ouRet 200401 cl Cardno

Contact Mike Laverty Shaping the Future

19 June 2008

Chief Executive Officer Cardno (Qld) Pty Led
Sunshine Coast Regional Council ABN 57 051 074.992
P O Box 141

Tewantin QLD 4565 Cardno Centre

Level 1, 9 Maud Street
Maroochydore Qld 4558
PO Box 152, Maroochydore
Queensland 4558 Australia
Telephone: 07 5443 2555

Attention: Assessment Manager

OPERATIONAL WORKS APPLICATION FOR CIVIL WORKS

AT: 71 Pacific Avenue, Sunshine Beach Facsimile: 07 5443 5642
FOR: Comiskey Group — Comiskey Management Services Pty Ltd International: +61 7 5443 2555
PROPERTY NO: Lot 31 RP149005 Email: [email protected]

Web: www.cardno.com.au
On behalf of our client, Comiskey Group — Comiskey Management Services Pty
Ltd, we submit the attached application for operational works approval for the

a Cardno Offices
above subdivision. Brishane
Syd

The proposed works are associated with the construction of a Childcare Centre canons
and associated infrastructure. This application is submitted pursuant to Melbourne
Development Application 06/1180. Perth
. . Darwin

The assessment fees for the engineering components of the works were
calculated by council as shown below: Cairns
Townsville
PLAN EXAM Rockhampton
Hervey Bay
19 spaces @ $23 = $437 } Sunshine Coast
900m2 use area 18 x $60 = $1080 } 3.2.1 = $1,517 Toowoomba
Gold Coast
Minimum Fee } 3.2.3 =$ 880 Gosford
Baulkham Hills
Minor earthworks } 332 =$355 Busselton

Port Moresby, PNG
Abu Dhabi, UAE
Portland, USA

Sediment - Building (1000m2) = $115 }
- Carpark (460m2) =$36 }
- Widening (420m2)=$36 } 3.4 =$ 187

 

Pavement Design (both sides) } 3.4 = $ 400
As Cons } 37  =$175
INSPECTIONS
2005

External works 4.1.1 = $760 fh Ons,
Internal works (1500m2) 4.1.2 = $310 t ma i
Minor earthworks = $ 760 \ J

. for Ereallonce

WINNER

Access, carparking, stormwater, roadworks, minor earthworks, Frontage works

TOTAL = $5,344 Ee

   

7)

Our client’s cheque for this amount is enclosed. coma eae encuty
ndorss
Company

a vt 728

J42384-01 CHILO CARE - SUNSHINE BEACH\Adnministration\Letters\080618 OPW 238401 Application SCRC Itr.doc
Full text of the other 72 pages

Page 2

Enclosed are the IDAS Assessment Checklist and Form 1 Parts A and E.
The following engineering drawings are enclosed:

2384-01-001
2384-01-002
2384-01-003
2384-01-004
2384-01-005
2384-01-006
2384-01-007
2384-01-008
2384-01-009

Please contact Mike Laverty if you wish to discuss or clarify any matter associated with this
application.

Yours faithfully,

Cltok PRS

Mike Laverty
Project Manager
for Cardno

Enc: IDAS Forms A, E & Checklist
Cardno Engineering drawings as listed above (4 copies)
Cardno Report — Stormwater Quality Management Plan dated 18 June 2008 (4 copies)
Cardno Report — Erosion and Sediment Control Plan dated 18 June 2008 (4 copies)
Cardno Report — Environmental Management Plan dated 18 June 2008 (4 copies)
Cheque No. 001979

Ce: Comiskey Group

Page 3

 

INTEGRATED PLANNING ACT 1997

    

Part A, Version 3.1, 3 March 2008

Form 1 Development Application

Part A

Common details

INOTE: Answer alt questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

(Ap plicant details (The Applicant is the person responsible for making the application and need nol be the owner of the land. The Applicant is responsible for ensuring the
information provided on the IDAS Application Form is correct. This information is refled upon by the Assessment Manager and any referral agencies when assessing and
Iecting this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or preliminary
lapproval that may be issued as a consequence of this application wil be issued to the Applicant.)

 

 

 

Company/organisation name (if applicable) [comiskey GROUP - COMISKEY MANAGEMENT SERVICES PTY LTD, C/- CARONOg§|

 

Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)

Title Firstname |MIKE Lastname |LAVERTY

Postal address [cARDNO, PO BOX 152, MAROOCHYDORE, QLD, 4558

Contact telephone number [54432555 Mobile phone number [TF
Facsimile number 54435642 e-mail address [email protected]

 

 

 

 

 

 

 

 

 

 

 

 

 

[Details of the premises (.¢. the land on which the development is proposed refer to the advice at the dnd of the form). + Ry

1, Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the vremises)
Table A If the application is for a mobite and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

 

[ , Name of each local goverment area in which the mobile and temporary ERA is proposed to operate _

| 1
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)

 

 

 

 

 

(i) &] Street address / lot on plan for the premises (Appropriate for most applications including building applications); or

(i) {] Street address /ot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water 0.9. jotty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, @ Rate’ notice, or from the focal government)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Street Address ; Lot on plan description Oo
Tat | Sreat Plan fype and Local government a area (e.g. Logan,
No. | No. Street Name and official suburbflocality name ‘ Post Code | Lot No. Plan Number .|. Calms) Py
1 71 | PACIFIC AVE 4567 31 RP149005 SUNSHINE COAST REGIONAL COUNCIL
AND/ OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (0.9. channel dredging in Moreton
Bay) etc.)
Goons . 2 rn Maen - |
(Note: place each set of coordinates in a separate row} Zone Local government area
. i . - Reference Datum (if applicable)
Easting Northing Latitude Longitude
1 ([] pepas4
1] wesea
0 Other -

 

 

 

 

 

 

 

 

 

 

2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, take, cana)
Name of water body, watercourse or aquifer (if known} |
‘

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port Authority for the lot
1

Table F Complete if the premises are in tidal water
Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)

 

 

 

 

 

 

 

 

 

 

 

[1

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

Total area of premises

 

1,614.00 Dm? (Jhectares {Tick applicable unit)

 

 

 

 

 

Existing use of the premises. ° x }
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

[1 [vacant Lano

 

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
& No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

‘Proposal detaits ]
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture)

 

 

CHILDCARE CENTRE

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
oO No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

Resource entitlement (if applicable) _- further information is provided in the advice section at the end of the form ]

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

XX] No - Goto09 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitfement must be submitted with the application. You do nol need to answer Q9 - go to the next section.

 

‘Owner's consent {if applicable} _- further information is provided in the advice section at the end of the form J

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on fand below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable,

 

Premises Owner's namels Details of the premises owned tea ae Date consent —

Table H anid postal address (street address or lot on plan description) Owner’ signature was obtained

 

 

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. {f the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

 

F * . :
Attachments and supporting information (Compiete Table! - Use a separate row for each type of attachment or information, including information required
“under this Perl) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, éfc, are securely attached to this Part of the Form,

 

    

~ Description of attachment or information
Table I (0.9. Part C of Form 1, owner's consent, evidence of resource
allocationventitement, plans, drawings, reports)

Title (W apptcabe) Method of delivery to

 

{4 Genera! Authonty James SteetTrafic Regoty| Date assessment manager

 

 

 

 

 

 

 

 

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

[Portable Long Service Leave (PLSL) levy (Appicable ‘or certain building and construction work valued over $80,000 only} ]
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if appficabte)
(LJ the application seeks a preliminary approval only;

[_] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

[_ all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -

Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

14, Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
[No - End of Part A

DX] Yes - Answer 012 below

12. Has the PLSL levy been paid?

XX No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by
the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a
Notification and Payment Form to QLeave.)

oO Yes - Complete Table J and submit, with the application, the "yellow" (Local Government's (Council) / Private Certifier's) copy of the receipted QLeave Form

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. Receiving officer's Reference

Fee ($) Date received name numbers
| NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER |
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of teat _ f |
-eagagement ‘Name . . BSA Certification number {

   

 

 

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certiffer if applicable)

 

 

Date receipted
Description of the work QLeave ProjactNumber {Amount paid ($)} Date paid form sighle “aby Name of offer who sighted the
manager
[1

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 4 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will net be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

Advice for completing Part A

General advice

. Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Applicant details

if the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

 

Details of the premises

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land’ is also defined to inctude the estate in, on, over or under the land.

Details of the land are not required if the application involves a mobile and temporary Environmentaily Relevant Activity only. Instead complete

Table A.

The premises may be identified in a number of ways ~

« Street address and lot on plan are most common and will apply to most applications.

« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand,

StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on

strategic port land) and the Queensland Transport (Ports) website.

‘Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local goverment has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection

Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to integrated Planning
Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a Jot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the IPA website for the provision of owner's consent as an attachment to this form, However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises,
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

 

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry
{Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction industryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave} Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www,gleave.gld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

www. gleave.ald.gov.au )

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

   
 

    

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 
 

 

‘Nature of the works |

4. Nature of work that requires assessment against a planning scheme:

 

[_] Building work - Complete Table A ({X] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
X] Roadworks (J Stormwater ([] Water infrastructure [-] Sewerage infrastructure
[[] Landscaping ([] Earthworks (_] Drainage Works (] Signage
(LJ Clearing vegetation under the planning scheme ([] Other - Specify below

(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit ([] Preliminary approval (J Both (Specify betow)

(iti) Is the operational work necessary to facilitate the creation of new lots {i.¢. subdivision)?
[XJ No [J Yes - Specify the number of lots being created

{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

()No — [X] Yes - Complete Table B(a)

 

 

 

 

 

 

 

 

Table B(a) List of approval references Date approved Date approval lapses (if known)
1
Table B
(i) Whatis the nature of the operational work?
( Roadworks LX] Stormwater (_] Water infrastructure (_] Sewerage infrastructure
( Landscaping ([] Earthworks [_] Drainage Works L] Signage
[[] Clearing vegetation under the planning scheme [-] Other - Specify below

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

Development Permit (Preliminary approval J Both (Specify batow)

{iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
IX] No [J Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

[No — [X] Yes - Complete Table Ba)

 

Table B(a) . List of approval references Date approved | — Date approval laps es (known)
1

 

 

 

 

 

 

 

 

 

Page 8

 

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

 

Table B
(i) What is the nature of the operational work?
(-) Roadworks ) Stormwater L Water infrastructure [-] Sewerage infrastructure
(J Landscaping BX] Earthworks ([] Drainage Works 1 Signage
(_] Clearing vegetation under the planning scheme (] Other - Specify below

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit CJ] Preliminary approval (] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
—X}No _[[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

[J No — &X] Yes - Complete Table B(a)

 

Table B(a) ; List of approval references - ‘| Date approved Date approval lapses (if known)
1

 

 

 

 

 

 

 

 

 

2. What is the dollar value of this operational work? (i.e. the total value including GST, materials and labour) | $

 

 

 

‘Mandatory Information “

 

3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

oedremeet of Method of lodgement
Plans, andspecticaions if applicable, showing the nature and location of the proposed works (including the [2] Confirmed | over the counter
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
« Part A must also be completed for all IDAS development applications.
* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

 

Page 9

   
 
   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

IROUAAAI Om P= A100) SDAA cal e828 Lece LO

IDAS

Assessment Checklist

 

loas Development Application Form 1 is the approved form for ail development applications under the integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.

Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.

For more information about development applications on land in an urban development area, refer to. www,ulda,qid.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

Does the application seek approval to materially change use of the premises?

 

 

 

 

 

 

 

 

ifyes - complete Section 2 of this checklist DYes |JNo
Does the application seek approval to reconfigure a lot? Clyes |2No
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out operational work? S

if yas - complete Section 4 of this checktist Yes |()No
Does the application seek approval to carry out duilding work requiring assessment against the Fisheries Act 1994? Ces |52No

if yes - complete Section 5 of this checklist

 

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
ifyes - complete Section 6 of this checklist. Ba Yes |]No

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? Kl Yes |CNo
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |[K]No
Assessment is by a building certifier

 

 

 

 

 

 

 

 

 

SECTION 1 "Section 1 must bé completed for all applications that require completion ofthe {DAS Assessment Cheettist.

‘HERITAGE |
1.1A Is any part of the proposal intended to be carried out on a Queensland Heritage place under the Queens/and Heritage Act 1992?
IX] No-Gotor18 =] Yes

1P4, schedide 8. part {, table 5, Lem 2: iP Regilation, schedute 2, table 7. tant 11, fable 2. item 18: 1PA, section 1.3.5 (Definitions for termis used m development),

 

 

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

1.1B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be cared out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 19927

No - Goto Q1.2 O Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant local government against the IDAS
Code in the Queensiand Heritage Regulation 2003. if the development involves building work and the local
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.

IPA, schedule 8. part 1 table 5, iten 2A, schediia 9. tables 1. 2 3, 4 & 5, IP Regulation, schedule 2, lable 1, item 11A; IPA, section 1.3.5 (Definibons lor tonins used in developmen);
Queensiand Heritage Regulation 2003, schedule 2 (DAS Coste).

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA

 

4.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
—X) No-cotoa13 ([] Yes

IPA, schedule 8, part 1, tablo 5, item 1:1P Regulation, schedule 2, table 2, item 11:1P Regulation. schedule 1, table 5. item 2 (wild river area); Walor Act 2000.
section 966C; Wild Rivers Act 2005, section 43A

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJ No-Gotoar4 [_] Yes

IPA, schextula 8, part 1. table 2, fam 1; IPA, schedule 8 part 1 lable 5. dems 3 and 4: iP Requlation, schedule 2, table 2, tems 1 and 23; Environmental Projection Act 1994. section
TIAA (oid nver area): Wid Rivers Act 2095, section 434; relevant wild river declaration; Wild Rivers Code.

 

 

 

WITHIN THE LIMITS OF A PORT ge sy ees . ae at |
1.4 ts any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

DX] No - Goto. 07.5

CL] Yes

IP Regulation, schedule 2, table 2, items 15 and 16

 

DECLARED FISH HABITAT AREA

 

1.6 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Go to 01.6

LL] Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2. table 2, tem 26

‘COMMUNITY INFRASTRUCTURE 2 ‘ " 4

 

 

1.6 Is any part of the premises designated for community infrastructure?
(J No - Goto 1.7
Yes
If yes, is the community infrastructure intended to be provided by a public sector entity?

—X] No
Yes

IP Regulation. schedule 2, table 3, tem 7

 

WASTE WATER MANAGEMENT ]

41.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
EX] No - End of Section? [_] Yes

iP Regulation, schetule 2. table 3. item 5

 

SECTION 4. Section 4 must be completed when the application:-seeks approval to carry out operational work, _
[PLANNING SCHEME i

41 Is any of the proposed operational work assessable under a planning scheme?
LJ No - Go to 04.2 DX] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,

 

 

 

 

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 21.3, 9 May 2008

 

 

‘STATE-CONTROLLED ROAD |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

—X] No

(Yes

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

BX] No - Goto 04.1.2

O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedule 2, table 3. item 3; 1P Regulation, schedule 2 lable 3. item f(b}

‘ACID SULFATE SOILS ]

4.1.2 1s any of the operational work proposed in a local government area listed“! in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

IX] No -Gotoa4.1.3 C1 Yes

4A punakun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloota, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation. schedule 2. table 3, item 4: State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Soils, section 3.6

iEASEMENTS AND SUBSTATIONS

4.1.3 Is any of the proposed operational work for filling or excavation?

 

 

 

   

XJ No -Gotoa4.14

LC] Yes

IP Regulation, schedule 2, table 3 item 10fa): iP Reyulation, schedule 2, table 3, item 10{b)

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

DX] No -Gotoas1.5 (_] Yes

IP Regulation, schedule 2, table 3. item 17

 

 

[PUBLIC PASSENGER TRANSPORT |
4.1.5 Is any of the proposed operational work listed in schedule 13C of the /ntegrated Planning Regulation 1998 and does it exceed the
specified threshold?

EX] No-Gotoa41.6  [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedute 2, table 3. tem 14

 

 

RAILWAY SAFETY AND EFFICIENCY |
4.1.6 Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

No-Gotoa41.7 — [_} Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2. table 3, ten 15

IKOALA CONSERVATION |

 

4.1.7 |s any part of the premises in a koala conservation area or koala sustainability area?
X] No -Gotoas2 [] Yes

IP Regulation. schedule 2, tahle 3, item 19

 

‘WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial _
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of development.

 

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

01 No -Gotoas3 [7] Yes

IPA, schedule 8, part 1, table 4. item 2, iP Regulation, schedule 1, part 2, table 5, item t(c}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban

 

 

 

area}
|VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

PX] No -Gotoas4 [(] Yes

IPA, schedule 8, part 1, table 4, items 14-1G; IP Regulation, schedule 2. table 2, item § (vegetation clearing): IP Regulation. schedule 2, table 2, item 34 (koala
conservation), 1? Regulation, schedule 1, part 3, table 4 item (vegetation clearinyéwild river area), Veyelatian Management Act 1999, section 22A (vegetation
clearingwild river area); Wild Rivers Act 2005, sections 31F and 43A

 

[TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

DX] No -Gotoa45 [_] Yes - Answer (a) and (b) below

IPA, schedule 8, pait 1, table 4, lems 3{a). IP Regulation, schedule 2, table 2. tem 8: IP Regidation, schudule 7, part 3, table 4 items 3 and 34; Waler Act 2000, section 966A (wild river
area); Wild Rivers Act 2008. section 434; refevant wild river declaration, Wild Rivers Code
4.5 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck fo pump water)?
& No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water

(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(h); [P Regulation, schedule 2, lable 2. ftem 8, IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers cade (Note’ the code does nut currently contain applicable provisions for taking or interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[EX] No -Gotoa47 [_] Yes - Answer (a) and (b) below
IPA, schedtile 8. part 1, fable 4, lem 3tcyi: IP Regulation, schedule 2, (able 2, Rem 8: iP Requiation, schedule 7, part 3. table 4, Kent 3; Weter Act 2000, section 9GGA (wild river area);
Wild Rivers Act 2005, section 434; relevant wild river declaration, Wilt Rivers Code.
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck fo pump water)?
[XJ No -Gotoasa [_] Yes
IPA, schedule 8. part 1, table 4, item 3{c}(ti): IP Regulation, schedule 2, lable 2. item 8; 1P Rogulation, schedule 1, part 3, table 4, tem 3
Water Act 2000. section 966A (wad river area}(Note: no current Wiki River declaration identifies taking or interfering with subartesian water as assessable)
Wild River cade (Note: the code does not currently contain applicable provisions for sub aitesian water}
4.8 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
LX] No -Gotoas9 [_] Yes - Answer both (a) and (b) below

IPA, schedule 8. part 1, lable 4. items 3¢)(i) and 3{d). iP Regulation, schedute 2. table 2. lem 9. IP Regulation, schedule |, part 3. table 4. itens 34; Water Act 2000, section 9668 (with
aver area) relevanl wilt aver declaration, Witd Rivers Code

49 ls the proposed operationa! work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [4] No OO Yes
(i) To increase the storage capacity of a referable dam by more than 10% —) No 0 Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and

Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency,

IPA, schedule 8, pert 1. table 4. lem 4; IP Regulation, schedule 2. table 2, lem 10

 

TIDAL WORK; WILD RIVER AREA " ]

4.10 \s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoas11 [7] Yes - Answer (a) and (b) below

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
IPA, schedule 8, part 7. table 4, item 5: IP Regulation. schedule 2, table 2, items 12. 14 and 17- IP Regulation. schedule 1, part 3, lable 4. tems 4A and 5
Coastal Protection end Management Act 1995, section 104A (wild river area)

 

‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |

 

4.11 Is any of the operational work proposed to be carried out within a coastal management district?
IX] No -Gotoasi2 ((] Yes

IPA, schedile 8. part 1, lable 4. item 5: IP Regulation. schedule 2, table 2. items 12 and 14: IP Regulation. schedule 1, pad 3. table 4, items 4A and §
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area}: Wild Rivers Act 2005, section 43A

WATERWAY BARRIER WORKS; WILO RIVER AREA |

4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
IX] No -Gotoa413 [[] Yes

IPA, schedule 8 part |, table 4 dem 6: IPA, schedule 8. pail 2. table 4, stein 2. Fisheries Regulation 1995 $113A (self-assessabie codes}; IP Regulation. schedule 2 table 2, sein 28; iP
Regulation. schedide 1, part 3, table 4, tem 6, Fishenes Act 1994, section 76D (wid nver erea); Wild Rivers Act 2005. section 43A.

 

 

 

 

 

IDECLARED FISH HABITAT AREA; WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the

Fisheries Act 1994?

EX] No - Goto Q4.14

CJ Yes

“A, schedule 8. part 2. table 4, fam 3; Fisharles Regulaiion 1995 $113A (self assessoble vodes}, 1F Reguiation, schedule 2, lable 2, tern 25, 1
yn 7; Witd Rivers Act 2005, cechons 43A° Fisheries Act, section 76DC (wild siver area),

 
 

JPA, schedule §, part 3, lable 4. Kem ?,
Regulation, schedule 7, part 3. table

 

‘REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA ]

4.14 !s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

[DX] No -Gotoas15 [_] Yes
IPA, schextule 8, part 1, table 4, item 8: IPA, schedule & part 2 lable 4, item 4: Fisheries Regulation 1995 $113A (sell-assessable codes); iP Regulaton, schedule 2. table 2, item 29; 1P
Regulation. schedule 1. part 2. tabve 4. dein 8. Fisheries Aci 1994. section 76DB jwild river erea). Wid RNvers Act 2005, section 434; refevart wild river declan atian, Wiki Rivers Code.

 

 

WILD RIVER AREA wre oie ans Bo nase ae f

     

4,15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

[X] No -Gotoas.16 [_] Yes
IPA, schedule 8. part 1, table 4, item 10; IP Regulation, schedule 2. table 2, item 37; Wild Rivers Act 2005. sections 42, 434

 

STATE-CONTROLLED ROAD : i

 

4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsection4 [] Yes

IP Regulation, schedule 2, table 2, item 3

 

SECTION 6 Complete Section 6 if you have received a referral agency response about an aspect of your proposal prior to making

       

 

 

 

 

 

 

hoe an application & Pr # cw : af
IPRE APPLICATION REFERRAL AGENCY RESPONSE |
6.1
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS ° . |have you satisfied any conditions oy
BEEN RECEIVED UNDER IPA S3.2.2 - list a separate matter in each row stated in the response?
1 EPA - POTENTIAL UNEXPLODED ORDINANCES LJNo (Yes [1 No Conditions

 

 

 

 

 

if yes for any of the referral matters listed in the table above - A referral for this matter is not required, and the relevant Part identified in the IDAS Assessment
Checklist is not required to be completed. A copy of the referral agency response and evidence
of how you have satisfied any conditions stated in the response must be attached to your
application,

if no for any of the referral matters listed in the table above - The relevant Part identified in the DAS Assessment Checklist is required to be completed. The
application must be referred {o the relevant referral agency, unless the referral agency is the
Assessment Manager.

Page 14

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability {including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

Page 15

Cl Cardno

Shaping the Future

 

STORMWATER QUALITY MANAGEMENT PLAN

PROPOSED CHILDCARE CENTRE,
LOT 31 RP149005,
SUNSHINE BEACH

18 June 2008

Job No. 238401 Comiskey Group

 

Page 16

STORMWATER QUALITY MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

Cardno (Qid) Pty Ltd
ABN 57 051 074 992
Cardno Centre

Level 1, 9 Maud Street
Maroochydore Qid 4558
PO Box 152, Maroochydore
Queensland 4558 Australia
Telephone: 07 5443 2555
Facsimile: 07 5443 5642
International: +61 7 5443 2555
[email protected]

www.cardno.com.au

 

 

 

 

 

 

 

 

 

Document Control
Author Reviewer
Version Date
Name Initials Name Initials
1 18 June 2008 Mike Laverty SY Gavin Fields Wa

 

 

 

"© 2008 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the
prior written consent of Cardno (Qld) Pty Ltd.”

 

Comiskey Group Page i 18 June 2008
238401 ML Stormwater Quatity Report doc Commercial in Confidence Version 1

Page 17

STORMWATER QUALITY MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

TABLE OF CONTENTS

 
  
  

 

1. INTRODUCTION 0... eeccesssscesscsseeesenseeasssesecessnsnecasecosesscessauseanenesaneasnersaseceascoesenaseanene 1

2. STORMWATER MANAGEMENT AND WATER HARVESTING. ..........:ceccsssssessesseessecneesee 1
2.1 Site Characteristics..........0. cece ceeeessseccececeeeeeeeeeeensssseeeesseaeeeesssaaeeeeesnueereeseeeesenenaes 1
2.2 Water Cycle Management Concept...... 1
2.3 Stormwater Runoff from Site Catchments....... wid
2.4 Re-use of Stored Non-Potabie Water ............. wid
2.5 Water Re-use Criteria... ccc cessseecceeeeeseeeeeees 2

2.5.1 Roof Catchment Areas..............c0. cece v2
2.5.2 Storage Tanks ....... ccc ecccceceseeecesccessecesscesesseesseesssssecssnseeneenessaeenesieseeseneeages 2

3. STORMWATER QUALITY .........csccccssccecseccensesntenecensessssecesessassnnscnevsrsssseeseunenseesensceensaereasens 3
3.1. Water Quality Management Concept.... beseeaceeseeevnneesateets 3
3.2 Receiving Waters 0.0... cece eee eteeeeeeteeee 38
3.3. Stormwater Quality Control & Treatment ........... ee 3
3.4 Management of Water Quality during Construction Phase..... wd
3,5  CONCIUSIONS ........ eee eccceececeeeeeeceeceeeeeeeecesesseeerseeereseeeeaseeseescnsesenseeeenseeesseeeeeeneeesoaeens 3

4. DISCHARGE TO EXISTING DRAINAGE SYSTEM .............:sscsssessrsecsesteesensssesssaneenecsanees 3
4.1 Stormwater Detention 2.2.0.0... cece essen enssesseeeeenseereseesseeensessseseeseeeseneeeeceaeeenaes
4.2 Discharge to existing SySteM ............ ec ee ences teeters
4.3 Assessment of Detention Storage ve
4A CONCIUSIONS ........ ccc ccccceceeeccccteeeceeeeeeeseeeeeeesesseseeeressseeeeeseeessesaeeeeeenesaeeeeeteaeenaneeecnd

LIST OF TABLES

Table 1 Summary of Peak Discharges for the 10 and 100 Year ARI ............0: ieee 5

LIST OF FIGURES

Figure 1 10 Year ARI Existing Results

Figure 2 10 Year ARI Developed (Mitigated) Results
Figure 3 100 Year ARI Existing Results

Figure 4 100 Year ARI Development (Mitigated) Results

APPENDICES

APPENDIX A _Cardno Proposed Stormwater Drainage Plans

 

Comiskey Group Page ii 18 June 2008
238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 18

STORMWATER QUALITY MANAGEMENT PLAN Cc » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

1. INTRODUCTION

Cardno has been commissioned by Comiskey Group, to provide a report addressing the
stormwater management for a proposed development at Lot 31 on RP149005 at 71 Pacific
Avenue, Sunshine Beach.

This report is to accompany the application to Sunshine Coast Regional Council (SCRC)
for Operational Works approval of the proposed development. The relevant issues are
addressed in the following sections.

2. STORMWATER MANAGEMENT AND WATER HARVESTING

2.1 Site Characteristics

The applicant is seeking to develop Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine
Beach through the construction of a Childcare Centre development with the provision of car
parking. The existing site has a Council approval DA06/1180.

The proposed development comprises approximately 410m? of building and 461m? of
hardstand and carparking. The total site area is 1614m? and the proposed development will
create catchments at a number of levels including roof area, paved areas and recreational
landscaped areas.

2.2 Water Cycle Management Concept

Stormwater runoff from the site will be managed in accordance with the principles of Water

Sensitive Urban Design (WSUD) as expressed by the following performance criteria and

objectives (Melbourne Water, 2005):

> Recycle stormwater for non-potable use (to reduce demand on water resources);

> Protect and enhance natural water systems within urban developments;

> Integrate stormwater treatment into the landscape;

> Use stormwater infrastructure in the landscape to maximise visual and recreational
amenity;

Vv

Control and improve the quality of water draining from the urban development;
> Minimise the drainage infrastructure cost of development.

The management concept aims to comply with SCRC requirements in terms of:

> Water quality;
> Water reuse.

 

Comiskey Group Page 1 18 June 2008

238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 19

STORMWATER QUALITY MANAGEMENT PLAN CJ > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

2.3 Stormwater Runoff from Site Catchments
Stormwater from the site runoff will be controlled as follows:

> “Clean” roof runoff will be harvested by draining to on-site storage for re-use;
> Paved carparking and hardstand areas will drain to a gross pollutant trap and for
treatment prior to discharging off the site.

The buildings will be provided with duplicate runoff collection plumbing, where required, to
separate ‘clean’ roof runoff and paved area runoff.

2.4 Re-use of Stored Non-Potable Water

Stored non-potable roof water runoff will be re-used for the following:

¢ Irrigation watering of garden areas;

e Toilet Flushing.

2.5 Water Re-use Criteria

The water re-use criteria for the site aim to comply with the SCRC requirements enabling
the benefits from Sections 5.10, 5.11 and 5.13 of the Queensland Water Recycling Strategy
(QWRS) (EPA, 2001) to be achieved. Based on this, the criteria used to determine water
re-use included the following:

e ‘Fit for purpose’ uses
e Source substitution

e Wastewater minimisation

2.5.1 Roof Catchment Areas

The ‘clean’ roof catchment area was determined to total 590m’.

2.5.2 Storage Tanks

The storage tanks have been sized in accordance with the conditions of the development
approval and Table 2 of the SCRC Integrated Water Management Guidelines. Using the
15Um? of roof area, the storage requirement for the site is equal to 8,850L. It is proposed
to use an18,000 L precast concrete underground tank with a structural slab over.

 

Comiskey Group Page 2 18 June 2008

236401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 20

STORMWATER QUALITY MANAGEMENT PLAN Cc > Cardna

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

3. STORMWATER QUALITY

3.1 Water Quality Management Concept

The aim of the water quality management system for the proposed development is to
protect and enhance natural water systems within urban developments in accordance with
the policies of SCRC.

3.2 Receiving Waters

Stormwater runoff from the overall site discharges into the existing drainage system along
David Low Way on the north western boundary of the site. This drainage connects to a
drainage system that eventually flows to Girraween Reserve.

3.3 Stormwater Quality Control & Treatment

Stormwater quality will be controlled by treatment through the use of two “Clearmake” gross
pollutant traps (or equivalent) located in the carpark area prior to discharging into the
existing on-site drainage system.

3.4 Management of Water Quality during Construction Phase

During the construction phase, the potential exists for significant increases in the amount of
pollutants, particularly sediment, exported from the site. During this period, an Erosion and
Sediment Control Plan will be implemented as part of the overall Environmental
Management Plan prepared for the construction phase.

Erosion and sediment control measures will be implemented in accordance with Council
requirements and the recommendations of “Soif Erosion and Sediment Control,
Engineering Guidelines for Queensland Construction Sites” by the Institution of Engineers
Australia, 1996.

3.5 Conclusions

The inclusion of rainwater harvesting, gross pollutant traps and stormwater detention within
the proposed development on Lot 31 on RP149005 at 71 Pacific Avenue, Sunshine Beach
will minimise the impact of the development with respect to stormwater quality.

4. DISCHARGE TO EXISTING DRAINAGE SYSTEM

4.1 Stormwater Detention

In accordance with the Council's conditions of approval “The maximum discharge of
stormwater drainage allowable ...... at any one location is 25litres/second.” Reduced runoff
and peak flows from the development by local detention measures is necessary. It is
proposed that a portion of the proposed 18,000 litre storage tank is used to attenuate the
stormwater discharge from the site.

 

Comiskey Group Page 3 18 June 2008

238401 ML Stormwater Quality Report.doc. Commercial in Confidence Version 1

Page 21

STORMWATER QUALITY MANAGEMENT PLAN Cc ) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

4.2 Discharge to existing system

To facilitate the carparking and hardstand area to be treated by the proposed GPT's the
carpark has been designed to drain towards the southwest corner

The proposed 100 year ARI discharges calculated using the rational method would be.

Pre-Development

Internal Catchment

Area = 0.1614Ha

Fraction Impervious = 0.4
C100 = 0.94

Time of Concentration = 5 mins
Rainfall Intensity = 319 mm/h
Q100 = 0.1344 m/s

Post-Development

Internal Catchment

Area = 0.1614Ha

Fraction Impervious = 0.85
C100 = 1.0

Time of Concentration = 5 mins
Rainfall Intensity = 319 mm/h
Q100 = 0.143 m¥/s

Total increase in Peak Flow
Q100 = 0.0086 m*/s

4.3 Assessment of Detention Storage

In order to assess the effectiveness of the storage volume an XPSWMM model was
developed. The model input parameters were as follows:

e Rainfall patterns as per Australian Rainfall & Runoff 1987;
Initial losses of Omm for pervious and impervious catchment areas;
e Continuing losses of 2.5mm/hour for the pervious catchments and Omm/hr for the
impervious catchment areas;
Hydrologic method — Laurenson’s Method; and
Hydrographs were routed using the Hydraulic Layer within XPSWMM.

As noted previously it is proposed that an 18,000L rainwater tank be utilised for harvesting
and to provide detention storage within the site. The storage volume incorporated within
the XPSWMM model was approximately 9,150L. The rainwater tank is being designed to
accept runoff from the entire roof area within the site, which is the dominant increase in
impervious area.

The inclusion of the above storage volume within the XPSWMM model provided significant
attenuation to the roof catchment area, but was unable to reduce the peak discharge via
the minor drainage system to less than 25L/s or demonstrate non-worsening of the total
site discharges. In order to reduce the discharge from the minor drainage system it was
identified that additional storage was required in-line with the internal pipework to comply
with the key criteria for the site.

 

Comiskey Group Page 4 18 June 2008

238401 ML Stormwater Quatity Report.doc Commercial in Confidence Version 1

Page 22

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Cc Cardno

 

Due to the constraints from both limited cover and existing invert levels to the external
drainage infrastructure it was determined that the storage could be achieved through the
use of oversized stormwater pipes. Based on the XPSWMM analysis it was identified that
30m of 525mm diameter stormwater pipe, controlled by a 225mm diameter outlet, would
attenuate the site discharges to 25L/s during the major event (100 year ARI). In addition,
the storage reduces the combined discharges from the site to less than the existing

discharges from the site.

The following table summarises the peak discharges obtained for the existing and
developed (mitigated) scenarios.

Table 1 Summary of Peak Discharges for the 10 and 100 Year ARI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Average Storm Duration Existing Discharge Developed
Recurrence (mins) (m/s) (Mitigated)
Interval (Years) Discharge (m*/s)
10 10 0.070 0.028
10 15 0.089 0.030
10 20 0.088 0.034
10 25 0.082 0.032
10 30 0.086 0.037
10 45 0.076 0.033
10 60 0.080 0.040
10 120 0.065 0.036
10 180 0.047 0.033
100 10 0.106 0.043
100 15 0.129 0.046
100 20 0.126 0.050
100 25 0.127 0.052
100 30 0.120 0.051
100 45 0.110 0.048
100 60 0.114 0.053
100 120 0.086 0.047
100 180 0.065 0.044
The following figures depict the results included in Table 1.
Comiskey Group Page 5 18 June 2008
238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 23

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Cardno

Gq

 

Conduit Link3 from Existing to Node4

 

 

 

 

 

 

 

 

 

eel — —— = ee
10 [Max 0.070] 15 [Max 0.089] 20 [Max 0.088] 25 [Max 0.082] 30 [Max 0.086]
—_ — — —
45 [Max 0.076] 60 [Max 0.080] 120 [Max 0.065] 180 [Max 0.047]
0.09
0.08
0.07
0.06
0.05
é
i
0.04
0.03
0.02
0.01
0.00
1 Sun 1AM 2AM 3AM
Jan 2006 Time
Figure 1 10 Year ARI Existing Results
Conduit Link4 from NodeS to Outlet
eau — a ait “oe 4
10 [Max 0.028} 15 [Max 0.030] 20 [Max 0.034] 25 [Max 0.032] 30 [Max 0.037]
— — — eee
45 [Max 0.033] 60 [Max 0.040] 120 [Max 0.036] 180 [Max 0.033]
0.040
0.035 :
0.030
0.025
é
it 0.020
0.015 _
0.010 ~
0.005
0.000 ~ —
1 Sun 1AM 2AM 3AM
Jan 2006 Time
Figure 2 10 Year ARI Developed (Mitigated) Results

 

Comiskey Group Page 6

238401 ML Stormwater Quality Report. doc Commercial in Confidence

18 June 2008

Version 1

Page 24

STORMWATER QUALITY MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Gq

Cardno

 

Conduit Link3 from Existing to Node4

25 [Max 0 127]

45 [Max 0.110}

— —
30 [Max 0 120} 60 [Max0 114] 120 [Max 0 066)

—_— —=
15 [Max 0.129) 20 [Max 0 126)

—
10 [Max 0 106}

012

010
009
008

3007
0.06
005
004
003
002

001

 

0.00
1Sun
Jan 2006 Time

100 Year ARI Existing Results

Conduit Link4 from NodeS to Outlet

Figure 3

we —_—— — a) — — —
10 [Max0.043] 15 [Max0.046] 20 (Max0.050) 25 (Max0.052] 30 (Max0.051] 45 [Max0.048] 60 [Max 0.053} 120 [Max 0.047]

005:

a

0.050

0045

0040

0.035

0020

0015

0010

0.005

0.000

 

180 [Max 0.065}

 

180 [Max 0.044]

 

 

1Sun 1AM

Jan 2006

Figure 4

2AM
Time

100 Year ARI Development (Mitigated) Results

 

Comiskey Group Page 7

238401 ML Stormwater Quality Report doc Commercial in Confidence

18 June 2008

Version 1

Page 25

STORMWATER QUALITY MANAGEMENT PLAN < i Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

4.4 Conclusions

Based on the results from the XPSWMM model it was identified that the limiting constraint
for the site was the restriction on the discharge from the minor drainage system of 25L/s.
The resulting detention volumes afforded significant reductions in peak discharges for each
storm analysed.

The modelling has demonstrated that the site is able to ensure peak discharges are non-
worsened in accordance with the requirements of the SCRC and the Queensland Urban
Drainage Manual.

 

Comiskey Group Page 8 18 June 2008

238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 26

STORMWATER QUALITY MANAGEMENT PLAN Cc > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

APPENDIX A

Cardno Proposed Stormwater Drainage Plans

 

Comiskey Group Page 9 18 June 2008

238401 ML Stormwater Quality Report.doc Commercial in Confidence Version 1

Page 27

 

LZ00-10-v8Ez

 

 

~ ‘g00Z/SO/6L

“vo

 

SYLN3O 3YVOCTIHO HOVSS SNIHSNNS

NV 1d 39¥NIVYC YALWMINYOLS

SO06PLd LE 107

 

dnoud ASXSINOD

 

 

or
weer 50 scokocorery weg ON 8

vay
pi Aig (PID) oupseD

coupe € [

 

a

 

Coe Tuo

we) 320 L800 meas

 

 

0 ro Chem hued om ie 3 an@cRsece Moncey 15 UDRUIINR: Ka RULE FO FE OO
zea rin ssa 18

 

 

9900 01) MO) OUD LAM a /2 RAR ae RADIO JUD
a om cue oy a 1, MA ONT Aes (PO) Bue Aa DeENCOW 8 WALLOON Haj

 

 

 

Tn

 

 

 

 

a 2 as | ep hee pe ina maint doen na
‘OHV woiva| LY FE emt] oes 0) x10 a cen Amaro og 0 sm han Om wm es MOD

 

 

 

 

 

 

 

 

 

BOOZ Parsesons siu6ny ity PIT Ald (PIO) OUDIED @)

 

PIT Aid (PID) oupved Joy Vm “CE WSNNLYNOIS pA UORdY

 

 

 

827 06)'N

yapow

WWMSdX Wo4j SMo}, adid
OLD 404 Ue}g juawabeueyw
Ayneng 1ajemwioys 04 sajay

‘JLON

 

(OL0) L 3NIT NOILI3S TVNIGALIDNOT

 

 

 

 

 

 

 

 

 

 

 

Ev - 0071 bv - 0021

 

 

JINVYEVIdd¥ 1VY43N39 ONY SNOISN3WIG JLVWIXONddy SLIZLON ©

318ISSOd SV NOOS S¥ 39110d LIVINOD = *

Se
woo 08 09 O07 02 0 02

NOILVIOTS1IOL 31N0¥ 3H13LON

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aye; uorjuayap
Jajyemwsoys
se pasn dy S7SO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

        

          
                  

 

  

t INIT NOSY3d H3HLO ANV AG GagHNLsiO ONIZA
= Mmi6eikeeike i.e le 1) LN3A3Ud OL SIMNSV3W INV ONY 193/80 3H1 GyNLSId LONOG = ®
2 is |g le |3 [3 (8 NIVEO SNO TV NOILD¥ ONIMOTIO4 3H1 34V1 GNNO4 SI 40 43H1 LYvd
JINVLSIC HO JINVNOHO 3AISO1dX] NV ONI3G JO O31)9dSNS 13370 NVI © Y= uo!}2a5 04 NV ld LNOAVI
m 2[m zim 2[m 2[m 2[r 2[m NOILAV 3NG HLIM 03390Nd GINOHS LNIWdO13A30 Jasay - youuey) \
B als als 2/3 8/3 3/3 S]e S3LVNIGYOO) SIML O1 G31¥134 FINVEUNLSIO TOS HO SHYOMHLYV3 'NOILVAYIX2 = * mais pus eo A <: i
2 x]3 2/8 s/o 2/3 3/3 Slz 1NOL3S ALIS SIHL NO LSIX3 AVW S3INVNOHO 03001dX3NN TWNGIS3Y © pescdo.d ~"
FYNLINGLS "W3UV SIHL NI SSINVNOYO C300 TdX3NN ONINYVM ons
. yyed A0)) puejiaaod
wr a a wa wa we w Pasodoid jo jana) juaau
&@ |8 lg ls |S |g |é S13A31 33V4UNS 48 Trem 42019 Buytsix9 o4us
= is js |8 |s {8 [8 G3HSINI4 paso? aq 04 $a}0y D019 x 7
24/2 gle sie |s sie 6 %
2 2/3 sls giz 3/2 sles $133) 4
S S/3 B/S S/S Sis RIF FS LY3ANI zoo | 1-9 \ Z
S5o| Spee sas | oes one toons Eis 2
2 S/S 2)f 2/8 g]3 318 3 S13A31 TOH woo | ir }
sooo | I-€ & S
= =l= ele ele sle sles : = >
3 sls 3/8 2/3 3/3 3/8 3 LYIANI OL H1d3d a - -
OVE TE ANIVE aureaav Bsa
S/W T3A IWILYVd ‘
0 $/W XLI013A J1€V1 LN3WHILV)
e059 wns MOT
Ser] oor] 008 | OV | Oe | DUET HION3T a °
OSB) KOSS, MN ET KZLT Mow el] Xie % 3avyo — “er SUR} 21NeIpAY 04 Jajyay \
~~ ct yuey punosBsapun 04 smo}4 Aynpey uoijuayap
Thyszz[teyszs]iMszz | hszz|Miszz]Ih}sz (SSV1)) 3ZIS ev-ontliv=oet 4 Zw06S uaWYr4e) ooy UED!) Jajemwioys
se pasn d)u Szs@
™~ SS ¥-¥ NOILI3S
paun jun, :
gull
nT oot OT
sariasas buiysixa
jauuey> Ao 04 abewep pioae
pueysaao pasodoig 04 Bulyeaeoxa uaym
uayey ag 04 ase ang
\
Asepunog juawyrjer sajyemwsoys es se so
Ly \
4ayu pyary Ooty gid Ayjn6 Burysixa
aunadid abeuiesg ee O4ul uory2auUO?
ulseq uoljuayap perouodd
Je{eAWsolsS se Ayenued pasn
syyedyoo; ayaunu0) yue, punossapun J
Buuapia peoy 1000'aL pasodoig
aul] quay jeuwoy = =—— —— —— —— — 4
aunasyua> peoy = —— — ——_ - ——
WRUNG $0 9B app py ap oe —
my pasodoug
ee
S Sif Sie slit sis sie sie
@ cle fle 2/e Lie rg 2)8
2 ald als ale als alZ a3
a sie sit sie Si 3/3 3/5 NOlLdidS30
Ss 9 9 S| $19 319
| eS | ee JYNLINGLS
«| s| «w| a] elt
es [
Se | (ee | a ee es IWVN
JYNLINYLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 28

CJ Cardno

Shaping the Future

 

EROSION AND SEDIMENT PLAN

PROPOSED CHILDCARE CENTRE,
LOT 31 RP149005,
SUNSHINE BEACH

18 June 2008

Job No, 238401 Com iskey Grou p

 

Page 29

SITE EROSION AND SEDIMENT PLAN < Cardro

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Cardno Centre

Level 1, 9 Maud Street
Maroochydore Qld 4558
PO Box 152, Maroochydore
Queensland 4558 Australia
Telephone: 07 5443 2555
Facsimile: 07 5443 5642
International: +61 7 5443 2555
[email protected]

www.cardno.com.au

 

 

 

 

Document Control
Author Reviewer
Version Date
Name Initials Name Initials
1 18 June 2008 Mike Laverty 14 lL Gavin Fields Wa

 

 

 

 

 

 

 

 

"© 2008 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qid) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the
prior written consent of Cardno (Qld) Pty Ltd.”

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence Page i

Page 30

SITE EROSION AND SEDIMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Cc Cardno

 

SITE EROSION AND SEDIMENT REPORT
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

TABLE OF CONTENTS
1. SITE EROSION AND SEDIMENT HAZARD ..........:cccscscscccccensesscersscccessassenseenensentesenesenenas 1
4.1 Hydrologic impact 2.0... ccc cccn essen ste teceereneeeeeeecetesenerereeersnetietienrsneeseereretens 1
4.2 Site Physical Characteristics Constraints and Opportunities...............0 cece 4
1.3 Erosion Hazard ASSESSMENT... ee rene E EERE REE EE EERE EEE ARE E EERE AE EEE 1
4.3.1 SOI TyPe oo. ec ccceecceceerteete cesses sescesneceeesensscsseessesesseersssesneesseseeesesnnenas 4
4.3.2  SlOPO occ eccccceeeeseressecsecsessecesssecsseseessesssneeeessenessesesaeseenssnseaaeenaesnernetegs 1
1.3.3 Duration of Soil disturbance
1.3.4 Waterway Disturbance... cece cece eee rerseneeeescneeenesesesteeceeeneeeeteeeneeen
1.3.5 Rehabilitation Method.....

  

1.3.6 Receiving environment...
1.3.7. External Catchments ...

 

1.4 Acid Sulphate Soils... cc ce cseeees cee rseeeteecaseeeeesserscssnenessstessseessesesesseeeeeneneenne 2

2. SEDIMENT AND EROSION CONTROL DEVICES .........ccssssssssessseussrenccurposseenteveneneenennre 2
2.1 Sediment FENCES... ccccecccssccssseceeeeeecesecesssecesseversaecnacersesenseeesssesseseessseeeaeneees
2.2 Mulching / Revegetation ...........cccccee cece ener sneer ete etereerietieneeeesiestssetnrerernettess
2.3. Kerb Entry and Field Inlet Filters.

3. STORMWATER QUALITY IMPROVEMENT DEVICES ...........cccccccsscesessseseessecenerenensnee 3
BV GPUS oicecccccccccccseeceeceeseecssceecneeneerareneeeseeeenecesesneeseneecnreeeesieenseserenssesseneeeeseeeeeeeeeea 3

4. EROSION AND SEDIMENT CONTROLS PHASING. ..........ccsssssssseerecsseteentennseetesseenensneens 3
4.1. Phase 1 — Prior to commencement of CONStrUCTION ...0... io cece et ctnteeeteeeeeeneees 3
4.2 Phase 2 — Bulk Earthworks... ccc ceere er teneeteneeercecenereeeecuneeeneeeestaeeenaaeees 3
4.3. Phase 3 — Civil and building COMStrUCTION..............cc cc eecte ce eee eeeteeeteetteeeeeeeesenaeeeeiae 3
4.4 Phase 4 — Post CONMSHIUCTION ........ cece eeececteteeenrettere eet e renee n ned Aree eeeeEE eS cee EEE ESE eE re 3

5. MAINTENANCE AND MANAGEMENT ............ccssssscsssctsestensesseersessecenseseseacenssensensnasnnneeas 3
5.1 Maintenance Considerations ............ ccc ce ade 3
5.2 Site ManageMent ....... cee ee cnn eeeeeseseeteetenees steers tene ener ceeesneneennieenseetetiecenetiees 4
5.3. Maintenance Program ........ cece cient ene sereeesteeserseiecaeteteeneeneeteeteereeneentees 4
5.4 Post-Conmstruction oo... ccc cccccecceesereceneeeecteneesssaseseeeeeseneensesessereestescneaeeneessneseeenes 4
5.5 Erosion and Sediment Control Plan review............... cece cet eeennreeeenneeeeneeeeeeeeeeess 4

APPENDICES

Appendix A Erosion and Sediment Control Plan

Appendix B Inspection and Testing Plan

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence Page ii

Page 31

SITE EROSION AND SEDIMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH GC Cardno

 

EXECUTIVE SUMMARY

This report is for the Site Erosion and Sediment control measures associated with the
construction works for a Childcare Centre Development at 71 Pacific Avenue, Sunshine
Beach. This report is to be read in conjunction with all the engineering plans for the site and
the relevant statutory approvals for the site.

1. SITE EROSION AND SEDIMENT HAZARD

Where practical the soil erosion hazard is to be kept as low as possible, at all times.

1.1 Hydrologic impact

During construction the potential exists for impacts on downstream drainage systems and
ultimately water bodies. This is to be ameliorated by the provision of silt fences and inlet
filters thereby minimising the majority of potential impact on downstream drainage systems
and ultimately water bodies.

1.2 Site Physical Characteristics Constraints and Opportunities
The development site has the benefit of being partially enclosed by a recently constructed
concrete block wall. This wal! has the benefit of containing all of the surface runoff from the
internal site and thus gives the opportunity to prevent sediment entering the drainage
system.

1.3 Erosion Hazard Assessment

The following hazard factors have been considered in putting together the Soil Erosion and
Sediment Control Plans.

1.3.1 Soil Type
The soil type is generally classified as sand and is deemed to be of ow risk.
1.3.2 Slope

The existing topography of the site slopes at approximately 7% towards the David Low Way
and Pacific Avenue intersection.

1.3.3 Duration of Soil disturbance

It is intended that the entire construction program will take no more than 24 weeks, with the
earthworks portion of the work taking only 6 weeks. Upon completion of earthworks, the
site will be stabilised and inspected by the Engineer.

1.3.4 Waterway Disturbance

No significant waterways are to be disturbed as a part of these works.

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc = Commercial in Confidence Page 1

Page 32

SITE EROSION AND SEDIMENT PLAN a >. real
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH CG a mo

 

1.3.5 Rehabilitation Method

The finished surface of the development will be rehabilitated according to its location and
intended final use. The majority of the site will be covered with buildings and concrete
pavements.

All landscape areas and batters are to be prepped, topsoiled, mulched and revegetated.
Prior to the placement of any topsoil the surface is to scarified/roughened along the
contour. Topsoil is only to be moved when it is in a damp condition to ensure the soil
aggregate condition is maintained.

1.3.6 Receiving environment

The development is adjacent to the David Low Way with an existing drainage network to
which the internal catchment network will be connected. This existing drainage system
eventually flows to the Girraween Reserve.

1.3.7 External Catchments

One external catchment, part of an adjoining residential lot, contributes stormwater that
runs through the proposed construction site.

1.4 Acid Sulphate Soils

Acid Sulphate Soils are not expected at this site and no detailed investigation was
undertaken.

 

2. SEDIMENT AND EROSION CONTROL DEVICES
The following devices are proposed to be used during the construction of the development.
2.1 Sediment Fences
Sediment fences are to be constructed as close as possible to follow the contours of the
site. Sediment fences are to be installed in accordance with the standard details supplied in
the IEAust (QLD) ESC Guidelines June 1998.
2.2 Mulching / Revegetation
All landscape areas are to be mulched immediately after final formation. The entire
landscaped areas of the site are undergoing a major landscape program to bring back the
natural flora characteristics of the area.
2.3 Kerb Entry and Field Inlet Filters
As kerb entry pits and field inlets are built, inlet filters are to be placed immediately to
minimise the amount of sediment entering the pipework and the sediment ponds.

COMISKEY GROUP Version 1 18 June 2008

238401 ML Site Erosion and Sediment Report.doc = Commercial in Confidence Page 2

Page 33

SITE EROSION AND SEDIMENT PLAN » roi
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH Cc Ca mo

 

 

3. STORMWATER QUALITY IMPROVEMENT DEVICES
3.1 GPT’s
Two “Clearmake” GPT’s are to be installed within the internal pipe network. Once installed,
the devices will collect large particle sediment that is washed into the pipe system from the
carpark area. These devices are to remain as part of the overall stormwater quality
treatment train for the finished development.
4. EROSION AND SEDIMENT CONTROLS PHASING
4.1 Phase 1 — Prior to commencement of construction
e Construct construction entrance
Install silt fences and cut off drains
e Install inlet filters
4.2 Phase 2 — Bulk Earthworks
Strip top soil to stockpile and fence stockpile
Monitor construction entry/dust levels
Review erosion and sediment devices weekly and after heavy storm events and
repair as required
¢ Spread top soil from stockpile and mulch landscape areas as earthworks are
completed
4.3 Phase 3 — Civil and building construction
¢ Monitor construction entry/dust levels
» Review erosion and sediment devices weekly and after heavy storm events and
repair as required
4.4 Phase 4 — Post construction
« Remove sediment fences
e Decommission inlet filters
5. MAINTENANCE AND MANAGEMENT
5.1 Maintenance considerations
Maintenance inspections need to be carried out at least weekly and prior to and after
rainfall events. The site foreman is responsible for the maintenance of all sediment and
erosion contro! devices.
COMISKEY GROUP Version 1 148 June 2008

238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence Page 3

Page 34

SITE EROSION AND SEDIMENT PLAN re
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH C Ca mo

 

5.2 Site Management

Management of the site is by the principal contractor who is responsible for the appropriate
construction and sequence of installation of all devices and measures contained in this
document and as indicated on the Erosion and Sediment control plans. The superintendent
may, at his discretion, direct the contractor to carry out additional controls, as and when
required.

5.3 Maintenance Program

The contractor is to follow the attached Inspection and testing program and to carry out
weekly inspections of all devices, during the construction period. Specific inspections of all
devices are required prior to any rainfall event and after to ensure devices are operational.
5.4 Post-Construction

When works are complete, the building roofs, concrete pavements and mulched
landscaping will negate the need for any erosion and sediment control.

5.5 Erosion and Sediment Control Plan review

The plans and report making up the erosion and sediment control plan are to be reviewed

and updated, as required, by the Superintendent, following consuitation with the Contractor,
Developer and Council's representative, if required.

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence Page 4

Page 35

SITE EROSION AND SEDIMENT PLAN < Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

APPENDIX A

Erosion and Sediment Control Plan

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence

Page 36

EROSION AND SEDIMENT MANAGEMENT STRATEGY \

ENVIRONMENTAL ISSUE MANAGEMENT STRATEGY Erosion and Sediment Control ©)

Objective/Target Comply with the erosion and sediment control plan as shown,
to control erosion and sediment flows j Sediment trap (sandbags or fence)
Ensure that all erosion and sediment control devices are
operational at all times , : og Direction of minor flow

Management Strategy Site foreman to identify and check direction of stormwater Direction of major flow

land flows as shown on plan. Provide barriers and other t
measures shown on the plan to prevent stormwater flows
ke it lly pits.
over embankments, and sediments into gully pits. on | Construction Entry/Exit

Tasks/Actions Erect sedimentation barriers at perimeter of construction
areas as shown on this drawing

Frequency/Deadline Site foreman to monitor performance after every heavy
rainfall.

Responsible Person/ Site foreman to be responsible for

Organisation inspections.

Reporting/Review Site workmen to advise foreman if they notice any barrier
needing repair.

Corrective Actions Site foreman to report and order through supervisor, extra
barriers as required

EROSION & SEDIMENT CONTROL NOTES:
This site has low erosion risk potential
Refer IPWEAQ Standard Drawings D-0040 and D-0041 for
details of sediment traps.
All gullies shall be provided with on grade kerb inlet
sediment trap refer IPWEAG Standard Drawing D-0041.
The Contractor shall construct Entry/Exit Sediment Trap
Alternative 2, refer IPWEAQ Standard Drawing D-0040
Grass filter strips 600mm wide shall be placed along back
of kerb and channel, pathways and other impervious
areas. Locations shall be confirmed by contractor.
All allotments shall be revegetated with mulch or grass
seeding as specified in Section A5-B2 of Soil Erosion and
Sediment Control Guidelines for Queensland Construction
Sites, June 1996, IEAQ

0 20 40 6.0 80 10.0m

Ss
1200- Al 400- A3
RPE) 844- signaTuREC?S: /fwereA . For Cardno (Qld) Pty Ltd

© Carano (id) Py Lic Al Fights Reserved 2008 ies tn eaomee COMISKEY GROUP

Coogee n Fe wrote anc very Dano! Pa rewire bmg 16 Carre (Och Py iD ae ” re
Dare: cs

Ie W dara ches comedy aecatient le RET ofa seme
A : 2 ; = : ‘ SUNSHINE BEACH CHILDCARE CENTRE =
aL. ap 7 S * | LOT 31 RP149005
. J Cardno (Qid) Pty Ltd © «
° ] Car z 2 ABN 57 Get G74 O02 3 7) 4037 = a
tad ‘ om 06 8 ee eae NG | cox mmemcsa nT ee ween rs : 1 EROSION AND SEDIMENT CONTROL PLAN 2384-01-008

 

 

 

 

 

 

 

 

 

 

 

Page 37

SITE EROSION AND SEDIMENT PLAN < | Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

 

APPENDIX B

Inspection and Test Plan

 

COMISKEY GROUP Version 1 18 June 2008
238401 ML Site Erosion and Sediment Report.doc Commercial in Confidence

Page 38

SITE EROSION AND SEDIMENT REPORT
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Sp) Cardno

 

INSPECTION AND TEST PLAN

Project:
Prepared by:

Authorised by:

Issued to:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspection Activity Acceptance Criteria Test Frequency | Super | Con | Remarks Area
Method
Confirm all approvals | Superintendent approval of
received ESCP, construction
program. Relevant
authorities’ approvals
received and forwarded to
contractor
Confirm site erosion Stabilised access,
and sediment controls | stormwater filters, sed
in place fences, bunds, sediment
basins.
Check condition of Inspect all erosion and sed
erosion and sediment | control devices, before and
controls after storm events as a
minimum weekly
Confirm construction Stockpiles, direction of
area erosion and surface flows, kerb inlet
sediment controls in protection, sediment fences
place turf strips
Check storage of Stockpiles sed fences |
materials and surrounding
stockpiles
Site restoration Ground prepared, treated,
topsoiled. Planting, turf or
seeding in accordance with
plan.
Final inspection Disturbed areas reinstated,
temporary control devices
removed.
Comiskey Group Version 1 18 June 2008

238401 ML Site Erosion and Sediment Report.doc

Commercial in Confidence

Page 39

cy Cardno

Shaping the Future

 

ENVIRONMENTAL MANAGEMENT PLAN

PROPOSED CHILDCARE CENTRE,
LOT 31 RP149005,
SUNSHINE BEACH

18 June 2008

Job No. 238401 Comiskey Group

 

Page 40

ENVIRONMENTAL MANAGEMENT PLAN C i Cardnoa

PROPOSED CHILOCARE CENTRE, SUNSHINE BEACH

Cardno (QId) Pty Ltd
ABN 57 051 074 992
Cardno Centre

Level 1, 9 Maud Street
Maroochydore Qld 4558
PO Box 152, Maroochydore
Queensland 4558 Australia
Telephone: 07 5443 2555
Facsimile: 07 5443 5642
Intemational; +61 7 5443 2555
[email protected]

www.cardno.com.au

 

 

 

 

 

 

 

Document Control
Author Reviewer
Version Date
Name Initials Name Initials
1 18 June 2008 Mike Laverty M L Gavin Fields LL

 

 

 

 

 

"© 2008 Cardno (Qid) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced
in whole or in part in any manner or form or in or on any media to any person without the prior written
consent of Cardno (Qld) Pty Ltd.”

 

Comiskey Group i 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 41

ENVIRONMENTAL MANAGEMENT PLAN CC Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ENVIRONMENTAL MANAGEMENT PLAN

TABLE OF CONTENTS

1. PREAMBLE TO THE ENVIRONMENTAL MANAGEMENT PLAN.............cccecccsssecssseeeeeee 1
4.1 Terminology ......... ee cece eects eecteeeneeeeeeeeeeeennereeeeeesesseneeeeessaneteeereesesatecessneneennpessaaeetoes 1
1.2 Program and Contractual Obligations 00.0.0... cece eee cree eneeereeersenarneesnseseese 1
1.3 Corrective ACtiOn 0.0... cece eee eneeceeseseneeeseersnsceacessceesaseaeceaestenecssetitesesatessaeeerenate 2
1.4 Management of the Site... ees eeceeenneeesceenecesseneesseateeetreseedeeseeeserenae 2

2. SITE FACTORS. .......sssecssesescsecsssersccscsncenseseserssnenenscaossecuesseessnessdssnessceessesseacenesoucneeegenessssonss 3
2.1 Gemeral Description ........0.. cece ceceessescreesecesssueeecesseceneeessceusaeeecesseaaneeeeeeeeeessceneags 3
2.2 Engineering Constraints... eccceceseeeneccneeereseneesneseaeenseseaeesiiesneseiseesteesenaeeenene 3

3. METHODS 2... ec eceesseeeeceseesensseesesssnseneessnvecessssesseneneaseeneceudscarseceaseeseossecsnsserasseoansnaeaansets 3
3.1 COMSTHPUCTION. 0... eee cee cceenee ee tine eee cbeeeetndeeeceueecenaeeseeeeneaeesenbereseeaeeetenaeteneneeeaaa 3
3.2  MOMIBOFiNg......... cece eeeeeeerrettereceeeteeeessaaeeeeseeessdeeeecsenueeseeeeeeeaeeescesaaaareeeateeseenieees 3

CONSTRUCTION ELEMENTS

 

ELEMENT C1 Site Control and Waste Management Plan

ELEMENT C2 Community Amenity

ELEMENT C3 Air Quality

ELEMENT C4 Noise Control

ELEMENT C5 Erosion and Sedimentation Control

ELEMENT C6 Site Restoration and Rehabilitation

OPERATIONAL ELEMENTS

ELEMENT 01 Site Restoration and Rehabilitation

APPENDIX A Sample Corrective Action Request Form
Preliminary O Author Mike Laverty
Draft O Signature
Draft Final O Date 18 June, 2008
Final Oo Reviewer Gavin Fields
Superseded Oo Signature
Other (Specify) O Date

 

This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client in accordance with the terms of the
retainer. Cardno (Qld) Pty Ltd does not and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by any third party on the content of this document.

© Cardno (Qld) Pty Ltd All Rights Reserved 2008. Copyright in the whole and every part of this document belongs to Cardno (Qld) Pty
Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media, to any
person other than by agreement with Cardno (Qld) Pty Ltd

 

Comiskey Group ii 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 42

ENVIRONMENTAL MANAGEMENT PLAN Cc y Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

1. PREAMBLE TO THE ENVIRONMENTAL MANAGEMENT PLAN

1.1 Terminology

The term Superintendent refers to the present owner/developer of the site, and its
successors in title.

The Contractor refers to the party or company performing construction works on site, and
includes all employees of the Contractor and sub-contractors.

The Consultant refers to the civil engineering design consultant employed by the
Superintendent.

Council refers to the Sunshine Coast Regional Council
EPA refers to the Environmental Protection Agency

EMP refers to the Environmental Management Plan

1.2 Program and Contractual Obligations

The EMP is divided to reflect the two phases of the construction program, construction and
operation.

The construction phase refers to the period from the commencement of works on site to
the substantial completion of the works. The Contractor is generally responsible for
ensuring that the provisions of the Environmental Management Plan are met, except for
certain planning or design issues, which are explicitly noted as being the responsibility of
the Superintendent or Consultant, as appropriate.

The operational phase refers to the period following completion of the construction
activity, whether for an individual element of the works, or the entire project.

Operational phase relates to the period from substantial completion to the expiry of the on-
maintenance period (sometimes referred to as the defects liability period, or the defects
correction period). In these cases, the Contractor is generally responsible to ensure that
the provisions of the EMP are met during this period, and that the permanent works (gross
pollutant traps, rehabilitation works etc.) function as intended.

Upon the expiry of the on-maintenance period, infrastructure works (roads, drainage etc)
will be accepted by Council, who then become responsible for their maintenance. Council
may wish to adopt its own environmental management and monitoring program during the
operational phase.

In these cases, the EMP should be regarded as a condition of the contract between the
Contractor and the Superintendent. Although the Superintendent may hold ultimate
responsibility to ensure that the proposed development complies with relevant
environmental legislation, such as the Environmental Protection Act (EPA) 1994 and the
Environmental Protection (Water) Policy 1997 (EP(W)P), its duties regarding construction
are subordinated to the Contractor by the contract.

 

Comiskey Group 1 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 43

ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

It should be noted that the Environmental Protection Act places a duty on any person
undertaking any activity to report any incidences that may cause environmental harm.

1.3 Corrective Action

The Contractor is required to complete corrective action request (CAR) forms, a sample of
which is included in Appendix A. The Contractor is also required to maintain a register of
CARs, which shall demonstrate that all required remediation measures have been
completed. Copies of CARs shall be provided to Council upon request.

In some instances, further investigation or monitoring may be required to establish whether
the Contractor has failed to adequately implement the EMP, or has failed to comply with
relevant legislation, guidelines and statutes. For example, monitoring may be required for
bulk air sampling, or noise emitted from site activities as the result of a dispute with a
neighbouring party. In these instances, an independent party such as the Consultant shall
carry out the investigation or monitoring. If it is established that the cause for complaint has
arisen from the Contractors actions or omissions, then the costs of the monitoring shall be
deducted from payments to the Contractor and paid to the Consultant, otherwise the costs
of the monitoring shall be obtained from the Superintendent and paid to the Consultant.

1.4 Management of the Site

The following personnel can be contacted regarding the management of the site during
both construction & operational stages.

° Developer: Comiskey Group
Contact Person: Rob Comiskey
Contact Ph No.: 38822533

° Consulting Engineer: Cardno (QId) Pty Ltd
Contact Person: Mike Laverty
Contact Ph No.: 5443 2555

° Contractor: To be Advised

Contact Person:
Contact Ph No.:

e Local Authority: Sunshine Coast Regional Council:
Contact Person: TBA
Contact Ph No.: TBA

° Government Agencies: EPA

Contact Person: TBA
Contact Ph No.: TBA

 

Comiskey Group 2 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 44

ENVIRONMENTAL MANAGEMENT PLAN Cc » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

2. SITE FACTORS

2.1 General Description

The site is located at 71 Pacific Avenue, Sunshine Beach. The proposal consists of
Childcare Centre and associated infrastructure. The site has an area of approximately
1614m2 which consists of land that is gently sloping to the west from RL52.8 to RL55.2.
The site has two road frontages with an existing drainage system into which all
stormwater will be discharged.

2.2 Engineering Constraints

There is an existing sewer main through the rear of the block that requires a 3.0m
easement. The existing drainage inlet on the northwest frontage of the site is the only
suitable outlet for stormwater discharge via direct connection.

3. METHODS

3.1. Construction

A site based management plan will be developed by the nominated contractor to
incorporate practical approaches and site experience into minimizing site impacts. Staging
plans will be developed to minimize the extents of exposed areas at any time and ensure
that all external flows are diverted from areas of works. The resources, plant and timing
proposed by the contractor will be the basis of the documentation of procedures, in
accordance with the ESCP Guidelines (iEAust, 1996).

3.2. Monitoring

All site monitoring shall be conducted in accordance with the elements outlined in this EMP.
Any recommendations outlined in the accompanying reports shall be incorporated into the
Site Based Management Plan prepared by the Contractor and approved by Cardno prior to
works commencing on site. Any discrepancies shall be brought to the attention of the
engineer during the development of the SBMP.

 

Comiskey Group 3 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 45

ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C1 — SITE CONTROL AND WASTE MANAGEMENT PLAN

POLICY: To maintain construction compounds in a neat and tidy state without build up
of litter and to provide a safe facility for the storage of construction equipment
and materials.

PERFORMANCE The site shall be maintained in a safe and tidy condition. Waste materials
OBJECTIVES: generated on site shall be stored in safe temporary storage prior to final
disposal. All relevant Council by-laws shall be complied with.

CONTROL Within the site, the Contractor shall establish a Litter and Waste Control Plan,
MEASURES: to manage the collection, storage and removal of all litter and waste on the
site, whatsoever its origin.

All litter and waste, including pre-existing materials, construction wastes,
human waste, used oils and any other surplus materials shall not be disposed
of on site. Material shall not be burnt or buried on site. All such materials shall
be collected as they are accumulated, using appropriate methods to enable
their future removal from the site and disposal. All such materials shall be
stored on site in approved secure confined area(s).

Specific areas shall be set aside for the storage of construction materials. In
particular, a safe storage location for fuels and oils shall be provided in
accordance with AS 1940 “The Storage and Handling of Combustible Liquids”.
This area shall be bunded in compliance with the standard.

MONITORING: The Contractor shall monitor the construction and record details of work areas,
fencing, storage locations and access roads.

Weekly inspections of the site by the Contractor to verify locations and storage
of litter and waste on the site.

REPORTING: Records of removal of oils, litter and waste should be kept for later referral if
necessary. The responsibility for creating and maintaining this database shall
be borne by the Contractors, Site Foreman. Records shall be provided to
Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented by the Contractor and a

ACTION: corrective action request (CAR) issued. All CARs shall be included in the Non-
conformance Register which will be developed and maintained by the
Contractor. CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 4 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 46

ENVIRONMENTAL MANAGEMENT PLAN Cc ) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C2 —- COMMUNITY AMENITY

POLICY: To minimize the impact of construction on the local community.

PERFORMANCE No unreasonable disruption to the residential amenity of the local area shall
OBJECTIVES: be allowed.

If a complaint is received, the cause of the complaint shall be investigated
and, so far as it is the Contractor’s responsibility to do so, the cause of the
complaint shall be remedied such that there is no cause for further complaint.

CONTROL The Contractor should establish an induction program to the satisfaction of the

MEASURES: construction Superintendent, to inform all site workers of environmental
protection requirements and practices on the site, prior to their
commencement on the site.

The Contractor shall advise loca! residents (occupants of all residences to be
directly affected by the proposed works) of the proposed construction
program. The Contractor shall provide means to advise residents and
landowners in advance of construction activities that may impact upon them
and establish a system to receive complaints and comments from and to seek
the cooperation and assistance of the community.

The Contractor shall advise Council and the Superintendent when the resident
advice process is complete.

MONITORING: The Contractor shall maintain records of the Contractor's induction training,
and all communications with local residents.

REPORTING: The Contractor shall submit monthly reports to the Superintendent, which
include records of communications with local residents and full details of any
contentious issues and actions taken. All reports and records will be provided
to Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 5 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 47

ENVIRONMENTAL MANAGEMENT PLAN Ci > Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C3 — AIR QUALITY
POLICY: To minimize the impact of construction activity on air quality.

PERFORMANCE To comply with the Environmental Protection Act, the subordinate
OBJECTIVES: Environmental Protection Policy (Air), Council By-Laws and health and safety
requirements.

If air quality complaints are received by the Contractor or Council from
adjacent residents, the Contractor will investigate those complaints. If
necessary, air quality contro! measures shall be reviewed and upgraded if
appropriate.

If a complaint is received concerning dust, the Contractor shall implement bulk

air quality monitoring and, if the results of this monitoring exceed limits

prescribed in Table C3.1, then necessary action will be undertaken to reduce
@ dust emissions from the development site.

CONTROL General

MEASURES: The Contractor shall establish an Air Quality Control System to the satisfaction
of the Superintendent, prior to commencing work, to manage air quality control
on the site. The following specific issues will be addressed:

Eumes

All equipment shall be efficient, operated in accordance with established
operating procedures and maintained to minimize exhaust emissions.
Engines shall not be left idling needlessly.

All vehicles and plant shall be properly maintained so as to ensure that
emission levels are less than the limits defined by relevant Commonwealth
Department of Transport and Regional Services Federal Office of Road Safety
Australian Design Rules:

e ADR30 Diesel Engine Exhaust Smoke Emissions
@ « ADR36 Exhaust Emission Control for Heavy Duty Vehicles
e ADR37 Emission Control for Light Vehicles
e ADR70 Exhaust Emission Control for Diesel Engine Vehicles
Odours

All materials (eg paints) or processes (eg. painting) that generate fumes or
odours shall be properly stored and used with efficient equipment to
established procedures.

Dust

Dust control measures shali be used on all processes that generate dust.
Windbreak screens shall be employed where considered necessary between
working areas and abutting residential areas. Oil must not be used for the
suppression of dust.

 

Comiskey Group 6 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 48

ENVIRONMENTAL MANAGEMENT PLAN q » Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Earthworks
Earthworks shall be managed to control dust. Specific control measures
include;

e Completion of vegetation clearing in stages, in order that a minimum area
of ground is open at any one time

¢ Early stabilisation and revegetation of cut or filled areas and slope works
using, for example, wood chip layers
Watering of all exposed areas, including haul routes
Provision of windbreaks and silt fences as required.

Deliveries
Deliveries shall be managed to control dust. Specific control measures
include;

e Covering of loads entering and leaving the site
@ e Collection of material which falls from trucks or their wheels on a daily
basis
« Removal of soil from wheels of vehicles which leave site

Stockpiles
Stockpiles shall be managed to control dust. Specific control measures

include;

e Minimisation and stabilisation of stockpile areas. Stabilisation shall be
undertaken by ensuring that angles of repose are not exceeded and, if
necessary, by the placement of supporting structures to retain the
stockpile within a designated area. If required, the surface of the stockpile
shall be covered with either mulched vegetative matter, or an artificial
cover, suitably weighted to prevent movement.

e Maintenance of stockpiles within designated areas and prevention of
spread of stockpile material into adjacent areas.

e Creation of no more stock piles than are necessary, and removal of all
stockpiles upon completion of works on site.

} ¢ Provision of windbreaks and silt fences as required.

MONITORING: Daily inspections of the site by the Contractor of the types, locations and
details of control measures in place. Weekly recording by the Contractor on
the effectiveness of control measures in place.

Recording by the Contractor of all air quality complaints received and details
of all control measures undertaken.

In the event of a dispute, an independent party, such as the Consultant shall
implement bulk air quality monitoring. The Contractor shall take necessary
action should the limits in Table C3.1 be exceeded.

REPORTING: The Contractor shall submit monthly reports to the Superintendent on the
monitoring activities, control measures and corrective action undertaken. All
reports and records will be provided to Council upon request.

 

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action
ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Comiskey Group 7 18 June 2008

Environmental Management Plan Rev: 4 238401

Page 49

ENVIRONMENTAL MANAGEMENT PLAN Cc ) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

Table C3.1
Air Quality Criteria as per Environmental Protection (Air) Amendment Policy (No. 1) 1998 -
Dust Emission

 

 

 

 

 

 

 

 

PARAMETER MAXIMUM ACCEPTABLE
CONCENTRATION

Annual, 24 hour averaged dust concentration, total 90 pg/m®
suspended particulate
Annual, 24 hour averaged dust concentration, as PMio 50 g/m?
24 hour average dust concentration, as PMio 150 pg/m®
Visibility 20 km
Average dust deposition rate 120 mg/m?/day

 

 

Note: PM49 is suspended particulate matter less than 10 microns in diameter.

 

Comiskey Group 8 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 50

ENVIRONMENTAL MANAGEMENT PLAN Cc > Cardnoa

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

3.2.1 ELEMENT C4 — NOISE CONTROL

POLICY: To control noise generated by construction activities and to minimise the
impact of construction noise on the amenity of the local community.

PERFORMANCE To comply with the Environmental Protection Act, the EPA guideline, Planning
OBJECTIVES: for Noise Control and Council local-laws.

Since there are no established noise criteria in Queensland for the
assessment of impacts associated with the long-term construction noise
sources, particularly at night, it is suggested that assessment criteria should
reflect the noise environment that is considered acceptable for normal
functioning of adjoining developments (e.g residential uses).

CONTROL As part of the SBMP, the Contractor shall establish a Noise Control Plan to

MEASURES: minimise noise levels within adjacent residential areas. All noise generating
mobile and stationary plant, equipment and processes shall be controlled to
minimise noise emissions in accordance with AS 2436.

Control measures may include:

The fitting of effective exhaust silencers to all mobile plant.

The fitting of engine acoustic shielding.

Using exhaust silencers on compressed air exhausts.

The use of physical noise barriers such as earth mounds or mobile
screens.

e Review of times of operation of plant.

Lighting devices shall be used instead of whistles, bells and buzzers to control
site operations. Audible alarms shall only be used for safety warnings.

All vehicles entering, leaving or used within the site shall be operated and
maintained in a manner which ensures that the resulting noise levels are
within the limits prescribed in the Commonwealth Department of Transport
and Regional Services, Federal Office of Road Safety, Australian Design Rule
ADR28- External Noise of Motor Vehicles.

In the event that the adjusted noise level for a single noise source or activity
exceeds the maximum permitted noise level by more than 10 dB(A),
consideration shall be given to restricting the times during which the activity
can occur to a number of separate periods each day. Persons affected by the
noise shall be consulted with regard to suitable hours and advised of the
agreed operations schedule.

Working hours on site shall comply with EPA guideline, Planning for Noise
Control and Council local-laws , and shall be generally as recommended in
Table C4.1

 

Comiskey Group 9 18 June 2008
Environmental Management Plan Rev: 4 238401

Page 51

ENVIRONMENTAL MANAGEMENT PLAN Ci Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

MONITORING: The Contractor shall perform weekly inspections of all noise producing
sources (including inspection of new items of plant before they commence
work on the site).

If complaints about noise are received, the Contractor shall visit the location of
the complaint to determine its validity and implement appropriate mitigation
measures, if required. In the event of a dispute, an independent party, such as
the Superintendent, shall undertake noise monitoring.

The Contractor shall keep a written record of all complaints and subsequent
noise monitoring and remediation measures.

REPORTING: Monthly reports by the Contractor, to the Superintendent, on monitoring,
control measures and corrective actions taken.

CORRECTIVE Non-conformance shall be documented, by the Contractor, and a corrective
ACTION: action request (CAR) issued. All CAR’s shall be included in the Non-
conformance Register maintained by the Contractor.

The Contractor shall implement the corrective action, as required, within the
agreed time frame noted in the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

Tabie C4.1 Recommended Hours of Operation

 

Recommended Hours of Operation

7.00am to 7.00pm.
Monday to Saturday

 

 

 

 

 

Comiskey Group 10 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 52

ENVIRONMENTAL MANAGEMENT PLAN C i >) Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C5 — EROSION AND SEDIMENTATION CONTROL
POLICY: To minimize the impact of soil erosion on or outside the construction site.

PERFORMANCE Limitation of erosion of soil within the construction site.

 

OBJECTIVES:

Prevention of transport of eroded material from the construction site.

If vegetation growth fails in any area, vegetation is to be established, and the

re-vegetation strategy modified appropriately to prevent further failure.

Otherwise, corrective action will consist of replacement of damaged or failed

control devices.

CONTROL A Site Erosion Control Plan shall be prepared by Cardno and approved by
MEASURES: Council prior to any works commencing on site. No site works shall be
permitted until the Plan is approved by Council.

The following mechanisms shall be used to control erosion on the site, and to

prevent discharge of sediment contaminated runoff to receiving waters:

e Where possible, earthworks shall be completed in stages, such that a
minimal area of ground is open at any one time.

e Perimeter bunds shall be constructed around disturbed areas to divert
external catchment flows around these areas. Silt fences shall be used to
prevent sediment transport from disturbed areas in close proximity to
receiving waters.

¢ Drains shall be protected from scour using regular check dams made from
rock rubble. Drains may be lined with turf, rock or sprayed concrete if
required.

e Sediment traps are to be used in conjunction with drainage lines to collect
silt contained in the runoff.

¢ Soil stockpile areas are to be stabilized to prevent erosion.

e Embankment slopes shall be stabilized following construction to retain
vegetation, moisture and topsoil and promote successful planting.

e Where areas are required to remain open for any significant period of time
prior to re-vegetation and/or stabilization, the soil surface shall be covered
with straw or other suitable material to prevent raindrop splatter.

Erosion and water quality control activities on the site shall generally be in

accordance with Table C5.1

Comiskey Group 41 18 June 2008

Environmental Management Plan Rev: 1 238401

Page 53

ENVIRONMENTAL MANAGEMENT PLAN Gq > Cardna

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

MONITORING: The inspection schedule for sediment and erosion control measures is
contained in Table C5.2.

The Contractor shall monitor the works on a weekly basis for evidence of;

e Satisfactory provision and functionality of erosion control measures.
e Signs of erosion, such as gully erosion
e Accumulation of sediment at discharge points

During wet weather, the Contractor shall inspect the site daily to check
sediment traps, and silt fences etc. for damage such as scour, soil erosion,
sediment deposition, by-passing of treatment measures etc.

REPORTING: Monthly reporting by the Contractor to the Superintendent covering all
maintenance activities and corrective actions. All reports and records will be
r provided to Council upon request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance
Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 12 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 54

ENVIRONMENTAL MANAGEMENT PLAN CC Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Table C5.1
Erosion and Sediment Control Measures

 

EVENT ACTIVITY

 

Prior to vegetation disturbance | Construction of retardation basins in areas subject to disturbance
or earthworks activity

 

Commencement of Instatlation of silt fences using appropriate geotextile mesh or other
construction material around any areas likely to be disturbed, to capture all eroded
material.

Use of other mechanisms such as soil stabilization techniques, to further
prevent sediment transport from the site.

Construction of low earth bunds around the upstream side of any
working area, so as to divert upstream drainage around the site.

 

During vegetation clearing and | Stacking and removal of nominated vegetation.
earthworks
Stockpiling and stabilization of excavated topsoil and other soil materials
to prevent erosion.

Maintenance of minimum ground-opened area at any one time.

 

After completion of earthworks | Re-vegetation and stabilization of affected areas, using stockpiled
topsoil, so as to prevent erosion and sediment transport.

 

After completion of project Vegetation of overland flow paths and any disturbed areas to eliminate
ongoing erosion.

 

 

 

 

Table C5.2
Schedule of Inspection for Erosion and Sediment Control Measures

 

 

 

Period Frequency | Location Type Parameters to be Monitored

Whilst Weekly All erosion control Visual Check to ensure that erosion control

temporary measures measures are in place and are

sediment functioning satisfactorily.

control

measures Retention ponds Visual e Degradation of water quality

are in place and treatment « Signs of erosion, such as gulley
areas erosion

e Accumulation of sediment at
discharge points

 

Daily during | All erosion control Visual Check for damage, bypassing,

wet weather | measures deposition of excessive silt, scour etc.
including sediment
traps, silt fences,
GPTs etc

 

 

 

 

 

 

 

 

Comiskey Group 13 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 55

ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

ELEMENT C6 - SITE RESTORATION, REHABILITATION AND WEED CONTROL

POLICY: To provide a completed development of pleasing appearance and ecological
values with a suitable vegetated surface treatment of all disturbed areas and
rehabilitation of weed infested areas.

PERFORMANCE To create conditions and implement measures that would ensure the prompt
OBJECTIVES: establishment of vegetation that consists primarily of native species, within all
areas that have been disturbed as part of the proposed development.

Restoration shall be carried out as specified to the satisfaction of the
Superintendent and Council.

CONTROL The application of mulch, free from contamination by weed species, to all

MEASURES: areas of soil that have been cleared as part of the proposed works and that
are to be subsequently planted with trees and shrubs. Particular attention shall
be paid to exposed soil on steep slopes.

Design and implementation of a staged weed control program that forms part
of the detailed landscaping and maintenance programs for the site. The weed
control program shall ensure that the area of cleared land that has not been
rehabilitated shall be minimised at all times. Such an approach shall reduce
the impact of weed clearing activities upon fauna habitat resources.

Treatment of existing infestations of invasive non-native species using
appropriate, species specific means including non-residual herbicides,
physical removal of the whole plant, hand pulling of seedlings and cut-stump
applications of residual herbicides for woody weeds.

Removal of weed infested vegetation and weed stockpiles from all clearance
areas.

Stockpiled weed infested vegetation shall not be mulched for re-use on site,
nor disposed of at a green waste recycling facility due to the fact that such
practices facilitate the re-establishment and/or spread of weed species. Of
particular note in this respect is the prevalence of weeds such as the Madeira
Vine, which are capable of propagation from fragments of stems or leaves.
Appropriate disposal methods include disposal at an appropriate landfill
facility, pit burning, or other disposal approved of by Council.

The prompt and progressive rehabilitation of areas within which infestations of
weed species have been treated. Early rehabilitation is required to minimise
the risk of subsequent re-establishment of weeds. Such rehabilitation shall
involve the planting of native trees, shrubs and under-storey species with the
emphasis on species that are local to the area and which are components of
ecosystem types that originally occurred in the area.

Soil erosion measures shall be implemented as described in the EMP Element
for Soil Erosion and Sediment Control, which will reduce the risk of
transportation of weed seeds or viable plants from site in surface water runoff.

All construction plant shall be cleaned prior to transportation onto the site to
prevent the introduction of exotic species.

 

Comiskey Group 14 18 June 2008
Environmental Management Plan Rev: 1 238401

Page 56

ENVIRONMENTAL MANAGEMENT PLAN Cc Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

Fertiliser application rates shall be closely monitored to ensure that excess
material is not washed off by stormwater runoff and discharged to downstream
water bodies. Controlled-release fertilisers shall be used wherever possible.
Retardation basins or other sediment capture devices shall be maintained
downstream of disturbed areas until re-vegetation is judged to be suitably
advanced to limit soil erosion.

MONITORING: Monitoring of treated areas to detect the re-emergence of weed species shall
be undertaken at intervals of no greater than six months. Any weed species
detected shall be treated within appropriate measures to prevent re-
establishment and subsequent displacement of native species.

Monitoring of rehabilitation works and landscaping works shall be undertaken
at monthly intervals to assess the health and vigour of plantings. Any
unhealthy plantings shall be treated or replaced. The frequency of monitoring
may be progressively reduced as the plantings become established.

REPORTING: Monthly reporting by the Contractor to the Superintendent covering all
monitoring activities. All reports and records will be provided to Council upon
request.

CORRECTIVE Non-conformance with this plan shall be documented and a corrective action

ACTION: request (CAR) issued. All CARs shall be included in the Non-conformance

Register which will be developer and maintained by the Contractor. Copies of
CARs shall be provided to Council upon request.

The Contractor shall implement the corrective action as required within the
agreed time frame noted on the CAR.

The Contractor shall advise the Superintendent upon completion of the
corrective action.

 

Comiskey Group 15 48 June 2008
Environmental Management Plan Rev: 1 238401

Page 57

ENVIRONMENTAL MANAGEMENT PLAN
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

GC

ELEMENT O1 — OPERATIONAL MAINTENANCE OF WSUD ELEMENTS

RATIONALE

OBJECTIVE /
TARGET

MANAGEMENT
STRATEGY

TASKS /
ACTIONS

FREQUENCY /
DEADLINE

REPORTING
AND REVIEW

CORRECTIVE
ACTION

Servicing and maintenance of the on-site stormwater quality improvement
devices is required to ensure the devices perform as required and the
stormwater quality discharged from the site meets the identified water quality
objectives.

To treat stormwater to meet the identified water quality objectives.

To implement and maintain the stormwater treatment system at the proposed
development.

The Building Management shall ensure that all maintenance tasks are
completed as required under this Operational EMP.

e To inspect and maintain Gross Pollutant Traps.
e¢ To inspect and maintain rainwater storage tank

Gross Pollutant Traps and Rainwater Storage Tank Maintenance

The following monitoring and maintenance tasks will be required to be
undertaken.

Any accumulated litter including leaves and other debris shall be removed
from the filters on an as required basis.

The Gross Pollutant Traps should be inspected and cleared after every
significant rainfall event and cleaned out on a minimum 3 monthly basis.

Implementation is to be ongoing.

Reporting to the Building Management upon requirement to complete a CAR
and the actions taken in respect of the CAR.

Should there be non-compliance with the stated performance indicator the
following corrective actions are to be implemented.

e Identification of the cause of the non-compliance;
Implementation of appropriate mitigation measures as determined by
the Building Management; and

e Relevant validation monitoring to confirm that the nominated corrective
actions have been effective.

The Building Management shall implement the corrective action(s) as required
within the time frame noted on the CAR.

 

Comiskey Group

Environmental Management Plan

16 18 June 2008
Rev: 1 238401

Cardno

Page 58

ENVIRONMENTAL MANAGEMENT PLAN CG y Cardno

PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

APPENDIX A

SAMPLE CORRECTIVE ACTION REQUEST FORM

Page 59

ENVIRONMENTAL MANAGEMENT PLAN < |
PROPOSED CHILDCARE CENTRE, SUNSHINE BEACH

CORRECTIVE ACTION REQUEST
REPOrt MO; one eeeceecceccseeesscsessevesssecsecenseeceseeeeeesaeecuceecseecsaseeeesseeeescessaeeecrscsseesenssesceseeens

Date, ccc eccccecececccsccueusccccccceneeressessseseseeseeeeeeseeessseceerseeceeccscueesurererseeseecsceeesenees

 

DETAILS OF NON-CONFORMANCE:

Inspected by:

 

DETAILS OF PROPOSED ACTION

Passed to Client (as applicable):y/n Date:
Reply required by:

 

CONSULTANT/CLIENT ADVICE (as required):

Date action required by (if applicable):

 

Signed (by client or client's representative): Date:
AUTHORITY TO PROCEED
Sign: Date:

 

ACTION CARRIED OUT

Sign: Date:

 

ELEMENT RE-INSPECTED BY

Sign: Date:

 

COPY ISSUED TO CLIENT: Date:

 

 

 

Page 60

SUNSHINE BEACH - CHILDCARE
CENTRE

yy

ZAR Maw

a

<

SCHEDULE OF DRAWINGS

2386-01-001 LOCALITY PLAN AND SCHEDULE OF DRAWINGS
2384-01-002 SURVEY AND SERVICES PLAN

2384-01-003 SITE LAYOUT PLAN

2364-01-004 KERB LONGITUDINAL SECTIONS - NORTHERN KERB
2384-01-005 KERB LONGITUDINAL SECTION ~ SOUTHERN KERB
2384-01-006 CARPARK LAYOUT PLAN & DETAILS
2384-01-007 STORMWATER DRAINAGE PLAN

2384-01-008 EROSION AND SEDIMENT CONTROL PLAN
2384-01-009 SIGNAGE AND LINE MARKING PLAN

PLANKO

THE

EXISTING SERVICES NOTE:

e — Services shown on these plans are only those evident at the time of
survey, from As Constructed survey and from ‘Dial Before You Dig’
searches. There may be more services not shown on these drawings.
It is the responsibility of the Contractor to contact the relevant
service utility providers to confirm the location of all existing
services prior to commencement of works.

Any damage to services shall be repaired by the Contractor or the
relevant authority at the Contractor's expense.

WARNING UNEXPLODED ORDNANCES IN THIS AREA:
RESIDUAL UNEXPLODED ORDNANCES MAY EXIST ON THIS SITE
EXCAVATION, EARTHWORKS OR SOIL DISTURBANCE RELATED TO THIS .
DEVELOPMENT SHOULD PROCEED WITH DUE CAUTION Sunshine
IF AN OBJECT SUSPECTED OF BEING AN EXPLOSIVE ORDNANCE OR
PART THERE OF IS FOUND TAKE THE FOLLOWING ACTION Beach
DO NOT DISTURB THE OBJECT AND TAKE MEASURES TO PREVENT IT
BEING DISTURBED BY ANY OTHER PERSON High
NOTE ITS APPROXIMATE DIMENSIONS AND GENERAL APPEARANCE

NOTE THE ROUTE TO ITS LOCATION
CONTACT POLICE AS SOON AS POSSIBLE Map reproduced with permission of UBD, LOCALITY PLAN
Copyright Universal Publishers Pty LtdDG01/05 its SS

pee:
FH OO, Set

te
+ tee,

Peel ee,
wae

COORDINATE DATUM NOTE:
THIS PROJECT HAS BEEN DESIGNED ON AN
ARBITRARY COORDINATE BASE SUPPLIED
BY WD SURVEYS THE SCALE FACTOR USED
1S ONE(1).

100 0 100 200 300 400 500m

RE ——_————EE
1:10000 - At 1:20000 - A3

RPEQVAA4. SIGNATURE:CA.9- Jha uerecd. , For Carcino (Qld) Ply Ltd
orem: A7E- aS Bn eas ee e COMISKEY GROUP
Sete 07 SID OT DATE:

= eenm A
‘Stim loom a> | weer Bese | SUNSHINE BEACH CHILDCARE CENTRE RE ry
RECOMMENDED: at APPROD: Pa) po oe ‘ wn sizes98 | LOT 31 RP149005 :
meeneremroceamnmermeeren” | BUG A! ro Sesoee gh eee an se 2384-01-001
Ofte - 5 ane
ae = eee LECT A AN SCHEDULE OF DRAWINGS ove

{nd Wal nol arsare any reEnonaitly oF Labity whelecever to any Pao pany anking Oo!
{bny on orvutarce by fed panty cn hw corse ol a womens ‘QUNEMINE COAST OFFICE: Love). 5 Mave,
Emet eeoOsun entre cones MOT) BUSSES Fen 177) 422602

19/05/2008.

 

 

 

Page 61

 

 

|

Deters Ua GREETS US wg wunvmnms mamone MT

 

 

Roar oe smoAemceyy iens UY | eT JOkgse LSYOD INNES

 

Z00- LO-v8Ez NW1d S30IAN3S ONY ASANNS

 

2
ce aie Sy

91 Ag (ID) oupseD

 

 

 

fe‘ “caAOM atv
22M OND

 

 

 

  

 

 

 

 

 

 

 

           
       

 

 

 

 

 

 

 

 

 

 

 

 

 

= HEE = 3YLN30 SHVOCTIHO HOWaa SNIHSNNS | , mpm oupIes cJ> ‘ay iwc Ly
dNOYD ASHSINOOD | ™ a

Br Ra (P10) OuBIED 104 “VIMO MUNLYNDIS PPR L O34 pe
‘ a :

ee
woo 08 09 07 02 0 02

 

 

9957
az

 

S006dY ;
Le :

 

UleW UOI4e)ND1484 Jayem

 

/
Jayem Bulysixg f
uew Ajiaesg = —— 5s — — @ — yf
Jamas Bulysix9 a
/
a a /
sayemwsoys Buysixg = 43 — = 7;
/
JazeMwo4s Buiysixg i
uawnyiq 3086p} ~~ ——m—— m9 ~~ i
auljasyuad peoy Se) f
qQay eee /
/
syJompeoy Bulysix9
aul) esysyay ow fw oor oe
aul) Ayiis42a)a peaysaag —Ho2 — — — —

saviasas Bulysixy
sanoyuod arejsins Burysix3 =

s4ysomysseq Bulysixg
°GN3931

 

Mp,

 

 

 

 

Page 62

Pavement widening required
to achieve lane widths as shown

LEGEND:
Existing

— — — — E/0K —

Overhead electricity line
Existing kerb and chanenl

Edge of bitumen
Road centreline

\e

Proposed connection into
existing gully pit

Due care to be taken
when excavating to
avoid damage to
‘existing services

Proposed location of
drainage line

Cutback existing traffic island and
construct new kerb line as shown
Nominal width of widening 0.25m
Refer below for pavement widening
detail

Relocate existing
bus stop sign to
suif'new kerb

Proposed 12.5m long Busbay

Proposed
Childcare
* Centre

Surrounding Wall Nominal kerb line

Telstra line : Road widening

Gra’

ity main Concrete footpaths

Water reticulation main

WARNING UNEXPLODED ORDNANCES IN THIS AREA:

152
ppgnsee

Pavement widening required width

varies nominally 0.8m, refer to

Drawing 2384-01-004 for details
Reconstruct asphalt
pathway to suit
proposed kerb levels

Proposed intersection
upgrade right turn lane
to be provided.

RESIDUAL UNEXPLODED ORDNANCES MAY EXIST ON THIS SITE
EXCAVATION, EARTHWORKS OR SOIL DISTURBANCE RELATED TO THIS
DEVELOPMENT SHOULD PROCEED WITH DUE CAUTION

IF AN OBJECT SUSPECTED OF BEING AN EXPLOSIVE ORDNANCE OR
PART THERE OF IS FOUND TAKE THE FOLLOWING ACTION

DO NOT DISTURB THE OBJECT AND TAKE MEASURES TO PREVENT IT
BEING DISTURBED BY ANY OTHER PERSON

NOTE ITS APPROXIMATE DIMENSIONS AND GENERAL APPEARANCE
NOTE THE ROUTE TO ITS LOCATION

CONTACT POLICE AS SOON AS POSSIBLE

450
ppgnsie

Existing gully pits to be
taken up and new pits to be
constructed on proposed
kerb alignment.

469
ppsisee

Driveway crossovers to be
constructed and connections
made good at all existing
driveways.

Proposed 2.0m wide
concrete pathway

Oo

i:
2]
Existing concrete =
block fence O
es
ae
Y,
A

Assumed existing sewer connection
- if not contractor to provide
sewer connection to existing
manhole

Assumed existing water connection
- if not Council to provide water
meter and connection to main at
developer's expense

 

 

 

 

 

 

 

Pavement widening required width =.
varies nominally 3.0m, refer to
Drawing 2384-01-005 for details

Existing lightpole to be
relocated to suit new kerb
alignment. By others in
accordance with Energex
requirements
29
ppgnse?
Proposed carpark refer to
Drawing 2384-01-006 for
details
Easement over sewer and
Zone of influence to be 20 0 20 40 60 80 10.0m
confirmed by surveyor
1:200 - Al 1:400 - AZ

COMISKEY GROUP

 

SUNSHINE BEACH CHILDCARE CENTRE
LOT 31 RP149005

SITE LAYOUT PLAN

DRAWING No:

2384-01-003

 

 

Page 63

Pavement widening required
to achieve lane widths as shown

Cutback existing traffic istand and
construct new kerb line as shown

Pavement widening required, width
varies nominally 0.8m, refer to

Reconstruct asphalt
pathway as required to suit

Existing gully pits to be taken up
and new pits to be constructed on

Driveway crossovers to be
constructed and connections made

proposed kerb alignment good at all existing driveways.

Nominal width of widening 0.25m below for details proposed kerb levels
Refer below for pavement widening £ is - : 3 x =
detail

=

 

 

 

 

 

 

 

PACIFIC AVENUE

Proposed intersection upgrade
right turn lane to be provided

; a ee

NORTHERN KERB TT |

NEW KEREUNE : VE i @ fb A v7 ~~ — =. >

a OL

PAVEMENT DESIGN
1 In accordance with Austroads-Pavement Design Manual, 1992, Figure 8.4 DESIGN CHART FOR GRANULAR
PAVEMENTS WITH THIN BITUMINOUS SURFACING" (For flexible pavements less than 10°6) and ARRB SR41

[ type | DESCRIPTION ASSUMED CBR | DESIGNESA | STREET CLASSIFICATION

25mm A.C. Surfacing
145mm compacted base Type 2.2 (min. CBR60)
145mm compacted sub-base Type 2.4 (min. CBR40)

Proposed kerb lip

1.P.54.326, 55.806

LP.79.393, 56.635

Trunk Collector
1.4 x 10° Street

\
\
1.P.71.204, 56.4146

Existing Surface

59.326, 55.986

TYPE B MOUNTABLE KERB
SCALE 1:10

54.326, 55.789

BARRIER KERB AND CHANNEL
SCALE 1:10

> Denotes Nominal Kerb Line

\_ LP.23.790, 54.270
49.326, 55.558

\
38.958, 55.043

BARRIER TYPE KERB AND CHANNEL WIDTH OF WIDENING REQUIRED

25mm DGB30 AC SEAL

 

XISTING ASPHALT SURFACING TO
BE SAW CUT TO PROVIDE OVERLAP
OF NEW ASPHALT SURFACING

33.790, 54.780

3% MIN. XFALL
VERGE

23.790, 54.256

PROVIDE SUBSOIL DRAINS TO KERB:

13.790, 53.705

 

W TYPE C PAVEMENT
ALTERNATIVE - LEAN MIX
CONCRETE DEPTH MIN. 300mm

XISTING PAVEMENT TO
BE CUTBACK TO PROVIDE
CLEAN FACES FOR NEW
PAVEMENT.

VC LENGTH

PAVEMENT WIDENING DETAIL pane

Scale 125-A1 150-A3 a —
Padific Avenue|- Northern tide

 

4.961%

 

 

 

 

 

DATUM R.L.53.0
EASTING

XFALLTO MATCH EXIST

‘XISTING ASPHALT SURFACING TO
BE SAW CUT TO PROVIDE OVERLAP
OF NEW ASPHALT SURFACING

Je

EXIST. TRAFFIC ISLAND

 

NORTHING

MOUNTABLE TYPE B KERB,

=

 

CUT/FILL
(Depth of)

DESIGN LEVELS
KERB LIP

XIST. SURFACE
EVELS

0,000 | 5201.370| 2022.835)
0.015 | 5198.195| 2026.698)
0.141 | 5195.020 | 2030.560}
0.158 |5192.736 | 2033.339
0.159 | 5191.783|2034.368}
0.159 | 5188.386 | 2038.038}
0.144 |5184.990} 204 1.708}
0.108 | 5181594] 2045.377}
0,162 | 5178.198|2049.04 7}
0.167 | 5174.801] 2052.716
0.116 | 5171.405|2056.386
0.157 |5168.009/2060.055
0.158 |5167.342| 2060.777}
0.177 |5164.552 | 2063.66:
0.172 | 5161.081| 2067.267}
0.169 | 5157.610|2070.865}
0.155 | 5154.139|2074 464}
0.072 | 5150.667| 2078.062
-0.005 | 5147.196 | 2081.66
-0,001/5144.498)/2084.458}
-0.000 |$143.727|2085.262|
0.000 | 5143.201] 2085.811

NEW TYPE C PAVEMENT
ALTERNATIVE - LEAN MIX
CONCRETE DEPTH MIN. 300mm

 

!

XISTING PAVEMENT TO
BE CUTBACK TO PROVIDE
CLEAN FACES FOR NEW
PAVEMENT

PAVEMENT WIDENING DETAIL - TRAFFIC ISLAND
Scale ¥25-AT 150-A3

52.926
53.209
53.491
53.694
53.773
54.051
54.321
54.585
55.095
55.343
55.591
55.638
55.817
56.190
56.370
56.516
56.649
56.737
56.762
56.779

 

 

55.004) 54.842

52.926
53.194,
53.632
53.852
53.932
54.209
$4,692
55.748
55.196
55.994
56.525
56.588
56.644
56.735
56.761
56.779

 

 

25.000] 54.465

9.000

5.000
10.000
13.597
15.000
20.000
e000 56.182] 56.010

40.000| 55.262
45.000} 55.459
65.000| 56.359

30.000
35.000
50,000
50.983
55,000
70.000
75.000
80.000
83.886
85.000
85.761

CHAINAGE

 

 

HORIZONTAL

20 0 20 40 60 80 100m 02 0
Ee
1200 - Al 4:400 - AZ

VERTICAL

0.2 04 06 08 10m
=
1:20 - Al 1:60 - AB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NORTHERN KERB
LONGITUDINAL SECTION rPea }O¢Fsicnature: ©, 9-/ Lyw-e~e For Cardno (Qid) Pty Ltd

COMISKEY GROUP

SUNSHINE BEACH CHILDCARE CENTRE
LOT 31 RP149005

 

 

 

 

 

 

 

Carano (Qid) Pty Lid

 

gergeregerg

 

004

 

SUNSHINE COAST OFPCE Love ree! Marcocryaore Oe a8be
Emer scour cwrrecom a Ph (67) S43 2585 Fax (07) $443 S642

 

 

KERB LONGITUDINAL SECTIONS - NORTHERN KERB

Page 64

Proposed intersection upgrade
right turn lane to be provided

Existing kerb
entry pit,

TRE — ee ee aa eee a \ Pavement widening required width
So eee aL 2,75 m | 2 ee af iae erie cornell 3.0m, refer below

bus stop sign to OSE

pathway refer to ¥ suiting here AY piopexes Busbay) alignment. By others in

detail below Existing gum tree l accordance with Energex

~~ to be removed * Y requirements
% \ iN | f

Existing gum tree to be retained
proposed pathway to give minimun
of 300mm clearance to trunk bea a

SOUTHERN KERB
PLAN Proposed kerb lip

ALL CONSTRUCTION JOINTS TO BE 30mm SAW-CUT
3m MAX. SPACING OF JOINTS & BROOM FINISH Om WIDE:PALHWAY, tla a hee

\\ 1P.60.597, 55.903
75.12k, 56.422
LP.78.224, 56.508
80.724, 56.567
LP.86.312, 56.701

2% MINIMUM CROSSFALL

70.597, 56.246

\\ 1P.42.516, 55.000

60.597, 55.864

100mm MINIMUM COMPACTED GRAVEL SUB-BASE Existing Surface

WAY DETAILS SL82 MESH CENTRALLY PLACED
Scale 1:20

42516, 55.000

BARRIER TYPE KERB AND CHANNEL WIDTH OF WIDENING REQUIRED
‘25mm 0GB30 AC SEAL XISTING ASPHALT SURFACING TO
BE SAW CUT TO PROVIDE OVERLAP
OF NEW ASPHALT SURFACING
3% MIN. XFALL
VERGE

 

 

\. LP.12.795, 53.608

ge
a
m
an
=
©
s
o
a

PROVIDE SUBSOIL DRAINS TO KERB: EW TYPE C PAVEMENT

ALTERNATIVE - LEAN MIX MISTING PAVERENT TO.

‘ONCRET BE CUTBACK TO PROVIDE
CONCRETE DEPTH MIN. 300mm ETB TO ew

PAVEMENT VC LENGTH

RADIUS
PAVEMENT WIDENING DETAIL
“Scale 125-A1 150-A3 GRADE

8.587, 53.361 4

6.087, 53.203

<
NIA
Bin

wn
~

 

 

 

 

DATUM R.L.
PAVEMENT DESIGN

1. In accordance with Austroads-Pavement Design Manual, 1992, Figure 8.4 DESIGN CHART FOR GRANULAR EASTING
PAVEMENTS WITH THIN BITUMINOUS SURFACING” (For flexible pavements less than 10.6) and ARRB SR41

[ Tyee | DESCRIPTION ASSUMED CBR | DESIGN ESA STREET CLASSIFICATION NORTHING

ror ALC. Surfacing Trunk Collector

145mm compacted base Type 2.2 (min. CBR60) Street

145mm compacted sub-base Type 2.4 (min. CBR4O) es )
epth of

DESIGN LEVELS
KERB LIP

XIST. SURFACE
EVELS

 

0.137 | 5135.040] 2075.081| /

0.000 | 5185.346] 2010.89
0.001| 5185.345] 2011.07
-0,003 | 5184636] 2015.82
0.021] 582.407] 2020.27
0.103 | $180.787] 2022.17,
0.123 | 5175.68) 2027.65
0.134 | 5172.29] 2031319
0.167 | 168.849] 2034.96
0.132 | §165.439| 2038.626
0.126 | 5162.029|2042.283
0.143| 5158.619|2065.940
0.163] 5155.210| 2049.59
0.170 | 5154.762| 2050.07
0.155 | 5152.0722053.487
0.150 | 5148.976|2057.613
0.141|5145,879] 2061339
0.134 | 5142.783]2065.265
0.164 | 5139.686| 2069.191|
0.130 | 5136.590| 2073.117
0.137| 5135.119|2074.981|
~0.013 | 5133.39] 2076 904
-0.000| 5129.870| 2079.32
=0.000| 5129.756| 2079.384

|

 

52.742
52.756
53.127
53.443
53588
53.943
54.178]
54.413
56,667
54.882
55.126
55.314
55.407
55.616
55.839
56.042
56.226
56.397
56.550
o

56.607
56.610
56.669
56.750
56.752

 

At

52.742
52.757
53.124
53.422
53.691
54.066
56.312
54.579
54.779
55.008
55.267
55.537
55.577
$5.771
55.989
56.183
56.360
56.541
56.680
56.744
56.747
56.656
56.750
56.752

 

0.000

0.181

5.000
10.000
12.500
20.000
25.000
30,000
35.000
40.000
45.000
50.000
50.657
55.000
60.000]

65.000
70.000
75.000
80.000
82.375
82.502
85.000
89.243
89.370

CHAINAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HORIZONTAL VERTICAL

HC DATA
20 0 20 40 60 80 100m 02 0 02 04 06 08
= De SOUTHERN KERB

1200-A1 1400 - A3 120-A1 40 - AB LONGITUDINAL SECTION

Oar Le ela : arn — | “=. | COMISKEY GROUP

SUNSHINE BEACH CHILDCARE CENTRE
LOT 31 RP149005

 

 

 

 

 

 

 

 

 

 

 

 

KERB LONGITUDINAL SECTION - SOUTHERN KERB

Emer sco@avn earérocomm. Ph (G7) Saas 2888

Page 65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ors

 

 

 

 

 

 

 

;

009
Ds:

 

 

cf

 

stJ—<— SU
—h——
ws
| ead

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

nes aX msprsediey

yf

 

 

 

 

 

 

 

 

 

 

 

      

= S1VL30 2 NVId LNOAWT MaWddvo 0 , S09 LNGAY OVA Ve Fs sac] O35 Ose ims
900-L0-r8€z es ae Ee
el s006rida Le 107 a Pee wa Oh “canouey
= Se ana | 3YLN39 3YVOOTIHD HOW3 SNIHSNNS mise oupwes =
a rea a
dNOYS ASySINOD eas SoM =S
Lon
PIT Aid (PID) Oued 104 © 'Y 4) € YD FHNLYNSIS PHRLOAdY een
oor 31V9S —_—_—— ob 31¥IS
NV Id ONILNIOF 3L34INOI NV Id
v Ni uapsed &, uapsey
5, ®

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

(daap wupy x wwe) sunoy g
UIJIM yutol 4nd Res:

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

          

 

 

 

‘S]@Mop 4e8}9 04 YSAw yn>
*hyaayeusayyy Sundwes, hq
Pasned sjamop jo juawarow

juaaaid 04 ysaw gays 0,
SHY? 4eq JeUO!}IPPe apIAdIg

juiof 04 12}
‘SaJIA sew

 

 

 

juejeas paroudde yy!
Buiddes adky 42019 @
40 Buidde> ,diay5-e-diy, Aajueg

 

 

0S . 0S

 

  

 

 

 

 

 

 

 

 

 

 

 

 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8 x a = 4 x x
nama pan nama — naa f pana: naa Bee
" ra l es -KxR
%
Ove 2
¥ t f 4 ~
wn
5 i
z | ¥ 08s'€s Ty pil ‘deay
=— == —_ \ jueynjjod ssou6b
—SS|§S] S| S| | S| | SS = =k ayewJea}) apiaoid .
AN vi apeig “xeW oz| dwey S  apeug xeW oz dwey @% “>,
se
+4 kK} %
\ = \ il —) Se ape xew 021 dwey bys e
| fT / omens Ta pin ‘desy | %
4ysaw 2815 44IM 1500-4 Bag sdoys jaayn juesnjjod ssou6 Aajug
P4S DW 3di YyIM a2uepsor2e UI ayewsea}) apiaoig
48e2aud apiaoig JY1N3) IYVIOTIHD
4aaosso) — =| | —| OO7'ES Ty 1942] 400}4 gasod0ud
LZ S86 7E1S bosizoz 7”
LSLOELS SE0'9Z02 &z
9586215 198207 wz
S9SLELS. 98L 9202 2
31GISSOd SV NOOS SV 33110d L)V1NO)* ysiuly woosg 4y61) torens tae tiee é
Jaquinu a)gey ayeuipsoo: NOILV3O7 S1101 31NO¥Y FHL ILON e APIAOIg /P9JOU $UOIj2I0) aY4 UI S4UIO! JOu4JUOD PUE UO!4IN44SU0I ZLOOELS 4OL7E0Z a
quinu a}qey a4euipsoo}
saan dae JINVUVIdd¥ 1VY3INZD ONY SNOISN3WIG J1VWIXOUddY S1IFLON  * sim (48A02 do4 05) Ysaui 2975 UyIA a220jUIaY '24a42U09 Siesee, |e levees a
19497 UBIS8Q G95 Jy © NOSU3d Y3HLO ANY Ad 0384NLSIO ONIZA QE/SCN ONT Geis KeneAlip ofaoue> 421 Ost 42n4su03 'e 3st Leis zr 9z02 i
PISS 21084) oe) Se. USC {02: 82>) ee 2: ee re LI LN3A3¥%d OL S3UNSW3W 3¥VL ONY 123780 3HL BYNLSIG LONOG = Bee ere tierra dr canelene a! Muauorin La oechow Lrinis | sco *
Weyap yeridAy sad se yuior Kay Jajsewyanog, naa NOILIV ONIMONIO4 3HL ML GNNOS SI 40 JYIHL Lud aS eae 222 (PSI Aaieuepeas ou ered» reeerel || eee eee
juajeainba so jaaes6 4°7 ssey) Ssauyr144 OG, aseq-qns yINsysuo) 7 bL6'LELS. L0702 a
ysedue? a4a4u0) WHOS, YO 3INVNGYO 3AISO1dX3 NV ONI9G 4O G91939dSNS LISPGONV I ® apesbgns arejins Burysixa wis) “s}ios paqunysip jos yooud ISLES $60°9€02 u
NOILNW) 3NG HLIM G33904d GINOHS LN3Wd013A30 pue y2edwo} ‘ajis wouy arowas pue jlosdoy ‘uolyesaBaa ye dys Siecne soerore .
SIL 01 O3LV134 JINVEYNLSIO TOS YO SHYOMHLYY] 'NOILVAVIX3] = ® NOL LYE OSS 126 9202 a
aNn3a931 ALIS SIHL NO 1SIX3 AVW S3INVNGYO 03001dx3NN TwNGIS3y —* Wila1ads LNAW3AVd 3LI8INO) a pa ae f
‘W3YV SIHL NI SSINVNGYO 0300 1dX3NN ONINYVM £86 2515 72572702 S
Ey dF oh CY 48 024 620°S515 v€e 0702 7
LV 42 Ob bv 42 OL 08L 8515 LOE 9E0Z €
FS) LNIOF LNI-MVS WWIIdAL WG, W130 LNior Aly eV ay Ve netaivaS 665°9S15 cer e702 z
4L9 BSS 9ZL E907 ‘
aseqans % .YILSVWIIMOd, ATINVO IWIIdAL V-V NOlLD35
pepecans vase DNIHLYON | ONILS¥3 | “°N YOO)
‘Guippag pues eee ieadgeds Latin, nite eae ARB)
payredwor wwos sao Quin aouepsoaze 421248 U} parjeysut payedwo) wos, 4SO284q 0)8q UOIjerIjI2ads aas "yDI4Yy
aq 04 sway! Kseyaisdoud ,Aayueg, tiv Ww9s, yuawaaed ayaurU0)
aBpam 9 aye4s yyIM pua
juiof Kay gst Aaqued, 9944 x14 °S]@MOp 0} Sanaa)s
549 0S 4@ Sianop auends 4eynbue 4224 saysewjaaog i
uo} 09% x wig, Aayueg, sAaqueg, 5u0} 902 apiaoid —
juiof sapun asin nes-X %L wi = é
LO nes-x %b = Nes-X %S
Paypads se ier mira dwey | | areds ysedsie) | Nesy-x %S Aemaaiig =a aneds ysedsie)
ol o7S 029 , 07s ,

 

 

 

Page 66

 

 

 

 

 

200- LO-v8EZz NW1d 39¥NIVYC Y3LYMNYOLS = ear remem eeione (nan gtinieranone

 

200 910 4 ¥
p17 Aig (PIO) ouRseD

 

 

 

:0N Snemeeea so06ridu 16 1071

 

 

 

 

 

 

I 00z/S0/61 ava | 3YLN39 SYVOCTIHO HOW38 SNIHSNNS

 

 

OupIeay ‘ay smnuva

 

dNOUXS ASXSINOD

 

 

 

 

 

 

 

  

 

 

 

 

BIT Aid (PIO) OupIeD 104 Yams] °("y) SUNLYNOIS oady
¥/ *¢ DHBC EV - 007d Lv - 0024

 

 

 

 

 

 

 

 

 

 

 

    
          

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 

 

         
                   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

——— ee
(01D) L INIT NOILI3S IVNIGNLISNO1 31GISSOd Sv NOOS SV 32110d L)V1NO) * woo 08 09 07 02 0 02
NOILVIO1 $1101 31N0Y 3H1 LON #
L 3Nt0 JINVYVIdd¥ 1VY3N39 ONV SNOISN3WIC JLVWIXOUddY SLIZLON
NOSY3d Y3HLO ANV AG G3BHNLSIO ONIZA
== se je le
3/8 [& |S je |e |g Li LN3A3¥d OL S3YNSW3W INV ONV 133/80 3H1 BUNLSIGLONOG
s jf |8 |8 |8 [8 [8 page a NOILIV ONIMO1104 FHL 3AVL ONNO4 SI JO 3H3HL LYVd
¥O 3INVNOHO 3AISO1dX3 NV ONIZG 4O G31I3dSNS 1I3/GONV dl © V-V¥ Uo142a5 05 NV ld LNOAV1
212) S| Soe Se Sea NOILNW 3NG HLIM G33I0Yd GINOHS LN3WdO13A30 42424 ~ jauuey)
3 8 s 8 = s = s 8 = 8 a 3 3 S3LVNIGHOO) SIHL OL O31¥134 JINVEYNLSIC TOS HO SHHOMHLYV] 'NOILVAV)X3—® AO} pueyiarg a\ £
BIS BIS 8/8 Sle Sle slg sje INOLIaS ALIS SIHL NO LSIX3 AVW S3INVNGYO G3001dX3NN IWNGISIW —* pasodog 4
FYNLINGLS ‘WAY SIHL NI SJINVNGYO 0300 1dX3NN ONINYVM
® yyed Mo}y pueysaao
2 o ry o go o yg % - Ppasodoud jo Jana] jsaaui
@ © 2 2° w in oe S13A31 33VSYNS \ 42 12m 42019 Gurjisixa oyu
s js |8 |s |8 |8 fz
3 Ss s s Ss 3 2 Q3HSINIS Pasor aq 04 S2}04 0018 x 7
22/2 g/8 8/8 S18 8/8 2 S734) ee
3 2/3 8/8 3/3 S/2 sie s
Sao Sale ae alee LU3ANI woo | a .
CNIS RS LIS RIL Blo oo 8000 | 1-S %,
2 B/E 2/8 2/2 3/3 3/3 3 S13A31 T9'H woo | iy a
sooo | i-€ eo}
2 gle Sle Slo elo eles aro re 4
3 S/S Sle a3 8/3 ala & LYFANI OL HLd3d — -
6z0'0 | Int
TE TENT VT
japow . ey) easy) awen
WWMSdX Wou) SMo}) adid $50 b AAS S/W 'T3A IWILYVd
O10 404 Ueyg juawabeuew [97 | 7 390 | 290 | ce S/W XLIDO13A J1aV1 LNIWHILVI
Ayneng sayemwsoys 04 spay Shs A an arn ren why Mold
‘LON , :
OSET | OOOE] 008 | OIL | OOE | OOEL HLON]1 °
KOS T] KOSH] KOC] ALT [0a CT] MIE % Jove . Sue} >1)nespAY 04 49494 \
yue} punoJsBsapun 04 Smo) 4 Aynine; uoijuayap
THySez]Teysz4TMszz | In}szz|(A}szz]tA)szz| (SSV19) 3ZIS evden iy=0st 7965 juaWYr4e) joy Uea}) Jd4AWIO4S
~ Ss ¥-V NOILI3S se pasn dy S7sB
paul any *
gull
sariauas Bulysixa
Tee Als 04 abewep pioae
puejsaao pasodoig 04 Bulyeaeoxa vaya
uayey aq oj ase) ang
\
Asepunog yuawy4e sayeawsoys tes eet es “yp
4ayul pyaty 4y /\
Ayes uolyuayap ao% ~ \ gid Ayjn6 Burysixa
aunadid abeureag oe
Dh Oyu! Uoly2a@UUOD
se pasn 4)y S758 AaTetuue jena torte tep pasodojg +
4 4S se Ajjeiysed pasn 7 Lys
syyedyooy ayauou0) yue4 punoJbuapun o ‘ ” wr
Buuapia peoy 1000'a1 pasodoig
aul] quay jeuIwoN ee
duljasyua> peoy SS ee
waungig $0. 86p3 ap 9 ar —
St pasodoJq
ee
XR Sls Siz Siz Sis Sls Sle
Arle ele elo le nik LS
Z 32 3/2 slZ alZ al2 2l2
a e Sie Sie Sin 3
a} of al al ale oly NOILdl¥3S30
Se Si Sis sis JYNLINYLS
= | ie wl wits
EP IZ ie wiz
ee te ee IWVN
JYNLINGLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 67

EROSION AND SEDIMENT MANAGEMENT STRATEGY

ENVIRONMENTAL ISSUE MANAGEMENT STRATEGY Erosion and Sediment Control

Objective/Target Comply with the erosion and sediment control plan as shown,
to control erosion and sediment flows. Sediment trap (sandbags or fence)
Ensure that all erosion and sediment control devices are
operational at all times = Direction of minor flow

Management Strategy Site foreman to identify and check direction of stormwater ri =p Direction of major flow
land flows as shown on plan. Provide barriers and other

measures shown on the plan to prevent stormwater flows
over embankments, and sediments into gully pits eat Construction Entry/Exit

Tasks/Actions Erect sedimentation barriers at perimeter of construction
areas as shown on this drawing

Frequency/Deadline Site foreman to monitor performance after every heavy
rainfall

Responsible Person/ Site foreman to be responsible for

Organisation inspections.

Reporting/Review Site workmen to advise foreman if they notice any barrier
needing repair.

Corrective Actions Site foreman to report and order through supervisor, extra
barriers as required.

EROSION & SEDIMENT CONTROL NOTES:
This site has low erosion risk potential
Refer IPWEAQ Standard Drawings D-0040 and D-0041 for
details of sediment traps
All gullies shall be provided with on grade kerb inlet
sediment trap refer IPWEAQ Standard Drawing D-0041.
The Contractor shall construct Entry/Exit Sediment Trap
Alternative 2, refer IPWEAG Standard Drawing D-0040
Grass filter strips 600mm wide shall be placed along back
of kerb and channel, pathways and other impervious
areas. Locations shall be confirmed by contractor
All allotments shall be revegetated with mulch or grass
seeding as specified in Section AS-B2 of Soil Erosion and
Sediment Control Guidelines for Queensland Construction
Sites, June 1996, IEAQ

20 0 20 40 60 80 10.0m

————
4200-A1 1400 - AB ;
rpea’ ) 84+ sicnatuREC. 3: /fbwereA . For Cardno (Ald) Pty Lid

pean COMISKEY GROUP

SUNSHINE BEACH CHILDCARE CENTRE
LOT 31 RP149005

EROSION AND SEDIMENT CONTROL PLAN 2384-01 -008

 

 

 

 

DRAWING No.

 

 

 

 

 

 

 

Page 68

 

 

Dacre LO a see treT wuss apas ono NT TIE

 

 

 

NV1d ONINYYW 3ANIT ONY SDYNOIS

 

 

 

ame sear on ancAecomyy ems om fee) Bakds0 ASOD BUNS

600-L0-78ez

 

 

 

SO06yLdy LE LOT

 

 

22M ONURNIO

 

 

“SS Br Aid (B10) ouBseD 7 = ee 7e
ae Ws cower fm =
3Y1LN39 3YVO0TIHD HOW3E SNIHSNNS

 

 

= 3002/S0/61 “iva

 

 

 

 

 

 

 

= eS T
dNOUD ASNSINOD 7 Or? cJ> billie Mae

 

 

 

 

 

 

 

 

YT Ad (PID) OupIeD 104 © 2 yoy) f (Banivnois BR Oady \

 

 

 

Ev- 0071 LV - 0024
Se
wool 08 09 O07 02 0 02

   
                                   
 

Rasy Buruiny, apiadg:
joquds juawaned

ubIs _payyiwieg _
a) \

  

Burew
juawaaed uosaay> pue
BUIMIed ON, APIAOIg Wd¥¥ TWNOILI34IGINN

suolsuawip ysedue> 40) Wd TYNOILI34ICIG

900-L0-7BEZ 04 48524
umoYs se sysedue?
30 Burysewaur) apiaoig ,

NOIS JiddVUL ONILSIX]

NDIS G3SOd0ud

(0.1) 3NIT NUN

sareds Buyied aaiy
yoea 04 subis pue Burysew aury
wAlUO Buried 44845, 2PlAoig

 

(0H) 3NI7 SNIGTOH

(13) 3NI7 3903

(1) 3NI7 ALIANILNOD

(N11) N3MOMENN JNI1 INVT

  

quay mau 4ins
04 ubis doys sng
UlySiXa 84220]9y

g16d4

gv Bujuosaay? uo sjuawasinbay

QI.LAW YIM auepson2e
UI panjeysul aq 04 S,Wddy

9957644
gu

 

ysb
wo, - Guieds mose

Gurjsew yuawaared usny yybiy

juapuajuisadns ayy ggst639
Aq paaosdde poyjaw sayyo so 434205 97] Buisn usb

payyjeysul aq oj sueipaw ayas.u02 ui payero) subis -g.
9SEL ON Buimeig psepueys YW

YjIM anuepsor2e ul payjeysui aq oj ysod apingn sy.

‘@SIMJGYJO Pajyou Ssajun wcz oj Buieds Mody =9
Q9El Pue E9E1 SON Bulmesg psepuess

WG YsIA a2Ueps022e aq 04 ysoddns UbIS +g

 

 

S81AaQ JO44UO) 215424)
Wsop!U 40 JeNUeW, YyIm a2UePsOIIe UI }]24SUI
aq 04 Suiysew UoJAay) pue SMOIJe juaWaAeG 7 auijquay pasodoud yins
4.5921A8Q ]04;U0) 04 pasinbas se subis Burysixa payer0jay
DpJlsJ] W4OsIUT) JO JeNUeW, jsodsues) pue|suaanH ‘SION
YsIM aouepsorre ul aq 04 Burysewaul) pue subis € St op
asinsayjo payou ssajun g azis aq oj subls jy 2 buryseig :
@4IYM paztso43a)jas aq 04 Burysewaury iy Jajem Aq poyjaw paisajad - parowas
aq oj Guiyew aun yuepunpa. jiy eagddl
TION 9957
SNOIS ONY ONIMYVWINIT - SALON gst

 

 

 

 

oO
o
a
~
tod
08 ¢ BEeBBBHeeS
009 009
toooeeennn
009 009
TAREE oO
a a
00098
ou gc gon gocSs
0004 000€
|
AA TL ETT
cay oO
' 000d =

 

ONIMYVWANIT ~ ONI937

 

 

 

Page 69

 

Su nshine Co Q Sst DEVELOPM@T FEES & CONTRIBUTIONS @

. - (Cashier. Please Retum to Admin Officer, Development)
Regional Council |

| APPLICATION AND GENERAL FEES

‘Application _ | ”
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee

CONTRIBUTIONS
Developer Contribution — Landscaping
Developer Contribution - Road Other than PSP

Developer Contribution - Drainage Other than PSP

Developer Contribution - Pathway Other than PSP

Developer Contrib. ~ In Lieu Off St Parking (PSP13 Car parking) a ee
Developer Contribution - Other Parks and Community a ee

 
 
   
  

 
 
  

     
 
   
  

  
    
     
 

TYPE | BONDS - Bond Refun
Payee Name:
Address:

d Details

 

 

 

 

 

 
 

 

 
 
      
 

 

  
 
 
  

 
 
 
  

 

|CALCULATIONS
Lot Calculation

 

 

 
  
   
 
 

 

  

 

 
   
 

  

Plan Examination Calculation

 

 
 

 

 
  
 
 
 
 
 
  

 

  

ICS - Community Land (Not currently active)

ICS - Public Transport

ICS — Sewerage (PSP Rural)

ICS — Sewerage (PSP Coastal)

(CS ~ Sewerage — South Peregian (PSP Maroochy)
ICS - Water Supply (PSP)

 

 

   
 

 

 
 

[APPLICATION DETAILS
Payee Name: Comiskey Cave.

 

  
    
  
 
  
 

ICS - Sport and Recreation Land (PSP Parks)

ICS - Drainage (PSP Noosaville Master & Ward Street)
ICS — Road (CMRNICP) If BA not entered then use 594
ICS ~ Pathway (PSP)

 

 

 

 

 
   

Devel bi ion:
Total of Fees Paid (Excluding Bonds) evelopment Location:

 

 
 
 

 
  

CPI Date:

AMO RECEIPT TYP! PE | File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond

61 (Cat9)_ ith. 2008-10561
Date application properly made:

Receipt No: (}OSGR9 [Receipt Date: /O/6/O%],

     

 
  
 

Total of Fees Paid (Including Bonds) ‘$

 

 

P:/Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES, doc

Page 70

Page | of 2
4 >

Ann Moore

i

 

To: Mike Laverty
Subject: RE: Application fee for Operational Works for Childcare Centre

Mike
Quote for Op Works -

PLAN EXAM

19 spaces @ $23 = $437 }
900m2 use area 18x $60 = $1080 } 3.2.4 =$1,517

Minimum Fee } 3.23 =$ 880
Minor earthworks } 3.3.2 =$ 355
Sediment - Building (1000m2) = $115 }

- Carpark (460m2) =$36 }
- Widening(420m2) =$36 } 3.4 =$ 187

Pavement Design (both sides) } 3.4 =$ 400
As Cons / } 37 =$ 175
INSPECTIONS

External works 4.1.1 = $ 760
Internal works (1500m2) 4.1.2 = $310
Minor earthworks =$ 760

TOTAL Access, carparking, stormwater, roadworks, minor earthworks, Frontage works = $5,344

@ Ann Moore

Administration Officer

Land Development Section

Sunshine Coast Regional Council - Tewantin Office

PO Box 141

TEWANTIN QLD 4565

Ph: 5449 5261 Email:[email protected]

ones Original Message-----

From: Mike Laverty [mailto:[email protected]]

Sent: Monday, 16 June 2008 3:54 PM

To: Ann Moore

Subject: FW: Application fee for Operational Works for Childcare Centre

Warning: Email may contain offensive content. You are advised not to view email or attachments unless sent from a known and
trusted source.

Hi Ann,

17/06/2008

Page 71

Page 2 of 2
gh

«

Please find attached a preliminary copy of the engineering plans for a Proposed Childcare Centre at
Sunshine Beach.

Could you please let me know how much the application fee will be? There will be approximately
200cu.m of earthworks for the building pad and carpark within the site. The Landscaping component
has already been lodged as a separate application.

Regards

Mike Laverty
Project Manager

Cardno
P.O.Box 152
Maroochydore
Qid 4558

Phone 07 54432555
Fax 07 54435642

[email protected]

17/06/2008

Page 72

Page | of 1

’

Ann Moore

 

From: Mike Laverty [[email protected]]

Sent: Monday, 16 June 2008 3:54 PM

To: Ann Moore

Subject: FW: Application fee for Operational Works for Childcare Centre

Warning: Email may contain offensive content. You are advised not to view email or attachments unless sent from a known and trusted
source.

Hi Ann,

Please find attached a preliminary copy of the engineering plans for a Proposed Childcare Centre at Sunshine
Beach. .

Could you please let me know how much the application fee will be? There will be approximately 200cu.m of
earthworks for the building pad and carpark within the site. The Landscaping component has already been
lodged as a separate application.

Regards

Mike Laverty
Project Manager

Cardno
P.O.Box 152
Maroochydore
Qld 4558

Phone 07 54432555
Fax 07 54435642

[email protected]

16/06/2008

Page 73

: Qa=v|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Evora iw - 074
———— AA
“om

 
 

apse
on

yjedyoas 9194390)

 

 

 

won oz 0 OF,

990) spanossonn Lenaiag

pasodosg

pre vee moa sate,

 

—:——e—
—1---

—mn—— —

Buysixa

=»

94 s9yaa yoedse> pasedaug

           

wey nace» m3 but

 

%
3
z
a
e
%

 

     

uy e6eure sp
FO wojye20] patodo sg:

414 Aan Goa:
44 vj pawe> paredaag

 

NVid LNOAYT Bus: ~s axa =—_a
€00-L0-p8Ez ae a
ae
~ sore) = — SULNFO FUVITWHD HIVSS SNHSNAS |S =
dNOUD ASHSINOD ~S
—— HY Bag a

 

YVNIAITSHd

 

 

 

awit
9

 

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.