KG STRATEGIC STRATEGIC SOLUTIONS, CREATIVE THINKING Appendix B Landscaping Application for a Development Permit for Operational Works (Access, Frontage Works, Stormwater, Earthworks and Landscaping) 23 Edward Street, Noosaville QLD 4566 Lot 0, 1&2 on GTP462 Edward Street Development Pty Ltd rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Low scrubs and grasses:
Under planting to all trees:
Prostratum Lomandra / Dianella
Lornandra Westringia |
Dianella
E
B c
Pe" I he ae Oe ee la ey
line of green roof over
A |
|
I cd
|
e =
= AAA
j | _ BY,
| | Mull
r| = 4 eet
| = U
[o
| | 9 LI Green roof:
Fe | CO Yareena
| | g L “| Casuarina
DB 7 Glauca
| 6 — U Westringia
| | = —-
| | = ® |
>
| a CS :
ia fT Oe aS
— ‘ae le |
, Lt 4 Po eda |
| | \ ve i ‘ & Front verge
| : OS a ee 9° planting:
\ Bete a —| Grevilea
| p ! é ~~ Lomandra
i l aN Dianella
} fe PS | ey. Westringia
I 7 | # 1
= ( | { ' i st,
/ SS
© hg ee Lag ai Ls D
A | ] Ui ie a ly Sage _ —
| a ee
| a ,
| CU LU y A
L Sl J See
< c e-LIe
2} 2] 2} ae] 2] of of e ‘ =| of of | |
oem, bya peel hoes eS dt Be pec ee, ee 1 | eS
s ? Weceen
i |
ees -- = SULT
Palles eal
‘ Be ee —
E E E E E Ey rE E E ee B i ie
< i 4
b — i if
Green roof: Shaded spaces: |
Yareena Hardy fens - crows nest and biechnium
Casuarina Native basket fern (Drynaria) / Alyxia |
Glauca Myoporum / Native holly Low scrubs and grasses: |
Westringia Prostratum
Lomandra
Dianella
Site Address: 23 Edward Street, Noosaville QLD 4566
Title: Landscape Plan
Plan No. AO1
Drawn by: RG Strategic
Date: 4 August 2023
Revision: A
Project No. 002424
STRATEGIC
Under planting to all trees:
Lomandra
Dianella
Westringia
Hardly fens in shade area - crows nest and
blechnium Native basket fern (Drynaria) / Alyxia
Page 3
A Pandanus Tuckeroo B (Cupaniopsis Anacardioides) Fraiser Island Apple Cc (Acronychia Imperforata) Ivory Curl D (Buckinghama Celsissima) Red Cedar E (Syzigium Australe) SOOL 45L 4SL TOOL 300mm Quantity 13 Site Address: 23 Edward Street, Noosaville QLD 4566 Title: Legend Date: 4 August 2023 Revision: A Plan No. AO2 Drawn by: RG Strategic | Project No. 002424 Le STRATEGIC Name Prostratum Lomandra Westringia Casuarina Glauca Grevillea Yareena Crow's Nest Blechnum Drynaria Native Holy Pot 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm Quantity 30 30 15 20 20 10 20 10 10 10 10
Page 4
Notes:
~ Thoroughly water the root ball
immediately alter planting.
Form earthen watering
Gish around base of plant
Pull mulch away from
base of plant. 250. {
| x
wi ates
Do not allow fertiiser to ——————_}
come in contact with rools.
Imported soil blend
Water retention additive
COPPAN ING ETAL TUBESTOLK
Notes
Notes
~ Place the roctbal on a firmed base to
achiewe required FSL
- Thoroughly water the root ball
immediately aftar planting. =
- Number of stakes will vary with pot size. .)
Refer plant schedule
~ Cultivate sides and base of excavated
hole 50mm. Apply Gypsum @100g/m2
<
Pull mulch away trom
base of plart.
Form earthen watering dish
around base cf plant
Water retention additiwe ——
Imported soil blend
Do not allow fertiliser to ————""
come in comact wih
roots,
Cukivated area
PLANTIN! 14 mm
FSL = ——
+ ~ Al timer to be treated to AS1604, Hazard 4,
rough sawn pine unless otherwise shown.
- Use edge profile as indicated below. ; - All fixings to be hat dipped galv
- Edge radii shall be 20mm Timber edge ma i 7
real concrete edge on minimum 150 deep hi oe - Leading edge is to be free of burrs and
compacted base. = splinters
a levels shall be as shown on * Stakes Timber Edge: 120x35mm pine
~ Place 100! joints at minimum 5m centres. ee semen LPO bam teen
+ Make too joints at equal distances from both Existing/oompactad = 9 round at max. Space st 1200mm centres, or
ends. Make joint at points of change in ‘subgrade/subase saat caw Snes -
ee edge. \UNBIG hme? Baiges oneet al Comers
10 Greciion of edge. provicle double stakes,
aa Fhdngs: 2x60men gaWanised nails
Fgut Test
€
f g 5 EDGE TYPE 1 - EXTRUDED CONCRETE - TIMBER ED
Site Address: 23 Edward Street, Noosaville QLD 4566
Title: Landscape Details | Date: 4 August 2023 Revision: A i \
yd
TRATEGIC
Plan No. AO3 Drawn by: RG Strategic | Project No. 002424
rs \' *\
~ Place the football on a firmed Cc
base to achieve required FSL =
- Thoroughly water the root ball é
immediately after planting. oe!
~ Nurnber of stakes will vary with
pot size. Refer plant schedule.
- Cultivate sides and base of
excavated hole 50mm, Apply
Gypsum @109g'mn2.
Harcwood stake: Place 600mm af—> I
into the ground. Do not place
through rootball. Secure with ties c A
by looping in a figure eight pattern.
Raise plant 50mm above
finished surface level
Pull mich away trom base .
of plant,
Form earthen watering dish
around base of plant.
Imported soil blend
Water retention additive
Do not allow tertitser to
came in contact with roots
Cultivated area
| —wiatth (w}—b
t 2xw—
f 3 4 PLANTING DETAIL: 45-200Ltr
Novas.
- Al subsurface pipes to fall evenly to storm water system.
~ Join drains to upwe conduts on same diameter when
Placing under paved areas or areas that require compacted
sub-base.
- Sub-soil pipe to be 100mm dia. with filter sock.
.
i Y Imported soll blend under turf
T NO BARAAae 10mm = 20mm drainage
| ( f aggregate
3 1, ‘ Or>oKRRRE Sub-soil pipe
{ ROR O! a
0 |
. Z 4 SUB SOIL DRAINAGE
—— Compacted subgrade
Notes:
~ Muleh: 100ewn deep of 25mm Hoop Pine Mulch
~ Soil: Provice sufficient soil to fill planters to 100mm below
top of wail. Lightly compact soil in 200mm layers. Use
Premium grade soil blend with high saind content to reduce
slumping. Mix with Hydrocell Flake at 30% by volume.
~ Water retention: Provide 100mm thick Hydrocel hard foam
to base of planter.
Reler to Structural Engineers dws for waterproofing,
drainage and connections
Rockcote render
to top
Mulch-
Rockeote
render to faca
Imported soil blend: >
Waterproof
membrane
Water retention layer —fashad 1
Geotextile fabric P| becesest
Drainage layer - fact
Reinforcing -refer >» f
engineers drawings r |
Podium slab ———¥ ae | Saal ee
Pianter drain. Connect +s |
to SW system
g]
Height varies. Reter to
Extermal Works chwgs:
~
Notes:
- Ensure enough room behind to allow tor safe access during
construction
- Concrete block wall reinforced and core filled.
Blocks 390mm x 190mm typical with 10 men joints.
- Waterproot membrane to wrap over structural slab. Reter to
Structural Engineers specitication
- Reter plans for adjacent surtace treatment,
Podium planting area. Refer
to detail
— Reinforced block wal
Pee <—_— Rockcoat
f rr 5a
I On
& a WS
i>
¥ < Watesproot membrane
f ru
i
b . | — Steal raintorcing
Structural stab
Page 5
a Ci STRATEGIC STRATEGIC SOLUTIONS, CREATIVE THINKING rgstrategic.com.au
Used in these records
Attachment B- Landscaping.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.