Council archive · source document
06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published] · 142006.159
15/12/2005 10:47 61-7-54441158 RIENMAC PTY LTD SCST PAGE @3 RIENMAC envio CONSULTING ENGINEERS CIVIL AND STRUCTURAL -2- We recommend a soil raft be created to support the structure which would undergo uniform consolidation under the load. We understand the proposed development is two storeys with a suspended concrete slab and a slab on ground. We recommend the building area be excavated to 1200mm below present surface level which removes all the fill material and the remnant top soil layer. At this depth generally a medium dense saturated sand layer should be found. A sheet of Tensar Geogrid Geofabric should then be placed covering the entire building are. A layer of CBR15 material should then be placed on top of the geofabric to a depth of approximately 300mm compacted in layers. Any clean sand recovered from the excavation may then be placed in compacted layers on top of this material to the required level. Shallow footings may then be placed in this material designed for a safe bearing capacity of 100kPa. All the strip footings should be tied together to prevent differential settlement. Our preliminary foundation plan for the proposed development is shown on our drawing 98425-SI, which also outlines our required earthworks procedure. We consider this site has a class classification in accordance with AS2870 "Residential Slabs and Footings". If you require any further information or clarification regarding this report please do not hesitate to contact us. Yours faithfully, ? ConA PETER RIENECKER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0159 - Op Works - landscaping, Driveway and Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.