Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
01 No -Gotoas3 [7] Yes
IPA, schedule 8, part 1, table 4. item 2, iP Regulation, schedule 1, part 2, table 5, item t(c}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
|VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
PX] No -Gotoas4 [(] Yes
IPA, schedule 8, part 1, table 4, items 14-1G; IP Regulation, schedule 2. table 2, item § (vegetation clearing): IP Regulation. schedule 2, table 2, item 34 (koala
conservation), 1? Regulation, schedule 1, part 3, table 4 item (vegetation clearinyéwild river area), Veyelatian Management Act 1999, section 22A (vegetation
clearingwild river area); Wild Rivers Act 2005, sections 31F and 43A
[TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?
DX] No -Gotoa45 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, pait 1, table 4, lems 3{a). IP Regulation, schedule 2, table 2. tem 8: IP Regidation, schudule 7, part 3, table 4 items 3 and 34; Waler Act 2000, section 966A (wild river
area); Wild Rivers Act 2008. section 434; refevant wild river declaration, Wild Rivers Code
4.5 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck fo pump water)?
& No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(h); [P Regulation, schedule 2, lable 2. ftem 8, IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers cade (Note’ the code does nut currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[EX] No -Gotoa47 [_] Yes - Answer (a) and (b) below
IPA, schedtile 8. part 1, fable 4, lem 3tcyi: IP Regulation, schedule 2, (able 2, Rem 8: iP Requiation, schedule 7, part 3. table 4, Kent 3; Weter Act 2000, section 9GGA (wild river area);
Wild Rivers Act 2005, section 434; relevant wild river declaration, Wilt Rivers Code.
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck fo pump water)?
[XJ No -Gotoasa [_] Yes
IPA, schedule 8. part 1, table 4, item 3{c}(ti): IP Regulation, schedule 2, lable 2. item 8; 1P Rogulation, schedule 1, part 3, table 4, tem 3
Water Act 2000. section 966A (wad river area}(Note: no current Wiki River declaration identifies taking or interfering with subartesian water as assessable)
Wild River cade (Note: the code does not currently contain applicable provisions for sub aitesian water}
4.8 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
LX] No -Gotoas9 [_] Yes - Answer both (a) and (b) below
IPA, schedule 8. part 1, lable 4. items 3¢)(i) and 3{d). iP Regulation, schedute 2. table 2. lem 9. IP Regulation, schedule |, part 3. table 4. itens 34; Water Act 2000, section 9668 (with
aver area) relevanl wilt aver declaration, Witd Rivers Code
49 ls the proposed operationa! work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [4] No OO Yes
(i) To increase the storage capacity of a referable dam by more than 10% —) No 0 Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency,
IPA, schedule 8, pert 1. table 4. lem 4; IP Regulation, schedule 2. table 2, lem 10
TIDAL WORK; WILD RIVER AREA " ]
4.10 \s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoas11 [7] Yes - Answer (a) and (b) below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.