Original source · versioned page text
Attachment 3- Civil Engineering Plans B prepared by Barlow Shelly
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
4.1
R2
4.9
4.95 R1
2
R2
12.1
R24.1
5.05
6.325
11
2.55
5.05
6.325
R25
R11
11
5
R30
4.9
R25
1
1
0
R1
2
2
5
4.9
4.9
LEGEND - NEW WORKS EXTENT
8.0
EXTENT OF AC SEAL
EXTENT OF FILL EARTHWORKS
EXTENT OF CUT EARTHWORKS
KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
EXTENT OF 2m WIDE CONCRETE FOOTPATH
3.9
5
EXTENT OF COMMERICAL CONC. DRIVEWAY
ROAD CENTRELINE
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
DATUM AHD SHEET: OF
DESIGN MM
0 5.0 10 15 20 25m ................. 14 15
Director: CAMERON LANDRETH DRAWING TITLE: DRAWING NUMBER REV
DRAWN MM
SCALE 1:500 A3 (RPEQ 19358)
DESIGN CHECK CL
DRAWING STATUS
07 5443 8285
[email protected] www.barlowshelley.com.au
R14
This drawing is not to be copied or amended without written permission from
DATE 21-02-19 FOR APPROVAL
Barlow Shelley Consulting Engineers PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original