Council archive · source document
Attachment 7 - Bushfire Report · MCU18/0015
Attached to the e-mail Response to Information Request (Bushfire Report, Arborist Report, Previous Vegetation Clearing Approval & Registered Plan for Adjoining Viridian Covenant Area ) MCU18/0015 & RAL18/0001.
9.0 Assessment of proposal against State Planning Policy 2017
State Planning Policy – Natural hazards risk and resilience (SPP, December 2013, current version July 2017) replaces State
Planning Policy 1/03 Mitigating the Adverse Impacts of Flood, Bushfire and Landslide. The SPP Assessment Benchmarks –
Natural hazards risk and resilience provides a methodology for determining Bushfire Hazard based on Potential Fireline
Intensity. The methodology and hazard mapping has been included in Section 3.1 of this Plan in establishing the adjacent
area as potentially hazardous and as a bushfire prone area.
Part E of the SPP provides development assessment benchmarks to ensure that State interests are appropriately
considered in relation to natural hazards, including bushfire hazard areas. These provisions serve as general guidelines to
either avoid or otherwise adequately mitigate bushfire risk. Specific guidelines for bushfire hazard overlay codes are yet to
be provided, and this detail is addressed by this Plan in terms of meeting the current requirements of Local Government in
Section 9 below.
Interim Development Assessment Solutions Provided
Requirements – SPP Part E
(3) Development avoids natural hazard This Plan establishes the nature and potential severity of the
areas or where it is not possible to adjacent hazard and provides a combination of bushfire protection
avoid the natural hazard area, measures to mitigate risk including park management, building
construction, asset protection zones, access, water supplies and
development mitigates the risks to
utilities, and emergency management arrangements.
people and property to an acceptable
or tolerable level, and
(4) Development supports, and does not The combined effect of the bushfire protection measures specified
unduly burden, disaster management by this Plan serves to reduce risk to a low level and ensure resilience
response or recovery capacity and and preparedness for unplanned fire so that the response or
recovery capacity and capability of emergency services is not unduly
capabilities, and
burdened or impeded. This Plan serves to protect life and property
from bushfire without depending on emergency services for
protection.
(5) Development directly, indirectly and The development does reduces the nature of the existing hazard,
cumulatively avoids an increase in the and site layout and landscaping on the site is designed to moderate
severity of the natural hazard and the the exposure of buildings. The potential for damage to other
properties is not increased as a consequence of the proposed
potential for damage on the site or to
development.
other properties, and
(6) Risks to public safety and the Hazardous materials are not stored in quantities or locations on the
environment from the location of site which would pose a risk to the public or the environment.
hazardous materials and the release of
these materials is avoided, and
(7) The natural processes and the The development maintains the natural processes and protective
protective function of landforms and function of vegetation that previously existed for the site.
the vegetation that can mitigate risks
associated with the natural hazard are
maintained or enhanced.
Report compiled by Bushfire Risk Reducers for Innovative Planning Solutions Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Bushfire Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.