Original source · versioned page text
2019-03-12 Planning & Environment Committee Agenda
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 MARCH 2019
RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 12 March 2019 regarding Application No. 132008.1128.02 to make a
minor change to an existing approval for Multiple Housing – Type 3 Retirement & Special Needs;
Commercial Business – Type 2 Medical and Wellbeing – Type 1 Health; and Development
Permit for Reconfiguring a Lot (1 into 2 lots) situated at Grasstree Court Sunrise Beach and:
A. Amend the description of the approved use to Development Permit for Material Change of
Use for Multiple Housing – Type 3 Retirement & Special Needs and Commercial Business
– Type 2 Medical and Reconfiguring a Lot (1 into 2).
B. Approve the change and amend conditions 1, 5, 7, 12, 14, 18, 27, 30.1, 33, 35, 39, 40.1,
41, 64, 65 and 72 to read as follows:
1. The development must be undertaken in accordance with this approval and must
generally comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan Name Date
7448-06 Lots 1 & 9 Cancelling Lot 1 on SP177650 Prepared by 15 May 2008
Conics (Sunshine Coast) Pty Ltd
DA_106 Masterplan prepared by Smith and Tracey Architects November 2018
DA_107 Staging Plan prepared by Smith + Tracey Architects November 2018
DA_108 Precincts Plan prepared by Smith + Tracey Architects November 2018
DA_109 Pedestrian Circulation prepared by Smith + Tracey November 2018
Architects
DA_110 Vehicular Circulation prepared by Smith + Tracey November 2018
Architects
DA_111 Building Setbacks prepared by Smith + Tracey November 2018
Architects
DA_112 Landscaping Calculation prepared by Smith + Tracey November 2018
Architects
DA_113 Site Cover Calculations prepared by Smith + Tracey November 2018
Architects
DA_115 Typical Site Section A prepared by Smith + Tracey November 2018
Architects
DA_116 External Finishes Schedule prepared by Smith + Tracey November 2018
Architects
DA_117 Area Schedules prepared by Smith + Tracey Architects November 2018
DA_118 Residential Aged Care – Ground Floor Plan prepared by November 2018
Smith + Tracey Architects
DA_119 Residential Aged Care – First Floor Plan prepared by November 2018
Smith + Tracey Architects
DA_120 Residential Aged Care – Roof Plan prepared by Smith + November 2018
Tracey Architects
DA_121 Residential Aged Care – N and W Elevations prepared November 2018
by Smith + Tracy Architects
DA_122 Residential Aged Care – S and E Elevations prepared by November 2018
Smith + Tracy Architects
DA_123 Residential Aged Care – Typical Sections prepared by November 2018
Smith + Tracey Architects
DA_124 Residential Aged Care – Village Site Plan prepared by November 2018
Smith + Tracy Architects
DA_125 Central Facilities & ILAs – Basement Car Park prepared November 2018
by Smith + Tracey Architects
Page 12 of 116
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.