Minor Change Existing Approval - MCU25 0136 01 (As Published)

of 10
                                                                                     Officer:            Tess Henare
                                                                                     Direct Telephone:   07 5329 6245
                                                                                     Our Reference:      MCU25/0136.01
                                                                                     Your Reference:     n/a

               14 August 2026


               Olivine Properties P/L
               C/- Across Town Planning
               11 Bareki St
               WURTULLA QLD 4575
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 24 June 2026, requesting a minor change to an existing
               development approval. Council on 10 August 2026 decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU25/0136.01

                   Street address:              1 Olivine St, Cooroy Qld 4563

                   Real property description:   Lot 126 C 5604

                   Planning Scheme:             Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               The following type of approval was issued on 7 May 2026.
               •     Development Permit for a Material Change of Use - Multiple dwelling (5 units)
               In relation to the request to make a minor change to the existing approval, Council on 10 August
               2026, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend condition 3.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Log in to download the original (Minor Change Existing Approval - MCU25 0136 01 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Currency Period
               2.     This development approval lapses if the use has not happened by 7 May 2032, unless an
                      application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.       Rev.   Plan/Document Name                                   Date

                        DA1.03         G      Detail Survey prepared by Blackwood                  21/04/2026

                        DA1.04         G      Demolition Plan prepared by Blackwood                21/04/2026
                                              Annotated by Council

                        DA1.07         G      Property Plan prepared by Blackwood                  21/04/2026

                        DA1.08         K      Site Plan – Ground Level prepared by Blackwood       09/07/2026
                                              Annotated by Council

                        DA1.09         K      Site Plan – Upper Level prepared by Blackwood        09/07/2026

                        DA2.01         K      Ground Floor (Part A) prepared by Blackwood          09/07/2026

                        DA2.02         K      Ground Floor (Part B) prepared by Blackwood          09/07/2026

                        DA2.03         K      Upper Floor (Part A) prepared by Blackwood           09/07/2026

                        DA2.04         K      Upper Floor (Part B) prepared by Blackwood           09/07/2026

                        DA2.05         G      Roof Plan (Part A) prepared by Blackwood             21/04/2026

                        DA2.06         G      Roof Plan (Part B) prepared by Blackwood             21/04/2026

                        DA2.08         K      Type Two Plans prepared by Blackwood                 09/07/2026

                        DA3.01         G      North & South Elevations prepared by Blackwood       21/04/2026

                        DA3.02         K      East Elevation prepared by Blackwood                 09/07/2026

                        DA3.03         G      West Elevation prepared by Blackwood                 21/04/2026

                        DA4.01         G      Section A prepared by Blackwood                      21/04/2026

                        DA5.01         K      Site Cover prepared by Blackwood                     09/07/2026




                                                                                                      Page 2 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 3

                      Street Identification
               4.     The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
                      External Works
               5.     Olivine Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
               6.     construction of kerb and channelling and underground stormwater drainage to the
                      development side only. The kerb and channel must be offset 6.0 metres from the existing
                      kerb and channel on the north-western side of Olivine Street;
               7.     widening and sealing of the existing road pavement to match the alignment of kerb and
                      channel;
               8.     construction of a pedestrian footpath in accordance with the conditions of this Decision
                      Notice; and
               9.     upgrading the existing stormwater pit in accordance with the conditions of this Decision
                      Notice.
                      Site Access and Driveways
               10.    A sealed access driveway must be provided from Olivine Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must include in particular:
                      a.      a driveway crossover in accordance with Council’s standard drawing RS-051; and
               11.    a sealed driveway for the full length of the access handle, including visitor carparks and other
                      servicing and manoeuvring areas.
                      Car Parking
               12.    A minimum of 12 car parking spaces must be provided on the site. The works must be
                      undertaken in accordance with an Operational Works approval, be generally in accordance
                      with Blackwood’s Site Plan – Ground Level (DA1.08, Rev. F) dated 13 March 2026 and must
                      include in particular:
                      a.      2 visitor parking spaces within the total; and
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
                      Pedestrian and Bicycle Facilities
               13.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      a 1.5 metre wide footpath within the road verge for the entire length of the site’s
                              frontage to Olivine Street – the footpath’s width can be reduced (to a minimum of 1.2
                              metres), only in locations where a 1.5 metre wide footpath would impede on minimum
                              clearances from services (i.e., light poles) or result in the creation of trip hazards for
                              pedestrians.




                                                                                                         Page 3 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 4

                      Stormwater Drainage
               14.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      A stormwater quality treatment system in accordance sections 3 and 4 of Planning
                              Scheme Policy 6 Engineering Design Standards.
                      b.      On-site detention to ensure the peak flow rate is attenuated during all events up to the
                              1% AEP event adjusted for climate change.
                      c.      3,000 litres of rainwater storage per dwelling for non-potable reuse purposes.
                      d.      An upgrade to the existing stormwater pit in the Olivine Street road reserve that allows
                              for the conveyance of stormwater flow:
                              i.       from the existing upstream table drain; and
                              ii.      from the Olivine Street road formation, including an allowance for the
                                       construction of future kerb and channel upstream.
                      Services
               15.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot/unit in accordance with the standards and requirements of the relevant service
                      provider.
               16.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               17.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               18.    The development must provide a 2.0 metre Public Thoroughfare easement across the full
                      frontage of the site to Olivine Lane. The easement must be registered prior to
                      commencement of use and be free of all permanent structures, including but not limited to,
                      retaining walls, footpaths, pedestrian stairs and boundary fences.
               19.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               20.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               21.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               22.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be undertaken in accordance with an Operational
                      Works approval and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.
               23.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.



                                                                                                        Page 4 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 5

                      Damage to Services and Assets
               24.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Landscaping Works
               25.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include, but is not limited, to the following:
                      a.      A detailed landscape plan prepared by a suitably qualified landscape architect in
                              accordance with the requirements of the PSP2 – Landscaping, and that incorporate
                              items b-h (outlined below) or otherwise required by Council.
                      b.      The landscaping area is to be consistent with the area shown on the Landscape
                              Calculation plan (Landscape Calculation, prepared by Blackwood, 21/04/2026,
                              Revision F)
                      c.      a minimum 2 metre-wide landscaping strip within the front setback of Olivine Street,
                              exclusive of the access driveway, generally uncompromised by infrastructure items
                      d.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      e.      a minimum 2 metre-wide landscaping strip within the rear setback of Olivine Lane,
                              uncompromised by future infrastructure items
                      f.      provision of one (1) street tree within the road reserve for every 8 metres of road
                              frontage
                      g.      Vegetation with vertical scale to provide screening/buffering to reduce bulk and scale
                              of the built form when viewed from the street and adjacent properties as far as
                              practicable.
                      h.      All landscape areas must allow for deep planting in natural ground unobstructed by
                              footings or structures associated with side and rear boundary walls.
               26.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Retention of existing trees
               27.    Prior to any clearing, an Arborist Report must be submitted to Council for approval as part of
                      an Operational Works application. The report must be prepared by a qualified person* in
                      accordance with AS 4970:2025 Protection of Trees on Development Sites.
                      The Arborist Report must include, but is not limited to:
                      a.      Identification and assessment of all trees within the development site, the adjoining
                              road reserve, and on adjacent properties where trees are located in proximity to the
                              proposed works;
                      b.      Documentation of the species, condition, structural integrity, and retention value of
                              each tree;
                      c.      Nominate trees for removal and retention;



                                                                                                       Page 5 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 6

                      d.      Nominate Tree Protection Zones (TPZs) in accordance with AS 4970 – Protection of
                              Trees on Development Sites;
                      e.      Identification of potential impacts associated with the proposed development, including
                              construction activities, excavation, level changes, and site access; and
                      f.      Preparation of a Tree Management Plan, to be included within the Arborist Report,
                              detailing measures to protect all nominated retained trees during construction. The
                              Tree Management Plan must include, but is not limited to:
                              •          Installation of tree protection fencing in accordance with AS4970;
                              •          Ground protection measures where works are required within or adjacent to
                                         TPZs;
                              •          Management of construction activities, including vehicle access, material
                                         storage, and service installation;
                              •          Any pruning works to be undertaken in accordance with AS 4373 – Pruning of
                                         Amenity Trees; and
                              •          Monitoring and supervision by the project arborist at key stages of construction.
                      *(refer to Advisory Note)
               28.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
                      Fauna Management
               29.    Vegetation must only be removed or disturbed in accordance with a Fauna Management
                      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
                      Works approval.
                      Qualified Person
               30.    For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.
               31.    For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture (minimum AQF level 5) in addition to a minimum of 3 years
                              current experience in the field of arboriculture.
               32.    For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
                      be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
                      and management.
               5.     REFERENCE DOCUMENTS

                Plan No.          Rev.       Plan/Document Name                                   Date

                DA5.02            G          Landscape Calculation, prepared by Blackwood         21/04/2026

               6.     REFERAL AGENCIES

               Not applicable.




                                                                                                              Page 6 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 7

               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to Infrastructure Charges | Noosa Shire Council
                      Building and Construction Industry (Portable Long Service Leave) Levy
               2.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               3.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               4.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction;
                              ii.      maintenance of safe vehicle and pedestrian access for the areas affected by the
                                       works during and after daily construction has ceased;
                              iii.     proposed fencing to the site during the construction phase of the development;
                              iv.      approval of the Traffic Management Control Plan by the Department of Transport
                                       and Main Roads (DTMR) for any works on State controlled roads; and
                              v.       provision for worker car parking.
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures.
                      c.      works programme identifying key components of the works and their respective
                              durations.
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues.
                      e.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures




                                                                                                        Page 7 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 8

                      h.      details on the location of external fill sites/sources, the haulage route, type of vehicle
                              to be utilised during filling operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations shall be fully repaired at the
                              applicant’s expense
                      i.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the Pre-
                              Start Meeting for the project.
                      Community Title Scheme - Private Infrastructure
               5.     All private infrastructure for the development must be designed to meet the planning scheme
                      requirements unless otherwise agreed by the relevant authority
                      Plan Sealing
               6.     All works required by this permit must be completed and accepted by Council prior to
                      submitting an application for plan sealing.
                      Biosecurity Act 2014 – Fire Ant Control
               7.     Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
                      Qualified Person
               8.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.
               9.     For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
                              the field of arboriculture.
               10.    For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
                      be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
                      property notes
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                 Subject of the required Development Permit

                Development Permit for Operational Works            Road work, Stormwater,          Drainage     work,
                                                                    Earthworks, Landscaping.

                Development Permit for Building Works               All building work.




                                                                                                         Page 8 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 9

               11.      SUBMISSIONS

               Not applicable.
               12.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               13.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully,

               Georgina Schramm
               C/- Tess Henare
               Development Planner | Development Assessment
               Development & Regulation




               Enc:     Appeal Rights
                        Approved Plans/Documents


               DECISION NOTICE HISTORY
               •     Original Decision Notice – 7 May 2026.

               •     Decision Notice – Minor – MCU25/0136.01 – 10 August 2026, with an amendment to condition 3.




                                                                                                                   Page 9 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

Page 10

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 10 of 10
Document Set ID: 25046953
Version: 4, Version Date: 17/08/2026

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.