~ Thoroughly water the root ball
immediately alter planting.

 

Form earthen watering
Gish around base of plant

Pull mulch away from
base of plant. 250. {
| x

wi ates

 

     
    

Do not allow fertiiser to ——————_}

come in contact with rools.
Imported soil blend

Water retention additive

COPPAN ING ETAL TUBESTOLK

Notes

 

 

 

 

 

Notes

~ Place the roctbal on a firmed base to

achiewe required FSL

- Thoroughly water the root ball

immediately aftar planting. =

- Number of stakes will vary with pot size. .)

Refer plant schedule

~ Cultivate sides and base of excavated

hole 50mm. Apply Gypsum @100g/m2
<

 

 
   

Pull mulch away trom
base of plart.

Form earthen watering dish
around base cf plant

Water retention additiwe ——
Imported soil blend

Do not allow fertiliser to ————""
come in comact wih

roots,

Cukivated area

PLANTIN! 14 mm
FSL = ——
+ ~ Al timer to be treated to AS1604, Hazard 4,

rough sawn pine unless otherwise shown.

 

 

 

 

 

 

 

 

 

 

 

- Use edge profile as indicated below. ; - All fixings to be hat dipped galv
- Edge radii shall be 20mm Timber edge ma i 7
real concrete edge on minimum 150 deep hi oe - Leading edge is to be free of burrs and
compacted base. = splinters
a levels shall be as shown on * Stakes Timber Edge: 120x35mm pine
~ Place 100! joints at minimum 5m centres. ee semen LPO bam teen
+ Make too joints at equal distances from both Existing/oompactad = 9 round at max. Space st 1200mm centres, or
ends. Make joint at points of change in ‘subgrade/subase saat caw Snes -
ee edge. \UNBIG hme? Baiges oneet al Comers
10 Greciion of edge. provicle double stakes,
aa Fhdngs: 2x60men gaWanised nails
Fgut Test
€
f g 5 EDGE TYPE 1 - EXTRUDED CONCRETE - TIMBER ED
Site Address: 23 Edward Street, Noosaville QLD 4566
Title: Landscape Details | Date: 4 August 2023 Revision: A i \
yd
TRATEGIC
Plan No. AO3 Drawn by: RG Strategic | Project No. 002424

 

 

 

 

 

 

rs \' *\

~ Place the football on a firmed Cc
base to achieve required FSL =
- Thoroughly water the root ball é
immediately after planting. oe!

~ Nurnber of stakes will vary with
pot size. Refer plant schedule.

- Cultivate sides and base of
excavated hole 50mm, Apply
Gypsum @109g'mn2.

 

Harcwood stake: Place 600mm af—> I
into the ground. Do not place

through rootball. Secure with ties c A
by looping in a figure eight pattern.

   
 
 
  
 
    
    

Raise plant 50mm above
finished surface level
Pull mich away trom base .
of plant,

Form earthen watering dish
around base of plant.

Imported soil blend

Water retention additive

Do not allow tertitser to
came in contact with roots

Cultivated area

 

 

 

| —wiatth (w}—b
t 2xw—

f 3 4 PLANTING DETAIL: 45-200Ltr

Novas.

- Al subsurface pipes to fall evenly to storm water system.

~ Join drains to upwe conduts on same diameter when
Placing under paved areas or areas that require compacted
sub-base.

- Sub-soil pipe to be 100mm dia. with filter sock.

 

.
i Y Imported soll blend under turf
T NO BARAAae 10mm = 20mm drainage
| ( f aggregate
3 1, ‘ Or>oKRRRE Sub-soil pipe

{ ROR O! a
0 |

. Z 4 SUB SOIL DRAINAGE

—— Compacted subgrade

 

Notes:
~ Muleh: 100ewn deep of 25mm Hoop Pine Mulch
~ Soil: Provice sufficient soil to fill planters to 100mm below
top of wail. Lightly compact soil in 200mm layers. Use
Premium grade soil blend with high saind content to reduce
slumping. Mix with Hydrocell Flake at 30% by volume.
~ Water retention: Provide 100mm thick Hydrocel hard foam
to base of planter.

Reler to Structural Engineers dws for waterproofing,
drainage and connections

Rockcote render
to top

Mulch-

Rockeote

render to faca
Imported soil blend: >
Waterproof
membrane
Water retention layer —fashad 1
Geotextile fabric P| becesest
Drainage layer - fact
Reinforcing -refer >» f
engineers drawings r |

Podium slab ———¥ ae | Saal ee
Pianter drain. Connect +s |
to SW system

 

 

 

g]

 

 

 

 

Height varies. Reter to
Extermal Works chwgs:

 

 

 

~

 

 

 

 

Notes:

 

- Ensure enough room behind to allow tor safe access during
construction
- Concrete block wall reinforced and core filled.

Blocks 390mm x 190mm typical with 10 men joints.
- Waterproot membrane to wrap over structural slab. Reter to
Structural Engineers specitication
- Reter plans for adjacent surtace treatment,

Podium planting area. Refer
to detail

 

 

 

— Reinforced block wal
Pee <—_— Rockcoat
f rr 5a
I On
& a WS
i>
¥ < Watesproot membrane
f ru
i
b . | — Steal raintorcing

 

 

 

 

Structural stab

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment B- Landscaping.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.