
= | PAD LEVEL 48.40 | PAD LEVEL 48.40 7
: | ( ROCK FILTER DAM WITH OVER-TOPPING CREST
| LOCATED AT CENTER LINE OF LEVEL SPREADER
| » +7 ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
| | \
| | 7?
| \ 5 CONSTRUCT LEVEL SPREADER
| | | NY f DURING INITIAL EARTHWORKS STAGE
| REFER SHEET 8 FOR DETAILS
| pe
a | -*
| \
\ ra \ | EXCAVATE DETENTION BASIN DURING INITIAL
\ | Ties | EARTHWORKS STAGE
\ | \ WALL HRIGHT:14mn\ | LINE SIDES WITH GEOFABRIC AND LOOSE PLACED
| STONE PITCHING AS REQUIRED
| ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
|
{ \
|
\ |
— 1 7 Ti: J / |
,_\ SS ee ee ooo
\ \ |
\ L_p
Hy; \ \ ee \— DENOTES TEMPORARY SEDIMENT FENCE
jy) 6 \ aa SITE PLAN FINAL EXTENT TO BE REVIEWED AND
HH} = \ | SCALE 1:200 DETERMINED ON SIT!
Ty] \ \
|
| |!
pore 1 eee ee eee __ PROPOSED BUILDING RETAINING STRUCTURE
PROPOSED TEMPORARY CONSTRUCTION — V REFER FUTURE STRUCTURAL ENGINEERING
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH DRAWINGS
STREET GEOTECHNICAL REPORT WING
PROPOSED BUILDING OUTLINE /| _ EXCAVATE DETENTION BASIN DURING INITIAL
—————————— a oy EARTHWORKS STAGE . app RBERE
| J LINE SIDES WITH GEOFABRIC AND LOOSE PLACED ROCK FILTER DAM WITH OVER-TOPPING CREST
| 7 STONE PITCHING AS RE -— LOCATED AT CENTER LINE OF LEVEL SPREADER
pa oes PAD LEVEL 48 40 y ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
FILL
, —= aa
SECTION A ce a /
SCALE 1.200 a 3
/ a
| £m g
eee
CONTOUR :
Consulting Engineers ?:
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
PLAN DETAILS.
Designed: BPL
Drawn, RM
Checked: AWS
Datum: AHO
Date MAY 08
Rev | paTe
COMMENT BY | CHKD
PLAN TITLE
EARTH WORKS, SEDIMENT AND
EROSION CONTROL PLAN
@ or 3977 G 07 5493 0888 G oimin@ContourCE com.au
A Re |
pun ne S083 - OPWZ xcvsun B SHEET
2 or @
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.