TREE SCHEDULE
LANDSCAPE ARCHITECTS:
Point No pread (m) amater mm es Retaln/Remove oraglflg
2091 5 160 Allocasuarina linoralis Retain No
Remove existing 2092 6 150 Banksls aemula Retain N/A
concrete path prior to
revegetation works
2093
2095
2096
4
3
4
250
300
250
200
Allocasuarlna littoralis
Banksls aemula
Banksis aemula
Allocasuarina litteraUs
Retain
Retain
Retain
Retain
No
N/A
N/A
No
.~
2097 3
2098
2099
5
3
250
250
Allocasuarlna IIttoraUs
Banksla aemula
Retain
Retain
No
N/A
nSite
2101 3 250 Banksis aemula Retain N/A A
E M L
2102 3 200 Allocasuarina littoralis Relain No
2103 2 200 4 Banksls aemula Relaln N/A -Enviromental Management-Landscape Architecture
2104 6 400 4 Banksis aemula Retain N/A
2105 5 300 6 Allocasuarina littoralis Retain No
InSITE EM LA
2106 3 200 6 Banksls aemuta Retain N/A
2107 4 300 7 Allocasuarina linoraJis Remove No P.O. BOX 2460
2’12 4 350 3 Banksis aemula Retain N/A KEPERRA. QLO 4054
2113 4 250 4 Banksia aemula Retain N/A
2114 2 300 3 Banksls aemula Retain N/A T: 07 3351 8425
2116 3 200 4 Banksia aemula Retain N/A F: 07 3351 8635
21’7 5 200 3 Banksis aemula Retain N/A M:0421 883 238
2118 4 250 4 Banksls aemula Retain N/A ABN:89115479046
2121 4 250 4 Banksis aemula Relaln N/A
Retain N/A EMAIL:[email protected]
2122 5 250 3 Banksia aemula
2163 2 150 3 Banksla aemuls Remove N/A
CLIENT:
2165 3 300 3 8anksia aemula Retain N/A
SUNSHINE COAST REGIONAL COUNCIL
2166
2168
3
.3
250
250
3
4
Banksia aemula
Banksls aemula
Retain
Retain
N/A
N/A
Christian Brothers
2464 5 200 6 Corymbia intermedis Retain N/A
2469 3 250 4 Banksla aemula Remove N/A
PROJECT:
2470 3 250 4 Banksla aemula Remove N/A
APPROVED 2474
2475
2476
2477
3
3
3
3
250
250
250
200
3
3
3
5
BankSa aemule
Banksia aemuJe
Banksla aemula
Banksla aemula
Remove
Remove
Remove
Retain
N/A
N/A
N/A
N/A
Noosa Flexible Learning Centre
2480 5 200 4 Banksla aernula Retain N/A
OPW 13/0463 2481
2485 4 Sep 2013
3
5
200
300
4
4
Banksla aernula
Banksla aernula
Relain
Retain
N/A
N/A
2486 6 400 5 Banksla aemula Retain N/A PROJECT No:
2496 6 300 7 AUocasuarina littoralis Remove No
2497 5 350 7 Allocasuarine Uttoralis Remove No 12- 186
2498 5 350 7 Allocasuarina littoraUs Remove No
2499 4 200 5 Allocasuarina Uttoralis Remove No
2500 3 200 3 Banksia sernuls Remove N/A
2501 3 300 3 Banksia sernuls Remove N/A
2502 3 200 3 Banksia semuls Remove N/A LEGEND
2505 5 350 3 Banksia semuls Remove N/A
2506 3 250 8snksia semuls Remove N/A
2507
2508
2509
2510
5
5
4
6
250
250
250
200
4
4
5
6
Banksia aernuls
Banksia sernula
Allocasuarina littorals
Allocasuarlna littorals
Relaln
Remove
Remove
Retain
N/A
N/A
No
No
ru Alloc.suilrirl IIttorillls to be retaIned
refer v*’ ton M,negelflel!! 1!C(e5 VMP 02
2511 6 200 6 Allocasuarina linorahs Remove No
2512
2513
2514
2515
6
3
4
6
350
300
300
250
6
3
3
6
Allocasuarina littorals
Banksia aemula
Banksia eemuls
Allocasuarina linoratis
Retain
Remove
Remove
Retain
No
N/A
N/A
No
~ S.nkSlil ilemul. to be retaIned
refer V~lon H’ntgement notes VMP 02
2516 5 250 7 Allocasuarina littoralis Retain No
2527 6 400 7 Allocasuarina IIttoralis Retain No AlIocaSUfJriflil IICtOr#S to be removed
Retain N/A refer VevetMton H,negemen! not~ VHP 02
2528 4 300 3 Banksia aemLis
2531 4 300 5 Banksia aemule Retain N/A
2532 5 250 7 Benksia sernula Retain N/A
9011 5 250 6 Banksia aarnuls Retain N/A
3005
3007
3008
3009
3
3
4
6
120
150
120
120
7
4
7
8
Banksla aemula
Banksia aemula
Allocasuarina IIttoralis
Allocasuarina linoral
Remove
Remove
Retain
Retain
N/A
N/A
No
No
~ Banks;iI ilemu/a to be removed
mer Vegetation H’ntgement I!C(~ \IMP 02
3012 6 150 8 Allocasusrina littoral Retain Yes
3013
3014
3015
3016
6
6
8
8
150
120
200
150
8
6
6
6
AUocasuarina littoralis
Allocasuarina littoraUs
Atlocasuarina littoraUs
Allocasusrina lirtoralis
Retain
Retain
Remove
Retain
Yes
No
Yes
No
~- Tret! Protection Zone (indicilNve only)
refer V~1on H,n’gI!mef1t not" \IMP 02
3017 6 100 6 Allocasuarina littoralis Retain No
3018
3019
3020
3021
3
6
3
6
120
100
120
120
4
6
4
6
Banksia aernuls
Allocasuarina linoralis
Banksla aernula
Allocesuarlna IIttoralis
Retain
Retain
Remove
Retain
N/A
No
N/A
No
~ R~I!t.tion lone (Ind’Clltive only)
refer Ve9II!u HlM~t 1!C(e5 VMP 02
3022 6 120 6 Allocasuarina linoralis Remove No
3024 3 120 3 Banksis sernula Retain N/A
3025 3 120 3 Banksia aemula Remove N/A
3026 6 200 4 Banksis sernula Retain N/A
3027 6 200 4 Banksla semula Retain N/A
3028 3 100 4 Benksia semuls Retain N/A
3029 3 100 4 Bsnksia aemuls Retain N/A
3030 3 100 4 Bsnksls aernuls Retain N/A
3031 4 100 6 Allocasuarina littoralis Retain No
3032 3 300 4 Banksla aarnula Retain N/A
3033 4 100 6 Allocasuarina Ilttorales Retain No
3034 4 200 6 Allocasuarina lnoralis Retain No
3035 4 100 3 Banksia aemula Remove N/A
3036 4 250 4 Banksia aemula Remove N/A
3038 3 100 2 Banksia aemula Remove N/A
3039 4 200 4 Banksia aemula Remove N/A
3040 4 200 4 Banksis aernula Remove N/A
3042 3 100 Banksia aemula Retain N/A
3043 3 100 Banksia aarnuls Remove N/A
3044 3 120 Banksia aemula Remove N/A
3045 3 120 4 Bsnksia semuls Remove N/A
3046 4 100 6 Allocasuarina littorsls Remove No
3047 3 90 5 Allocasuarina littoral Remove No
3048 5 120 7 Acacia disparrima Remove N/A
3049 5 120 7 Allocasuarinalittorelis Retain No
3050 8 50 8 Allocasuarina littoraiis Remove No
3051 8 100 8 Alkx:asuarine littorelis Retain No
3052 8 100 8 Allocasuarina linoralis Retain No
3056 8 80 4 Allocasuarina IIrtoralis Remove No
3058 4 90 3 8enksia aernula Remove N/A
3059 5 150 4 Banksia semula Retain N/A
3060 5 100 3 Banksia aemula Retain N/A
3061 3 100 Banksia aemula Retain N/A
3063
3064
3065
3066
5
5
5
5
100
100
100
100
4
4
4
4
Banksia aemula
Banksia aemula
Banksia aemula
Banksia aemula
Retain
Retain
Remove
Remove
N/A
N/A
N/A
N/A
=ti
3067 5 100 4 Banksia aemuts Remove N/A A ’22-O~13! For OP WKS Assessment
Itevhfon DIKe: "’-,
3066 5 100 4 Banksia aemuts Remove N/A
3069 5 100 4 Banksia aemula Retain N/A
NORTH
3071
3072
3073
3074
5
5
5
5
100
100
100
100
4
4
4
4
Banksia semula
Banksia sarnuls
Banksia semula
Banksla aemula
Remove
Remove
Remove
Remove
N/A
N/A
N/A
N/A
.+
3075 5 100 4 Banksia aemula Remove N/A DRAWING TTTlE
3076 5 100 4 Banksia eemula Remove N/A
Vegetation Management Plan -
3077 3 90 4 Banksia aemLAa Remove N/A
Tree Protection Plan
3079 6 150 6 Altocasuarfna linoralls Remove No
3080 5 100 5 Banksia aemula Retain N/A DRAWING NUMBER
3081 6 90 6 Allocasuarina IittoraUs Retain No
3082 6 120 6 Allocasuarlna linoreJIs Retain No 12-186 VMP 01
3083 3 90 2 Banksia aemLAa Remove N/A
3084 3 90 2 Banksia aeTTllAa Retain N/A DRAWN BY: CHECKED
seA" DATE
oD 3085 3 90 3 Banksia aemula Retain N/A
3086 6 120 6 Allocasuarlna littoralls Retain No
1:200@Al July 2012
3088 3 100 3 Banksis eemula Remove N/A
3089 2 100 3 Allocasuarina littoraUs Relaln Yes
3090 2 100 3 Allocasuarina liuoralis Retain Yes TNlpllnWMptepereClbthe_dullvelo$4lcfINSITEEMLAPlylldlD~
3091 2 100 3 Allocasuarlna Itnoralis Retain Yes rWYlftt lor ~,.MInot be uaed lor My oilier purJ)OM Of
by..,DIhet’pef.onI
o 3092 2 100 3 AlIocasuartna linorells Remove Yes
Do not "*,,II’omlhll
~.
.-dIrnenItI:W*’II wne,.. 0QUIbIe.
3093 2 100 3 Allocasuarina liTtoralis Remove Yes
o o 3094 3 100 3 Allocasuarlna littoralis Retain Yes C~INSITE EM LA PtyLld2OOll.No~IiCIIon..herllllonor~of
te wIInout the written permlsalon 01
o i:l INt cIocurnenl 01’ pel1 m._1a
INSfTEEMLAI’IyUd.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 sections
Section 2
LANDSCAPE ARCHITECTS:
Remove existing
concrete path prior to
.~
revegetation works
in Site
E M L A
.Enviromental Management-Landscape Architecture
InSITE EM LA
P.O. BOX 2460
KEPERRA. QLD 4054
T: 07 3351 8425
F: 07 3351 8635
M: 0421 883 238
ABN:89 115 479046
EMAIL:[email protected]
CUENT:
Christian Brothers
PROJECT:
Noosa Flexible Learning Centre
f PROJECT No;
I 12 - 186
LEGEND
ill Allocasuarma Itttor llS to be retained
reterVeget tlon Mln.gementnot VMP02
fi Bank$la iJemu/iJ to be retained
refer \ieget.tlon Manliilement notel \IMP 02
rn AllocllSUlJrlnll IIttor"lts to be removed
reft:r V(!9eutlon M.".mcnt noU!S \IMP 02
Banks/a iJemuliJ to be removed
ref... vegeutlon M.Nlgemenl notes VMP 02
~ Tree Protection Zone (indicative only)
refer Vegedofl MilMgement nota \IMP 02
II Revegetation Mix A
refer vegeutlOl’1 MWWlgement not" on
liMP 02 Inti PlantSchedu!eson LoPOZ
Reveqet Uon Mile B
rete!" VegeuUOn MlIII9meM not.. on
liMP 02 .1Id Plant SChedlMs on L.P 02
\
\ Revegetation Mix C
\ refltl’YegllUltton Hnegement notes on
\IMP 02 .net Plant Schedu6es on lP 02
\
~ Revegetation Mix 0
reter Veget UOn M n emenl notes on
VMPOZ.ncI PI.iInt SchedulesonlP02
Remove
concrete path
revegetation SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 13/0463 4 Sep 2013
t
!
A 22-05-13 ’ For OP WKS Assessment
...- Date: DeIc:r1P:
NORTH
.~,
DRAWINGTITl.f
Vegetation Management Plan -
Revegetation Plan
DRAWING NUMBER
12-186 VMP 02
SCALE DATE BY, CHECKED
1:200@A1 July 2012 I
~"WN I
ThltpIMI.....lW9lrecllorthe..CUMuaeofINSITEEI.4L"Plyll kl~
......".CIOCumentedotllor~’."..noI~lIMCIfor ol’*pufPOMOt
byllnyolherperworllorCOl’1’*"Y.
o OonollCl6ell""omlt’lllplen uaeclrnenllorq...I’II,....,...
~INSlTE EM LA Ply Lid 2001. No rwproutllon, an.rdon or co01
o o INIcIoaImenI or I*t Iheteoflil ""-’OUt~.wrlltenpetnWllon 01
1NSfTE6ILAP’tr’llll.
Section 3
LANDSCAPE ARCHITECTS:
SUNSHINE COAST REGIONAL COUNCIL
~
APPROVED E
nSite
M A
OPW 13/0463 4 Sep 2013
.Enviromental Management-Landscape Architecture
InSITE EM LA
P.O. BOX 2460
KEPERRA, QLD 4054
T: 07 3351 8425
F: 07 3351 8635
M:0421 883 238
PLANT SCHEDULE REV MIX C
ABN:89115 479 046
Groundcovers EMAIL:[email protected]
CLIENT:
Planting Density
Biological Name Common Name Planting Size Number Christian Brothers
(m.spacings)
Lomandra multiflora Club Rush NT 0.8 60
PROJECT:
PLANT SCHEDULE REV MIX A
Shrubs
Noosa Flexible Leamlng Centre
Trees Planting Density
Biological Name Common Name Planting Size Number
(m.spacings)
Planting Density
Biological Name Common Name Planting Size Number
(m.spacings) Austromyrtus dulcis Midgen Berry NT 1.0 45
Allocasuarina littoralis Black Sheoak NT 2.0 75 Baeckea trutescens Weeping Coast Myrtle NT 1.0 60
PROJECT No:
Leptospermum polygalifo/ium Wild May NT 1.0 30 12 - 186
Xanthorrhoea spp Grasstree Transplant 3.0 20
PLANT SCHEDULE REV MIX D
Groundcovers
Planting Density
Biological Name Common Name Planting Size Number
(m.spacings)
PLANT SCHEDULE REV MIX B Lomandra multiflora Club Rush NT 0.8 80
Shrubs
Shrubs
Planting Density
Planting Density Biological Name Common Name Planting Size Number
Biological Name Common Name Planting Size Number (m.spacings)
(m.spacings)
Austromyrtus dulcis Midgen Berry NT 1.0 65
Xanthorrhoea spp Grasstree Transplant 3.0 40
Baeckea frufescens Weeping Coast Myrtle NT 1.0 80
Leptospermum polyga/ifo/ium Wild May NT 1.0 40
Shrubs
Planting Density
Biological Name Common Name Planting Size Number
(m.spacings)
AllocBsuanna IIttoralls Black Sheoak NT 2.0 25
BankSts aemu/a Wallum Banksia NT 2.0 25
Table 1 Weeds found during site survey
Biological Name Common Name Location Removal Method
Small infestations can be hand picked or or larger infestation can be treated using
Ageratum houstonianum Blue Billy Goat Weed Various location in isolated infestations throughout the site
a backpack sprayer with Glyphosate 360 at manufacturer’s recommended rates
Small infestations can be controlled by removing above ground parts and digging
Small infestations in various locations in isolated infestations up rhizomes and tubers, where practicable, with continued monitoring of any
Asparagus aethiopicus Asparagus Fem
throughout the site regrowth. Prevention of flowering is vital in existing stands as once seeds are set,
control of their dispersal by birds is impossible.
Small infestations can be hand picked or larger infestation can be treated using a
Various location in isolated infestations throughout the site
Bidens pilosa Cobbler’s Pegs backpack sprayer with Glyphosate 360 at manufacturer’s recommended rates.
particularly adjacent 10 Girraween Crt and along the bike path Seed pods should be removed and bagged prior to treatment
Small infestations can be hand piCked or larger infestation can be treated using a
Various location in isolated infestations throughout the site
Cenchrus echinatus Mosman River Grass backpack sprayer with using Glyphosate 360 at manufacturer’s recommended
particularly adjacent to Girraween Crt and along the bike path rates. Follow up treatment is recommended.
., --r
Small infestations can be hand picked or larger infestation can be treated using a
Various location in isolated infestations throughout the site
Euphorbia cyathophora Painted Spurge backpack sprayer with using Glyphosate 360 at manufacturer’s recommended ~22"’()S-13 1 For OPWKS Assessment
particularly adjacent to Girraween Crt and along the bike path rates. FollOW up treatment is recommended.
RIMt6cIn D_: 0ac:riptI0n:
NORTH
Small infestations can be controlled by removing above ground parts and digging
Small infestations in various locations in isolated infestations up rhizomes and tubers, where practicable, with continued monitoring of any
Macrotyloma axillare Archer axillaries
throughout the site particularly adjacent to Girraween Crt regrowth. Prevention of flowering is vital in existing stands as once seeds are set,
control of their dispersal by birds is impossible. DRAWING TITLE
Vegetation Management Plan- Plant Schedules,
Small infestations can be hand picked or larger infestation can be treated using a Weed Management Controls and Fence Images
Megathyrsus maximum Guinea Grass Various location through cleared areas of the site backpack sprayer with using Glyphosate 360 at manufacturer’s recommended
rates. Follow up treatment is recommended. TEMPORARY CONSTRUCTION FENCING DRAWING NUMBER
Panel Dimensions: 1600 high by 2400 wfde 12-186 VMP 03
Small infestations can be hand picked but care should be taken to remove the
entire plant including stems and shoots as the plant will regrow from the smallest
Isolated infestations throughout the site particularly adjacent to segment of plant remaining or larger infestation can be treated using a backpack SCAlf DATE ORAWN BY: CHECKED
Sphagneticola trilobata Singapore Daisy Girraween Crt and along the bike path sprayer with using metsulfuron-methyl
July 2012
(600gIL) at 10 g per 100 L water plus wetting agent.
Follow up treatment is recommended.
ThII__ptetedlotlhe..duIIrt.loIHoIINSITEeMLAP!yLI IO~
releYent men&elloflblUOl’nllalon&./’oIIIlnotbeUMdIor.nyotherpUfJ)OMOI
by~ott’eflJ8flOllllor~.
Do IIDt KeIe from’"pIen.1oIH dImtr’IIkIr*lg wM!’e poUI:JIit.
~IHmTEEMLA f’tyUI:zooe.Noreuc1ion,.II8fllionorc:oprlngol
~ menl or pert IN"IIIMIfI"IIIed .-.oullhe written pem!issQ1 01
IlEMlAPlyUa.
Section 4
l.ANOSCAPE ARCHITECTS:
VEGETATION PROTECTION METHODS: GRASS TREES:
VEGETATION MANAGEMENT STATEMENT
The extent of vegetation to be retained is shown on this plan. All precautions shall be The grass trees located within the tree protection zone are the be retained and
SITE DESCRIPTION:
The site is described as Lot 3 on RP 887636 and is located at 2 Girraween Court,
taken to protect this vegetation from loss or damage resulting from the impact of site
works. This includes but is not limited to; loss or scarring of tree limbs or trunk,
protected as detailed earlier under the heading Vegetation Management Methods.
The grass trees which have been identified for translocation are to be removed either
.~
Sunshine Beach. The subject property is bounded by Girraween Court to the south, unspecified removal of tree and the compaction of the soil under the tree canopies.
Eenie Creek Road to the north, the Noosa Tennis Academy to the west and the Protection methods for trees that are to be retained include, but not limited to; providing
singularly or in clusters by a suitable experienced contractor and under the direct
supervision of a fully qualified arbourist using industry recognised best practice
in Site
balance of the lot to the east. E M L A
existing vegetation using temporary construction
a protective barrier or fence to the
techniques and well maintained disease free equipment. Care is to be taken to ensure
The existing vegetation is a blend of regrowth open dry heath with a co-dominance of fencing. The only works to be allowed inside the enclosure, without prior approval, will damage to the surrounding vegetation is minimised. .Enviromental Management-Landscape Architecture
Allocasuan"na /ittora/is and Banksia aemu/a and cleared lands. Generally the native be the removal of debris or rubbish, the application of mulch and/or the planting of new
Once removed from their current position bound the root ball with moist hessian to InSITE EM LA
vegetation growing on this property are species which naturally occur in the regional vegetation where required.
ensure no loss of soil from around the roots and place directly within a pre-prepared P.O. BOX 2460
ecosystem 12.2.13. The cutting of tree roots should be avoided. In the event of root damage, immediately KEPERRA,QLD 4054
planting hole. The planting hole is to be the same depth as the rootball of the grass
No active koala habitat trees were identified on this site. prune the root with a sharp pruning tool or saw and apply a suitable fungicide to the tree being translocated but a minimum of 30% larger in diameter. Backfill the planting T: 07 3351 8425
wound. hole immediately using the excavated site topsoils, if suitable, or imported free draining F: 07 3351 8635
For the purpose of preparing this Vegetation Management Plan, only the significant M: 0421 883 238
trees growing on the site, generally 120mm O.B.H. or greater, were plotted and Any damage to the protected vegetation is to be remedied by an approved arborist as organic topsoil if the site topsoils are deemed unsuitable. Compact backfill material in ABN:89 115 479 046
identified but the intention is to preserve all the native vegetation on site wherever soon as practicable after the damage has occur and to the satisfaction of Council’s layers no greater than 100mm in depth to minimise subsidence and water liberally to ENAll:[email protected]
representative. remove air bubbles.
practicable. This will be done by either retaining and protecting the vegetation in situ or cueNT:
by translocating vegetation where practical and sustainable to locations on site which WEED REMOVAL: Create a soil bund around each plant to create a watering depression and apply Christian Brothers
are clear of proposed building works. at a maximum depth of 100mm after settling except for a
recycled forest mulch
While this plan concentrates on the native vegetation found on site it was noted that
VEGETATION MANAGEMENT: distance of 50mm from the base of each grass tree in all directions to prevent rotting.
PROJECT:
while undertaking the site surveys no class 1 or 2 declared plants were found, but if
Prior to any works commencing on site all significant trees and the associated discovered the presence of the plants are to be reported to Council and removed using Maintain as specified.’
Noosa Flexible Learning Centre
understorey plants as shown are to be protected with temporary construction fencing industry recognised and environmentally sound techniques. MAINTENANCE WORKS:
(refer Image VMP 02). This fencing shall remain for the full length of the construction
It was also noted that there were present several weed species that are listed in the The maintenance periOd of 12 weeks to commence at practical completion & shall
phase to protect the trees from the impacts associated with the development works
Sunshine Coast Regional Council Noosa Plan PSP 03 -
Landscape Plants and include;
including earthworks, location and storage of equipment, materials, site sheds and
Guidelines. These plants are listed on VMP02 and are required to be treated using
storage facilities. min 1 visit per week for the first 6 weeks PROJECT No:
industry recognised and environmentally sound techniques by a suitably qualified and
12 186
In general, no work is to be carried out within this fenced off area without an initial
-
experienced contractor. While this list details all the weeds found on site during the min 1 visit per fortnight for the 6 weeks following
subsurface root layout map being prepared by a suitable qualified and experience recent vegetation survey, any plants as listed as Undesirable Plants in the Noosa Plan works to be carried out during this period includes but is not limited to; watering,
arborist. All works within this area are to be carried out so that no major structural roots PSP 03 are also to be removed as detailed above.
weeding, pest & disease control, replacement planting, remulching, and keeping the
are affected.
If using herbicide to manage weeds, care must be taken to ensure no over-spray of site tidy.
A suitably qualified arborist is to be engaged and present at all times during the herbicide occurs. The Contractor shall be responsible for replacing any plant which has Refer to Council’s landscape requirements & details for further information.
undertaking of the works to ensure the safety and health of the tree is not died or is irrevocably damaged either within or adjacent to the project site caused by
compromised at any time. Any damage to the tree or its roots are to be repaired over-spray of herbicide.
without hesitation.
REVEGETATION/REHABILlTATION:
Eradicate all environmental and bushland weeds from the site if detected using an
Prior to commencement of any clearing works, a plant rescue is to be carried oul. The
established environmentally sensitive teChnique.
rescued plants shall either be translocated directly into areas on the site which are
Remove all rubbish, old fences including fence posts and gates, and debris from the
clear of any future works or potted up and taken off site to a suitable location where
site as required and dispose of in an approved manner.
they will be cared for until such time as they can be replanted on site as detailed on
Refer to Engineer’s drawings for details of sediment and erosion control devises. LP01 and LP02.
All removed vegetation, except weed species unless approved by the Superintendenfs The translocated plants will be protected with a vegetation protection fence and
Representative, shall be mulched and the material stockpiled on site as directed for appropriately maintained throughout the construction and establishment phases of the SUNSHINE COAST REGIONAL COUNCIL
re-use in landscape works proposed for the development. A suitably qualified arborist project. The potted stock will be maintained off site before being returned to site after
is to be engaged to inspect and certify the integrity and suitability of the vegetation to be the completion of construction works and replanted in the revegetation zones as shown
on LP01 at the prescribed plant densities detailed below.
APPROVED
retained.
SITE MANAGEMENT: REVEGETATION/REHABILlTATION WORKS:
Ensure all vehicles leaving the site are reasonably clean and free from soil and All works carried out in relation to this plan is to comply with the Sunshine Coast
vegetative material. Regional Council Noosa Plan Planning Scheme POlicies (PSP)3
and Guidelines.
-
Landscape Plants OPW 13/0463 4 Sep 2013
Construction personnel are not to allow their dogs, if any, within the area covered by
the Vegetation Management Plan prior to or during clearing works. Only plants grown from plant material sourced from this site are to be used for
revegetation works on the site.
FAUNA MANAGEMENT
SITE PREPARATION:
A qualified Fauna Spotter who is fully licensed with QPWS is required to inspect all
vegetation on the development site prior to the commencement of the clearing works Remove existing concrete pathway as indicated on VMP 01 and 02. Care is to be
for any fauna or habitat features. Any trees identified for removal that are found to taken to minimise damage to existing native vegetation. Re-trim area to remove all
contain native animals or birds are to be retained until the resident fauna relocate away depressions and blend new surface levels evenly into adjacent existing levels.
from the site. No fauna is to be physically relocated, but allowed to move on naturally, All areas to be revegetated shall be cultivated to a depth of 200mm prior to the
unless approved in writing by QPWS. planting. Take care when cultivating not to bring subgrade soil layers to the top. After
cultivation, remove all stone greater than 25mm diameter.
The Fauna Spotter is to supply a written report to the Council’s Ecologist certifying that
Take care when cultivating over service lines, pipes and around tree roots and if
the site has been inspected and clearing works can proceed.
necessary cultivate with hand tools. Lightly cultivate with hand tools within 600mm of
If deemed necessary by the Council’s Ecologist based on the findings of the Fauna hard pavements and structures.
Spotter’s pre-clearing certification report, the Fauna Spotter is to remain on site at all Cultivate parallel to final contours. do not cultivate when soil is wet or plastic.
times when clearing works are progressing.
Test site topsoils to ensure the soil’s ph is between 6.5-7.0 and its fertility is within
Following approval from the Fauna Spotter to commence clearing works, clearing is to acceptable limits. Ameliorate where necessary.
progress in a methodical manner starting from one end of the site and working
Spread site mulch evenly to a maximum depth of 100mm allowing for settlement.
towards the rear, where practicable.
The Fauna Spotter is to inspect all fallen trees, bark, debris and leaves for resident PLANTING WORKS:
fauna. Orphaned or injured animals that may require relocation are to be reported to
The only plant material to be used for revegetation is that which was rescued prior to
QPWS on tel: 1300 130372. Only personnel licensed to do so by QPWS are to handle construction. No supplementary supply of plants are to be used without prior approval
fauna.
of the Superintendent’s representative. +- +
..
Plantings are to be carried out as random mixtures of plants at the following plant r ~
-l--
densities:- 1 Tree per 5m2, 1 shrub per 3m2 and 2 groundcovers per 1 m2.
A ""22~~For OP WKS Assessment -
ltevlslon~ Desa1pl:Son:-
Water in well at time of planting and then as required to adequately sustain good
healthy plant growth. NORTH
Maintain as detailed.
DRAWING TITlE
Vegetation Management Plan -
Notes
DRAWING NUMBER
12-186 VMP 04
SCALf DATE DRAWN BV: CHECKED
July 2012
ThII pIaow.. prepiI’" brIM .....oIIN$ITE EM LA Ply Lid to ~
’’’’’’11’11 mentatlon lor IUbn’&."..not be IIMCI for II’l)’ otMrpurpOM or
IIyIlf1’foltler lorcorn,.
00 not ICMe from 1hIiI.. 11M cImenIIorq WMfe~.
Cc:oP~ If’lSITE EM LA pty Ud 200 No repnxlucIIon. altefIlIon or oo01
.
tht.cIoc:umenlot~lhereofllpemlittecl\lltltlOUllhe.....tenpennla.slonaf
INSITEfNl.APtylllr:l.
Section 5
PROJECT NOTES
GENERAL EROSION & SEDIMENT CONTROL GROUNDWORKS TESTING AND INSPECTIONS
1. ALL WORKS AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITY POLICIES 1. FOR STANDARD SEDIMENT CONTROL DEVICE DETAILS REFER TO THE INTERNATIONAL EROSION 1. THE GEOTECHNICAL REPORT FOR THE PROJECT REFERRED TO IN THE NOTES IS THE GEOTECHNICAL 1. TESTING SHALL BE COMPLETED IN ACCORDANCE WITH AUSTRALIAN STANDARDS,AND TO THE
,SPECIFICATIONS AND STANDARD DRAWINGS, OR IF THESE DO NOT APPLY THEN THE INSTITUTE OF CONTROL ASSOCIATION’S(IECA) STANDARD DRAWINGS INVESTIGATION REPORT BY SOIL SURVEYS ENGINEERING PTY LTO DATED SEPTEMBER, 2012. SATISFACTION OF THE SUPERINTENDENT.
MUNICIPAL ENGINEERS OF QUEENSLAND STANDARD DRAWINGS AND AUSTRALIAN STANDARDS; 2. REFER TO THE EROSION CONTROL PLAN AND IMPLEMENT EROSION CONTROL MEASURES PRIOR TO PROJECT NO. 112-14245, NOOSA FLEXIBLE LEARNING CENTRE 2. ROADWORKS TESTING SHALL BE UNDERTAKEN AS SPECIFIED AND AT LEAST AS FOLLOWS:
2. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT NEARBY PROPERTY COMMENCING WORKS ON SITE. MAINTAIN EROSION CONTROL MECHANISMS IN WORKING ORDER; 2. ALL EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH AS3798 AND SUPERVISION TO 2.1. EARTHWORKS INCLUDING TRENCH WORKS SHALL BE TESTED IN ACCORDANCE WITH AS3798
OWNERS FROM DUST POLLUTION DURING ALL PHASES OF WORKS CONSTRUCTION. FINISHED AREAS 3. SEDIMENT LOSS FROM THE WORK SITE SHALL BE MANAGED IN ACCORDANCE WITH CURRENT LEVEL 1 SHALL BE SUPPLIED BY THE CONTRACTOR. THE CONTRACTOR SHALL EMPLOY A QUALIFIED 2,2. SUBGRADE TO ROADWORKS AND BUILDING PLATFORMS REQUIRE 1 DENSITY TEST (BY SAND
OF EARTHWORKS SHALL BE KEPT WATERED WHERE NECESSARY UNTIL A SATISFACTORY VEGETATION RELEVANT ENVIRONMENTAL GUIDELINES AND LEGISLATION. THIS WILL NECESSITATE THE USE OF GEOTECHNICAL ENGINEER WHO IS A REGISTERED PROFESSIONAL ENGINEER OF QUEENSLAND WITH CONE)AND PLASTICITY TEST PER 500SCM.
COVER IS ACHIEVED. APPROPRIATE EROSION AND SEDIMENT CONTROLS. THESE SHALL BE IMPLEMENTED AT THE SITE A MINIMUM $5 MILLION PROFESSIONAL INDEMNITY INSURANCE,TO UNDERTAKE LEVEL 1 SUPERVISION 2.3. PAVEMENT MATERIALS REQUIRE 1 DENSITY TEST (BY SAND CONE)PER 1000SQM,AND SUBMISSION
3. ALL CONSTRUCTION WORKS ARE TO BE JOINED NEAllY TO EXISTING WORKS. ESTABLISHMENT PHASE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. OF EARTHWORKS AND WHOSE CERTIFICATION IN WRITING SHALL INCLUDE THE FOLLOWING: TO THE ENGINEER OF THE PAVEMENT MATERIAL SUPPLIERS SAMPLE TESTING RESULTS FOR
4. PUBLIC UTILITIES -
NOT WITHSTANDING THAT THE POSITIONS OF PUBLIC UTILITIES, FITIINGS, PIPES, 4. PRE.DISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE REINSTATED; 2.1. ENGINEERING CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS (ie. STRIPPING, GRADING, PLASTICITY AND SOAKED CBR. OTHER MATERIAL PROPERTIES MAY BE SPECIFIED FOR
POLES, MANHOLES ETC MAY BE INDICATED ON THE DRAWINGS, NO RESPONSIBILITY WILL BE 5. ALL VEHICLES EXITING FROM THE SITE ARE TO BE WASHED DOWN, CLEANED AND TREATED SO AS TO PROOF ROLLING OF SUBGRAOE, SUBGRADE TREATMENT, ETG) HAVE BEEN CARRIED OUT IN TESTING BY THE SUPERINTENDENT AT THEIR DISCRETION;
ACCEPTED BY THE PRINCIPAL FOR THE ACCURACY OF THE REPRESENTATION OR THE OMISSION PREVENT MATERIAL BEING TRACKED OR DEPOSITED ON PUBLIC ROADS. INSTALL MEASURES FOR ACCORDANCE WITH EARTHWORKS SPECIFICATION. 2.4. PAVEMENT SEALING BY ASPHALT SHALL BE CORE TESTED AND MARSHALL PROPERTIES,GRAOING,
THEREOF. CONTROL OF WASH DOWN. 2.2. ENGINEERING CERTIFICATION THAT FILL HAS BEEN PLACED AND COMPACTED TO THE REQUIRED STABILITY AND DENSITY TESTED. PAVEMENT SEALING BY SPRAY SEAL REQUIRES SUBMISSION OF
5. LOCATION AND LEVEL OF EXISTING SERVICES AND STRUCTURES HAS BEEN PLOTTED FROM S. ALL VEHICLE MOVEMENTS TO BE RESTRICTED TO BUILDING WORKS AREA ONLY, UNLESS APPROVED MINIMUM DENSITY IN ACCORDANCE WITH THE EARTHWORKS SPECIFICATION SUPPLIERS SAMPLE TESTING RESULTS INCLUDING SCLUBLE SULPHATE TESTS;
AVAILABLE RECORDS AND IS INDICATIVE ONLY. THE CONTRACTOR SHALL ACCURATELYLOCATE OTHERWISE BY THE SUPERINTENDENT. 2.3. ENGINEERING CERTIFICATION THAT ANY AREAS OF CUT HAVE BEEN COMPACTED TO THE 3. CONCRETE SHALL BE TESTED IN ACCORDANCE AS3S00,;
THESE ON SITE PRIOR TO COMMENCING WORKS AND SHALL PROTECT ALL EXISTING SERVICES 7. EROSION CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR WHO SHALL COMPLY WITH REQUIRED MINIMUM DENSITY IN ACCORDANCE WITH THE EARTHWORKS SPECIFICATION. 4. SAMPLE TEST RESULTS FROM SUPPLIERS FOR OTHER MATERIALS INCLUDING BEDDING GRAVEL’S,
DURING CONSTRUCTION. ANY DAMAGE TO EXISTING SERVICES SHALL BE REPAIRED AT THE COUNCIL REQUIREMENTS. 2.4. IF REQUIRED, ENGINEERING CERTIFICATION THAT THE CONTROLLED FILL MATERIAL IS SUITABLE DRAINAGE GRAVEL’S, GEOFABRICS, CAST IRON WORKS, WATER SUPPLY FITTINGS, PRE CAST
CONTRACTORS EXPENSE; 8. PROGRESSIVELY CLEAN UP ALL LITTER AND OIL LEAKS, AND PREVENT WASH OFF OF CEMENT SLURRY TO SUPPORT A CONVENTIONAL SLAB ON GROUND FLOOR. CONCRETE AND ALL PIPE SUPPLIES SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL;
S. VEGETATION OUTSIDE WORK AREAS SHALL NOT BE DISTURBED UNLESS SPECIFICALLY AUTHORISED ONTO SITE SOILS 2.5. ENGINEERING CERTIFICATION THAT THE QUALITY OF AN’( IMPORTED FILL COMPLIES WITH THE 5. ALL TESTING IS TO BE UNDERTAKEN BY A REGISTERED NATA CERTIFIED TESTING LABORATORY AND IS
BY THE SUPERINTENDENT. 9. ALL DOWN PIPES TO BE INSTALLED IMMEDIATELY FOLLOWING ROOF CONSTRUCTION ENSURE ooWN EARTHWORKS SPECIFICATION REQUIREMENTS TO BE IN ACCORDANCE WITH SAMPLING PROCEDURES AGREED WITH THE SUPERINTENDENT.
7. IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH ALL RELEVANT LEGISLATION; PIPES DISCHARGE TO DRAINAGE TRENCHES IN ACCORDANCE WITH STORMWATER DESIGN. 2.S. ENGINEERING CERTIFICATION THAT THE STABILITY OF CUTIFILL BATTERS AND TRENCHES IS S. PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN
8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE STABILITY OF AN’( TEMPORARY 10. ALL SEDIMENT AND EROSION CONTROL STRUCTURES SHALL BE FORMED FROM/IN NON.ERODABLE ADEQUATE ACCORDANCE WITH AS1547.200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT
WORKS ON THE SITE. MATERIALS. 3. UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION
9. THE CONTRACTOR SHALL CONFIRM THE CURRENCY OF THE SET OUT & LEVELS WITH THE 11. THE CONTRACTOR SHALL ADVISE THE SUPERINTENDENT ONCE THE ESC MEASURES HAVE BEEN GEOTECHNICAL ENGINEER ON SITE, FILLING SHALL BE COMPACTED IN ACCORDANCE WITH TABLE 5.1 ZONES, POST.CONSTRUCTION INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE
SUPERINTENDENT PRIOR TO COMMENCING CONSTRUCTION. INSTALLED. OF AS3798. ABSOLUTE MINIMUM DENSITY RATIOS FOR BUILDING PAD ONLY ARE THE FOLLOWING: LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE
10. THE SURVEY LEVEL DATUM IS AS PER DETAILED SURVEY BY GOODWIN MIDSCN, DRAWING No. 14210-2. 12. ALL DISTURBED AREAS SHALL BE LEFT IN A STABLE REVEGETATED CONDITION PRIOR TO THE 3.1. RESIDENTIAL LOTFILL. 95% STD; SUBMITTED TO THE SUPERINTENDENT.
11. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT LOCAL AUTHORITY REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES. ESC MEASURES SHALL NOT BE REMOVED 3.2. COMMERCIAL FILL (FOR MINOR LOADS) 98% STO;
. 7. CBR TESTING FREQUENCY IS AS FOLLOWS;
SPECIFICATIONS AND THE PROJECT SPECIFICATIONS. IN THE EVENT OF A DISCREPANCY, REFER TO UNTIL APPROVED IN WRITING BY SUPERINTENDENT. 3.3. PAVEMENTS (EXCEEDING 300MM BELOW SUBGRAOE).95% STO; 7.1. MINIMUM OF 3No. TESTS WHERE SUBGRAOE IS UNIFORM MATERIAL THROUGHOUT, OR WHERE
THE SUPERINTENDENT FOR CLARIFICATION. 3.4. PAVEMENTS (WITHIN 300MM OF SUBGRAOE) 98% STD;
. LESS THAN 3 DIFFERENT TYPES OF SOIL HORISON ARE OBSERVED (SEE NOTE 7.2 BELOW)
12. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH DRAWINGS PREPARED BY OTHER RELATED 4. AREAS OF CUT OF BE ALSO SUBJECT TO BE PROOF ROLLED AND COMPACTED TO THE SAME 7.2. CBR TEST TO BE UNDERTAKEN ON EACH DIFFERENT SOIL HORIZON OBSERVED AT PAVEMENT
CONSULTANTS, ALL PROJECT SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS STANDARDS AS FILL AREAS FORMATION.
MAY BE ISSUED DURING THE COURSE OF THE WORK. ALL THE DISCREPANCIES SHALL BE REFERRED 5. PRIOR TO COMMENCING EARTHWORKS THE CONTRACTOR SHALL SUBMIT A SAMPLE OF PROPOSED 7.3. 1 No. CBR TEST PER 200m’ OF PAVEMENT AREA SUBJECT TO NOTE 1 ABOVE
TO THE SUPERINTENDENT FOR DECISION BEFORE PROCEEDING WITH THE WORK. FILLING MATERIAL (FROM CUTTINGS OR IMPORTED)WITH ALL TEST RESULTS FOR ALL SPECIFIED
VEGETATION PROTECTION
13. ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL BE AS INDICATED ON BLIGH MATERIAL PROPERTIES PER THE SPECIFICATION.
1. ALL WORKS SHALL BE IN ACCORDANCE WITH THE APPROVED VEGETATION MANAGEMENT PLAN,
TANNER DRAWINGS AND SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION AND/OR S. UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE
WHICH TAKES PRECEDENCE OVER THESE NOTES.
FABRICATION IS COMMENCED. THE ENGINEERS DRAWINGS SHALL NOT BE SCALED, UNLESS GEOTECHNICAL ENGINEER ON SITE, FILLING AND SUBGRADE ARE SHALL BE COMPACTED IN MAXIMUM AS CONSTRUCTED INFORMATION
2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHOULD BE CONSTRUCTED
SPECIFICALLY NOTED OTHERWISE. LIFTS OF 300MM LOOSE THICKNESS AS FOLLOWS: PAVEMENT AREA MORE THAN 300MM BELOW 1. AS CONSTRUCTED INFORMATION IS TO REFLECT THE ACTUAL CONSTRUCTION AND IS TO BE ENDORSED
WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL GIRDLES
14. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPOSED PAVEMENT SUBGRADE 95% MIN. PAVEMENT AREA LESS THAN THAN 300 MM BELOW PAVEMENT BY A LICENSED SURVEYOR;
MUST BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
AND EXISTING WORKS IN A STABLE CONDITION AND ENSURING NO PART SHALL BE OVER STRESSED SUBGRADE 98% MIN. THE PERCENTAGES ARE MINIMUM DRY DENSITY RATIO IN ACCORDANCE WITH AS 2. THE CONTRACTOR IS TO SUPPLY ’AS CONSTRUCTED’ INFORMATION IN A FORMATTHAT IS IN
3. WHERE POSSIBLE, TREE ROOTS SHOULD BE TUNNELED UNDER, RATHER THAN SEVERED. IF ROOTS
UNDER CONSTRUCTION ACTIVITIES. 1289 5.1.1 (STANDARD COMPACTION) ACCORDANCE WITH COUNCIL REQUIREMENTS;
ARE SEVERED THE DAMAGED AREA SHOULD BE TREATED WITH A SUITABLE FUNGICIDE.
15. SAFETY REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE WORK PLACE, 7. REFER TO THE EROSION CONTROL PLAN AND IMPLEMENT EROSION CONTROL MEASURES PRIOR TO
4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY A PROFESSIONAL ARBORIST.
HEALTH AND SAFETY ACT (QLD). COMMENCING WORKS ON SITE. MAINTAIN EROSION CONTROL MECHANISMS IN WORKING ORDER.
5. THE CONTRACTOR IS NOT TO DISTURB OR CUT VEGETATION WITHOUT THE SUPERINTENDENTS
lS. THE APPROVAL FOR A SUBSTITUTION SHALL BE SOUGHT FROM THE SUPERINTENDENT BUT IS NOT AN 8. AREAS WHERE TOPSOIL AND OTHER ORGANIC MATTER IS TO BE STRIPPED PRIOR TO COMMENCING
AUTHORISATION FOR A VARIATION. ANY VARIATION MUST BE APPROVED BY THE SUPERINTENDENT
APPROVAL. CONCRETE WORKS
GROUNDWORKS SHALL BE MARKED OUT PRIOR COMMENCING EARTHWORKS. FILL SHALL BE
S. SELECTED TREES AND / OR SHRUBS WHICH ARE TO REMAIN UNDISTURBED SHALL BE MARKED BY THE 1. CONCRETE WORK SHALL COMPLY WITH AS3S00;
BEFORE WORK COMMENCES. STOCKPILED ON SITE. EARTH STOCKPILES SHALL BE SUITABLY PROTECTED FROM EROSION AND
SUPERINTENDENT WITH COLOURED TAPE OR SIMILAR MARKS. THE CONTRACTOR SHALL TAKE CARE 2. CONCRETE FINISHES SHALL BE IN ACCORDANCE WITH ARCHITECTS SPECIFICATION UNLESS NOTED
17. THE ACCESS FOR THE WORK SITE SHALL BE AS INDICATED ON THE CONTRACT OR AS APPROVED BY WEED INFESTATION BY COVERING WITH WEED MAT OR OTHER MEANS. RESPREAD TOPSCIL TO
NOT TO DAMAGE OR REMOVE ANY OF THESE TREES AND / SHRUBS IN CARRYING OUT THE WORKS OF
THE SUPERINTENDENT AND THE LOCAL AUTHORITIES. THE CONTRACTOR SHALL OBTAIN ALL FINISHED SURFACE LEVELS AND REVEGETATE TO SPECIFICATION PRIOR TO COMPLETION. OTHERWISE;
THE CONTRACT. 3. ALL CONCRETE KERB SHALL BE GRADE N32;
NECESSARY AND RELEVANT PERMITS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONSTRUCT AND 9. ALL LAYERS OF FILLING AND SUBGRAOE ARE TO BE PROOF ROLLED TO SUPERINTENDENTS
7. VEGETATION OUTSIDE WORK AREAS SHALL NOT BE DISTURBED UNLESS SPECIFICALLY AUTHORISED 4. ALL CONCRETE PAVEMENTS SHALL BE GRADE N25 UNLESS NOTED OTHERWISE;
MAINTAIN ACCESS AS THEY REQUIRE TO ALL PARTS OF CONTRACTORS WORK AREA APPROVAL.
BY THE SUPERINTENDENT. 5. THE SUPERINTENDENT SHALL BE NOTIFIED PRIOR TO POURING OF AN’( CONCRETE;
18. THE CONTRACTORS COMPOUND SHALL BE LOCATED AS APPROVED BY SUPERINTENDENT. 10. UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE
8. ALL VEGETATION WITHIN 4M OF GENERAL MACHINE OPERATION SHALL BE PROTECTED WITH A STAR S. CURING OF ALL CONCRETE IS TO BE ACHIEVED BY THE USE OF AN APPROVED CURING COMPOUND.
19. ALL WORKS SHALL COMPLY WITH THE WORK PLACE HEALTH AND SAFETY ACT. GEOTECHNICAL ENGINEER ON SITE, MAXIMUM BATTER SLOPES TO ANY CUTTING OR FILLING TO BE lV
PICKET AND ROPE FENCE CONSTRUCTED AT LEAST 1M CLEAR OF THE VEGETATION; 7. BASIC DRYING SHRINKAGE STRAIN MEASURED IN ACCORDANCE WITH AS 1012 PT.13 SHALL NOT
20. ALL WORKS SHALL BE IN ACCORDANCE WITH THE PROJECT ENVIRONMENTAL MANAGEMENT PLAN. TO 3H FOR LANDSCAPED SLOPES.
-
11. CONTRACTOR SHALL MAKE DUE ALLOWANCE FOR ADDRESSING SITE TRAFFICABILlTY IN ACCORDANCE EXCEED SOD MICROSTRAIN AT 8 WEEKS.
WITH THE GEOTECHNICAL REPORT FOR THE SITE, CONSIDERING WEATHER CONDITIONS LIKELY TO
MAINTAINING PERMEABILITY OF SITE SOILS PREVAIL DURING THE EARTHWORKS PERIOD.
1. THE CONTRACTOR MUST READ AND BE FAMILIAR WITH THE STORMWATER MANAGEMENT PLAN (BLIGH 12. INSITU SAND SOILS, WHERE FREE OF ORGANIC AND DELETERIOUS MATERIAL, MAY BE USED FOR IMPORTANT
TANNER PTY LTO, SITE BASED STORMWATER MANAGEMENT PLAN, JOB NO. 2012.1S7.600, 8 AUGUST STRUCTURAL FILL PROVIDED THE MOISTURE CONTENT OF THE SCILS ON PLACEMENT APPROXIMATES 1. THIS SITE MAY CONTAIN UNEXPLODED ORDNANCE. REFER
2012), WHICH CONTAINS IMPORTANT INFORMATION ON THE PURPOSE AND INTENT OF THE THE OPTIMUM MOISTURE CONTENT REQUIRED FOR COMPACTION. TO SITE CONTAMINATION REPORT 092.003918
STORMWATER MANAGEMENT STRATEGY FOR THE SITE. 13. IMPORTED GENERAL FILL MATERIAL (IF REQUIRED) SHOULD ONLY BE USED IN AREAS UNDER 2. NO EARTHWORKS OR EXCAVATIONS TO BE CARRIED OUT
2. PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN CONCRETE SLAB ON GROUND AREAS. INSITU SAND SOILS TO BE USED OUTSIDE PERIMETER OF SLAB UNTIL CONFIRMATION RECEIVED FROM SUPERINTENDENT
ACCORDANCE WITH AS1547-200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT TO ASSIST WITH INFILTRATION AS PER ’MAINTAINING PERMEABILITY OF SITE SOILS’ NOTES. THAT ALL NECESSARY INVESTIGATIONS AND REPORTING
LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION 14. REFER TO STRUCTURAL DRAWINGS FOR SPECIFCATION FOR STRUCTURAL FILL, HAVE BEEN COMPLETED
ZONES. POST.CONSTRUCTlON INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE
LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE
SUBMITIED TO THE SUPERINTENDENT.
3. THE NATURAL INFILTRATION RATE OF THE SITE IS TO BE MAINTAINED IN ALL LOCATIONS. THIS IS
IMPORTANT TO SUPPORT THE STORMWATER MANAGEMENT STRATEGY FOR THE SITE. THE ONLY
l EXCEPTIONS TO THIS ARE:
a. BUILDING FOOTINGS
~
’"
b. BUILDINGS WHICH ARE SLAB-ON GROUND CONSTRUCTION.
HOLD POINTS 7. SUB-BASE PROOF ROLL. SUNSHINE COAST REGIONAL COUNCIL
c. THE CONCRETE CROSSOVER AND THE DISABLED CAPRPARKING BAY AND ITS CONCRETE 8. BASE COMPACTION AND MATERIAL QUALITY TESTS TO BE SENT TO AND APPROVED BY ENGINNER.
~ SURROUND WHICH WILL HAVE IMPERMEABLE SURFACES. 9. BASE PROOF ROLL.
i. 4. THE CONTRACTOR IS TO SUBMIT DETAILED WORK METHOD STATEMENTS TO THE SUPERINTENDENT 1. PROVISION OF WORK METHOD STATEMENTS AS PER NOTE 4 OF ’MAINTAINING PERMEABILITY OF
10. PRE.SEAL INSPECTION IMMEDIATELY PRIOR TO SEALING,
~
i
FOR APPROVAL THAT CLEARLY DOCUMENT HOW THE INFILTRATION RATE OF SITE SCILS WILL BE
PRESERVED. THIS WILL INCLUDE DETAILS ABOUT:
SITE SCILS’ NOTES
2. PRE.START MEETING WITH CIVIL CONTRACTOR, CIVIL ENGINEER AND COUNCIL PRIOR TO AN’( CIVIL
WORKS COMMENCING.
11. WEARING COURSE MATERIAL QUALITY, COMPACTION AND APPLICATION RATE TEST RESULTS TO
BE SENT TO AND APPROVED BY ENGINEER PRIOR TO PRACTICAL CCMPLETION OR LlNEMARKING.
APPROVED
a. HOW THE SITE WILL BE ACCESSED AND HOW POTENTIAL COMPACTION FROM VEHICLE AND
12. WEARING COURSE INSPECTION.
~
z
PLANT MOVEMENT WILL BE MANAGED
b. HOW THE INFILTRATION SYSTEMS BENEATH BUILDINGS WILL BE CONSTRUCTED,AND
3, BULK EARTHWORKS LEVEL 1 CERTIFICATION TO BE SENT TO AND APPROVED BY ENGINEER PRIOR
TO BUILDING STRUCTURES OR PAVEMENT CONSTRUCTION.
13, LlNEMARKING AND SIGNAGE INSPECTION,
14. FINAL INSPECTION PRIOR TO PRACTICAL COMPlETION, OPW 13/0463 4 Sep 2013
PROTECTED FROM CONSTRUCTION DEBRIS 4. EROSION AND SEDIMENT CONTROL PRIOR TO CLEARING AND/OR EARTHWORKS COMMENCING.AT
~ c. HOW LIQUID, SLURRY AND FINE PARTICULAR MATERIALS WILL BE HANDLED LEAST MONTHLY AND AFTER HEAVY RAIN EVENTS.
ON MAINTENANCE/PRACTICAL COMPLETION INSPECTIONS
d. RECTIFICATION MEASURES TO RESTORE PRE.DEVELOPMENT INFILTRATION RATES WHERE PROVISION OF ALL REQUIRED TEST RESULTS AND COMPLETION OF PRIOR INSPECTIONS.
~ NECESSARY. ROADS/FOOTPATHS
1. SUBGRADE CBR TEST RESULTS TO BE SENT TO ENGINEER FOR CONFIRMATION OF PAVEMENT
1.
2. PROVISION OF CERTIFIED ’AS BUlLr DRAWINGS AND DATA BY A LICENSED SURVEYOR.
3. INSPECTION AND APPROVAL BY ENGINEER INCLUDING LOCAL AUTHORITY IF APPLICABLE.
i
DEPTH PRIOR TO FINALlSING SUBGRAOE AND BOX LEVEL.
2. SUBGRADE COMPACTION TESTS TO BE SENT TO AND APPROVED BY ENGINEER PRIOR TO
OFF MAINTENANCE/END OF DEFECT PERIOD INSPECTIONS
SUBGRADE INSPECTION.
1. INSPECTION AND APPROVAL BY ENGINEER OF ALL RECTIFICATIONS IDENTIFIED AT ON
3. PAVEMENT GRAVEL GRADING, CBR AND MATERIAL PROPERTIES TEST CERTIFICATES TO BE SENT
s MAINTENANCE/PRACTICAL COMPLETION.
TO ENGINEER FOR APPROVAL
i 4. SUBGRADE INSPECTION AND PROOF ROLL.
5. SIDE DRAIN INSPECTION PRIOR TO KERB AND CHANNEL GRAVEL BASE BEING PLACED,
S. SUB.BASE COMPACTION AND MATERIAL QUALITY TESTS TO BE SENT TO AND APPROVED BY
ENGINEER.
IMPORTANT
BLIGH TANNER CONSULTING ENGINEERS MUST BE INFORMED AT EACH OF
THESE HOLD POINTS AND GIVE PERMISSION TO PROCEED. FAILURE TO DO
NOTE
~sDRAWING TO BE READ IN CONJUNCTION
WITH STANDARD NOTES ON COOl
~ THIS MAY RESULT IN BLIGH TANNER BEING UNABLE TO CERTIFY WORKS 2. THIS DRAWING TO BE READ IN CONJUNCTION
WITH ALL OTHER CONSULTANTS DRAWINGS
!NOT FOR CONSTRUCTION
I Vl BLIGH TANNER
REV
A
B
DATE
18.12-2012
25.03-2013
DESCRIPnON
PREUMINARY ISSUE
FOR INFORMATION
DESIGN
PS
PS
ORA"""
PS
PS
CHECKED
AH
APPROVED RPEQ PROJECT
NOOSA FLC DRAVY1NGnTLE
STANDARD NOTES SCALES
~ C 17-05.2013 FOR REVIEW PS PS CR CR
N
... CONSULTING ENGINEERS
D 13-06.2013 OPERATIONAL WORKS PS PS CR CR LOCATION
2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD
ARCHITECT JOB NO
~ FULTON TROTTER 2012,164.200
LEVEL 9,269 WICKHAM STREET, PO BOX 612
i
x
FORTITUDE VALLEY OLD 4006 AUSTRALIA
T 07 3251 8555 F 07 3251 8599
CLIENT
FULTON TROTTER
ASSOCIATE CONSULTANT DRAWNGNO
COO1
REVISION
0
ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS (GRAPHIC,ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING)WITHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED,TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY
Section 6
Extent of works in adjoining
property to be determined with
Council's Ecologist at the
pre-start meeting
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 13/0463 4 Sep 2013
Section 7
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 13/0463 4 Sep 2013
Extent of works in adjoining property to
be determined with Council's Ecologist
at the pre-start meeting
Section 8
Extent of works in adjoining
property to be determined
with Council's Ecologist at
the pre-start meeting
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 13/0463 4 Sep 2013
Section 9
N32 CONCRETE 300
PAVEMENT
I
50mm COVER LAYER LOOSE
- N32 CONCRETE
IPAVEMENT
0(;)
:il 5-10mm CLEAN WASHED GRAVEL
, I
~
150mm GEOWEB LAYER -
TO BE LAID IN
LOT BOUNDARY
~ ~ f-
J ~j
SERVICES TO BE LOCATED AND ACCORDANCE WITH MANUFACTURES GUIDELINES
DEPTH CONFIRMED PRIOR TO COMMENCING AND FILLED WITH 5-10mm CLEAN WASHED GRAVEL
WORKS.MIN 600mm COVER REQUIRED-
TENSAR GEO-GRID TriA)( TX 140
..
SERVICES TO BE RELOCATED TO CORRECT
COVER IF REQUIRED OR PROTECTION
DETAIL AGREED WITH UTILITY OWNER
SUBGRADE TO BE COMPACTED
TO ACHIEVE A MINIMUM DENSITY
NOTE:
NO GEOFABRIC TO BE USED IN
SUBGRADE TO BE COMPACTED TO
j
.<1 100mm TRANSITION LAYER -
1-2mm ACHIEVE A MINIMUM DENSITY
<1 INDEX OF 75%(AS1289.5.6.1). PERMEABLE PAVEMENT CONSTRUCTION
. CLEAN WASHED WELL GRADED SAND INDEX OF 75% (AS1289.5.6.1).
(NO FINES) D15<lmm DB5>2mm
TYPICAL CONCRETE CARPARK TYPICAL CARPARK PERMEABLE TYPICAL CONCRETE FOOTPATH DETAIL
AND EDGING DETAIL PAVEMENT DETAIL SCALE 1:10
SCALE 1:10 SCALE 1:10
R16 DOWELS SAWCUT 400 LG AT
EXISTING 400 CRS GREASE ONE END STOP NOTE
EXISTING FOOTPATH
TO BE RETAINED
TO BE RETAINED
~ BARS 600MM FROM JOINT
STOP REINFORCEMENT 25
THIS PAVEMENT HAS BEEN DESIGNED TO SUNSHINE COAST REGIONAL COUNCIL
INTERSECTIONS MEET SUNSHINE COAST REGIONAL COUNCIL
CLEAR OF JOINT
LOCAL ROAD DESIGN SPECIFICATION -
THE
ESA’S FOR A LOCAL ROAD IS 5.0X 10’.
APPROVED
<1 Ll
OPW 13/0463 4 Sep 2013
_
-d 4
Ll.
2 N16 CONTINUOUS SUPPORT BARS ON
<1 Ll CHAIRS AND DISCS BARS NOT
CONTINUOUS THROUGH JOINT
<1
INTERSECTIONS
c
<1
PARCHEM FOSROC "ROADSEAL"OR
TYPICAL DOWELLED JOINT DETAIL (OJ1)
~ APPROVED EQUIV
Ll<1 . SCALE 1:10
Ll <1
ENSURE MIN 600mm CLEARANCE BEHIND -
<1
PARCHEM FOSROC "EXPANDAFOAM ROD"
KERB FOR VEHICLE OVERHANG
<1 OR SIMILAR
EXISTING MOUNTABLE KERB AND ,WHEELSTOP TO BE SECURELY ATTACHEDTO
CHANNEL TO BE CUT AND TYPE B IPWEAQ TYPE ER2 -
CONCRETE SLAB IN ACCORDANCE WITH
< PLANTING IN THIS AREA TO BE -
MOUNTABLE CROSSOVER CONSTRUCTED IN 1 REINFORCEMENT TO IPWEAQ MANUFACTURERS SPECIFICATION AN D
LOW LEVEL PLANTING -
REFER
KERB AND CHANNEL ACCORDANCE WITH STD DWG Ll <1 STD. DRG No. R-0080 GUIDELINES -
ENSURE OPENINGS BETWEEN
Ll. LANDSCAPE ARCHITECT
TO BE MAINTAINED IPWEAQ R-0051 -
EXISTING SUBSOIL WHEELSTOPS TO ALLOW OVERLAND FLOW CUT EVERY 2ND CROSS BAR
DRAWINGS FOR DETAILS
DRAINAGE TO BE MAINTAINED 25 CLEAR OF JOINT
:<1 ACCESS ROAD 230 CARPARK
Ll
. I 150
---:----
Ll<i
-~<r
--
1\
,
I :ilj I~
300
iSL72 MESH
/
---~ --,..,L~
NOTE: DEPRESS MESH LOCALLY TO
\,’ ~Ltl MAINTAIN COVER
@ GIRRAWEEN COURT
r--~---
, , 1’:l
" -...___ -
CROSSOVER DETAIL
~ I~ -
600
SUBGRADE TO BE COMPACTED
TYPICAL SAWN JOINT
SCALE 1:10
(SJ1)
150mm C8R45 TYPE 2.3
SCALE 1:50 380
TO ACHIEVE A MINIMUM DENSITY NOTE:
COMPACTED TO 98% STD MDD
INDEX OF 75% (AS1289.5.6.1). ~TTO BE AIR BLASTED PRIOR TO APPLICATION OF SEALANT.
REFER TO MANUFACTURERS SPECIFICATION FOR EARLIEST
BARRIER KERB TO EDGE OF KERB TO FRONT OF CUTTING TIME.
2. JOINTS TO BE PROVIDED AT A MIN AS FOLLOWS
PERMEABLE PAVEMENT CARPARKING BAYS DETAIL 2.1. SAWN JOINTS AT 3m MAX CENTRES
SCALE 1:10 SCALE 1:10 2.2. DOWEL JOINTS AT 12m MAX CENTRES
SECTION H
SCALE 1:20 (Al)
!
31.5
EXISTING KERB TO
tOm
MAX 1 IN 8
3.0m
MAX 1 IN 40 (VARIES) 2.03m (VARIES)
FOOTPATH TO MATCH EXISTING
FOOTPATH WIDTH AND CROSSFALL
""’"-’~
BE?fS
CUT AND REMOVED
~
~
.1
l
31
30.5
GIRRAWEEN COURT
./"
----
-
-=~t
I 30
---------------------------
~
f SECTION NOTE
SCALE 1:20 (Al) tTHiS DRAWING TO BE READ IN CONJUNCTION
WITH STANDARD NOTES ON COOl
I NOT FOR CONSTRUCTION 2. THIS DRAWING TO BE READ IN CONJUNCTION
WITH ALL OTHER CONSULTANTS DRAWINGS
SCALE 1.50
SCALE ,.,0 01
10
02 03
2.Om
04m
I
~
r=- BLIGH TANNER
... CONSULTING ENGINEERS
REV
A
B
C
D
DATE
25-09-2012
25-03-2013
17-05-2013
13-06-2013
DESCRIPTION
PRELIMINARY
FOR INFORMATION
FOR REVIEW
OPERATIONAL WORKS
OES~
PS
PS
PS
PS
ORA\\!<
PS
PS
PS
PS
CHECKED
AH
CR
CR
APPROW
CR
CR
RPEO PROJECT
LOCATION
2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD
NOOSA FLC DRAWNGTITLE
ARCHITECT
ROADWORKS DETAILS SCAlES
Joe NO
AS SHOWN
FULTON TRODER 2012.164.200
~ LEVEL 9, 269 WICKHAM STREET, PO BOX 612
~ FORTITUDE VALLEY aLD 4006 AUSTRALIA CLIENT ASSOCIATE CONSULTANT ORAWNGNO REVISION
I T 07 3251 8555 F 07 3251 8599 FULTON TRODER
C302 D
ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS (GRAPHIC,ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING)WITHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED, TO USE THIS OOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY
Section 10
Copyright
This drawing shows design features and elements of a design prepared by
Fulton Trotter Architects and is to be used only for work authorised in
writing by the designers. It cannot be copied directly or indirectly, in whole
or in part, nor shall it be used for any other building purposes. Unauthorised
use will be considered an infringement of these rights.
PROPOSED SITE PLAN LEGEND
35.
0 SIGNIFICANT TREES RETAINED
E
35.0
34 PROPOSED BUILDINGS
.5
LP
34
.0 D CONCRETE
35,532
2 15,203
A CREATE SETOUT
10,000
VEHICLE ACCESS
10,000
VEGETATION BUFFER
KNOWLEDGE SETOUT EASEMENT EASEMENT TIMBER DECKING
7,216
KNOWLEDGE SETOUT Proposed Boundary - plotted from RC246435 6,000
STN 2001
Screw in Conc
CREATE SETOUT
30° NEW BOUNDARY FENCE E 934.512
60°
34.5 N 4975.847
4,187
RL 32.86 PERMEABLE GRAVEL SURFACE
5
.7
33
RAISED TMB WALKWAY 4 BATTER DOWN FROM BOUNDARY
CRUSHED GRAVEL PATHS. REFER TO
11,000
100mm CONC LANDSCAPE DRAWINGS
GARDEN BED BLOCK
WHEELSTOP
4.0 ON CONC KERB
3WALL
VEGETATION BUFFER
500H
Road
TURF
LOADING
EASEMENT
.0
CARPARK LIGHTING
34
ONLY
20,000
89°58'40"
100.435
.5
33
33.5
of
KNOWLEDGE COUNCIL TREE PROTECTION ZONE
BICYCLE
VERANDAH RACKS CREATE
KNOWLEDGE
CL
RL 33.500
9
RL 34.600 ACCESS ROAD
4,800 6,200 4,800
REFER TO CIVIL ENG FENCING
8,000
DRAWINGS FOR LINE .0
33
4
8
MARKING & SIGNAGE SET
OUT OF ROADS/CARPARK 5
WHEELSTOPS CAR PARK .7 EARTHWORKS TO ADJACENT PROPERTY.
32
REFER TO CIVIL ENGINEERS DRAWINGS
3
7
CONC CAR PARK
6 EDGE WITH
AWD412
WHEELSTOPS PROPOSED SITE PLAN NOTES
2
6
7,622
A 1 REFER TO DETAIL
- BUILDINGS SETOUT FROM GRID/BOUNDARY
1
VEHICLE ACCESS
INTERSECTION.
5
AMENITIES SETOUT BOLLARD
2
EASEMENT
- VEGETATION CLEARING & PROTECTION IS TO BE
400
BIN
AMENITIES CONC-BF
.0
10,000
ENCLOSURE COMPLETED STRICTLY IN ACCORDANCE WITH THE
33
0
DECK SLABS CROSSOVER
SITE BOUNDARY
LANDSCAPE PLANS AND DIRECTIONS AND COUNCILS
SETOUT CHECK BETWEEN SUPPORT GRID 2 AND CREATE GRID 1
BICYCLE 32.654 CONC-BF
PATH CONDITIONS.
RACKS CONC-BF
PUMP
AMENITIES FLUSH CONC KERB TO - REFER TO SPECIFICATIONS AND CIVIL DRAWINGS FOR
RL 34.600 GRAVEL PATH IN GROUND PERMEABLE EDGE DETAILED INFO ON BUILDERS ACCESS AND
ENCLOSURE TURF TO OVAL
SPRING HYDRANT TRAFFICABILITY REQUIREMENTS.
- ALLOW FOR 3 NO. SLABS NOMINAL 1200x1200x100mm
LINE OF FENCING TRIM EXTG TREES TO THICK BROOM FINISH TO COINCIDE WITH ROOF ACCESS
32.672
R O A D
ALLOW CLEAR ACCESS LADDER BASE POSITIONS.
C O U R T
TRIM EXTG TREES ALONG PATHS
EXTG ANIMAL FENCE
22,691
SITE BOUNDARY 269°57'30"
BASKETBALL TRIM EXTG TREES TO LIGHTING
A TO ALLOW CLEAR
112.05
HOOP ALLOW CLEAR ACCESS BOLLARDS
ACCESS UP RAMP
ALONG PATHS .75 PROPERTY DESCRIPTION: Lot 3 on RP 887636
32
SITE AREA: Approximately 5000m2
C R E E K
PLANTER BOXES
G I R R A W E E N
32.690
11 ON GRAVEL BED
3
AMENITIES SETOUT
0°
PATH
32,302
CONC-BF
E E N I E
COVERED DECK
.5
RETREAT
32
RL 34.600 SOUND TMB BOARDS LAID
PATH
RL 33.500 ON SAND BASE
2 LIGHTING
C.O.S T TENDER ISSUE 21.06.13 MK
TE
RETREAT SETOUT
BOLLARDS REV. DESCRIPTION DATE INIT.
EXTG CONCRE
EAT
32.75
RETREAT
18,932
Road
VERANDAH RL 33.500
RAISED CO
VERED TM SUPPORT
B WALKWA RL 33.500
34.0
Y STORMWATER 32.25
33.5
86°25'40"
TRENCHES
of
11.635
34.25
AC ENCLOSURE MSB
1
32.5
CL
SUPPORT SETOUT
4,049
70
°
S
99.315 BRISBANE BRISBANE
10,984 359°58' SITE BOUNDARY 18 Portman Lane SYDNEY
150mm @ A1
24,551 P O Box 353
RETREAT SETOUT
SUPPORT SETOUT Spring Hill NORTHERN RIVERS
.75
QLD 4004
F
34
t. 07 3291 1511
STN 2000 f. 07 3291 1500
B Screw in Conc
E 875.425
e. [email protected]
N 4974.437
32.5 RL 32.800 DIRECTORS
Andrew Armstrong raia NSW 6321 QLD 2814
LP
34.0
Section 11
Greg Isaac raia NSW 6855 QLD 2920
Mark Trotter fraia VIC 17691 NSW 4421 QLD 1870
34.5 Paul Trotter fraia NSW 7177 QLD 2646
33
.0 33.0 Robert Wesener raia NSW 5802 QLD 2633
33.5
32.75
34.5 34.0 www.fultontrotter.com.au
.0
33
34.0
33.5
33
.0
Edmund Rice Education
CLIENT
33.0
100
PROJECT
Noosa FLC
ADDRESS
2 Girraween Court
SUNSHINE COAST REGIONAL COUNCIL Sunrise Beach
DRAWING
PROPOSED SITE & EXTERNAL
WORKS PLAN
APPROVED
50
Figured dimensions take precedence over
scale dimensions. Contractors must verify N
OPW 13/0463 4 Sep 2013 all dimensions on site before commencing
any work or making shop drawings.
1 PLAN SCALE @ A1 DIRECTOR DRAWN CHECKED
Proposed Site & External Works Plan 1:200 MT MK BH
SCALE: 1:200
PROJECT NUMBER DRAWING NUMBER REVISION
50 100 150mm @ A1
3286NO03 AWD101 T
plot date: Friday, 21 June 2013 file location: teamwork://BNEBIM/3286NO03 Noosa FLC v16
Used in these records
Approved PlansRelated documentApplication case desk ↗
About this file
- File size
- 12.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.