Council archive · source document
00154700.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. INTEGRATED PLANNING ACT 1997 "__"__-__IDAS Assessment Checklist, Version 20, 2 April 2007 -
Integration of land use and public 22. The application involves: {tick the applicable boxes) : |
ranspo , :
. For me information refer to Guide 23, schedule (_] (i) a material change of use assessable against the planning scheme for a-purpose
8A of the IPA, & schedule 2 of the IP Regulation. _ Mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above”, the schedule.
application triggers referral to QT as a~ ;
Concurrence agency. C1 (i) reconfiguring a tot—
. ee [1] (a) on land that is completely or partly within a public transport corridor, and the
oe S total number of lots increases; oe mo,
pe ["]{b) on fand that is completely or partly within a future-public transport corridor or -
an airport's public safety area;
. Cl] {c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater, -
oo J (d) for a residential purpose within the 25 ANEF contour for an airport;
’ (1 (e) for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
— SO material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) _
above, on land that— ~ oe
me (J (a) is completely or partly within a’public transport corridor or a future public
. transport corridor; . ,
, “|. [1 (b) will result in work that encroaches into an airport's operational airspace.
6 mS (iv) none of the above.
Railway safety and efficiency © 23. The application involves: (tick the applicable box/es)—-
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BAot the IPA & schedule 2 of the iP Regulation ulation Cy ° mentioned in schedule 43D of the IP Regulation and exceeding the thresholds set by that
: Unless you answered "none of the above”, the .
- Application triggers referral to QT as a . schedule. ae
concurrence agency. . C1 (ii) reconfiguring a lot— , ot
- [J {a)__ on land that is completely or partly within a future public transport corridor, ,
_ future railway land or a railway tunnel easement; ,
, [J (b) on land that is within 400m of a Citytrain passenger railway station or a future —
ae Citytrain passenger railway station, and the total site area is 5000m? or
_ greater;
7 C1] {c) on land that abuts rail corridor land, commercial corridor land or future railway
. ; land,.and the total number of lots increases; -
; (J (4) on and that abuts rail corridor land, commercial corridor land or future railway
. land’and an easement abutting the corridor or future railway land is created;
, C1 (e) ontand that is completely or partly within 100m of, and abutting an approach
, " tO, a railway level crossing, and the total number of lots increases;
. [1 (f) for a residential purpose resulting in 100 or more allotments.
@ oe C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
. above, involving extracting, excavating or filling greater than 50m’, on land that—
oe [1 (a) is completely or partly within rail corridor land or commercial corridor land, and
: . the work is not for rail transport infrastructure or other rail infrastructure;
, ao (J (b) _is completely or partly within future railway land, or a railway tunnel easement;
ee ce [1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
oo me the work is within 25m of the railway boundary. a
{1 (iv) none of the above. , -
Moonie to Brisbane pipeline - 24. The application involves the easement for the construction or operation of the Moonie to :
For more information refer to schedule ofthe IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
ee ‘ered “nane of the above’, the C1 (i) a material change of use assessable against the planning scheme and not associated
sppteation triggers vtlonel wie hoMierci - with reconfiguring a lot, and any structure or work will be located wholly or partly in the
- pipeline ficence No 1 issued under the Petroleum easement. © ;
Act 1 923, currently Santos QNT Pty Ltd, for , oO (ii) reconfiguring a lot
aaviee. CL (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
oe . work is located wholly or partly in the easement.
a _ «| > By (iv) none of the above. - -
: . . , Page 8 ; 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154700.001.pdfRelated documentPublic source context ↗
07/1086 - Preliminary Building Works Assessable againt the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.