Council archive · source document
00154700.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 . _ IDAS Assessment Checklist, Version 20, 2 April 2007
- Environmentally relevant activities | 20. Does the application involve an ERA? , ; _ ce
Most applications for an ERA in a HPA will not : . i
be accepted, Applications which may be made |. Xl NO CL] YES (ensure you have completed Part G of Formt) . ; ;
require referral to the EPA. The assessment of . -
"some ERAs is assessed by NRW, othershave |21. Is the application for an ERA 20 instream? , 4
. been devolved to DPIF, NRW or delegated / : 4
local government (see EPA website for more X NO C] YES , . ;
information on devolved ERAs) oo : : a :
woiete Oe 2124 to 020, you donot need to “199 Ig a quarry allocation notice held for the proposed ERA 20 instream? . : )
. it oS . .
if you answered YES to 020 and the NO L] Yes
‘ development is in a PA, your application must be ' : .
assessed by the administering authority?! a en om t 4
against the Wild Rivers Code and must comply 23. Does the application involve any of the following in a HPA?
i he code, unless the proposal for “b i) a level 2 ERA 11, {and is for specified works or a residential complex)
. development where an application will not be ss ae
- accepted, or is exempt from wild river ii) an ERA 19 (dredging)
a delemine fat appli vole opt ed iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
for the development by answering Q21 - Q24. ; the Wild Rivers Act 2005, and Environmental Protection Act 1994)
" Hyou answered NO to Q21, you do notneed to} iv) an ERA 22 {out of stream) : .
complete 022. If you answered YES to Q21 you X NO Oo YES :
are required to complete Q22. . . :
. If you answered NO to Q22, the application will . oo
* not be accepted. If you answered YES to Q22, | 24° |s the proposed development for ERA 20 {out of stream) and; ’
the application must be assessed by NRW ina FMA: and : : .
against the Wild Rivers Code and must comply ~ " . . .
© with the code: — not low impact; and .
If you answered NO to Q23 and the development . : : .
is proposed in the HPA the application will not be — not for a residential complex in the area, or for specified works.
. application must be assessed by the EPA or re NO U YES . :
accepted. If you answered YES to Q23, the . :
: NRW (as prescribed in schedule 8A of the IPA) ;
: against the Wild Rivers Code and must comply .
with the code. :
” ffyou answered YES to Q24 the application will . . ;
not be accepted. If you answered NO to Q24, : . : : .
your application must be assessed by NRW . . :
against the Wild Rivers Code and must comply : .
with the code. * : . :
Exempt ERAs in a designated urban : ; . : :
: area” : .
If the development is proposed in a designated . , : .
urban: area there may be no wild river . . , .
requirements. See Section 2 Q2... / , : .
Note: All applications that can be accepted must . , ,
be assessed against and must comply with the . :
Wild Rivers Code {other than exempt ERAs in a . :
designated urban area). .
Documentation - 25. Has documentation been included with the application describing how the applicant proposes to
ifyou answered NO to Q26, your application. comply with the mandatory requirements, required outcomes, and/ or performance requirements
may be subject to an information request and inth | rt/s of the Wild Ri Cod 7 . .
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code’
: : NO LJ Yes .
, 21 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW, -
, Page 14 -See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154700.001.pdfRelated documentPublic source context ↗
07/1086 - Preliminary Building Works Assessable againt the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.