Skip to the record
Beware of cheap imitations.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

EROSION AND SEDIMENT MANAGEMENT STRATEGY \

ENVIRONMENTAL ISSUE MANAGEMENT STRATEGY Erosion and Sediment Control ©)

Objective/Target Comply with the erosion and sediment control plan as shown,
to control erosion and sediment flows j Sediment trap (sandbags or fence)
Ensure that all erosion and sediment control devices are
operational at all times , : og Direction of minor flow

Management Strategy Site foreman to identify and check direction of stormwater Direction of major flow

land flows as shown on plan. Provide barriers and other t
measures shown on the plan to prevent stormwater flows
ke it lly pits.
over embankments, and sediments into gully pits. on | Construction Entry/Exit

Tasks/Actions Erect sedimentation barriers at perimeter of construction
areas as shown on this drawing

Frequency/Deadline Site foreman to monitor performance after every heavy
rainfall.

Responsible Person/ Site foreman to be responsible for

Organisation inspections.

Reporting/Review Site workmen to advise foreman if they notice any barrier
needing repair.

Corrective Actions Site foreman to report and order through supervisor, extra
barriers as required

EROSION & SEDIMENT CONTROL NOTES:
This site has low erosion risk potential
Refer IPWEAQ Standard Drawings D-0040 and D-0041 for
details of sediment traps.
All gullies shall be provided with on grade kerb inlet
sediment trap refer IPWEAG Standard Drawing D-0041.
The Contractor shall construct Entry/Exit Sediment Trap
Alternative 2, refer IPWEAQ Standard Drawing D-0040
Grass filter strips 600mm wide shall be placed along back
of kerb and channel, pathways and other impervious
areas. Locations shall be confirmed by contractor.
All allotments shall be revegetated with mulch or grass
seeding as specified in Section A5-B2 of Soil Erosion and
Sediment Control Guidelines for Queensland Construction
Sites, June 1996, IEAQ

0 20 40 6.0 80 10.0m

Ss
1200- Al 400- A3
RPE) 844- signaTuREC?S: /fwereA . For Cardno (Qld) Pty Ltd

© Carano (id) Py Lic Al Fights Reserved 2008 ies tn eaomee COMISKEY GROUP

Coogee n Fe wrote anc very Dano! Pa rewire bmg 16 Carre (Och Py iD ae ” re
Dare: cs

Ie W dara ches comedy aecatient le RET ofa seme
A : 2 ; = : ‘ SUNSHINE BEACH CHILDCARE CENTRE =
aL. ap 7 S * | LOT 31 RP149005
. J Cardno (Qid) Pty Ltd © «
° ] Car z 2 ABN 57 Get G74 O02 3 7) 4037 = a
tad ‘ om 06 8 ee eae NG | cox mmemcsa nT ee ween rs : 1 EROSION AND SEDIMENT CONTROL PLAN 2384-01-008

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.