20210008 - 9 Bottlebrush Ave Civil Plans RevB

Attached to the e-mail Response to RFI - 9 Bottlebrush Avenue Noosa Heads - MCU21/0133.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                  OP WORKS
                                                                                                                                                                                                                                                                                                                                           ISSUE


                                                                                                                                                                                                                                                                                                                                     LEGEND

                                                                                                                                                                                                                                                                                                                                           CONSTRUCTION ENTRY/EXIT
                                                                                             PROVIDE FABRIC WRAP INLET                                                                                                                                                                                                                     SHAKEDOWN AREA
                                                                                                                                                                                                                  PROVIDE SANDBAGS TO
                                                                                             PROTECTION TO PITS DURING                                              STORMWATER DRAINAGE TO                        CONTROL FLOW OF CATCH
                 KERB INBLET SEDIMENT TRAP TO BE                                                                                                                                                                                                                                                                                           SEDIMENT FENCE
                                                                                             CONSTRUCTION WORKS AS                                                  BE INSTALLED FOR FLOW DIVERSION.              DRAIN RUN-OFF TO PIT
                 INSTALLED AT DOWNSTREAM KERB                                                                                                                                                                                                                                                                                              (INDICATIVE LOCATION)
                                                                                             PER NSC STD DWG ESC-02                                                 REFER ROADS AND DRAINAGE LAYOUT.
                 INLET AS PER NSC STD DWG ESC-03
                                                                                                                                                                                                                                                                                                                                            CATCH DRAIN



                                                                                                                                                                                                                                                                                                                                            STORMWATER PIPE



                                                                                                                                                                                                                                                                                                                                            STORMWATER PIT


                                                                                                                                                                                                                                                                                                                                           SANDBAG PLACEMENT




                                                                                                                                                                                                   PROVIDE TURFED CATCH DRAIN TO DIVERT UPSTREAM
                                                                                     CONSTRUCTION SITE ENTRY
                                                                                                                                                                                                RUN-OFF TO STORMWATER DRAINAGE. REFER ROADS AND
                                                                                       ROCK SHAKEDOWN AREA
                                                                                                                                                                                                                           DRAINAGE LAYOUT PLAN




SEDIMENT RELEASE GUIDELINES                                     UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH             APPROVED DRAWINGS.                                  TEMPORARY CONSTRUCTION ENTRY/EXIT                                · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE)
                                                                THIS STANDARD.                                           7.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL      11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND              OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE,                                                                              IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE       SPECIFICATION REFER TO INTERNATIONAL EROSION                 · WITHIN 24 HOURS OF EXPECTED RAIN; AND
     UNLESS OTHERWISE NOTED IN THIS STANDARD, MUST NOT                                                                        LOCATION OF THE SITE ACCESS POINT AND WASH DOWN         CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                  · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT
                                                                                                                              AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE          PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02               OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE                08/07/21   ISSUED FOR OPW                      -    BRP
     EXCEED THE FOLLOWING LIMITS:                          SEDIMENT CONTROL
  1.1.   50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A                                                                          CONSTRUCTION PERIOD.                                    CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES              SEDIMENT ON SITE).                                               DATE              REVISION               MARK CHK
         MAXIMUM CONCENTRATION;                                                                                          8.   IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN       ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND      17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE                  PROJECT ENGINEER
                                                           1.   ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE               FOUND TO BE DIFFERENT OR FAILED IN SERVICE,                                                                        OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH
  1.2.   TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE                                                                                                                                    EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION
                                                                IN ACCORDANCE WITH INTERNATIONAL EROSION CONTROL              CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY                                                                  THE FOLLOWING TABLE:
         BACKGROUND;                                                                                                                                                                  GRID.
                                                                ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE               WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE
  1.3.   pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT        SPECIFICATIONS.
         WHERE, AND TO THE EXTENT THAT, THE NATURAL                                                                           ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH       KERB INLET
                                                           2.   SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE                AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT,
         RECEIVING WATERS LIE OUTSIDE THIS RANGE.               MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS                                                                       12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION                           MAINTENANCE SCHEDULE
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING                                                                            IF DEEMED NECESSARY AND RELEVANT.                       REFER TO INTERNATIONAL EROSION CONTROL                                                                    TIMEFRAME FOR
                                                                RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL                                                                                                                                  ESC MEASURES         MAINTENANCE TRIGGER            COMPLETION
     MAY ONLY EXCEED 50mg/L WHERE IT CAN BE                     MEASURES AS DEEMED NECESSARY THROUGHOUT                                                                               ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES                                                            OF MAINTENANCE
     DEMONSTRATED AND SUPPORTED THROUGH                                                                                  9.   OVERALL                                                 STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS      SEDIMENT BASISIN WHEN SETTLED SEDIMENT EXCEEDS WITHIN 7 DAYS OF THE
                                                                CONSTRUCTION.                                                 a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE                                                                                     THE VOLUME OF THE SEDIMENT        INSPECTION         E [email protected]
     DOCUMENTATION THAT:                                   3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL                                                                                                                                                   STORAGE ZONE (SEE COUNCIL'S
  2.1.   FURTHER SIGNIFICANT RAINFALL IS FORECAST TO                                                                             DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.    REVEGETATION                                                                     SEDIMENT BASIN DESIGN                             A 37 MARY ST NOOSAVILLE, QLD
                                                                SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER                b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS                                                                                            GUIDELINES
         OCCUR BEFORE THE TSS CONCENTRATION IS LIKELY           AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS                                                                       13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO          OTHER ESC      THE CAPACITY OF ESC MEASURES BY THE END OF THE DAY    P +61 7 5211 1003
         TO BE REDUCED TO 50mg/L;                                                                                                TO BE INSTALLED AND BE OPERATIONAL BEFORE            INTERNATIONAL EROSION CONTROL ASSOCIATION                 MEASURES               FALLS BELOW
                                                                REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF                     COMMENCING UP-SLOPE EARTHWORKS.
  2.2.   RELEASING A HIGHER CONCENTRATION OF TOTAL                                                                                                                                    AUSTRALASIA (IECA) BEST PRACTICES STANDARD                                                                                    CLIENT
                                                                WORKS.                                                        c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE
         SUSPENDED SOLIDS WILL RESULT IN A BETTER                                                                                                                                     DRAWING R-01 REVEGETATION GENERAL.
         ENVIRONMENTAL OUTCOME BY PROVIDING STORAGE
                                                           4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES                  CONTROLLED, EXPOSED SURFACES TO BE EITHER                                                                   REPORTING                                                                NOVATO GROUP
                                                                TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL                 MULCHED, COVERED WITH EROSION CONTROL                                                                       18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF
         FOR THE CAPTURE AND TREATMENT OF RUN-OFF               BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                              FIELD INLET                                                                                                                       PROJECT
         FROM THE IMMINENT RAINFALL AND RUN-OFF.                                                                                 BLANKETS OR TURFED IF EARTHWORKS ARE                                                                            ESC MAINTENANCE AND CONTROL OF ALL STAGES OF
  2.3.    ALL REASONABLE AND PRACTICABLE STEPS HAVE
                                                                a. STRIPPING OF TOPSOIL AND GRASS.                               EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.
                                                                                                                                                                                  14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION
                                                                                                                                                                                                                                                 WORK FOR APPROVAL BY THE SUPERINTENDENT.                             UNIT DEVELOPMENT
                                                                b. BULK EARTHWORKS TO THE SITE.                                                                                       REFER TO INTERNATIONAL EROSION CONTROL
         BEEN TAKEN TO TREAT THE WATER WITHIN                   c. SERVICES INSTALLATION.
                                                                                                                         SEDIMENT FENCE
                                                                                                                                                                                      ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES                                                                                   9 BOTTLEBRUSH AVENUE
         BEST-PRACTICE TIME FRAMES;                             d. PAVEMENT CONSTRUCTION                                                                                              STANDARD DRAWING ESC-02 GRATED STORMWATER
  2.4.   FLOCCULENT HAS BEEN APPROPRIATELY APPLIED         5.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN
                                                                                                                         10. FOR SEDIMENT FENCE STANDARD DETAIL AND                   (FIELD) INLET SEDIMENT TRAP.
                                                                                                                                                                                                                                                                                                                      NOOSA HEADS
          AND THE CONCENTRATION OF TSS IN THE CAPTURED                                                                       SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                                           TITLE
                                                                IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING
         WATER HAS ALREADY SIGNIFICANTLY DECREASED.                                                                          CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF                                                                  OPERATION AND MAINTENANCE
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND                 THE SILT CONTROL APPLICATIONS.
                                                                                                                             PRACTICES STANDARD DRAWINGS SF-01 AND SF-02
                                                                                                                             SEDIMENT FENCE.
                                                                                                                                                                                  15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC                                                                                   EROSION AND SEDIMENT
     DISCHARGES FROM THE SITE, THE RELEASE LIMIT           6.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT                                                                       MEASURES SHALL BE INSPECTED:
     PRESCRIBED IN (1a) ABOVE MUST NOT BE EXCEEDED              PLAN SHALL BE READ IN CONJUNCTION WITH THE
                                                                                                                                                                                                                                                                                                                      CONTROL PLAN
                                                                                                                                                                                                                                                       SEDIMENT AND EROSION CONTROL:
                                                                                                                                                                                                                                                       CONTRACTOR TO ALLOW FOR PROVISION OF ALL
                                                                                                                                                                                                                                                       REQUIRED SEDIMENT AND EROSION CONTROL                        PROJECT NO.      DRAWING NO.    STATUS
                                                                                                                                                                                                                                                       DEVICES IN ACCORDANCE WITH IECA AND NOOSA
                                                                                                                                                                                                                                                       SHIRE COUNCIL POLICIES AND GUIDELINES
                                                                                                                                                                                                                                                                                                                     20210008        C10             OPW
                                                                                                                                                                                                                                                                                                                    DRAWN            DESIGNED        SCALE             ISSUE

                                                                                                                                                                                                                                                                                                                    BRP              BRP            1:150               A
Log in to download the original file

20210008 - 9 Bottlebrush Ave Civil Plans RevB.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.