Skip to the record
Search everything, all in one place.

Original source · versioned page text

2 Kestrel Crescent; DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

0 bd ©)

 

 

8) O aeveliop 7 9) rs O are pe @ eated ana a S ended eo Os} @)
Intended use of lots created Residential Commercial Industrial Other, pleaSe specify:
Number of lots created SL

 

 

 

 

 

  
 
   
   
   
 

  

rN subdivision be staged?

[1 Yes ~ provide additional details below
LJ No

How many stages will the works include?

 

 

What stage(s) will this development application
apply to?

 

     

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
joke last

     

Intended use of parts created

   
   
 

  

Residential Cegmmercial Industrial Other, please specify:

 

 

 

 

Number of parts created

 

 

 

 

 

 

12) Boundary realignment

 
  

12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Argh (m?) Lot on plan description Area (m?)

   
 

 

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment?

 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)

Existing 9 Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

   

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
(] Road work LC] Stormwater ] Water infrastructure
(1 Drainage work ] Earthworks (1 Sewage infrastructure
L] Landscaping J Signage |_| Clearing vegetation
Other ~ please specify: (Svaverso, Cras olev

14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
C1] Yes — specify number of new lots:

iYNo

 
      

  
  

    
      
      
        
 

  
 
   

 

ueensland
overnment

2

 
Log in to download the original file

2 Kestrel Crescent; DA Form 1.pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.