Original source · versioned page text
Attachment 3- Civil Engineering Plans B prepared by Barlow Shelly
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
LOT 23
LOT 24
LOT 25
1.497 Ha
EE
NI
E
CR
EE
K
RO
AD
PROPOSED ACCESS DRIVEWAY
OFF INTERNAL PARKING ISLE.
TYPE B2 TO IPWEAQ RS-051
DRIVEWAY ACCESS TO LOTS 22-25
U
LOT 2
N
OFF EXISTING ROUNDABOUT. REFER
-N
TRAFFIC ENG ON PLAN R08 LEGEND - NEW WORKS EXTENT
AM
ED
EXTENT OF AC SEAL
R
O
AD
EXTENT OF FILL EARTHWORKS
EXTENT OF CUT EARTHWORKS
KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
EXTENT OF 2m WIDE CONCRETE FOOTPATH
EXTENT OF COMMERICAL DRIVEWAY
ROAD CENTRELINE
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
DATUM AHD SHEET: OF
DESIGN MM
0 10 20 30 40 50m ................. 8 15
Director: CAMERON LANDRETH DRAWING TITLE: DRAWING NUMBER REV
DRAWN MM
SCALE 1:1000 A3 (RPEQ 19358)
DESIGN CHECK CL
DRAWING STATUS
07 5443 8285
[email protected] www.barlowshelley.com.au
R08
This drawing is not to be copied or amended without written permission from
DATE 21-02-19 FOR APPROVAL
Barlow Shelley Consulting Engineers PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original