Original source · versioned page text
AMENDED Attachment 1_DA Form 1
Relevant plans of the proposed development are attached to the development application
6.3) Additional aspects of development
Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
Not required
Section 2 – Further development details
7) Does the proposed development application involve any of the following?
Material change of use Yes – complete division 1 if assessable against a local planning instrument
Reconfiguring a lot Yes – complete division 2
Operational work Yes – complete division 3
Building work Yes – complete DA Form 2 – Building work details
Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
Transport Depot ‘Transport depot means the use of 481m2
premises for –
a. Storing vehicle, or machinery,
that is sued for a commercial or
public purpose; or
b. Cleaning, repairing, or servicing
vehicles or machinery, if the use
is ancillary to the use in
paragraph (a).’
8.2) Does the proposed use involve the use of existing buildings on the premises?
Yes
No
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10)) Dividing land into parts by agreement (complete 11))
Boundary realignment (complete 12)) Creating or changing an easement giving access to a lot
from a constructed road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
Page 4
DA Form 1 – Development application details
Version 1.3— 28 September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original