INTEGRATED PLANNING ACT 1997
State-controlied road matters (cont)

Clearing vegetation

For more information refer to Guide 12.

‘Unless you answered “none of the above” to Q3, the

application requires assesament by the Department
ings (NREM).

if an agency other than NR&M ts the assessment

manager for the application, NRAM is a concurrence

agency for the application In relation so this matter.

(DAS Assessment Checklist, Version 15,0, 18 November 2005
(1 (i) development on land not contiguous to a State-controlied road and -
(1 (a) material change of use —
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

[J (b) reconfiguring a Jot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;

(O(c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b} above)—
« assessable against the local government's planning scheme; and
+ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

[AMiii) none of the above

The application involves: (tick applicable box/es)
C1 (i) material change of use -
(a) assessable against the planning scheme;
(b} ona lot containing —
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c} where the existing use of the land is a rural or environmental use; and
(d} where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot -
{a} ona lot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created: and
(d) where the size of any lot created is 25 hectares or smaller - complate Part J of Form 1
C1 (il) operational work -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the JPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a tot mentioned in (ii) - complete Part J of
Form 1

J2Liv) none of the above.

Diy

 

Strategic port land
For more information refer to Gyide 11.
you ticked (i) - the relevant Port Authority is the

The application involves:

[-] (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - comptete Part ! of Form 1

atsessment manager for the applicatian,
Uf you ticked (1) Queensland Transports 8 (7 (ii) a material change of use that is Inconsistent with the land use plan approved under the
Concurrence agency forthe application. TI Act for the strategic port land - complete Part | of Form 1
x (iii) none of the above
Acid sulfate soils

 

For more information refer to Guide 10,

Unless you answered “nane of the above" to Q5, the
application requires assessment by Department of
Natura! Resources and Mines {NRAM).

tan agency other than NR&M is the assessment
manager for the application, NR&M is an advice
agency for the appiication in relation to this matier.

 

The appfication involves development on land situated in an identified local government area
and where the surface of the land is: (tick applicable box)

(2) (below 20m AHDS and the development will invoive the excavation of 1000m%or more of
soit or sediment at or below 5m AHD, or
(71 fii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
Rei none of the above
7

5 The identified locai government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboollure, Cains, Calliope, Caloundra, Cardwell, Carpanteria, Cock,
Cooloola, Doungiss. Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redeliffe, Redland. Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Australian Height Datum (AHD).

Pane?

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_0159 - Op Works - landscaping, Driveway and Stormwater [As Published].pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.