- HIND STAKES AS SPECIFIED MN 2No
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN GX INTO
GROUND
SQmm WIDE GREEN RECYCLED TIEAS.
{ TYPICAL TREE PLANTING IN GARDEN BED.
SCAETD
SCALE 10
SPECFID
100mm LAYER OF MULGH AS SPECIFIED
KEEP MULCH CLEAR FROM TRUNK OF
TREE MJLCHTO BE FLUSH NTH
‘SURROUNDING MULCH LEVELSIN
GARDEN BED
GACKFILL TREE PIT WITH MOOFIED STE
TOPSOIL AS SPECIFIED FORM
RETENTION TOPSOIL 1OETENDMN
OUmm DEEP THROUGH GARDEN FED
#8 SPECIFEO
$50rrem QUL TIVATED SUBGRAKE
EXCAVATE EACH TREE PIT TOALLOW
FOR MIN {md OF SITE TOPSOIL TOBE
WSTALLED TREE PIT MUST BE MNIOD
LARGER THAN ROOT BALL ONAL
‘sis
CULTIVATE SUBGRADE TOMN 10cm
DEPTH
‘SUBGRADE AS PROFILED bY CML
CONTRACTOR
SPADE CUT EDGE 10 TREE PITS
WHERE SPECIFIED REFERTO
‘SURF ACE FINISHES PLAN
TURF AS SPECIFIED MIN 10mm
TOPSOIL TO TURF AREAS AS
SPEGFIED
GACKFILL TREE PUT WITHMOOFIED =
SITE TOPSOIL. AS SPECIRED FORM
SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSDML TO
EXTEND MIN 00mm OEEP THROUGH
GARDEN BED AS SPEGFED.
Tom p-——~ — ~ HIND STAKES AS SPECIFIED MN 2Nu
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN 600m INTO
GROUND
0mm WADE GREEN RECYCLED TE AS.
SPEGFIED
00mm LAYER OF MULCH AS
SPEQIFIED KEEP MULCH CLEAR FROM
TRUNK OF TREE MULCHTO EE FLUSH
WITH SURROUNDING MULCH LEVA SIN
GARDEN GED
—— KERB BY CIML CONTRACTOR
EXCAVATE EACH TREE Pf TOALLOW
FOR MIN 1m3 OF SITE TOPSOL TOBE
STALLED TREE PIT MAST BE MN 100
LARGER THAN ROOT BALL ONAL
‘SIDES
CULTIVATE SUBGRADE TO MN 150mm
DEPTH
SUBGRADE A3 PROFILED BY QML.
CONTRACTOR
TYPICAL TREE IN TURF
2 SCALE 12
400nm LAYER OF MULCH AS SPECIFIED.
KEEP MULCH CLEAR FROM STEM OF PLANT.
MULCH TO BE FLUSH WITH SURROUNDING
MULCH LEVELS IN GARDEN BED.
PLANT AS SPECIFIED - REFER TO PLANTING
PLANS, PREPARE PLANTING HOLE 100mm
DEEPER AND 100mm WIDER THAN
POT BACKFILL WITH PLANTING MIX
AS SPECIFIED ENSURING SOIL IS
LEVEL AROUND BASE OF PLANT.
100mm MULCH DISH ORAIN TO
BASE OF EACH PLANT
300 DEEP TOPSOIL AS SPECIFIED
SUBGRADE AS PROFILED BY CMIL
CONTRACTOR
180 DEEP CULTIVATED SUBGRADE AS
SPECIFIED
aa GROUND PLANTING - TYPICAL DETAIL
FOOTPATH AND SUB SLAFACE
AGGREGATE BY CIVIL CONTRACTOR
OR AS SPECIFIED REFER TO
‘SURE ACE FINSHES PLAN
HD STARES AS SPECIFIED MIN ZN
PER TREE ENSURE STANES ARE
FIRMLY SECURED MINSOQqm iNTO
GROUND
‘0mm WIDE GREEN RECYCLED NE AS
BACKFILL TREE XT WTHMOOFIED.
SITE TOPSOIL AS SPECIFIED FORM
‘SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSOL TO
EXTEND MIN g0Umm DEEP THROUGH
GARDEN BED AS SPECFED.
SPECIFIED
100mm LAYER OF MILCH AS
SPECIFIED KEEP MULCH CLEARFROM
TRUNK OF TREE MULCH TO BEFLUGH
WATH SURROUNDING MULCH LEVELSIN
GARDEN BED.
ERG BY GML CONTRACTOR
EXCAVATE EAGH TREE PIT TOA.LOW
FOR MN 1nid OF SITE TOPSON, TO BE.
INSTALLED TREE PIT MUST GE MN 300
LARGER THAN ROOT BALL ON AL
SIDES
CULTIVATE SUBGRADE TOMN 150mm
DEPTH
SUBGRADE AS PROFILED BY CML
CONTRACTOR:
(3 yas TREE ADJACENT PAVEMENT
SCALES D
LANDSCAPE ARCHITECT
EDAW 4ECOM
var evuey
PLATLA ae UE
SUPORTE cease
ARCO NO GLO 2 syesecoeT
KEY PLAN,
NOTES
"SHEET DETAILS
onal sea kam evi aor
‘Yenay a8 eng lera or atsprovoc reer
Ul Bioenstone areve wakimetrea eens her 96 OR
AMENDMENT / 1SSUE REGISTER
pemene [U riot ad ue
—
PROJECT
AURORA APARTMENTS
SUNSHINE BEACH
THLE
DETAILS
DRAWING INFORMATION
Dass Crane a Sc Coacind
sk [" [rors As sHOwn
‘Pract Ns [erormno to Ise
0851 2755.01 L-DT-901
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.