Original source · versioned page text
Attachment 3- Civil Engineering Plans B prepared by Barlow Shelly
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
LEGEND - NEW WORKS EXTENT
DENOTES DRIVEWAY ACCESS POINTS
LO
T2
2 EE
NI
E
CR LOT 23
N N DRIVE EE
LOT 24
RENE STREET
F MA K
RO
HO A D
LOT 25
1.497
Ha
LOT 2
LOT 1
12.782 Ha
HO
FM
LOT 21
AN
N
DR
20
T
19
LO
T
18
LO
E
T
17
Y DRIV
LO
LOT 3
T
LO
4.343 Ha
LOT 7
ER HA
2.975 Ha
WALT
4
T
LO
T5
PROPOSED HOFMANN LO
T6
LO
DRIVE EXTENSION T8
LO
LO
LOT 15 T9
PROPOSED ROAD B
LOT 16
LOT 14 PROPOSED ROAD A
LOT 10
LOT 13
LOT 11
LOT 12
E
RIV
YD
HA
R
TE
AL
W
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
DATUM AHD SHEET: OF
DESIGN MM
0 40 80 120 160 200m ................. 3 15
Director: CAMERON LANDRETH DRAWING TITLE: DRAWING NUMBER REV
DRAWN MM
SCALE 1:4000 A3 (RPEQ 19358)
DESIGN CHECK CL
DRAWING STATUS
07 5443 8285
[email protected] www.barlowshelley.com.au
R03
This drawing is not to be copied or amended without written permission from
DATE 21-02-19 FOR APPROVAL
Barlow Shelley Consulting Engineers PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original