Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published] · 142008.1168

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

- HIND STAKES AS SPECIFIED MN 2No
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN GX INTO
GROUND

SQmm WIDE GREEN RECYCLED TIEAS.

 

 

 

 

 

 

 

 

{ TYPICAL TREE PLANTING IN GARDEN BED.

SCAETD

 

SCALE 10

 

SPECFID

100mm LAYER OF MULGH AS SPECIFIED
KEEP MULCH CLEAR FROM TRUNK OF
TREE MJLCHTO BE FLUSH NTH
‘SURROUNDING MULCH LEVELSIN
GARDEN BED

GACKFILL TREE PIT WITH MOOFIED STE
TOPSOIL AS SPECIFIED FORM

 

RETENTION TOPSOIL 1OETENDMN
OUmm DEEP THROUGH GARDEN FED
#8 SPECIFEO

$50rrem QUL TIVATED SUBGRAKE

EXCAVATE EACH TREE PIT TOALLOW
FOR MIN {md OF SITE TOPSOIL TOBE
WSTALLED TREE PIT MUST BE MNIOD
LARGER THAN ROOT BALL ONAL
‘sis

CULTIVATE SUBGRADE TOMN 10cm
DEPTH

‘SUBGRADE AS PROFILED bY CML
CONTRACTOR

SPADE CUT EDGE 10 TREE PITS
WHERE SPECIFIED REFERTO
‘SURF ACE FINISHES PLAN

TURF AS SPECIFIED MIN 10mm
TOPSOIL TO TURF AREAS AS
SPEGFIED

 

   

GACKFILL TREE PUT WITHMOOFIED =
SITE TOPSOIL. AS SPECIRED FORM
SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSDML TO
EXTEND MIN 00mm OEEP THROUGH
GARDEN BED AS SPEGFED.

 

Tom p-——~ — ~ HIND STAKES AS SPECIFIED MN 2Nu
PER TREE ENSURE STAKES ARE
FIRMLY SECURED MIN 600m INTO
GROUND

0mm WADE GREEN RECYCLED TE AS.

 

 

 

 

 

 

SPEGFIED

00mm LAYER OF MULCH AS
SPEQIFIED KEEP MULCH CLEAR FROM
TRUNK OF TREE MULCHTO EE FLUSH
WITH SURROUNDING MULCH LEVA SIN
GARDEN GED

—— KERB BY CIML CONTRACTOR

EXCAVATE EACH TREE Pf TOALLOW
FOR MIN 1m3 OF SITE TOPSOL TOBE
STALLED TREE PIT MAST BE MN 100
LARGER THAN ROOT BALL ONAL
‘SIDES

CULTIVATE SUBGRADE TO MN 150mm
DEPTH

SUBGRADE A3 PROFILED BY QML.
CONTRACTOR

 

TYPICAL TREE IN TURF
2 SCALE 12

400nm LAYER OF MULCH AS SPECIFIED.
KEEP MULCH CLEAR FROM STEM OF PLANT.
MULCH TO BE FLUSH WITH SURROUNDING
MULCH LEVELS IN GARDEN BED.

PLANT AS SPECIFIED - REFER TO PLANTING
PLANS, PREPARE PLANTING HOLE 100mm
DEEPER AND 100mm WIDER THAN

POT BACKFILL WITH PLANTING MIX

AS SPECIFIED ENSURING SOIL IS

LEVEL AROUND BASE OF PLANT.

100mm MULCH DISH ORAIN TO

BASE OF EACH PLANT

300 DEEP TOPSOIL AS SPECIFIED

SUBGRADE AS PROFILED BY CMIL
CONTRACTOR

180 DEEP CULTIVATED SUBGRADE AS
SPECIFIED

aa GROUND PLANTING - TYPICAL DETAIL

FOOTPATH AND SUB SLAFACE
AGGREGATE BY CIVIL CONTRACTOR
OR AS SPECIFIED REFER TO
‘SURE ACE FINSHES PLAN

HD STARES AS SPECIFIED MIN ZN
PER TREE ENSURE STANES ARE
FIRMLY SECURED MINSOQqm iNTO
GROUND

‘0mm WIDE GREEN RECYCLED NE AS

 

 

 

 

 

 

BACKFILL TREE XT WTHMOOFIED.
SITE TOPSOIL AS SPECIFIED FORM
‘SHALLOW BERM TO TRUNK FOR
WATER RETENTION TOPSOL TO
EXTEND MIN g0Umm DEEP THROUGH
GARDEN BED AS SPECFED.

 

 

 

 

 

SPECIFIED

100mm LAYER OF MILCH AS
SPECIFIED KEEP MULCH CLEARFROM
TRUNK OF TREE MULCH TO BEFLUGH
WATH SURROUNDING MULCH LEVELSIN
GARDEN BED.

ERG BY GML CONTRACTOR

EXCAVATE EAGH TREE PIT TOA.LOW
FOR MN 1nid OF SITE TOPSON, TO BE.
INSTALLED TREE PIT MUST GE MN 300
LARGER THAN ROOT BALL ON AL
SIDES

CULTIVATE SUBGRADE TOMN 150mm
DEPTH

SUBGRADE AS PROFILED BY CML
CONTRACTOR:

 

(3 yas TREE ADJACENT PAVEMENT
SCALES D

LANDSCAPE ARCHITECT

 

EDAW 4ECOM

var evuey
PLATLA ae UE
SUPORTE cease
ARCO NO GLO 2 syesecoeT

 

 

 

KEY PLAN,

 

 

NOTES

 

 

"SHEET DETAILS

 

onal sea kam evi aor
‘Yenay a8 eng lera or atsprovoc reer

Ul Bioenstone areve wakimetrea eens her 96 OR

 

AMENDMENT / 1SSUE REGISTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pemene [U riot ad ue
—

PROJECT

AURORA APARTMENTS

SUNSHINE BEACH

 

THLE

 

DETAILS

 

DRAWING INFORMATION

 

 

 
  

 

 

Dass Crane a Sc Coacind
sk [" [rors As sHOwn
‘Pract Ns [erormno to Ise
0851 2755.01 L-DT-901

 

 

 

 

Used in these records

About this file

File size
6.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1168 - Operational Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.