- INTEGRATED PLANNING ACT 1997 : : IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits of a 12. Does the application involve development below high water mark’8 and within the limits of a port
port under the Transport Infrastructure Act 1994? co -
. "For more information refer to Guide 18. For ® NO / ‘ a y
: information about prescribed tidal work refer to ‘ . . . oy :
; * Guide 24, ; (_] YES - complete Part M of Form’ 1, or Part P of Form 1 if the work is prescribed tidal work , .
: If you:answered “YES” to Q12, the application , . .
- biggers. referral to the Port Authority. ; . .
_ The Port Authority is a concurrence:agency if the . So,
. development is - . . ‘ . . ‘ ,
, © within 200m of a shipping channel or an entry . ‘ ‘ ‘ ,
. " . and-exit shipping corridor for the post / L .
© within 1000m of a swing basin, a commercial | - _ . ‘
shipping wha, a mooring, anchorage or spoil . ; . ,
_ grounds; . - :
. © within 1000m of a planned port facility .
_ identified in a land use plan approved under : : .
the Transport Infrastructure Act 1994. . : ;
In:all other situation the Port Authority is an . . ,
advice agency. : . _ .
oe Marinas © no 13. Does the application involve operational work that is tidal work for a marina’ with more than 6
_For more information refer to Guide 18. For vessel berths? , oO .
information about whether a marina is prescribed . : . ,
tidal work refer to Guide 24. . The local . X NO os . ,
government is the assessment manager for all . , : i , x “ts cach H
prescribed tidal work. oO YES complete Part M of Form 1, or Part P.of Form 1 if the tidal work is prescribed tidal work .
Y you answered “YES" to Q13, the application , : ,
. triggers referral to Queenstand Fire and Rescue :
Service as an advice agency. : . ; . : a. Lo.
- Tidal works in strategic port land tidal| 14. Does the application involve tidal works within a strategic port land tidal area?0? Lo |
areas , Ne) : 7 : ;
_. ‘For more information refer to Guide 18. oO YES - complete Part Mof Form 1 . . |
Unless you answered “NO* ta Q14, the relevant os : . . .
Port Authority is the assessment manager for the . .
application and the Environmental Protection . . /
Agency (EPA) and Queenstand Transport (QT) :
are concurrence agencies for the application. ; . ; . ; , . ;
‘Heritage | 15. Does the application involve development in a heritage registered place as defined under the ,
For further information refer to Guide 19. Queensland Heritage Act 1992?
"Ifyou answered “YES” to 15, the application. NO . - . v
. triggers referrai to the Queenstand Herita . : oo. .
Council as concurrence agency for the: : C YES - complete Part C of Form 1 . :
_ application. : -
| 15(b)The application involves: (tick applicable boxes) ‘
Unless you answered “none of the above” to : . . . .
Q15(), the application involves referral to the CL) (i) amaterial change of use assessable against the planning scheme and the lot shares. a
- Environmental Protection Agency as an advice _ common boundary with a protected area or registered place under the Queensland
agency for the application . Heritage Act 1992; . :
@ ; “(J (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
oO oe mo ‘C1 (iii) none of the above. ;
se Declared catchment areas - + |46. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the involves: (tick the applicable box/es) . ;
declared catchment areas within Queensland, |” . . . . : : : we
refer to Guide 13 J (i) reconfiguring a fot if any lot resulting from the reconfiguration Is less than 16 hectares;
Unless you answered ‘none of the above” to . ED (ii) development assessable against the planning scheme involving the establishment or
Q16, the application requires assessment by the expansion of a.waste water disposal system, other than a disposal system for carrying
‘Department of Natural Resources and Water . - . .
(NRW). a ~ _. out an environmentally relevant activity under the Environmental Protection Act 1994;
if an agency other than NRW is the assessment C1 (iii) none of the above : . -
manager for the application, NRW'is.a . : . Te
concurrence agency for the application. in . ‘ .
"gelation to this matter. __ . ;
, 48 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. . . .
, 19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port iand.
. Page 5 ,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154700.001.pdfRelated documentPublic source context ↗
07/1086 - Preliminary Building Works Assessable againt the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.