1        Introduction
         ADG Consulting Pty Ltd (ADG) was engaged by David & Craig Dodd care of SCG Consulting Engineers (SCG)
         to prepare a Dewatering Management Plan (DMP) for the proposed residential development within
         property described as Lot 149 on N21859, situated at 30 Mossman Court, Noosa Heads, Queensland.
1.1      Proposed development
         The proposed development comprises the construction of a two‐storey residential building overlying a
         single level in‐ground basement on the 610 m2 site. The supplied information indicates that excavations
         will extend to a maximum depth of approximately 2.4 m below ground level (bgl; existing), corresponding
         to a maximum excavation elevation of approximately RL ‐0.7 m AHD (assuming 400 mm basement slab
         thickness). Localised deeper excavations may be required to facilitate other structural elements (i.e. pile
         caps and footings), where required.

         Groundwater depths have not yet been assessed, and it is understood that a geotechnical and acid sulfate
         soil investigation for the site is planned in the near future and could be used to update the DMP with site
         specific details at a later date, if required. Groundwater seepage was recorded at 1.6 m below ground
         level (approx. 0.5 m AHD) during preliminary geotechnical works (drilling) on a neighbouring site by
         Douglas Partners (2021). Standing groundwater levels are therefore conservatively expected to occur at
         an approximate elevation of around RL 1.0 m AHD.

         These conditions and the sites’ proximity to the adjacent Noosa canal (tidally connected part of Noosa
         River catchment) suggest that dewatering of the site will be necessary to allow the basement to be
         constructed in dry conditions. Based off information provided by SCG and ADG’s experience in the local
         area, it is noted that acid sulfate soil conditions are likely to be present, which has the potential to affect
         water quality during construction dewatering.
1.2      Relevant guidelines
         The DMP was prepared with reference to the following documents:
              Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and
               New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT,
               Australia.
              Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and
               New Zealand Environment and Conservation Council and Agriculture and Resource Management
               Council of Australia and New Zealand (ANZECC/ARMCANZ).
              Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment
               and Science (DES), Queensland Government.
              Noosa River environmental values and water quality objectives. 2022. Department of Environment
               and Science (DES), Queensland Government.
              Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health
               and Medical Research Council (NHMRC).
              Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment
               and Science (DES).
              Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and
               Heritage Protection (DEHP).
1.3      General environmental duty
         The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
         Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
         environmental harm unless the person takes all reasonable and practicable measures to prevent or
         minimise the harm”.




    ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                           Page 1
Log in to download the original file

Reference Document - OPW23 0189.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.