Council archive · source document
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
EROSION AND SEDIMENT MANAGEMENT STRATEGY \ ENVIRONMENTAL ISSUE MANAGEMENT STRATEGY Erosion and Sediment Control ©) Objective/Target Comply with the erosion and sediment control plan as shown, to control erosion and sediment flows j Sediment trap (sandbags or fence) Ensure that all erosion and sediment control devices are operational at all times , : og Direction of minor flow Management Strategy Site foreman to identify and check direction of stormwater Direction of major flow land flows as shown on plan. Provide barriers and other t measures shown on the plan to prevent stormwater flows ke it lly pits. over embankments, and sediments into gully pits. on | Construction Entry/Exit Tasks/Actions Erect sedimentation barriers at perimeter of construction areas as shown on this drawing Frequency/Deadline Site foreman to monitor performance after every heavy rainfall. Responsible Person/ Site foreman to be responsible for Organisation inspections. Reporting/Review Site workmen to advise foreman if they notice any barrier needing repair. Corrective Actions Site foreman to report and order through supervisor, extra barriers as required EROSION & SEDIMENT CONTROL NOTES: This site has low erosion risk potential Refer IPWEAQ Standard Drawings D-0040 and D-0041 for details of sediment traps. All gullies shall be provided with on grade kerb inlet sediment trap refer IPWEAG Standard Drawing D-0041. The Contractor shall construct Entry/Exit Sediment Trap Alternative 2, refer IPWEAQ Standard Drawing D-0040 Grass filter strips 600mm wide shall be placed along back of kerb and channel, pathways and other impervious areas. Locations shall be confirmed by contractor. All allotments shall be revegetated with mulch or grass seeding as specified in Section A5-B2 of Soil Erosion and Sediment Control Guidelines for Queensland Construction Sites, June 1996, IEAQ 0 20 40 6.0 80 10.0m Ss 1200- Al 400- A3 RPE) 844- signaTuREC?S: /fwereA . For Cardno (Qld) Pty Ltd © Carano (id) Py Lic Al Fights Reserved 2008 ies tn eaomee COMISKEY GROUP Coogee n Fe wrote anc very Dano! Pa rewire bmg 16 Carre (Och Py iD ae ” re Dare: cs Ie W dara ches comedy aecatient le RET ofa seme A : 2 ; = : ‘ SUNSHINE BEACH CHILDCARE CENTRE = aL. ap 7 S * | LOT 31 RP149005 . J Cardno (Qid) Pty Ltd © « ° ] Car z 2 ABN 57 Get G74 O02 3 7) 4037 = a tad ‘ om 06 8 ee eae NG | cox mmemcsa nT ee ween rs : 1 EROSION AND SEDIMENT CONTROL PLAN 2384-01-008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.