                                       Form 6 - Decision Notice
                                       INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2006/2552                            Date of Decision:    21 June 2007

1.    APPLICANT DETAILS

 Name:               Raphill Pty Ltd

 Postal address:     CARE Ken Hicks & Associates Pty Ltd
                     PO Box 6380
                     MAROOCHYDORE BC QLD 4558
 Phone no:           5471 3401 07 5443         Fax no:     617 5443 7146
                     2844

2.    PROPERTY DESCRIPTION

 Street address:     228 David Low Way Peregian Beach, 226 David Low Way Peregian Beach

 Real property       Lot 1 RP 152737, and part of Lot 78 P: 9311 County of March, Parish of Weyba
 description:

3.    OWNER DETAILS

 Name:               Raphill Pty Ltd

 Postal address:     PO Box 186
                     PEREGIAN BEACH QLD 4573

4.    REFERRAL AGENCIES

 Referral Agency            Address                                                   Basis
 Environmental              GPO Box 2771 Brisbane Qld 4001                            Concurrence Agency
 Protection Agency

5.    APPLICATION TYPE

 Development                      Development Details                       Preliminary        Development
                                                                             Approval             Permit
 Material Change of Use           Visitor Accommodation Type 4 -                No                   Yes
                                  Motel

6.    DECISION DETAILS

Council on 21 June 2007 decided to :
A.    Approve the application and grant a Development Permit subject to conditions contained in the
      Environment & Planning Directorates Report dated 8 June 2007.
B.    Note the approval on The Noosa Plan in accordance with Section 3.5.27, Subsection (2a) of the
      Integrated Planning Act 1997 and give the chief executive written notice of the notation and the land to
      which the note relates in accordance with Section 3.5.27, Subsection (2b) of the Integrated Planning Act
      1997
C.    Approve the development despite the conflict with The Noosa Plan for the following reasons:-
      a.     The proposal will not compromise the Shire Wide Desired Environmental Outcomes contained in
             The Noosa Plan;
      b.     The development complies with the relevant Overall Outcomes of the Eastern Beaches Locality
             Code;
      c.     The applicant has demonstrated sufficient planning need for the development which will be of
             benefit to the general community; and
Full text of the other 14 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                               2 of 15

       d.     The scale of the development is consistent with the surrounding land uses on adjacent properties
              and located in an area that will not have a detrimental impact on the amenity of the Eastern
              Beaches Locality.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Advertising Devices Code.

8.     SUBMISSIONS

One. See attached list.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached. Conditions from the
Environmental Protection Agency, as a concurrence agency are also attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit For Building Works               All Building Works

 Development Permit for Operational Works            Landscaping, car parking & access, frontage works,
                                                     stormwater drainage, erosion & sediment control, road works
                                                     and site civil works

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                               Date:      22 June2007




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                3 of 15




                                      Noosa Council Conditions
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


      Land Use
      1.     Development undertaken in accordance with this approval must generally comply with the
             approved plans of development. The approved plans titled Site Plan Drawing, Ground Floor Plan,
             First Floor Plan, Ground Floor Plan Dimensions, First Floor Plan Dimensions, Elevations (1),
             Elevations (2) and Roof Sheet Layout all numbered Drawing No. 6164 prepared by design studio
             and dated 10 March 2007 and as may be amended by these conditions. Notwithstanding this the
             screens, finishes and other architectural treatments, as illustrated in the plans, for the David Low
             Way elevation, must be incorporated into the building to the reasonable satisfaction of the
             Manager Land Use.

      2.     The development must be undertaken and operated in a manner that causes no detrimental effect
             upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting
             nuisance or other emissions.

      3.     The open space and setback areas are to be landscaped in accordance with Council’s Policy on
             Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
             Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises
             being occupied and maintained at all times thereafter. These landscape plans shall demonstrate
             the following:-

      3.1.   The provision of screening vegetation of local origin with a minimum depth of 2 metres to all
             property boundaries excluding the rear property boundary and the front setback area;

      3.2.   The provision of a minimum of 0.5 metres of dense screening vegetation of local origin between
             the pool and the rear property boundary;

      3.3.   Three (3) x 100 Litre species of local origin shall be provided in the uncovered hardstand areas
             adjacent to ‘carpark 14 and 15’ to soften the built form of the development;

      3.4.   The provision of dense screening vegetation of local origin to the 6 metre frontage setback area
             excluding the area designated ‘carpark 13’;

             3.4.1.     A minimum of 2 metres of dense screening vegetation of local origin shall be provided
                        between ‘carpark 13’ and the front property boundary; and

      3.5.   The two (2) Pandanus tectorius located along the northern side boundary shall be retained and
             maintained accordingly.

      4.     Existing trees on the site and within road reserves are to be retained, except where required to be
             removed due to building operations or the conduct of the approved use. These landscape plans
             required to be submitted are to denote areas of existing vegetation or existing trees proposed or
             required to be retained.

      5.     Cleared vegetation is to be suitably processed by one of the following methods and removed from
             the site:-

      5.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
             heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
             between edges of heaps.

      5.2.   Disposal for firewood.

      5.3.   Disposal for landscaping purposes.

      5.4.   Transport to alternative site for breaking down materials provided that all necessary permits have
             been obtained to allow the alternate site to be used for this purpose.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                4 of 15


      5.5.   The disposal method for clearing works is to be submitted in conjunction with an application for a
             Development Permit for Operational Work. The Applicant is advised that other methods may be
             considered provided full details of the method are submitted.

      5.6.   The Applicant is advised that burning off is an unacceptable method of disposal.

      6.     Any advertising sign or device is to comply with Council's policies on advertising.

      7.     The developer shall provide noise attenuation fencing to the rear property boundary adjacent to
             pool and the northern property boundary to preserve the acoustic amenity for adjoining properties.

      8.     All fencing shall be setback at least 1 metre from the front property boundary, with at least half of
             the fencing setback 2 metres. The area of land between the fence and the front property boundary
             shall be densely landscaped to screen any fencing from the street.

      9.     Site cover for the development shall not exceed 40%.
                                                                                 2
      10.    The Gross Floor Area of the development shall not exceed 528 m .

      11.    The development shall be no greater than two (2) storeys and shall not exceed a maximum
             building height of 7.5 metres as measured from the natural ground line.

      12.    The ‘inhouse dining area’ shall only be available to guests residing at the visitor accommodation.

      13.    The development shall consist of no greater than twelve (12) visitor accommodation units and no
             more than one (1) manager’s dwelling unit.

      14.    The population density of the site shall not exceed 18.2 persons.

      15.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus
             remaining as open structures.

      16.    The external walkway areas shall contain openings as indicated on the approved plans and
             therefore shall not be enclosed.

      17.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply with
             the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient
             Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage
             Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All
             tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and
             washing machines are excluded from this requirement.

      18.    The subject site is located within an area previously contaminated by Unexploded Ordnance
             (UXO). Whilst the site has been given clearance by the Environmental Protection Agency, care
             should be exercised while excavation works for the proposed development are undertaken. For
             further information contact the Environmental Protection Agency. Should a device be found during
             building or excavation works, all work should cease and the police contacted immediately.

      19.    The requirements of this development approval are to be effected, prior to the use of the premises.
             Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to
             effect compliance with conditions.

      20.    Security in the form of a cash bond or trading bank guarantee to the sum of $25000 must be
             submitted, to secure performance of all conditions of this approval, prior to the issue of a
             Development Permit for Operational works. The cash bond or trading bank guarantee will be
             returned on performance of the conditions of approval less any costs incurred by Council in
             respect of enforcing performance of this permit.

      21.    The Development Permit for a material change of use of premises lapses if the use has not
             happened by 21 June 2011, unless an application to extend the currency is approved by Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                5 of 15


      Land Development
      Lot Amalgamation
      22.    Any necessary boundary realignments or amalgamations of separate, adjoining lots that form part
             of this application shall be completed in accordance with Section 3.7.3 of the Integrated Planning
             Act and the Plan of Survey submitted for registration at the Land Titles Office. Proof of title being
             issued for the amalgamated lot shall be submitted to Council prior to the issue of the Development
             Permit for Operational Works.
      Vehicle Access
      23.    A vehicular access driveway to serve the development shall be constructed from the David Low
             Way frontage of the site with a maximum width of 5.5m. This access shall be a left in - left out
             facility only.

      24.    The driveway shall be designed and constructed to Council’s design standards and to grades that
             prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along
             the footpath without any step or level difference. Should any driveways be constructed to grades
             that do not comply with AS2890.1-2004, Council will require that the driveway be removed and
             reconstructed to levels that do comply.
             Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to
             have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or
             fall.
      25.    To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
             driveway and any associated fencing or vegetation near the driveway shall comply with the
             minimum sight line requirements as defined in AS2890.1, section 3.2.4. The applicant shall
             demonstrate compliance by illustrating these sight lines on the plans submitted for both
             Operational Works approval and Building Works approval.

      26.    All vehicles shall enter and leave the site in a forward direction.
      Car Parking
      Off Street
      27.    Carparking shall be provided within the site as shown on drawing number 6164 Sheet 5 dated
             10/03/07 by Design Studio, except as modified herein.

      28.    A minimum of 15 carparking spaces shall be provided on site, including 1 clearly defined disabled
             carpark space.

      29.    The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user
             class 2 with allowance for vehicles to enter and leave the site in a forward gear and with a
             minimum head clearance (headroom) at any point of 2.2m.

      30.    The columns of the building shall be designed to comply with Figure 5.2 of AS 2890.1-2004.

      31.    All carparking shall be kept, maintained and line-marked in a condition fit for use.
      Vegetation Protection & Preservation
      32.    Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be
             designed as a pervious pavement (such as grass paving cells or similar), as this will allow water
             that falls on this surface to penetrate to the trees root system. The pavement shall be constructed
             so as not to damage the tree or their root system and in this regard temporary fencing shall be
             provided around the trees during construction to help protect them.
             Plans shall be submitted to the Council for approval that clearly show the type and extent of the
             pervious pavement and the temporary fencing prior to obtaining a Development Permit for
             Operational Works.

      Frontage Works
      33.    Footpath improvements such as topsoiling, grassing, and tree planting are required to the David
             Low Way frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping
             Plants & Guidelines. Grass shall be couch, free of weeds.

      34.    A new 2.0m wide concrete path shall be constructed along the David Low Way frontage of the site
             in accordance with Council’s design standards and to an alignment that protects any significant
             vegetation or any underground services.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  6 of 15


      35.    All paths, pram ramps, driveways and parking areas shall be designed and constructed to ensure
             pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in
             accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for
             Access & Mobility.

      36.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
             footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard
             specifications prior to commencement of the use permitted by this permit.
      Roof Water & Stormwater Drainage
      37.    Roof runoff from the new building shall be directed to a rainwater storage system or tank (minimum
             storage 9000 litres) that is installed to ensure water from the tank is used for external uses (such
             as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
             outdoor cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks
             are to be designed and installed in accordance with the Queensland Development Code (QDC),
             Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
             building approval. The location and capacity of the tanks shall be clearly shown on the plans
             submitted for Operational Works approval and any overflow shall be directed to the road frontage.

      38.    All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
             collected and discharged so there is no net increase in stormwater runoff from the site.
             Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
      38.1. existing drainage structures in David Low Way. Plans of the drainage design shall be prepared by
            a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
            Development Permit for Operational Works, and/or
      38.2. kerb & channel street drainage system in David Low Way. Plans of the drainage design shall be
            prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
            Development Permit for Operational Works.
                      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel
                      street drainage system at any one location is 25 litres/second.
      39.    As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed within
             the site to collect and discharge stormwater runoff from all adjoining properties to prevent
             additional ponding/flooding on these properties.

      40.    To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater
             run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of
             rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to being permitted to
             discharge into Council’s drainage system.
             All other clean stormwater, such as roof water, can be collected on site and discharged through a
             single underground drain line directly into the existing drainage system, bypassing the grease/oil
             arrestor.
             To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors,
             which shall be submitted to the Council prior to obtaining a Development Permit for Operational
             Works.
             The approved maintenance plan shall be incorporated in the management of the development and
             a copy of this shall be provided for Council’s records prior to commencement of the approved Use.
             A Development Permit for Building Works shall not be granted until a Development Permit for
             Operational Works has been issued in regard to the drainage scheme.
      41.    All site stormwater drainage shall be by means of a gravity system.
      Sewer Mains
      42.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed
             in accordance with Council’s standards and requirements at no cost to Council.

      43.    The existing sewer main that traverses the site and the ‘zone of influence’ (taken as the area within
             a 45-degree angle measured from the invert of the sewer main to the finished surface level) shall
             be accurately located and determined by a licensed Surveyor and shown on all plans submitted for
             Operational Works approval.
             To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk
             of damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
             exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or
             within 1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant
             shall amend Operational Works plans including Building plans to ensure compliance.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    7 of 15


      Town Water Supply
      44.    The site shall be connected to Council’s existing town water supply and be constructed in
             accordance with Council’s standards and requirements at no cost to Council.

      45.    Each individual water connection to the water reticulation system shall extend to the property
             boundary and be metered. All fees for the supply of water meters shall be paid to the Council.

      46.    All water meters must be located outside the property boundary and in an easily assessable
             location to facilitate unhindered reading by Council and/or Council’s contracted water meter
             readers, and not behind fences or locked gates. In this regard approval of the water meter
             configuration and location must be obtained from Council’s Water & Sewerage Capital Works
             Manager prior to lodgement and approval of hydraulic drawings.
      Service Easements
      47.    A registered easement shall be created over the zone of influence of all sewers within the subject
             site and over those parts of the subject site that are impacted upon by sewers on any adjoining
             sites. The easements shall generally be parallel to and centred over the sewer main and be
             equivalent in width to twice the depth to invert level of the sewer at the deepest point within the
             allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this
             regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary
             width of the easement, which shall be shown on any plans submitted for Operational Works /
             Building Works approval. To this extent the surveyor shall certify that the sewer and the zone of
             influence is wholly contained within the easement to be created.
             In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking
             in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office
             and any additional Titles Office forms or requisitions requiring the consent of Council will be
             attended to promptly.
             A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
             commencing.
             Any changes required by Council’s Solicitor must be corrected immediately.
      48.    No building or other structure shall be constructed or encroach over an easement.
      Earthworks
      49.    Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
             Engineering Design Standards Manual and so as not to cause the additional ponding of water on
             any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site
             surveys indicating natural surface levels and contours of the adjoining properties must be provided
             with the application for a Development Permit for Operational Works for Filling and Drainage.
             This may require the design and construction of drainage pipes and/or an overland flow-path within
             the development site that caters for drainage from the adjoining sites for a design storm with an
             Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water
             encompassing the drainage pipes or overland flow-path will also be required. In this regard a
             Development Permit for Operational Works shall be obtained.
             Should evidence be provided to Council indicating that no additional ponding of stormwater will
             occur on the adjoining properties the requirement for the drainage pipes, overland flow-path and
             easement shall not apply.
      50.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
             structures that border the development site. Fences that are affected shall be replaced prior to the
             Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
             shall be clearly shown on the plans submitted for Operational Works approval.
      Acid Sulfate Soils
                                                                                                         3
      51.    As the site is located below the 5m AHD, any excavation works consisting of 100m or greater
                                                          3
             and/or any filling works consisting of 500m or greater and with an average depth of 0.5m or
             greater will need to be carried out in accordance with State Planning Policy 2/02 Planning and
             Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
             supporting documentation prepared by a suitably qualified specialist shall be submitted to Council
             for approval prior to obtaining a Development Permit for Operational Works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  8 of 15


      Site Stability
      52.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
             determine the soil classification, establish whether any measures are required to protect the
             stability of adjoining buildings and/or structures and/or land, and make recommendations on the
             type of foundation system(s) best suited for the proposed development. The recommendations of
             this report shall be incorporated into the design and construction of the proposed development.
      Erosion and Sediment Control
      53.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
             Site control measures such as silt fencing, controlled gravel access to the site and controlled
             disposal of waste, will be necessary.
             In this regard plans detailing the methods of controlling erosion and sediment are required to be
             submitted to the Council for approval prior to obtaining a Development Permit for Operational
             Works.

      Contributions Towards Council Infrastructure
      54.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
             upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of
             the contribution amounts under the current Council policies and requirements is outlined in the
             table below:

                Contribution Required For:                                                            Amount:

                PSP12 – Public Open Space Contributions (Park)                                        $16,444
                PSP16 – Sewerage Headworks Contributions                                              $56,832
                PSP17 – Water Supply Headworks Contributions                                          $37,400
                PSP20 – Pathway Trunk Network Contributions                                           $3,696

                TOTAL Contribution Amount =                                                           $124,876

                Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
                from March 2007 until the date of payment.
             All contributions must be paid prior to the issue of a Development Permit for Operational Works.
             Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
             contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
             Processing of bonds for security where specific Council approval has been given for the bonding of
             contributions will incur an administration fee in accordance with Council’s Land Development
             Commercial & Regulatory Fees at the time of lodgement.
             In the event that the Development Permit for Material Change of Use of Premises lapses or is
             cancelled, the trading bank guarantee will be returned.

      General
      55.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
             specifications for all engineering works that will become Council infrastructure, which shall be
             submitted in conjunction with an application for a Development Permit for Operational Works. In
             this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
             submitted in conjunction with any application for Operational Works.

      56.    To facilitate production of As Constructed drawings it is suggested that all design drawings are
             submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
             ADAC are available at www.adac.com.au).

      57.    Any damage caused to any public utility during the course of construction shall be repaired to
             Council’s standards and at no cost to Council.

      58.    Any alteration of any public utility or other facilities necessitated by the development of the land or
             associated construction works external to the site shall be at no cost to Council.

      59.    The transportation of all materials to and from the site shall be undertaken in a manner such that
             no particle matter escapes onto a public road. All vehicles carrying materials either to or from the
             site shall be covered to prevent materials including dust being windblown from the vehicle.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                                9 of 15


      60.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for
             design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of
             all services and structures. All of which shall be submitted to Council for checking and for
             Council’s records.
             The data must fully detail levels for all engineering works including but not limited to drainage
             structures, finished ground levels and pavement surface levels. The data shall be submitted in the
             Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
             available at www.adac.com.au).
      61.    Approval of works shall not be granted until all As Constructed information has been supplied and
             accepted by Council.
      Environmental Health
      62.    The developer must provide waste storage and disposal facilities in accordance with Planning
             Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
             Premises”, including an external imperviously paved area correctly sized for all refuse and
             recycling containers and suitably screened from public places and neighbouring properties. A bin
             wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
             trap. The drain outlet is to be designed to prevent storm water entry to the sewerage system and
             this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or
             alternatively the waste area can be roofed, or any other design approved by Council.

      63.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
             pumps etc) shall comply with the following requirements:
             The equipment shall be installed and located in a manner that prevents excessive noise in
             accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
             spot fines) may apply for offences.
             A person must not use equipment on any day if it makes or causes noise to be made –
             From 10pm to 7am: More than the lower of either –
                  40 dB(A)

                  3 dB(A) above the background noise level

                  No audible noise for pool pumps apply during these hours.
                    From 7am to 7pm: More than the lower of either –
                  50 dB(A)

                  5 dB(A) above the background noise level
             From 7pm to 10pm: More than 3 dB(A) above the background noise level.
      64.    Submission of written certification from a suitably qualified person confirming that the noise levels
             from all mechanical equipment comply with the cause above when measured at either the
             residential boundary or outside the most exposed part of an affected building, whichever is the
             closest to the equipment.
             The assessment and certification is required immediately after installation of the equipment and
             prior to any occupation of the building, and in a format approved by Council. This assessment
             must take into account noise from any other fixed equipment on the property e.g. swimming pool
             pump, heating/cooling equipment, etc that may increase the overall noise level emitted.

      Advice: It is highly recommended that the person you engage to certify the installation is involved at the
      plan development stage so they can recommend where this equipment is best located. They can also
      advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more
      costly to try and deal with noise problems after everything is built.

      Trade Waste
      65.    The hydraulic drawings are to show all the Trade Waste requirements in accordance with the
             Noosa Trade Waste Policy. NB: A Trade Waste Permit must cover all types of Trade Waste
             discharged.

      66.    The Trade Waste application fee of ($105.00) is required at the time of the application.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                              10 of 15


      67.    Trade Waste requirements are to be in place, inspected and approved prior to the commencement
             of trading or operation. The appropriate Trade Waste Permits will be issued following approval at
             final inspection.

      68.    A place of food preparation and/or cooking is to have the liquid waste connected to a Trade Waste
             line, that discharges to an approved grease arrestor of a size determined by Council’s Trade
             Waste Policy.

      69.    The floor of the bin wash area is to fall to a bucket trap with the waste pre-treated by a grease
             arrestor prior to discharge to the sewer and also an appropriate backflow prevention devise is to be
             installed. Rainwater is to be excluded from the bin wash area and if in excess of 700mm x700mm
             (max 0.5m²) it is to be roofed.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                                                      11 of 15



                                       Local Laws, Policies & State
                                       Regulation Requirements
                                       INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The applicant is advised that development contributions and infrastructure charges applicable to this
        development approval have been based on the following Uses Class/ Uses and applicable quantities:-

                                Existing Development                                        Approved Development
                  Existing Use Class /                                        Approved Use Class /
                                                  Existing Quantity                                           Approved Quantity
                          Use                                                        Use
                                                                             Visitor Accommodation –
                Detached House                0                                                             12 x 1 Bedroom Units
                                                                             Type 4 Conventional
                                                                             Multiple Housing - Type 4
                Detached House                0                                                             1 x 1 Bedroom Units
                                                                             – Conventional

2.      The applicant is informed that approval of this development application will trigger an Infrastructure
        Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
        amount of $10,504 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
        March 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
        Chapter 5 of the Integrated Planning Act 1997.

        3.     The applicant is informed that payment via credit card transaction will not be an acceptable method
               of payment for development contributions conditioned in this permit or for infrastructure charge
               notices issued separately.

        4.     The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
               boundaries of the development site shall be obtained from Council’s Plumbing Services Section
               prior to obtaining a Development Permit for Building Works.

        5.     This proposal has not been assessed in relation to the spread of fire between properties /
               buildings. It is the building certifiers responsibility to assess the requirements for fire services, fire
               separation and appropriate methods of construction as part of the building works approval process.
               Referral to the Queensland Fire and Rescue Service (QFRS) may be required as part of the
               Building Approval process.

        6.     Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
               amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the
               dwelling to the pool enclosure is not permitted.

        7.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the
               cost of operational works exceeds $80,000, then a portable long service leave levy is required to
               be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
               form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that
               confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the
               cost of the operational works must be submitted to Council with the lodgement of any application
               for operational works over the site.

        8.     Where any food premises is included in a development, the following is required:

        8.1.   Plans and application is to be made to Council’s Environmental Health Section for approval prior to
               any building approval, fitting out or use of the premises.

        8.2.   A statement indicating the purpose of the food premises, type of food sold, proposed menu and
               maximum number of patrons at any time, is to accompany the application for plan approval.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 12

NOOSA COUNCIL IDAS Development Application Decision Notice                                              12 of 15


      8.3.   Construction and use of the food premises should comply with Council’s Food Premises Policy and
             the Food Safety Standards. (Both available from Council)

      8.4.   Toilets for customers and staff to be provided in accordance with Building Code of Australia.
             Obtain advice from a building certifier on numbers and standards, including disable access.

      8.5.   Plans and approval is required for any mechanical exhaust ventilation system, which should
             comply with AS1668. A certificate from the installer certifying the system complies with the
             Standard must be obtained and lodged with Council prior to commencement of trade.

      8.6.   Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must obtain a Food
             License from Council, prior to use of those premises.

      9.     The development should be undertaken and operated in a manner that causes no detrimental
             effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
             lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
             emissions in accordance with the nuisance provisions of the Environmental Protection Regulation
             1998 or Council’s Local Law No. 12 – Control of Nuisances.

      10.    Noise from building works associated with commercial and or industrial development should
             comply with the following –

      10.1. Limited to between 7:00am to 6:30pm Monday to Saturday.

      10.2. All reasonable measures are taken to minimise noise emissions.

      10.3. Not permitted on Sunday or public holidays.

      11.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
             cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it
             could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse.
             On the spot fines apply for such offences.

      12.    The plans for the proposed building work have not been assessed for compliance with the
             requirements of the Building Code of Australia as they relate to people with disabilities. Your
             attention is drawn to the matter that either or both the Disability Discrimination Act
             1992(commonwealth) and the Anti-Discrimination Act 1991 (Queensland) may impact on the
             proposed building work.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 13

NOOSA COUNCIL IDAS Development Application Decision Notice                                       13 of 15



                                    List of Submitters
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION




Roberto & Kim Robazza
97 Elliot Street
Hawthorne Qld 4171




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 14

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        14 of 15



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Page 15

NOOSA COUNCIL IDAS Development Application Decision Notice                                       15 of 15

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@080874c2\@[email protected]

Used in these records

About this file

File size
66 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00002552.001 [As Published].pdf · 66 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.