INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 ©
State-controfled road matters 2. The application involves: (tick applicable box/es) ; , ‘
For more information refer to Guide 3. . ; . . ‘
Unless you answered “none of the above to Q2, [J (i) development on land contiguous* to a State controlled road and for
. : —_—- . : ‘
_ the application triggers referral to the Department (_] (a) material change of use assessable against the planning scheme; ;
of Main Roads (DMR) as a referral agency. a ‘
se . . [_] (b) reconfiguring a fot unless - :
In certain ciscumstances DMR will be an advice . .
-agency, while in other circumstances DMR'will:..| . . « the total number of lots is not increased; and -
be a concurrence agency. e the total number of lots abutting the State-controlled road is notincreased; -_-
hedule 2 of the IP Regulation will assi ' : . .
Soe ye Rae [1 (0) operational work (not associated with a material change of use assessable against the
_ "concurrence agency for the appiication, . planning scheme or reconfiguring a lot mentioned in (b) above)—
. - associated with access to a State-controlled road; or
. , e for filling or excavation; or
ef ¢ involving the redirection or intensification of site stormwater from the land, through a
- ; ; : pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a.
PBT State-controtled road.
, a (_) (ii) development on land not contiguous to a State-controlled road and -
- _ (1 (@) material change of use - , |
ne i. « assessable against the local government's planning scheme, and
ne Soa ft « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set . by
ee . that schedule; _ . .
. m "4 [-] (0) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
@ : a, and exceeding the thresholds set by that schedule;
Co - (1 {c) operational work (not associated with a material change of use assessable against the —
mo, - planning scheme or reconfiguring a lot mentioned in (b) above} - ‘
. « assessable against the local government's planning scheme; and
a oO « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by ~
. . , that schedule. ;
{X] (iii) none of the above . :
Clearing vegetation - 3. The application involves: (tick applicable box/es)
’ For more information refer to Guide 125 | (i) material ch ange of use - . . /
Unless you answered “none of the above” toQ3,| . Oo .
the application requires assessment by the . | (a) assessable against the planning scheme; . —
Department of Natural Resources and Water ft . .
“ee | (b) on a lot containing .
if an agency other than NRW is the assessment ; * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa + if there is no property map of assessable vegetation for the lot - remnant vegetation;
concurrence agency forthe application in relation) (c) where the existing use of the land is a rural or environmental use; and oe
‘you ticked Q3() or (3), your application requires (d) where the’size of the land is 2 hectares or larger - complete Part J of Form 1 ° .
. ____ féferral to NRW for assessment regardless of - C) (ii) reconfiguring a lot - . ,
whether vegetation clearing is proposed or not. © : . . :
: (a) on alot containing a category 1, 2 or 3 area shown on a property map of
@ oo : assessable vegetation or, if there is no property map of assessable vegetation for
. ., ow ie the lot, remnant vegetation; : a ,
| (b) where the size of the lot before the reconfiguration is 2 hectares or larger,
no - (c) where 2 or more lots are created; and _
ye (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
, : CI {iii) operational work - - .
. “ * , . - . : .
' (a) for the clearing of native vegetation where the vegetation clearing is made
. assessable under Schedule 8 of the IPA; and
— , (b) not associated with a material change of use assessable against the planning
. scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
. : _. Form . .
_ | Riv) none of the above. ,
Strategic port land 7 _|4. The applicationinvolves: =
- . Formore wa the ae eae eh (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
"Ifyou ticked (i) - the relevant Port Authority is the .
assessment manager for the application. Act) complete Part | of Form 1 . .
. ifyou ticked (ii) Queenstand Transportisa J (ii) a material. change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application, — TI Act for the strategic port land - complete ParttofForm1
- a * , (X (iii) none of the above
4 Land contiguous to a State-contolted road is defined in schedule 14 of the IP Reguiation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
. controlted road. . ;
. - "Page 2 _ :See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154700.001.pdfRelated documentPublic source context ↗
07/1086 - Preliminary Building Works Assessable againt the Planning Scheme [As Published]Related documentApplication case desk ↗