Council archive · source document
Approved Plans OPW19-0278 · OPW19/0278
Plans and drawings: the text below has words only, no drawings.
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
54
44
1. 1.
43
61
58
48
1.
1.
1.
1.
1.
1
1.
1.
PP PP
51
1. .59
56
1.
55
54
50
1.
1
54
1.
1.
1.
55
40
WM
1.
1.
WM
66
1.
54
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON
94
1.
66
1.
8252
17.10
2
2 ST
74
BRIC
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77 3
72
66
1.
1.
1.
742m²
SHED
35.46
GTP156
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
GTP
Issue:
DEBUILD T/A
- ABN 40 098 481 899
NOOSA COUNCIL Title:
APPROVED PLAN Project
OPW19/0278 8 JAN 2020
Date: Drawn
Checked: Drg No. Rev.
[OCR of page images]
DRAWING SIZE — At
| LOTS 2 & 3 on RP 78252
Lael Ostum HD
Level Orig PA 58277, RL. 1.635m
0 i 2 & a
teh a 8 on Tey nu ee puoimesl ”
oom — I \ | son
| =+ \ ~~ rerosn wasn
zl | \— fetta a ge
gi | t Dav eae sj
al le |
al\ ley |
ie
ale \3 FL. APPROX, FILL| VOLUME 1495m° 2
enstesusaees i I's : :
7 'é Fhsom .
ha FLL-10n 13
___i& less 3 |
|
era" es | beset tit 4 3| Be
“es on img g
weyenrene Ko | HERES - el Saco 2 /
Seen s 3 [ig
= me | 6
‘CRITICAL DEPTH LINE “WS DETAL A150 APSLES TD EXSTNG FOUNDATENS, . 1 &
EASES ita aon fo '
me m I
7 |g Fu-a% rw Tee
=
REFER ORG OWE FOR eK SP ‘
fe owen —
. 4
‘SITE PLAN — EARTHWORKS & RW SETOUT
GONRAGTOR To [HTP AL Eevcts Pauw To TLL UNE RNG TOBE W ACOORDANTE LEGEND
owevcne wows on TE A swcs wt || Wut Cees AS Pad STNG SURFACE SPOT LEVELS.
So ee ae oe E INDICATES OVERHEAD ELECTRICITY
Sort Ne
OATES BATHS NER UNE
ICATES PROPOSED EVE LNE
NOOSA COUNCIL : overs TASTE we 4psOH
GWENT SOLE TO Caer
HHCY LOCATON PRO WES
beforeyoudig.com.au APPROVED PLAN swe Iveares ass soRMNATER
—— bean
DIAL1100 OPW19/0278 8 JAN 2020 soca oom ou TL
BEFORE YOU DIG riién ss hoTo
1/12 TOP
FILLED LOT
GROUND LeveL
199 Block ~ CORE
FILLED W12—400 Ve Hw
~ LAP BARS SOM,
ALL CORES CLEARED
BEFORE POUR A
CLEAN-OUT BLOCKS. aN
ROUND LEVEL
200MM FREE DRANING
BACKFUL WITH ACI PPE
= TTT] wo ouner,
0 THK HEEL SL82
450
FONG BEAN
WESH TOP 40 COVER,
SLINTW TOP & aoTTOM
E-UGS AT 800 CTRS
300, |, 4000
BLOCK RETAINING WALL ~ TYPE 1
TYPICAL SECTION
\
al] PON RAN o& SILER
vermcaL wena as age |
SLE, 700 CTR. RAKE
BACK AT ANGLE SHOWN
[ TO RE-DVERT STORMAATER
CEOFABRIC 0 SIMILAR FOR
SILT/FINES RETAENSION,
200150 HORIZONTALS
FOR DEPTHS UP TO 1600,
BEYOND USE 20047. 200K¢004 FREE. DRAINING
BCKFUL IN CEOFABRIC
— WRAPPING WTH scl PRE To
‘unr.
1Y RETAREINED
GRADE. CONCRETE AWAY
FROM POSTS.
20NPA COMPACTED
‘CONCRETE
DHE ASSSORERED,
SLEEPER RETAINING WALL ALTERNATIVE DETAIL.
"A RETANED | VERTOAL VENGER ] FOOTNG DEPTH
(0x8)
i Hox 0
00 70-3 75 300
1200 700 « 100 00
600 100 x 200 1500
7000 2725 5 20 1600
r i
VERTICAL”
wewser ~ 10 |
CONSTRUCTION NOTES
cee:
Teno cue 5 cam
4 Sine abe eran mo wo
Fans mo oem
Ese FANE a se FW ROI,
1 ns ee fee aa
oct ne EN TED
fan Sethe OR
rx cnpene
FILLING NOTES:
“AEST 1619 SAFE LEG OF AL RCA WATER 80
ves
CGMPACTIN TOBE SFRCENT T ACHE 4 Lo
LOWS FE Stine WAN S01) FER SAD PNEMEMEER
FoR OB OF 10m ELON HEAT LBL GIES oF
COMPACTIN TEST ACTS SL BE FRESENED T So GONSLING
NERS FR ROL,
~ TE FL MAE AW GAUL AML 80 TOA
CUNY iho ACOODANCE MH ASTI) BE FE OF x
(HMC MATRAL AND HEA LAY COMTENT OF ESS 12
(PUSDATY nome LSS TAN 25% LNA SHRMEAE F158) HE
"EFL TE ACE AN CMPACTEDACORDAACE
‘SSE 96 104 BEL STCDAT 0 ACHE 4 LDL
CERO WT AN ATE REL 0KSTY OF #5
UNG 8D CAPAC AOUCEXT ING SMATAES 1S
INSTT ACORDANCE WIN TE ASSORTED TALS 3
SHCRCATINS.
“EAS WERE UST SUCNSES REE AE REUOD SAUL
ACAILID WH TE > FL WTERAL COPATED
1 ODI F t
ny IS SFT MAHAL WME ASE
FEPARATN GL EE ROVE 0 FEPLCED HE ePOHED
FLL VATA CAPACI W ACRE WI ASETOE. TD.
ACHE 8 Wa RELATE FELD DIY F258
Po ESRI COMME
KEY
1 SWPT- ISIN STORUWATER WANE /PmT
1 SUP BISING SEWER CONECTON PNT
CHW, —-RENFORCED CONCRETE HEADWALL
1C SMH BISTNG SEWER WANKOLE
1c SWWH STNG STORUWATER WANHOLE
SWE NEW 050 STORMHTER MANHOLE
ME
Ep eLECTCAL Pov PoLE
Ke ISTNG HERON
"FOR APPROVAL
00 NOT SCALE FROM THIS DRAWING
ia
C) Sto SEE
OPERATIONAL WORKS:
EARTHWORKS & RW DETAILS
"Lots 2 de 3 RP78252
Elizabeth St, NOOSAVILLE
8 Now 16 Be OSk
04s | FBS. { }26281-OW3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
54
44
1. 1.
43
61
58
48
1.
1.
1.
1.
1.
1
1.
1.
PP PP
P
51
1. .59
56
1.
55
54
50
1.
1
54
1.
1.
1.
55
40
WM
1.
1.
WM
66
1.
54
03
1.
58
20.92 20.92
20 92
58
2.
1.
59
64
1.
1.
1.
COMMON
94
1.
66
1.
8252
17.10
2
2 ST
74
BRIC
1.
35.46
67 2 GTP395
59
1. 630m²
6
630m
1.
6
6.09
77 3
72
66
1.
1.
1.
742m²
SHED
S HED
H D
5 46
35.46
35
3 46
GTP156
68
1.
18.36
18
DECK
IO
O
M
MH
LL: 1.
1.53
53
CP
49
0.52
IL: 0.5
52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
GTP
Issue:
DEBUILD T/A
ABN 40 098 481 899
- Title:
NOOSA COUNCIL
APPROVED PLAN Project
OPW19/0278 8 JAN 2020 Date: Drawn
Checked: Drg No. Rev.
[OCR of page images]
DRAWING SIZE — At
| LOTS 2 & 3 on RP 78252
Lael Ostum HD
Lael Orig PM 58277, RL. 1.635
a=
ENA SL
oan ve rote
sey eouRG co
0mm TOP COVER \
LONER SLAB MESH 10 MAINTAN
40mm TOP COVER CUT EVERY SECOND
WRE 50mm CLEAR ALONS UNE OF
JONT
TJ) TOOLED JOINT DETAIL
16 DONELS,
Ifo) cooury, 800 CRS. 125 Tek
EY JOINT PROFLE,
STOP MESH Sora
FROW JONT.
(KJ) DANLEY KEY JOINT DETAIL
ya ee
fm COVER,
PIT_TRMMER DETAIL FOR PITS
ENSURE SMOOTH TRANSITION FROW
NEW FOOTPATH TO NEW DRNEWAY
EDGE, NO STEP, TYPICAL
ete wma
ND INERNAL PEST
Ps
ENISTING CROSSOVER. REINSTATE
ERS TO COUNCIL STADNARIS.
eS eet
NEW CONCRETE 125 FOOTPATH /PAVED
AREAS SHOWN. SHADED TO COUNCIL
STANDARDS (PAEA Org
ax TOOL JOINT SPA
CCTRS, REFER LANDSCAPE ARCHTECTS
PLAN FOR SURFACE TREATMENTS.
WAX CROSSFALL GRADE OF 1 IN 40.
[ain PEGEE RPA
»— few
nose mn
fi et
“%
Ty
RiP. BOUNDARY
FFL 270
UNIT 3
FFL 270
HATCHING INDICATES PROPOSED
“um WE EASEMENT FOR
INTER-ALOTWENT DRAINAGE
‘SITE_PLAN
Seale T= 200
DRIVEWAY & ACCESS
Ar RE ene Tew AE
THE QLEENLIND WANGAL OF UNIFORM
Hai camo bcs & 4s zo
PARKING FACUTES P48 OFF-STREET Ca
CONTRACTOR TO LOHTE ALL SERIES Pt TO
CCAWENENG WORKS OF STE. AL SERVICES AE
TOBE PROTECTED ACCORDANCE THE
AHORITY RESPORSBLE FOR WE SEE
TW 1S CHANEL TO BEM AORDICE
Wik CNL STHADIRD DETALS
Ibeforeyou
DIAL1100
BEFORE YOU DIG
com.
NOOSA COUNCIL
, APPROVED PLAN
OPW19/0278 8 JAN 2020
ENISTING CROSSOVER, RENSTATE
ERB TO COUNCIL STADNARIS.
HATCHING INDICATES PROPOSED
1.0m WDE EASEMENT FoR
INTER-ALOTMENT DRANAGE.
FTA)” SUBGRADE PREPERATIN, REFER
LAY] CeNeRaL NOTES
ert
DETERWNED
ON-STE
PAVEMENT MATERIALS
125mm N25 CONCRETE PAVEMENT, SL82 MESH MIDDLE
100 THK COMPSCTED BASE COURSE SAND OR CRUSHER QUST
~SUB-GRADE PREPERATION IN ACCORDANCE. WTH
SPECIFICATIONS /NOTES
DRIVEWAY CARPARK PAVEMENT SECTION
LEGEND
INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AKO.
MISTING SURFACE SPOT LEVELS.
INDICATES PROPOSED FISHED
SURFACE LEVELS
ray INDICATES DIRECTION OF FALL
To FINSHED SURFACES,
125 THK. DRNEWAY SLAB ON
CCONPACTED MATERIAL, SLB2 MESH,
TOP 50 COVER, FLEXIBLE JOINT
AGANST WASONRY /CONCRETE
100 THK, TERRACE SLA8
CONPACTED MATERIAL, SL72 MES,
TP 40 COMER, 200{H) X 200(0)
EDGE THICKENING AT UNSUPPORTED
EDGES, FLENELE WNT AGANST
NasoNY /CONCAETE
(14) DENOTES WET TOOLED JONT To
> TERRACE SLAB, REFER 70 DETALS
Hoots rorueo KEY sowT 10
ORNEMAY SLAB, DETAL TO DETALS
F—— _INDIOATES OVERHEAD ELECTRICITY
SUPPLY UNE
INDICATES EXISTING SEVER UNE
———v— _INDICATES WATER WAIN APPROX
ALICAWENT, BUILDER TO CONF
EXACT LOCATION PRIOR TO WORKS
1 INDICATES TELSTRA LINE APPROX
ALUCAWENT, BUILDER TO CONFRN
EXACT LOCATION PRIOR TO WORKS
sy NDICATES STORMWATER ORAN
PROPOSED AS NOTED MIN T IN
100 FALL UNLESS NOTED
OTHERWISE
nye _NDICATES STORMWATER ORAN
MISTING. AS NOTED MIN IN 100
FALL UNLESS NOTED OTHERWSE
ENR -
Fae a0 Sa
remus
‘CLE SS om a OUCUATE OY ERT
iui Ona NEY Pu
Sono wes ou as are
Goa rh mo Uke ste Jee COSTRSTD R
ta US ACY TES
Trea ce "
‘aN oo COWEZTNS SIL AME EOE HE A
‘Seer
VNU ot PES NS 1 TDW OE
ese at BERND LENA AMT OT RPP
0 SVE ESTE UNA EAL PE
KEY
1 SWPT_ ISIN STORUWATER WANE /PmT
1c SIP BISING SEWER CONECTON PNT
CHW, —-RENFORCED CONCRETE HEADWALL
1C SMH BISTNG SEAER WANKOLE
1c SWWH STNG STORUWATER ANKLE
WMH NEW 050 STORMHTER MANHOLE
ME
Ep eLECTCAL Pov PoLe
Fe ISTNG HERON
peer]
beset
aR cl ebay orear7
Tea | mai ae
"FOR APPROVAL
00 Nor SCALE FROM THIS DRAWING
“OPERATIONAL WORKS:
DRIVEWAY & ACCESS
=
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILE
Oy ox
i Fass, { '26281-OW6
Page 3
BM: NAIL IN KERB
RL: 1.600
57 61
47
57
1. .35
1. .40
55
44
1.
43
58 1.
48
54
1.
1.
1.
1.
1
1
1.
1.
PP PP
51
1.
59
55 56
1.
1.
54
50
1.
54
1.
1.
1.
55
40
WM
1.
1.
WM
66
54
1.
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON
94
1.
66
1.
8252
17.10
2
2 ST
74
1. BRIC
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77 3
72
66
1.
1.
1.
742m²
SHED
35.46
GTP156
68
1.
18.36
DECK
IO
MH
LL: 1.53
IL: 0.52
1.
49 CP
50
47
65
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
GTP
Issue:
DEBUILD T/A
ABN 40 098 481 899
- Title:
NOOSA COUNCIL
APPROVED PLAN
Project
OPW19/0278 8 JAN 2020 Date:
Checked:
Drawn
Drg No. Rev.
[OCR of page images]
DRAWING SIZE — At
LEGEND
— INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD,
[ISTNG SURFACE SPOT LEVELS.
INDICATES DIRECTION OF FALL
L TO FNSHED SPOON ORANS.
Lows 2 & 3 oN RP 7H252
Level Oar aH |
Lee righ PM 56277, RL 1.635
INDICATES PROPOSED FISHED ‘ie ones
SURFACE LEVELS 5 GONE DENT 10 Tew THC ECLEOG AA
1S0(N) GRATED ORAN WH Sore sant 5
HEAVY OUTY CRATE & fanrotn rte 8 J AUG COAL SUE
=x
3 esos PPE JUNCTION 80x HTH STASI Ba ee PE MT AED De
EX) caitta tp, pre-cast POPLAR nat re coy gene
ie 2/125x75x4.0 RHS (GHLV) CONCRETE $e vin cts ce
2 LAD ATT 10 on Ha dias wap wo one sean)
fuser sonar iS INSTALL TO NEW KERS 4505q FIELD INLET, PRE-CAST Pi HO COMERS
rie ADAPTORS AND WAKE EE] conckere ww risen ceeve ror wears
FOOTPATH ooo LANDSCAPED AREA ORANACE | MERE es Som we ee
3 soy FELD NREL Pa-cas Se tA no EO HE
50059 FELD INLET, PRE-CAST fugne sng Te nuestra
oa ELIZABETH STREET EE concent wnt RAISED cRATE FoR 2 AL We SL CMY WHE EEN OF ADRES
FALL LANDSCAPED AREAS TO LANDSCAPED AREA ORANAGE ‘me
fo , aux) FORUED FLOM PATHS TD DVERT (Oe cman 0c Ee Fa
ru aww ecxnme apse ms (ctv) RUNOFF 10 GRATED DRANS AND 2/1 25475440 RHS (CAV) SF stomuwater veer. nets 10 Sg Sera a ee we a
{ [-—$ 93 {aD aT coun, Seers. OMN FAL ho ar 00M tum abuser PononG roe Tee ee eae es
ss nome vr SIAL NEW KERB Tea. tal o"NEW HERD ALBAN PROPER ears eey
feinen whole Hop ADAPTORS AND /— SOABTORS AND WAKE REFER OETA, leon nd a BD
__ FOOTPATH ooo. INDICATES PaOOSED STORMWATER 5 i PUA eT co
[DRAIN ERSTNG MIN 1 in 100, 7 tr SER AE EL GND BE
GRADE. UNO. fa Bou ones no en Ne 3,
OP beNoTeS aPPRONNATE DOPE Tetbcog S MEML ME SO ENE Be
_ LOCATIONS 10 BE CONFRIED BY ate ers wr FEST UND SHES HO AL
ARCHTECT AND HYORAUUC ‘ive ron EES 3 RUD
DESIONER Aroacemvsoee ROE MLS RSL
IAL a TES SL SE W EOE WARM
vee Et SOE HEARN ML
lagna SNE
MEAL car om
g
Pk A ow Fons
Ho enone 1
sys caoo Lm
(C Z
[Wi = TCL ETAL I OL ca
sre 1 ca Sv feng mar cto
ftshat row biome cL U ea
SECON X-¥
aouypagy
AUSORAIN ENVIROMOOULE 2
INALIRATION CELLS, REFER
DETAIL ON THIS SHEET,
Pool
SOREN ENVRONOQULE 2
if INFILTRATION SELLS. REFER
{5 DETAL ON THIS SHEET.
5
1300 wv @ 1:100_ | \
Ls,
1008 uP\ @ f:100
HATCHING INDICATES PROPOSED
‘0m NDE EASEMENT FOR
INTER-ALOTMENT DRAINAGE
Rp
x
CREATE FALL TOWARD
ROAD RESERVE IN FISHED <
GROUND PROFLE,
\
THIS SP PROVIDED AS
DISCHARGE PONT FoR
NEIGHBOURING ALOTHENT
ORANAGE
LocaTE sToRMMATER PrTs
AT LOW PONT ON
NEIGHBOURING PROPERTY
REFER TYPICAL DETAL
KEY.
1 SHPT_ SING STORUWATER WaNLE/PmT
1 SP ISING SEWER CONNECTON PONT
AC HW, -RENFORCED CONCRETE HEADWALL
DC SMM ISTNG SEAER WANHOLE
1 SWWH STNG STORUWATER WANE
SWE NEW 050 STORMHTER WANE
DISTNG CE OF STUMEN
TEC STNG RERE CHANEL
ASL WATAL SURFACE LL
FRE HVRANT
‘sw _1508 uPVC &
MISTING HO3's & NEW SW DRAINAGE
LUNE TO BE PROTECTED AS PER
SENER/STORMWATER PROTECTION
DETAILS ON DRC 26781-0W"
iH
RANFALL
az terome nora saz
EP ELECTCAL PoE Pole
KE@ —_ISTNO HERON
me
Sie RFYBONORY
‘Om WIDE EASEMENT FOR
INTER-ALOTMENT ORANAGE
DRIVEWAY SINGLE STOREY RPT29
il FALL LANDSCAPED AREAS TO
SITE PLAN — STORMWATER MANAGEMENT \__ FORVED Low PATHS TO DNERT
Saket 200 RUNOFF TO SW PITS. 1 in 100 © _| Sm DmVEWaY LEVELS Au leant
(aR IURanON Ps MN FALL. NPIL ae oe pe
—TREAT FIRST FLUSH RUNOFF FROM ROOF'S *_|pwro eauesr new 1 qucut7/e0bay |O7/02/7
—Titet wo CIN RILRETON CONRICTER To LONE AL SERCES Pa To Tame | oa
REDUCES DEVELOPED STE RUNOFF ING NORKS OM STE. AL SERVICES RE
4”
Tae PROECIED I ACOOANCE WT THE
ARTY RESPONSE FoR THE SERICE
AUSORAIN ENVIROMOOULE 2
PROVE NSPECTON OPENINGS
(105) FRow SLOTTED PPE I
EASE FOR FLUSH OUT or
"FOR APPROVAL
‘COUNCIL STORMWATER INFILTRATION CELLS 10 IN LIE, OVERFLOW GRATE WHERE NO 00 NOT SCALE FROM THIS DRAWING
s1sTON “Hs ORANG I 03 EAD W cownICEN WRAPPED IN GEOFABRIC STORIWATER QUTLET set odematt cna ed
tc uct eh V panameniedinge
WATER CYCLE DIAGRAMATIC So COVSULING AGNES 2525/5) storuwer 125 LOS sroguwares
inrtow i Fi omow
TAL APES 106 LAD ATW 10 UN i
UNLESS NOD XK PROVIDE DROS AT EACH END
= iz OF THE PTT FROMTHE AN
wwnw.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278 8 JAN 2020
PROVIDE SLOTTED PIPE
THROUGH SOTTOM OF
Ls
AUSDRAIN INFILTRATION SOAKER PIT DETAIL
THROUGH DRAIN 70 THE
SLOTIED PPE WN THE B8SE
ALL PIPE PENETRATIONS THROUGH THE GEOFABRIC TO
BE FITTED WTH STANLESS STEEL PIPE CLAMPS,
CEOFABRIC TO SE LAPPED AT WOINS WITH & ROOT
INHBTOR PROVIDED ALONG THE JON UNES
“OPERATIONAL WORKS:
STORMWATER MANAGEMENT
=
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILE
Oy ox
as] Bes, £ 26281-Sm | B
Page 4
1.0 GENERAL Unless otherwise specified, reinstate all existing surfaces, Methods of protection shall include but not be limited to Sandy subsoils are preferred for these works. Clay soils 9.0 TURFING LANDSCAPE SPECIFICATION
All works to be performed by a licensed Contractor items, structures and anything disturbed or damaged by the following: may be used when in a dry state, but extreme care is Supply and install A-grade turf (variety specified on
familiar with landscape construction of this nature. The the performance of the works, to its condition at the necessary to ensure the resulting subsoil profiles are not drawings) to areas shown on drawings. Finishing levels
· Construction of temporary surface swales;
Contractor shall verify the location of utilities on site prior commencement of the Contract, other than that forming compacted or subject to excess moisture. should be flush with adjacent surfaces unless otherwise
· Diversion and dispersal of concentrated flows to point
to the commencement of construction, and ensure that part of or directly modified by the new work. detailed. Spread topsoil and grade surface to ensure a
where the water can pass through the site without Supply and install imported topsoil that complies with
they will not have an effect on the works. The Landscape Remove and cart away debris, spoil and surplus building level finished surface, which drains to nominated field
damage; Australian Standards to all turf (100mm) and garden -
Subcontractor is advised to visit the site to satisfy gullies.
NOOSA COUNCIL
materials from the site and buildings, with the exception · Construction and maintenance of silt traps (eg hay (300mm) areas as shown on drawings unless otherwise
themselves as to local conditions, accessibility, storage of those works associated with others prior to practical
bales) to prevent the discharge of scoured materials to specified. Ensure modified site soil is free from stones, Turf to be free from nutgrass or other noxious weeds or
space, the full extent and character of the works and the
APPROVED PLAN
completion. any other material deleterious to plant growth.
downstream areas; sticks, roots, rubbish and material toxic to plant growth.
site, the nature of the ground, the level of the subsoil
· Progressive restoration of disturbed areas; Modified topsoil shall have a friable structure with good Deliver the turf within 24 hours of cutting, and lay it
OPW19/0278 8 JAN 2020
water, the supply of materials and water and the
2.0 EXCAVATION AND EARTHWORKS · Construction of temporary siltation fencing. drainage and high organic content. within 36 hours of cutting. Prevent it from drying out
execution of the contract generally. No claim will be
allowed for any alleged inadequacy of the description Inspect the site and ascertain the nature of excavation Any erosion damage reinstatement or cleanup as a result between cutting and laying.
Fire Ant Control
herein. Should there be any conflict, the Contractor shall required and the working conditions that will be of the contractor not adequately protecting the site,
The Landscape Subcontractor is to allow to carry out all
notify the Landscape designer immediately. encountered prior to the commencement of work. The materials or the works shall be the responsibility of the
necessary measures, inspections and safeguards to ensure 10.0 EDGING
location of topsoil stockpiles, roadway and cut landscape contractor.
Fire Ants do not enter the site via equipment, machinery, Supply and install all edging as per drawings. Paved edging
Figured dimensions shall take precedence over scale embankment profiles and water connection points must
Remove temporary erosion control measures when they materials and plant stock. shall sit on 100mm of concrete. Timber edging must be
measurements and large scale drawings over small scale. be taken into account.
are no longer required. constructed from hardwood and joined using galvanised
Unless otherwise specified the Drawings and Specification The Landscape Subcontractor shall ensure measures to
shall include everything reasonable for the proper and fittings.
minimise erosion and siltation relative to the works EXISTING TREES 6.0 FERTILISER
entire completion of the work, not withstanding any outlined in this specification, including staging of the Protect all existing vegetation unless otherwise specified. Provide proprietary fertilisers, delivered to the site in
omission in the Specification or Drawings. works, stabilisation of exposed surfaces, diversion drains All vegetation and weed removal is to be carried out using sealed bags marked to show manufacturer or vendor,
Verify discrepancies between Specification and Drawings 11.0 IRRIGATION
and silt traps over and above those already installed in industry standard accepted safety procedures and weight, fertiliser type, N:P:K ratio, recommended uses and The irrigation system shall be fully automatic provide even
with the Landscape Designer before proceeding with the civil works. equipment to ensure personal and environmental application rates. Store in a dry secure environment.
particular work. Failure to do so will not be taken as a cover to all grass and planting areas. Do not waste water.
protection. Avoid damage to nearby trees and Apply according to manufacturer's recommendations Take particular care to install the correct nozzle for the
reason to claim for extra work. Surface drainage shall be diverted clear of excavations and
surroundings. (rate/reapplication/watering). situation, and also allow for specific sprinkler and valve
covers shall be provided where necessary for safety.
Convey soils, earth, sand, loose debris and the like to or Ensure that run-off is not concentrated onto adjoining Garden beds - Slow Release - Osmocote or similar adjustment as will be required.
Grub out stumps and roots over 75mm diameter to a
from the site in a manner that will prevent dropping of properties and does not cause a nuisance thereto. minimum depth of 500mm below sub-grade. Stumps less approved. This Specification is not project or site specific. The intent
materials on streets, public and private areas. Cover all Finished surfaces shall be graded in accordance with than 75mm diameter shall be cut off at ground level and Tree plantings - Slow Release - Osmocote or similar is to provide a basis on which a professional standard,
loads with taut heavy-duty purpose fitted tarpaulins to Construction Plans. treated to prevent regrowth. approved. fully operational, compliant (with all applicable industry,
ensure no loss of load or dust. Ensure that the wheels, Erect barriers as required to prevent excavated material Grassing - Growforce 301 or similar approved100kg/Ha local authority and Australian standards) irrigation system
tracks and body surfaces of all vehicles and plant leaving and rocks from intruding onto adjoining properties. Completely remove woody weeds within the extent of can be provided for the site. Submission of the design to
the site are free of mud and that mud is not carried onto Establish exact locations of services, drains, sewers and works. Local Authority for approval and all costs involved are the
adjacent paved streets or other areas. 7.0 MULCH responsibility of the irrigation subcontractor.
water supply lines and points prior to commencing works Supply and install organic mulch to a minimum of 100mm
and ensure their protection during the works. Fully automatic commercial quality system:
Check all delivery tickets, labels, identification marks 3.0 FINISHED LEVELS & GRADES and gravel mulch to a minimum of 50mm. Ensure mulch
and, the goods themselves to ensure that all products All major earthworks associated with this project shall be Minimum cross falls of 1:50 on planting and pathways to meets Australian Standards and is free from deleterious · 24 station (min) commercial controller in lockable box;
comply with the project documents. Where different carried out as part of the Landscape Works. drainage collection points and overflow points. Planting matter, fungi and disease. Mulch shall finish 25mm below · Mains tapping point back flow device, including dual
types of any product are specified, check to ensure that areas should not exceed 1:3. adjacent surfaces. check valve in lockable box to council requirements, to
the correct type is being used in each location. In ENVIRONMENTAL PROTECTION
be undertaken by builder refer to hydraulic drawings;
particular, check that:- The Landscape Subcontractor should consider in every
· Filter at back flow;
All stock has been adequately protected for loading and in instance whether the use of chemicals is strictly necessary 4.0 CULTIVATION & SUBSURFACE DRAINAGE 8.0 PLANT SUPPLY
· Control wire;
transit. before application, and assess the product, site conditions The Landscape Subcontractor is to provide for sufficient The Contractor shall supply plants as specified in the
· Conduit access to all isolated areas;
The sources, types, qualities, finishes and colours are and species to ensure minimum risk to his employees, surface and sub-surface drainage to garden and grass planting schedule. Plants shall be delivered on site true to
· Drip irrigation to new garden areas;
correct, and match any approved samples. other users of the site and the environment. areas to ensure adequately drained soft landscaped areas pot size, species and type, and free of weeds, disease and
· Pop-up irrigation to grassed areas;
The correct species, cultivars, pot sizes, plant height, girth free from surface ponding water and heavy/ waterlogged fungal infection. Substitutes will not be made without
· Coordinate penetrations and suspended under slab
or spread have been supplied for each consignment from When using pesticides the Landscape Subcontractor must prior consent of the Landscape Designer.
soils. Surface and sub-surface drainage is to aid in the conduit and copper work with builder.
the supplier. use a certified operator and take appropriate safety
healthy growth and continued thriving of all plant stock All plants shall be true to scheduled nomenclature, well · An approved rainswitch override is to be installed to
All materials should be clean, undamaged and otherwise precautions in accordance with all current statutory
and grass areas. formed, hardened off and disease free nursery stock. cut-off irrigation after a pre-set rainfall level has been
in good condition. regulations.
Comply with the relevant Australian Standards to the They shall be container grown in potting soil with root reached. Install to manufacturers' directions with a
Where appropriate protective covers should be intact system firmly established but with no large roots growing manual override switch.
with unbroken seals. The Landscape Subcontractor must dispose of unused extent that they are relevant and not over-ridden by the
specification. out of the container. No plant shall be pot bound.
and unwanted containers and chemicals in a safe way in
Ensure that trunks and branches are free of dieback, Give 10 working days notice of the proposed date for the
Ensure adequate provision is made for the protection and accordance with the methods approved by the relevant
Cultivate sub-grade to a minimum depth of 150mm prior cavities, sunburn and secretions. Trunk and branches are instruction. Provide written operational instructions for
storage of deliveries. In particular ensure that:- authorities. Disposal will be off site.
to placing topsoil to all planting and turf areas on ground. to be evenly tapered and textured typical of the specie. the installation under the Contract. The defects liability
Materials which may deteriorate with storage must not period for the irrigation system shall be 52 weeks from
be stockpiled on site. Herbicide must never drift, fall or run-off onto open water Plant material is to be matured enough to support
or onto adjacent sites, gardens or ground not intended for themselves without staking. the date of Practical Completion.
Adequate and appropriate provision is made for storage
prior to deliveries arriving on site. ALL materials in treatment. 5.0 FILL & TOPSOIL
storage are to be suitably protected from physical damage Fill and subsoil material used to make up levels shall be Branches should be evenly distributed, exhibit a full well
The Landscape Subcontractor will be responsible for re-used from previous earthworks operations on site or 12.0 TANK INSTALLATION
and extremes of weather and to minimise hazards assessing any potential wildlife problem when tendering formed canopy that occupies a minimum 1/3 of the
imported as required and shall be excavated material Supply and install tank to size and location specified as per
persons, materials and equipment. Keep storage areas and during the course of the works. Allowance must be overall current height. Specimens are to be prepared for
which is composed of natural site subsoils but free from: drawing by others.
neat and tidy. made for any protection or control of such pests the their intended purpose. For ex-ground stock where
Do not use roads, driveways, paths hard standings and the Landscape Subcontractor deems necessary. Subsequent canopy modification is intended, provide details of how
· Logs, stumps or other un-decomposed vegetative each specimen's visual character will be at time of
like forming part of the works for access or storage unless wallaby or rabbit damage to planting or other works will 13.0 LIGHTING
material. delivery.
prior written approval has been given. be deemed as defective work and subject to replacement All lighting is to be carried out out a qualified electrician.
· Materials susceptible to spontaneous combustion.
as per the normal contract conditions. Foliage shall be evenly distributed across the crown in All recommended lighting is merely a suggestion, with the
Operatives must be appropriately skilled and experienced · Clay, of liquid limit exceeding 90 and/or plasticity index
proportion to the branching structure as well as be of a ultimate style of lighting used at the description of the
for the type and quality of work and familiar with the exceeding 65.
Any proposed method of protection or control of pests true colour typical of the specie, dense and of good size. client.
terms of the specification. · Refuse and rubbish, including paper, plastics, rubber,
must be agreed with the Superintendent prior to use on Ensure foliage is free of deficiencies and burn. Plant
Inspect products/materials/stock carefully before use and metal and all type of containers.
site. material is to be 'hardened' to full sun and exposed
· Concrete, bitumen, brick, steel, masonry rubble or other
reject any which are defective. conditions by the supplier to ensure successful plant 14.0 MAINTENANCE/ESTABLISHMENT PERIOD
deleterious material.
Use products/materials only in the method and for the Restrict dust caused by the Works to a minimum. Take all establishment into the site environment. For ex-ground Maintenance of all landscape works is to be carried out by
· Toxic substances and compounds that would inhibit
purpose recommended by the manufacturer. practicable steps to minimise noise resulting from the stock apply an anti-transpirant. the Contractor until completion of the landscape works.
healthy plant life.
Ensure appropriate quantities are utilised, provide Works. Maintenance includes replacement of dead and/or
· Any material not capable of being satisfactorily At the time of the last plant stock review prior to site
adequate measures for mixing and spreading of all diseased plant stock, removal of weeds and rubbish, weed
EROSION AND SEDIMENT CONTROL compacted. delivery, plant material is to conform with the specified
products or materials. spraying and mowing.
Set out components or stock to ensure correct Take all precautions necessary to prevent erosion, minimum plant sizes in the Plant Schedule. Plants shall not
contamination and sedimentation of the site, surrounding Any such material shall be removed from site to the exhibit signs of having been stressed at any stage during
positioning and spacings are achieved.
areas, water and drainage systems, in accordance with Landscape Subcontractors own tip. their development due to inadequate watering, excessive
Protect finished work from subsequent operations and
interference by others as project progresses. the Environmental Protection (Water) Policy 1997. shade/sunlight, suffered physical damage or have
restricted habit due to growth in nursery rows.
seed landscape design NOTES
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Attn: Developer/Builder
Landscape Compliance Certification may be
necessary at BA Stage of development.
DRAWING
specification
CLIENT
KIDD + Co
PROJECT
160614
Please contact Landscape Designer for Detailed drawing no. 160614 01
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS 46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au © 2016 SEED Landscapes ISSUE
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
28/10/18
B
Page 5
-
1:200@ A3
NOOSA COUNCIL LANDSCAPE PLAN
Scale 1:200 @ A3
0 5 10 20 50 100 APPROVED PLAN
Elizabeth Street OPW19/0278 8 JAN 2020
06 TURFED AREA:
04 Install A-Grade Green Couch Turf over
100mm topsoil to council verge
CONCRETE DRIVEWAY:
EXISTING TREES: Standard entry driveway, Standard BCC
Protect and retain existing trees as per crossover; all necessary council
BCC Guidelines and AS4970 approvals to be in place prior to
01 TREE PLANTING: constructing driveway or crossover
04 Shade trees with non-invasive root
systems to maintain privacy and aid in SCREEN PLANTING: 03
sustainable building practices Shrubs and trees to screen fence 04
and provide privacy from street and
02 CLIMBING PLANTING: develop visually interesting frontage
04 Climbing vine to narrow garden bed to
GARDEN EDGING: 07
grow over fence and reduce visual impact
Concrete edging to separate garden 04
and turfed areas
HARDSTAND AREA:
Extended precast concrete pavers or TURFED AREA: 06
Install A-Grade Green Couch Turf 04
concrete slab of decking around pool to
accommodate pool fencing and extend over 100mm topsoil to private open
recreation space for residents space
enjoyment
03
04
SCREEN PLANTING:
Shrubs and trees to screen fence and U1
provide privacy from neighbours
U2 SCREEN PLANTING:
Shrubs and trees to screen fence
and provide privacy from
neighbours
03
04
ORGANIC MULCH: 04
75mm deep organic Hoop Pine (no 04
fines) mulch to all garden beds unless
otherwise stated
02 GARDEN PLANTING:
04 Native local species planting for GARDEN PLANTING: 02
environmental responsible practice, Small groundcovers in gap between 04
300mm cultivated garden soil to beds concrete slabs to soften visual impact
HARDSTAND AREA:
Precast concrete pavers or concrete slab
U4 ORGANIC MULCH:
75mm deep organic Hoop Pine (no 04
fines) mulch to untility area to allow
04
DRAINAGE:
All paths and garden beds to fall
away from proposed building and
excess storm water to be collected
06
to extend passive recreational area for
resident
TURFED AREA:
U3 access and 'soft' edge for planting
HARDSTAND AREA:
Extended precast concrete pavers or
in stormwater pits where available concrete slab of decking around pool to
04 Install A-Grade Green Couch Turf over accommodate pool fencing and extend
IRRIGATION: 100mm topsoil to council verge recreation space for residents
Drip line irrigation system to be fully enjoyment
automated to cover all garden areas; POOL FENCING:
Spray irrigation pop-ups in all turf Frameless glass pool fencing and gate to pool TURFED AREA: 06
zone; fencing must comply to local council Install A-Grade Green Couch Turf 04
SOIL CONDITIONER: and Australian Standards codes over 100mm topsoil to private open
ECO Hydro Terraplex (source from POOL: space
Eco-environment) conditioner to all Pool and pool position by architect; refer to
garden beds; refer to manufacturers architects details POOL:
specifications Pool and pool position by architect;
04 SANDSTONE GRAVEL MULCH: refer to architects details
04 70-140mm tumbled Sandstone River rock
gravel mulch in all pool area planting DRYING AREA:
seed
zone Fence mounted clotheslines to drying
area; refer to manufacturer's detail
NOTES DRAWING CLIENT LEGEND PROJECT
landscape design Attn: Developer/Builder
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Landscape Compliance Certification may be
necessary at BA Stage of development.
Please contact Landscape Designer for Detailed
landscape plan KIDD + Co proposed tree
existing tree
driveway
pedestrian path
160614
drawing no. 160614 02
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS groundcovers/grasses paved area
46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au north proposed shrubs
ISSUE
'
© 2016 SEED Landscapes
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
turfed areas 28/10/18
B
Page 6
-
1:200@ A3 PLANTING PLAN
NOOSA COUNCIL Scale 1:200 @ A3
0 5 10 20 50 100
APPROVED PLAN
Elizabeth Street OPW19/0278 8 JAN 2020
3 BAN eri
3 BAN spi
3 BAN spi 5 LOM lon
3 HIB spl 5 BAN eri
2 HIB div
3 COR rub 5 ALP cae
3 HIB div
1 BAN rob 1 MEL qui 5 CAR app 2 BAN spi
3 WES fru 5 WES fru
3 SYZ aus
3 PAN tec 2 ARC cun
3 PAN tec
6 LEP art 6 SYZ HG
3 ALP cae 1 ARC cun
6 SYZ HG 1 ARC cun
4 HIB spl 7 CAR app 4 WES fru
2 BAC cit 10 LEP art
4 WES fru
12 LEP art 6 SYZ aus
3 ARC cun
1 STE sin
3 ALP cae 6 LEP art
6 ALP cae
U1
4 SYZ HG
2 COR rub
4 WES fru
U2
26 DIA cae
2 MEL ell 7 COR rub
15 LEP art
3 ALO bri
3 LIN mon 2 PAN tec
4 HIB sca 6 ALP cae
3 LIN mon
4 SYZ aus 4 WES fru
9 ALP cae
6 WES fru 6 SYZ HG
5 WES fru 1 ARC cun
3 LOP con 4 ALO bri
6 SYZ HG 10 COR rub
9 ALP cae 3 CRI ped
14 LEP art 3 WES fru
5 SYZ aus 2 MEL ell
4 VIO ban
5 ALP cae
18 CAR app
U4
1 MEL ell 6 SYZ HG
1 ARC cun
1 SYZ aus
U3 8 VIO ban
5 COR rub
6 COR rub 1 SYZ aus
1 ARC cun
5 WES fru
25 CAR app
1 MEL qui
4 SYZ HG
5 ALP cae
1 STE sin
6 SYZ aus 6 SYZ aus
6 COR rub 1 STE sin
1 LOP con
4 WES fru 4 WES fru
2 ARC cun 4 BAC cit
seed
1 ARC cun
30 CRI ped 5 SYZ HG
4 SYZ aus 6 SYZ aus
4 BAC cit
10 LOM lon
NOTES DRAWING CLIENT LEGEND PROJECT
landscape design Attn: Developer/Builder
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Landscape Compliance Certification may be
necessary at BA Stage of development.
Please contact Landscape Designer for Detailed
planting plan KIDD + Co proposed tree
existing tree
driveway
pedestrian path
160614
drawing no. 160614 03
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps DESIGNERS groundcovers/grasses paved area
46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au north proposed shrubs
ISSUE
'
© 2016 SEED Landscapes
Document Set ID: 21024968
abn 85 468 007 510
Version: 1, Version Date: 11/12/2019
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
turfed areas 28/10/18
B
Page 7
- LANDSCAPE DETAILS
NOOSA COUNCIL
APPROVED PLAN
OPW19/0278 8 JAN 2020
Provide depression
in mulch at base
of plant
Provide depression
in mulch at base of
plant
75mm Mulch
75mm Mulch
Stake and tie single
stemmed stock with
appropriate materials SUBGRADE
Excavate hole 100mm cultivated Excavate hole 200mm wider &
1000mm wide subgrade deeper than pot size and backfill
with imported topsoil
and 1000mm
deep, backfill 03 SHRUB PLANTING DETAIL
hole with 04 Scale 1:25 @A3
modified site
topsoil 100mm mulch layer
75mm mulch layer
300mm deep modified
300mm deep modified site soil except where
4 x 10g slow site soil except where
release tree plantings occur
tree plantings occur
fertilizer tablets Cultivate subgrade to
Cultivate subgrade to
Install root 100mm depth. 100mm depth.
barrier to
900mm
deep
Cultivate soil at
base of hole to
100mm depth SUBGRADE
01 TREE PLANTING DETAIL 04 ORGANIC MULCH DETAIL 05 GRAVEL MULCH DETAIL
04 Scale 1:25 @A3 04 Scale 1:25 @A3 04 Scale 1:25 @A3
Provide depression
in mulch at base of
plant 75mm
Mulch
MULCH: Refer to
Specification.
CONCRETE MOWING STRIP:
Continuous extruded mowing strip.
Profile as indicated below and refer
to drawings.
TURF: A-Grade turf TOPSOIL:Refer to Specification
SUBGRADE IMPORTED SOIL: CULTIVATED SUBGRADE:Refer to
100mm depth bedding course Specification.
100mm Excavate hole 200mm wider CULTIVATED SUBGRADE: COMPACTED SUBGRADE:Min.
& deeper than pot size and 100mm min depth cultivated SUBGRADE
cultivated sub-grade 150mm thickness.
subgrade backfill with imported topsoil
NOTES
02 MASS PLANTING DETAIL 1. CONSTRUCTION JOINTS:Place at
04 Scale 1:25 @A3 minimum 5m centres.
2. TOOL JOINTS:Make tool joint at
equal distances from both ends.
seed
SUBGRADE Make joint at points of change in
curvature/ direction. Joints to be at
05 TURF DETAIL 07 CONCRETE EDGE DETAIL
04 Scale 1:25 @A3 04 Scale 1:25 @A3
NOTES DRAWING CLIENT PROJECT
landscape design Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Attn: Developer/Builder
Landscape Compliance Certification may be
necessary at BA Stage of development.
details KIDD + Co 160614
Please contact Landscape Designer for Detailed drawing no. 160614 04
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn ps
DESIGNERS 46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au © 2016 SEED Landscapes ISSUE
Document Set ID: 21024968abn 85 468 007 510
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
28/10/18
B
Version: 1, Version Date: 11/12/2019
Used in these records
Approved Plans OPW19-0278.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.