Decision Notice - 010.2008.00000242.001 [As Published] · 132008.242
2008/242
32. The use of vibratory equipment of any kind is not permitted to be used (including vibrating
rollers and the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques) unless approved and supervised by a Certified Geotechnical
Engineer. Under such circumstances the operator of such equipment shall at all times comply
with the directions of the Geotechnical engineer and the reasonable and lawful directions of
Council officers.
The proposed use of such equipment shall be detailed in any application for a Development
Permit for Operational Works.
33. Certification of the completed works must be provided to Council by the supervising engineer.
The certification shall state that the completed works, including any on site infiltration, conform
with all aspects of the design and that the completed works will not have any adverse affects
on the stability of adjoining buildings and/or structures and/or services and/or lands.
Site Stability
34. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
35. Should the recommendations of the geotechnical report require any part of the works
(including excavation, retaining structures, tie backs etc) to be temporarily or permanently
constructed within any adjoining property a letter of authority from the adjoining property
owner shall be submitted to Council prior to the issue of operational works approval.
Erosion and Sediment Control
36. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
37. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP20 – Pathway Trunk Network Contributions $691
TOTAL Contribution Amount = $691
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Page 5 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000242.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.