Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application Part 1 of 2 · OPW11/0131

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

16. List below alt of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)

 

 

 

 

 

 

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager

ECL General Notes aud Drang Ia dex Hard Copy - uaa
ECL Proposed Roundabout Fastin eat Layout Pla bow
ECS Cotheveg Due Cross- Secon’ “ & “
ECU-ECS E dunund: Bd Cross- $ ections “ie “
ECG kerb Setout Co-Ordinates ond Levels Wee

 

|

 

17. Applicant’s declaration

 

 

LC] By making this application, | declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).

 

Notes for completing this form

Question 8:

Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is tequired for an
application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
QOwner’s consent is not required for a mobile and temporary ERA.

Question 9:

Section 264 of the Sustainable Planning Act 2009 provides that If a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.

Question 13:

The Building and Construction Industry (Portable Long Service Leave) Act 1994 prescribes when the portable tong
service leave levy is payable.

The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a devetapment permit is issued.
Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.

 

version 1.0148 December 2009

 

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.