Council archive · source document
Development Application Part 1 of 2 · OPW11/0131
: oPwiloi3} eu Integrated Development Ore System form Application details—IDAS form 1 hoc lec ni (Sustainable Planning Act zoog version 1.0 effective 18 December 2009) You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: e complete this form (Application details—IDAS form 1) e complete any other forms relevant to your application « provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) Name/s (individual or company name in full) TG MG mea Pi L4d For companies, contact name Darréu Th 1 a3, Postal address PO Box SEs W Ballarat Contact phone number O% 5220€ aa Mobile number (non-mandatory) Fax number (non-mandatory) 02 532323 SIS e-mail address (non-mandatory) darren 4 @ tam qfouPpelCom Oe) | Bee uci ecot Toco ce iT ae fas) eo: (ee RSV eat cla
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
1, What Is the nature of development proposed? (tick all applicable box/es) i material change of use of premises EC] building work operational work [| reconfiguring a lot 2. What type of approval is being sought? om development permit L] preliminary approval | both—provide details below 3. Is the application for a mobile and temporary environmentally relevant activity (ERA)? of L] Yes—complete table A and then go to question 5 Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate 4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row) Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the premises street address/lot on the plan | street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) Street address Lot on plan description | Local government area Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type (e.g. Logan, Cairns) no. no, locality name code and plan no. 1% |Eumund:) NoesaRd $0 |spzég> |Nooga 2 Application deiails—IDAS form 1 Version 1.0 18 December 2009
Page 3
Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates Zone Datum Local government (note: place each set of coordinates in a separate row) reference area (if applicable) Easting Northing Latitude Longitude C] GDA94 [_] wessq [| other 5. Total area of the premises on which the development is proposed (indicate hectares or m?) 3-|€2 ta 6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.) Ex Sti ek Roalways Zo To 7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) Recoufiquie existing Nadesechous iw accodauce With relevarl CoudHous tu DEKIS fon Notce LOCN(2SE, flanechesiteae readw orks, Stormwater diai nage, Street lighting and landscaping cy Zz oy 8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information) [% No | Yes—complete either table D, table E or table F as applicable Table D Name of owner/s of the land 1/We, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date Application detaits—IDAS form 1 Version 1.0 18 December 2009
Page 4
Table E
Name of owner/s of the land
Cl The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
L] By making this application, |, the applicaat, declare that the owner has given written consent to the making of the
application.
[ 9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
: Refer to the notes at the end of this form for more information)
oH No C] Yes—complete table G
Table G—state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the {] Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)
CJ Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
CJ Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
10. Identify if any of the following apply to the premises (tick applicable box/es)
C] adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H
C on strategic port land under the 7ransport infrastructure Act 1994—complete table |
L in a tidal water area—complete table J
Table H Name of water body, watercourse or aquifer
Lévis ~IDAS form 1
Version 1.0 18 December 2009
Page 5
Table | Lot on plan description for strategic port land Port authority for the lot Table } Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable) 21, Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.) aA No [] Yes—ensure the type, location and dimension of each easement is included in the plans submitted 12. Does the proposal include new building work or operational work on the premises? (including any services) CL No oH Yes—ensure the nature, location and dimension of proposed works are included in plans submitted 13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this form for more information) C] No-—go to question 15 [ves 44. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information) a Yes—complete table K and submit with this application the yellow local government/private certifier’s copy of the receipted QLeave form Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B, E, Lor P) 15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 2009? of im Yes—please provide details below Name of local government Date of written notice given | Reference number of written notice given by local government by local government (if applicable) slapul-abion aoreels—IDAS form 4 Version 1.0 18 December 2009
Page 6
16. List below alt of the forms and supporting information that accompany this application (include all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made on-line using Smart eDA) Description of attachment or title of attachment Method of lodgement to assessment manager ECL General Notes aud Drang Ia dex Hard Copy - uaa ECL Proposed Roundabout Fastin eat Layout Pla bow ECS Cotheveg Due Cross- Secon’ “ & “ ECU-ECS E dunund: Bd Cross- $ ections “ie “ ECG kerb Setout Co-Ordinates ond Levels Wee | 17. Applicant’s declaration LC] By making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is tequired for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. QOwner’s consent is not required for a mobile and temporary ERA. Question 9: Section 264 of the Sustainable Planning Act 2009 provides that If a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: The Building and Construction Industry (Portable Long Service Leave) Act 1994 prescribes when the portable tong service leave levy is payable. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a devetapment permit is issued. Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au. version 1.0148 December 2009
Page 7
Privacy—the information coltected in this form will be used by the Department of infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to information Act 2009) ar as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002,
OFFICE USE ONLY
Date received
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
toin this application
Reference numbers
Council. { have been engaged as the private certifier for the building work referred
Date of engagement
Name
BSA Certification license number
Building
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Description of the work
QLeave Project
Number ($)
Amount paid
Date paid
Date receipted
form sighted by
assessment
manager
Name of officer who
sighted the form
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Application detatls—IDAS form 4
Version 1.0 18 December z009
Page 8
Building or operational work assessable against a planning scheme—IDAS form 6 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) This form must be completed for development applications for building works or operational work assessable against a planning scheme. You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: « complete Application details—/DAS form 1 « complete any other forms relevant to your application . provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 of the Sustainable Planning Regulation 2009. This form can also be used for development on strategic port tand under the 7ransport Infrastructure Act 1994. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au 1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es) C] building work—complete table A ra operational work—complete table B [ TableA What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) C] development permit Lj preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) List of approval reference/s Date approved Date approval lapses
Page 9
Table B road works stormwater C] water infrastructure | drainage works om earthworks LJ sewerage infrastructure of landscaping signage | clearing vegetation under the planning scheme What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es) iy] other—provide details Street Usalotin g aud | andS capi 4 (te roundabout) ao — attachment to this form to detail each approval request) L] development permit | preliminary approval | both—specify below What type of approval is being sought? (if you have indicated multiple works in the above question, please use an p perat oud a Pprou al No CE] Yes—specify the number of tots being created + 1s the operational work necessary to facilitate the creation of new lots? (e.g. subdivision) Are there any current approvals associated with this application? (e.g. material change of use) C] No Yes—provide details below List of approval reference/s Date approved Date approval lapses Decistou Notre 2007 /256 10 Suly2 00% i) 2. What Is the dollar value of the proposed building work? (inc GST, materials and tabour) | 3. Confirm that the following mandatory supporting information accompanies this application Confirmation of lodgement Method of lodgement All applications for operational works site plans drawn to scale which show the following: ® the location and site area of the land to which the application relates (relevant land) ® the north point © the boundaries of the relevant land e the allotment fayout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) [co nfirmed e-iDAS form 6 Version 1.0 18 December 2008
Page 10
* any existing or proposed easements on the relevant land and their function
© any access limitation strips
all existing and proposed roads and access points on the relevant fand
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant to
the application
| confirmed
Applications for operational works involving earthworks (filling and excavating) L
drawings showing:
e existing and proposed contours
© areas to be cut and filled
e the location and level of any permanent survey marks or reference stations
used as datum for the works
« the location of any proposed retaining walls on the relevant land and their
height
© the defined flood level (if applicable)
® the defined fill level (if applicable)
ivi confirmed
Applications for operational works involving roadworks
drawings showing:
existing and proposed contours
the centreline or construction tine showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
© information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if appticable) and
curve widening (if applicable)
© kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not paraltel to centreline)
© edge of pavement where kerb is not constructed
© position and extent of channelisation
© location and details of all traffic signs, guideposts, guardrail and other street
furniture
® pavement markings including details on raised pavement markers
» catchpit, manhole and pipeline locations
® drainage details (if applicable)
© cross road drainage culverts (if applicable)
« concrete footpaths and cycle paths
» location and details for access points, ramps and invert crossings
e changes in surfacing material
[A confirmed
4 {DAS form &
fon 1.018 December 2009
Page 11
Applications for operational warks involving stormwater drainage 7 drawings showing: e existing and proposed contours e drainage locations, diameters and class of pipe, open drains and easements ® manhole location, chainage and offset or co-ordinates and intet and outlet invert levels ® inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels | confirmed Applications for operational works involving water reticulation drawings showing: « kerb lines or edge of pavement where kerb is not constructed e location and levels of other utility services where affected by water reticulation works e pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs | confirmed Applications for operational works involving sewerage reticulation drawings showing: © tocation of all existing and proposed services e tocation of all existing and proposed sewer lines and manhole locations ® location of all house connection branches * kerb lines or edge of pavement where kerb is not constructed ® chainages e design sewer invert levels e design top of manhole levels © type of manhole and manhole cover © pipe diameter, type of pipe and pipe alignment e location of house connections (if applicable) © sewer pump station details (if applicable) | confirmed Applications for operational works involving street lighting drawings showing: e location of all light poles and service conduits e location of all other cross road conduits © type of wattage and lighting ® any traffic calming devices « additional plans for roundabouts and major roads (if applicable) « details of any variations to normal alignment « details of lighting levels CJ confirmed TBA “= IDAS form 6 sion 1.078 December 2009
Page 12
Applications for operational works involving public utility services drawings showing: C] confirmed © any existing light poles and power poles © any existing underground services details of proposed services alternation to existing services Applications for operational works involving landscaping works drawings showing: LC] confirmed « the location of proposed plant species © aplant schedule indicating common and botanical names, pot sizes and numbers of plants * planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden T BR h edge » the location and type of any existing trees to be retained * construction details of planter boxes, retaining walls and fences e the proposed maintenance period e irrigation system details Notes for completing this form: ¢ This form can also be used for development applications for building works or operational works assessable against the tand use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy—please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. emeIDAS form 6 Version 1.0 18 December 2009
Used in these records
Development Application Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.