Council archive · source document
DARepCDA - 1052410 · 132008.175.02
DELEGATED REPORT PLANNING REQUEST TO EXTEND RELEVANT PERIOD Application No: 132008.175.02 Author: Denis Wallace - Coordinator Planning Project Director: Denis Wallace - Coordinator Planning APPLICATION DETAILS Application Number: 132008.175.02 132008.175132008.175.01 Applicant: CBD Settlers Cove Pty Ltd Request Received Date: 16/07/15 Original Approval Type: MCU – Multiple Dwellings (22 Units) Number of Submissions for Original Application: Nil PROPERTY DETAILS Property Address: 16 Serenity Cl NOOSA HEADS QLD 4567 RP Description: Lot 9 SP 195871 Land Area: No Land Area details available Existing Use of Land: Vacant STATUTORY DETAILS SEQRP Designation: Urban Footprint Planning Scheme: The Noosa Plan (16 September 2013) Planning Locality: Noosa Heads Attached Housing Planning Zone: Assessment Type: Change to Approval – Extension to Relevant Period PROPOSAL: The applicant seeks a 2 year extension of the relevant period of 132008.175.02 - Development Permit for a Material Change of Use for Multiple Dwellings (22 Units). The applicant requests an extension of 2 years for the following reasons: BACKGROUND: The site is one of 8 Residential High Density lots created under development approval 23118DA in 2003 for Settler’s Cove on the southern banks of Noosa Inlet / Weyba Creek. The approval established the following: A combination of Residential High Density and Detached Housing allotments; Developable areas within those lots, with retained vegetation and environmental corridors within lots protected under covenants; and Public conservation land dedications of approximately 20Ha of significant environmental areas. Conditions of approval 23118DA stipulate the developable area of these lots and environmental buffers in the area identified as Open Space Conservation & Waterways. The conditions require no development to occur in the Open Space area and with a further 6 metre building setback applicable. The development approval is subject to extensive management plans, including an Environmental Management Plan, Ecological Restoration Plan and Specifications, Sediment & Erosion Control Plan and Management Plans for Fauna, Landscape, Fire, Acid Sulphate Soils, Stormwater and Water Quality and Construction. The subject approval for Lot 9 replaced a previous approval, 23119DA, for 22 units which lapsed in April 2009. The subject development permit for a Material Change of Use for 22 Units was issued on 12 August 2009. The development consists of 22 x two and three bedroom units serviced by a basement car park for 43 cars. The units are contained within two separate buildings above the common basement. At the time the original application was publicly notified no submissions were received. Council approved an extension to the relevant period for the development on 15 January 2014, with the current lapsing date being 6 August 2017. STATUTORY PROCESS: In accordance with Section 388 of the Sustainable Planning Act 2009, in deciding a request to extend the relevant period, the assessment manager must only have regard to: (a) the consistency of the approval, including its conditions, with current laws and policies applying to the development, including, for example, the amount and type of infrastructure contributions, or infrastructure charges payable under an infrastructure charges schedule; (b) the community’s current awareness of the development approval; and (c) whether, if the request were refused- (i) further rights to make a submission may be available for a further development application; and (ii) the likely extent to which those rights may be exercised; and (d) the views of any concurrence agency for the approval… ASSESSMENT: Consistency with Current Planning Scheme & State Policies/Regulations The approved development was originally assessed against the provisions of The Noosa Plan and was almost fully compliant (with the only relaxation involving a small rear setback incursion). The original application is still generally compliant with the applicable provisions. The site has been previously cleared and no koala trees are affected by the development and, as such, the development complies with the State Koala regulatory Provisions. Infrastructure Charges This approval for an extension to the relevant period will trigger an Infrastructure Charge Notice for the amount of $5,184 to be issued in relation to the Public Transport network missing from the original approvals & Infrastructure Agreement dated 19/12/2013. An additional Advisory Note as is to be included in the decision accordingly. Community’s Current Awareness of the Development, Rights to Submit and Likelihood of Further Submissions The original application was publicly notified in February 2009. The period of time that has elapsed since the original notification period is not considered to substantially affect the community’s awareness of the development. The developer has maintained awareness through its publicity and sales material and signs on the site showing the future development. New submissions raising valid grounds for objection would not be expected, given the development is broadl;y consistent with the planning scheme. Concurrence Agencies There original application was referred to DNRW & DERM in relation to vegetation and koala matters respectively. The lead agency for these matters is now the State Assessment & Referral Agency (SARA) and the applicant referred the request to it to seek its views. SARA responded on 10 September 2015 stating it had no objection to the request. RECOMMENDATION APPROVED - It is recommended the Relevant Period for 132008.175.02 is extended for a period of 2 years, to now expire on 6 August 2019. Condition 22 is to be changed accordingly and the following further advisory note added: Additional ADVISORY NOTE dated XXXX Infrastructure Charges This Development Permit for a “Change to Existing Approval for an Extension to Relevant Period” will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (adopted charges). This Infrastructure Charge relates: Only to the Public Transport network previously missing from the earlier approvals; and Is additional to the Infrastructure Agreement dated 19/12/2013 that also remains applicable to the original development approval and extension to relevant period. [word/footer1.xml] FM1517s/4-22/06/2013 [Attachment: image1.png (image text)] Based on the sequential development of the Residential High Density lots from Lot 5 at Settler’s Cove, it is unlikely that development works will be completed on Lot 9 by this date. Accordingly, we hereby seek to extend the Relevant Period pursuant to Condition 22 by a further two (2) years to 6 August 2019, on the basis of: @ Lot 5 “Iluka” & “Emerald” being 100% completed by the required date of 2" December 2016; (ii) Development works on Lots 7 & 8 (41 dwellings) being commenced sequentially after “Emerald Apartments”, and; (iii) Lot 9 being the final stage of the residential apartments; (iv) Consistency of the established streetscape along Serenity Close and the diminishing impact of built form on Noosa Sound as the stages progress; and; 03) Our acknowledgment that further infrastructure levies have been applied in consideration to previous requests.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DARepCDA - 1052410Related documentApplication case desk ↗
About this file
- File size
- 87 KB (small file)
- File type
- DOCX
No other editions are linked here.