Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-03-12 Planning & Environment Committee Agenda

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   12 MARCH 2019




                                                   Page 57 of 116

Attachment 1

                                                                      ABBREVIATION LEGEND
                   DRAWING SCHEDULE                                                                                           NOTES
                                                                        ee     eee ese uivir                                  .     GROUND LEVELS, FINISHED FLOOR LEVELS, SITE WORKS AND RETAINING ARE INDICATIVE ONLY AND ARE TO BE CONFIRMED ON
| * |                TITLE                       REV. DATE              wl    AWNING TYPE?                                         SITE PRIOR TO CONSTRUCTION. SITE PLANS ARE TO BE READ IN CONJUNCTION WITH AVAILABLE SURVEY/ENGINEERING PLANS
                                                                        at    eee eee oe 1                                          ALL DIMENSIONS ARE TO BE CHECKED WITH EXISTING AND PROPOSED SITE CONDITIONS.
[200 [PROPOSED SITE PLAN                        14.01.19                       ae   RY Elise a                                -     NO VARIATION MAY BE MADE TO THESE DRAWINGS WITHOUT THE PRIOR APPROVAL OF THE ARCHITECT
 [202 _ [PROPOSED FLOOR PLAN            PB      [4019                   CH    CABINETRY HANDLE TYPE 1                         .     REFER TO ENGINEERS DESIGN, DOCUMENTATION AND CALCULATION FOR DETAILS ON SLAB, FOOTINGS, STRUCTURE, RETAINING
[202 [PROPOSED ROOF PLAN                EB   | 16.01.49                 pee oe eR POWER OUTLET                                      WALLS, FINISHED FLOOR LEVELS, SITEWORKS AND STORMWATER DETAILS.
 500 — PROPOSED ELEVATION                5        ors                   eee eee ee cascia                                     -     THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS SHEETS, CONSULTANTS DRAWINGS, DOCUMENTS,
                                                  '                                                                                 SCHEDULES AND SPECIFICATIONS (AS APPLICABLE).
[302 _ |PROPOSED ELEVATION               Er _fosazae                    FAL   pasa TYPE 1
 [nn                                                                               Ne ee                                      .     THE BUILDER AND SUBCONTRACTOR SHALL ENSURE THAT ALL STORMWATER DRAINS, SEWER PIPES AND THE LIKE ARE LOCATED
                                                                        fo    ctasnine types                                        AT A SUFFICIENT DISTANCE FROM ANY BUILDINGS FOOTING AND/OR SLAB EDGE BEAMS SO AS TO PREVENT GENERAL MOISTURE
[400 [SECTION + SINK DETAIL            B        14.01.19                FSS   FOLDING SHOWER SEAT                                   PENETRATION, DAMPNESS, WEAKENING & UNDERMINING OF ANY BUILDING AND ITS FOOTING SYSTEM.
PO                                                                      FW    FLOOR WASTE
 [TERRA ELEVATIONS                      Eons                            rue   fore                                                  LOCATION OF ALL EXISTING ONSITE SERVICES TO BE CONFIRMED ONSITE PRIOR TO CONSTRUCTION
                                                                        Mast Mee poor SHEETING TYPE                           -     ALL TIMBER FRAMING, IN ACCORDANCE WITH AS1684 AND ENGINEERS REQUIREMENTS
                                                                        eee eer ee           TING TYPE?                       -     ALL WET AREAS ARE TO BE WATERPROOF ED THROUGHOUT WITH A PROPRIETARY WATERPROOFING SYSTEM INSTALLED IN
                                                                        eee ees                                                     ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. PROVIDE INSULATION IN ACCORDANCE WITH PART 3.12 OF THE BCA.
                                                                        eee era                                               -     BUILDING WORKS IN ACCORDANCE WITH BCA ENVIRONMENTAL GUIDELINES.
                                                                        bee   OLAS eR Bonny TYE? - WETAREAS                   .     ALL GLAZING SHALL COMPLY WITH AS1288, (DOORS AND WINDOWS SUBJECT TO HUMAN IMPACT, GLAZING TYPE AND THICKNESS
                                                                        see   eebek tomes wieeenser                                 6.38MM GRADE A LAMINATED GLASS)
                                                                        Pw    PARTITION WALLS
                                                                        Rol   aehbenty pow -TBA~ TYPE.                        .     THE PROVISION OF ENERGY EFFICIENT LIGHTING TO COMPLY WITH EITHER THE QUEENSLAND DEVELOPMENT CODE METHODOLOGY
                                                                        peat benbenen peoee wore                                    FOR 80% ENERGY EFFICIENT LIGHTING OR THE BCA METHODOLOGY BASED ON WATTS PER SQUARE METER.
                                                                        Bey   nehbeaee Finis TYPE 1                           -     ALL WORK MUST COMPLY WITH THE BUILDING CODE OF AUSTRALIA AND AUSTRALIAN STANDARDS, AND ALL OTHER RELEVANT BY
                                                                        oe    envees                                               LAWS AND AUTHORITIES. NO WORK SHALL BE UNDERTAKEN PRIOR TO APPROVAL BY A REGISTERED CERTIFIER.
                                                                        See eee           eal TYPE 2                          -     NO FOOTING, OR WALL TO ENCROACH THE TITLE BOUNDARY.
                                                                              eee RAMP                                        -   _ DOWNPIPES 90MM@ ZINCALUME U.N.0, ALLOW TO CONNECT TO IN-GROUND STORM WATER DRAINS 150MMO UPVC, OR 2/90MM DIA.
                                                                        Se    ae    ae eee                                          1:100 MINIMUM GRADE WITH I.0'S AT EACH CHANGE OF DIRECTION AND 6000MM CENTRES. THE PROVISION OF WATER TANKS TO
                                                                        eee eee eee seein TYPE 1                                    COMPLY WITH QUEENSLAND DEVELOPMENT CODE.
                                                                        ea    aeee e oeiMELINE CHAMPER BOARD                        PLUMBING TO BE CARRIED OUT BY A LICENSED PLUMBER AND IN ACCORDANCE WITH THE REQUIREMENT OF LOCAL AUTHORITIES.
                                                                        Wet   toe Syne                                              THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND APPROVALS. ALL HOT WATER LINES SHALL BE FULLY INSULATED.
                                                                        Woo   tower tye >                                           SANITARY PLUMBING SHALL BE CONNECTED TO EXISTING SYSTEM WITH MATERIALS APPROVED BY THE LOCAL AUTHORITY.
                                                                                                                              .     TERMITE PROTECTION TO BE CARRIED OUT IN ACCORDANCE WITH AS3660 AND THE REQUIREMENTS OF THE BUILDING CODE OF
                                                                                                                                    AUSTRALIA PART 3.1.3.
                                                                                                                                    ALL DOMESTIC HOT WATER TO BASINS, SHOWERS AND BATHS TO HAVE MAXIMUM TEMPERATURE OF 50C.
                                                                                                                                    ALLOW TO SUPPLY AND INSTALL TEMPERING VALVES WHERE REQUIRED, AS NOMINATED IN THE BCA AND RELEVANT STANDARDS.
                                                                                                                              .     SUPPLY AND INSTALL APPROVED SMOKE DETECTORS IN ACCORDANCE WITH ‘NCC VOLUME TWO, PART 3.7.2 - SMOKE ALARMS" AND
                                                                                                                                    ALL QFES REQUIREMENTS. ALARMS TO BE INTERCONNECTED TO ACTIVATE AT THE SAME TIME, SMOKE ALARMS MUST BE
                                                                                                                                    HARDWIRED TO MAINS POWER WITH A SECONDARY POWER SOURCE
                                                                                                                              .     FIRE EXTINGUISHERS TO BE PLACED AS PER BCA REQUIREMENTS - CLASS 6 BUILDING

                                                                                             Cuan                                                     [ vssee | care | ossonencn   | tana | ORANG TITLE                  PROUT WO
                     Cs                    Taam  amt   nme ae nas tna the                    NC OLIVER Properties         NEW BUILD                      ———_—                             GENERAL NOTES & DRAWING |     16-049
                        ~~                 Seceta er                                                                                                     5 | pn  promenecemecs             SCHEDULE                       sue
                    ——                     nia                                               merwraree                    sm, ws orammnenoenane                                                                           ExetmeA
                                                                                                                                                                                           a          en                    on           —
Log in to download the original file

2019-03-12 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.