Council archive · source document
Attachment 7 - Bushfire Report · MCU18/0015
Attached to the e-mail Response to Information Request (Bushfire Report, Arborist Report, Previous Vegetation Clearing Approval & Registered Plan for Adjoining Viridian Covenant Area ) MCU18/0015 & RAL18/0001.
No buildings require construction to BAL 29 under AS3959-2009. The significance of the radiant heat flux levels discussed is shown below in Table 11. Table 6. Significance of various RHF levels (Source: NSW RFS, 2006) 7.0 Bushfire Protection Measures in Combination Figure 12. Bushfire Planning Measures in Combination (Source: NSW RFS, 2006) Figure 12, taken from Planning for Bushfire Protection (NSW Rural Fire Service, 2006) illustrates that there are other factors and measures which need to be integrated to mutually support one another to provide protection against bushfire. Simply removing the hazard (bushland) is one possible way of removing risk to life and property, but this approach is hardly desirable. The safety of life and property can be achieved whilst retaining the natural amenity and value of bushland areas, provided these integrated bushfire protection measures are applied. Report compiled by Bushfire Risk Reducers for Innovative Planning Solutions Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Bushfire Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.