Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

 February 2014
September   2016
ENGINEERING REPORT


      Tincidunt ut
      adipiscing elit,

      quis nostrud
      praeseptatum.




                          Proposed Extension to
                           Tewantin Noosa RSL
                              Development
                                 1 Memorial Avenue
                                 Tewantin, QLD 4565


                         Engineering Report & Stormwater
                                Management Plan

                                   Project No.: 16144
                                       Revision: A

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 78 (of 94)

Page 2

                                                                                                                                                                            ENG
                                                                                Engineering Report & Stormwater Management Plan
                                                                      Date:                 22/09/2016              Document No.:                16144-ENG-01.Docx

                                                                       By:                       MRS                 Revision No.:                          A




            Contents
1.                  Introduction ...................................................................................................................................... 3
     a.             Existing Topography ........................................................................................................................ 4
     b.             Proposed Land Use ......................................................................................................................... 4
2.                  Erosion and Sediment Control ......................................................................................................... 4
3.                  Earthworks ....................................................................................................................................... 6
4.                  Roadworks ....................................................................................................................................... 6
5.                  Stormwater Drainage ....................................................................................................................... 6
     a.             Stormwater Quality Management .................................................................................................... 7
     b.             Water Quality Objectives ................................................................................................................. 7
     c.             MUSIC Model .................................................................................................................................. 8
     d.             MUSIC Model Results.................................................................................................................... 11
     e.             Stormwater Quantity Management ................................................................................................ 11
     f.             Maintenance .................................................................................................................................. 11
6.                  Flood Zoning .................................................................................................................................. 13
7.                  Sewer Reticulation ......................................................................................................................... 14
8.                  Water Reticulation ......................................................................................................................... 15
9.                  Electrical and Telecommunication ................................................................................................. 15
10.                 Development Codes ...................................................................................................................... 15
11.                 Conclusions ................................................................................................................................... 15
Appendix A - Survey Plan ..................................................................................................................................... 16
Appendix B - Proposed Design Drawings ............................................................................................................. 17
Appendix C - Noosa Erosion and Sediment Control Assessment Form ............................................................... 18
Appendix D - IECA (Australasia) Standard Drawings ........................................................................................... 19
Appendix E - State Planning Policy April 2016 – Water Quality development assessment code.......................... 20
Appendix F - Stormwater360 Operations and Maintenance Manuals ................................................................... 21
Appendix G – Development Codes ....................................................................................................................... 22




      A PO Box 26, Carina Q 4152                                                                                                                       1|P a g e
      E [email protected]
      W www.vtce.com.au

Page 3

                                                                                                                            ENG
                                                         Engineering Report & Stormwater Management Plan
                                                 Date:           22/09/2016       Document No.:         16144-ENG-01.Docx

                                                  By:                MRS            Revision No.:               A




Document Status:
      REVISION                   PREPARED BY                  REVIEWED BY                           DATE
         Draft                       M. Sutton                  A. van Tonder                 22/09/16
                                                                A. van Tonder
            A                        M. Sutton
                                                                (RPEQ 16132)                  22/09/16




This document is produced by vT Consulting Engineers for the benefit and use by the client in accordance with the
terms of the agreement. vT Consulting Engineers does not and shall not assume any responsibility or liability
whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.



A PO Box 26, Carina Q 4152                                                                                  2|P a g e
E [email protected]
W www.vtce.com.au

Page 4

                                                                                                                  ENG
                                                      Engineering Report & Stormwater Management Plan
                                              Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                               By:              MRS          Revision No.:              A


 1. Introduction
vT Consulting Engineers has been commissioned by Rubicon Design and Construct Pty Ltd to
prepare this engineering services report and stormwater management plan. The development
is located at 1 Memorial Avenue, Tewantin QLD 4565 (Lot 10 on SP236319). The site locality is
illustrated in Figure1.1. This report is being submitted to support the Development Approval
for the proposed Tewantin Noosa RSL Entertainment and Dining Business Extension for Noosa
Regional Council’s (NRC) consideration.

The following report will detail civil engineering requirements for the development.

    Street Address                         1 Memorial Avenue, Tewantin QLD 4565
    RP Description                         Lot 10 on SP236319
    Total Site Area                        4426m2
    Proposed Use                           Entertainment and Dining Business
    Local Authority                        Noosa Regional Council




                                                      SITE




      Figure 1.1:            Site Layout Plan (Google Maps)




A PO Box 26, Carina Q 4152                                                                        3|P a g e
E [email protected]
W www.vtce.com.au

Page 5

                                                                                                             ENG
                                                 Engineering Report & Stormwater Management Plan
                                         Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                          By:              MRS          Revision No.:              A


                     a. Existing Topography
The site is currently developed, accommodating the existing Tewantin Noosa RSL Club, a low-
set timber and brick house and bitumen paving and car-parking, covering a total of
approximately 96% of the site. The balance of the site (160m2) is landscaped with a series of
garden beds containing shrubs and several medium sized trees.

The site grades from a level of approximately RL8.2 in the north-west corner on Memorial
Avenue Street down to approximately RL5.0 in the south-west corner at the corner of
Memorial Avenue and Doonella Street. A detailed survey has been conducted on this site by
Statewide Survey Group Pty Ltd, dated 25 March 2015. Refer to Appendix A for current survey
plan. The site is generally bounded by commercial buildings with several high-set individual
dwellings to the south in Doonella Street.



                     b. Proposed Land Use
The proposed development involves staged extensions to the existing building, demolition of
the timber and brick building at the rear in Pelican Street as well as associated car parking.

Refer attached Appendix B for proposed layout plans and details.


 2. Erosion and Sediment Control
Using the Noosa Sediment and Erosion Control Assessment form in Appendix C, it is
considered that the erosion risk proposed by the site is low as the proposed development
involves an area of land which will only be exposed for a minimal amount of time during the
earthworks required for service trenching and constructing the new building platforms and
car-parking. The trenches will only be exposed while the services are being installed and then
will be covered by the proposed building works. To further mitigate the impact of the
development construction an Erosion and Sediment Control Plan will be prepared during
detailed design stage. Appendix D shows the International Erosion Control Association
Australasia (AustIECA) standard drawings and control notes applicable to this development.

The construction contractor is responsible for ensuring that soil and debris does not leave the
site as well as the confines of the construction zone and is not deposited on external roads or
existing in-use areas due to the proposed earthworks and construction activity.

     Acid Sulphate Soils
The local council is listed in Table 4: Acid sulphate soils-affected local government areas in
State Planning Policy April 2016 (SPP 2016) and therefore this development application
requires compliance with the SPP 2016 acid sulphate soils development objectives.

Acid sulphate soil testing is typically conducted in areas with reduced levels of less than 5.0m
Australian Height Datum (AHD) as stated in SPP 2016. This policy also states that

A PO Box 26, Carina Q 4152                                                                   4|P a g e
E [email protected]
W www.vtce.com.au

Page 6

                                                                                                            ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                         By:              MRS          Revision No.:              A


developments below 20.0m AHD that involve a Material Change of Use or operational works
are required to be assessed against the SPP 2016 acid sulphate soils development objectives.
As the lowest point on this site is an approximate level of RL5.0m, we believe there is a
possibility of acid sulphate soil being present and therefore testing may be necessary.

The requirements for Acid Sulphate Testing will be confirmed by a geotechnical engineer prior
to the detailed design stage of this proposed development.

    Land Disturbing Activities
Important causes/issues of erosion for this site would consist of the following:
    Precipitation and consequent run-off
    Stripping and removal of topsoil
    Removal of fill
    Other earthwork operations
    Heavy vehicle use on site
    Wind erosion

The proposed development is a short construction period which will be programmed so that
the shortest period of time elapses between ground cover removal and restoration.

      Erosion and Sediment Control Measures
Sediment control filter fabric will be securely placed around the perimeter of the construction
site. This will ensure sediment is trapped before being released into the catchment. Refer
Appendix D.

An ESC measure will be provided at any vehicular access points to the site. Construction and
maintenance details are given in Appendix D. A temporary construction entrance will be
provided from Pelican Street for access during construction.

A filter sock sediment trap will be utilized on all downstream stormwater inlets. Refer
Appendix D for construction and maintenance details.

No clearing will be undertaken unless preceded or accompanied by installation of adequate
run-off and sediment control measures, as described above.

Following practical completion of the project a minimum of 70% coverage of all soil with
ground cover (i.e. topsoiling and seeding) will be provided within 30 calendar days.

During the construction phase spraying of water will be used with care to act as a dust
suppression method.

      Monitoring and Maintenance Programs
Water discharge from the site will adhere to a total suspended solid content of less than 50
milligrams per litre and a pH range of between 6.5 and 8.5 at all times. If the pH of the

A PO Box 26, Carina Q 4152                                                                  5|P a g e
E [email protected]
W www.vtce.com.au

Page 7

                                                                                                             ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          22/09/2016     Document No.:      16144-ENG-01.Docx

                                         By:              MRS          Revision No.:              A


flocculated water is not achieved than pH adjustments will be required. This could possibly be
done by a dosing of lime.

Site personnel will inspect all erosion and control measures at least at the following
frequencies:
     Daily during construction works,
     Weekly when construction works are not happening,
     Within 24 hours of expected rain, and
     Within 18 hours of an impacting rainfall event.

All erosion and sediment control measures that have an order of efficiency below 75% will be
corrected by the end of that working day.

     Staging of ESC Measures
The design of the proposed erosion and sediment control treatment devices is to be
confirmed during detailed design and following confirmation of the construction sequences
for the development. The proposed treatment measures will be designed in accordance with
the International Erosion Control Association Australasia standards and standard drawings to
ensure that the proposed works minimise any impact on the downstream water quality.


 3. Earthworks
For the purpose of this proposed development earthworks will be conducted for constructing
the new proposed building platforms and carparks. Excavation on site will be required for the
building footings and service trenches. Any excess cut will need to be removed from the site
by the contractor.

A geotechnical investigation will be undertaken and a report will be prepared for the site prior
to starting the detailed design stage of the development to ensure that the earthworks and
erosion control measures are designed to suit the site conditions.


 4. Roadworks
The proposed development fronts onto Memorial Avenue, Doonella Street and Pelican Street.
Road works will be limited to line-marking and crossovers.


 5. Stormwater Drainage
The proposed development site will utilise existing stormwater infrastructure to service the
existing development which remains unchanged (Please refer to Drawing 16144-P001 in
Appendix B for details) as well as new infrastructure for the new construction, including a
proprietary stormwater quality improvement device as described in the following section.




A PO Box 26, Carina Q 4152                                                                   6|P a g e
E [email protected]
W www.vtce.com.au

Page 8

                                                                                                                 ENG
                                                  Engineering Report & Stormwater Management Plan
                                          Date:          22/09/2016     Document No.:        16144-ENG-01.Docx

                                           By:              MRS          Revision No.:              A


                     a. Stormwater Quality Management

     State Planning Policy
The State Planning Policy April 2016 applies for stormwater quality management and
management of new or expanded non-tidal artificial waterways applies to development that is
outlined below in Table 5.1.



          SPP2016 PART E: INTERIM DEVELOPMENT ASSESSMENT
                                                                                         YES / NO
           REQUIREMENTS. STATE INTEREST – WATER QUALITY
     Material change of use for urban purposes that involves a land area
     greater than 2500m2 that:
        will result in an impervious area greater than 25% of the net
        developable area                                                                   YES
          Will result in 6 or more dwellings                                               NO
     Reconfiguring a lot for urban purposes that involves a land area
     greater than 2500m2 and will result in six or more lots:                              NO
     Operational works for urban purposes that involve disturbing more
     than 2500m2 of land                                                                   NO
      Table 5.1:      Water Quality Objectives

As the proposed development triggers one or more applicable items in the above Table 5.1,
the State Planning Policy April 2016 is applicable and compliance will be expected by the local
government authority.

To achieve the above State Planning Policy outcomes the development is to:
     avoid or minimise development impacts arising from altered stormwater quality and
        flow by providing for development and construction activities in accordance with
        acceptable design objectives
     avoid or minimise development impacts of waste water (other than contaminated
        stormwater) on water quality objectives
     avoid or minimise development impacts arising from the creation or expansion of
        non-tidal artificial waterways such as urban lakes

The proposed development will comply with the State Planning Policy April 2016 – Water
Quality policies.

A copy of the completed State Planning Policy April 2016 —Water Quality development
assessment code is attached in Appendix E.


                     b. Water Quality Objectives
Water quality parameters and the proposed limits applicable to this site have been selected in
accordance with SPP2016 Appendix 3, Table B and MUSIC Modelling Guidelines for South East
Queensland Version (2010).

A PO Box 26, Carina Q 4152                                                                       7|P a g e
E [email protected]
W www.vtce.com.au

Page 9

                                                                                                                  ENG
                                                      Engineering Report & Stormwater Management Plan
                                              Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                               By:              MRS          Revision No.:              A




It is proposed that best practice stormwater treatment be used and therefore it is required to
demonstrate the achievement of the following load reduction targets:


                  POLLUTANT TYPES                         WATER QUALITY OBJECTIVE (WQO)
             Total Suspended Solids (TSS)                  80% reduction of average annual load
                 Total Phosphorus (TP)                     60% reduction of average annual load
                    Total Nitrogen(TN)                     45% reduction of average annual load
                 Litter/gross pollutants                   90% reduction of average annual load
      Table 5.2:             Water Quality Objectives

                     c. MUSIC Model
The software program Model for Urban Stormwater Improvement Conceptualisation (MUSIC)
Version 6, was used was used to assess pollutant generation and the performance of the
stormwater treatment measures for the proposed development. Selection and testing of
stormwater management options was undertaken in accordance with MUSIC Modelling
Guidelines prepared by Water by Design (2010).

The MUSIC model was set up using the site catchment area which was further split to include
roof areas, road areas and ground areas in accordance with the MUSIC Modelling Guidelines
prepared by Water by Design (2010). The figure below shows a schematic of these areas.




      Figure 5.2:            Music Model Roof, Road and Ground Areas Adapted from wbp
                             Architects Drawing 1620/DA/0.01/Rev 2

A PO Box 26, Carina Q 4152                                                                        8|P a g e
E [email protected]
W www.vtce.com.au

Page 10

                                                                                                                   ENG
                                                     Engineering Report & Stormwater Management Plan
                                             Date:          22/09/2016       Document No.:     16144-ENG-01.Docx

                                              By:              MRS            Revision No.:            A


The stormwater quality treatment train, supplied by Stormwater 360, used in the MUSIC
model is shown in the figure below.




      Figure 5.3:            Music Model Treatment Train – Stormwater360


     Music Model Parameters
The split catchment parameters used as the MUSIC Pollutant Export Parameters are shown
below in Table 5.3, and where derived from Table 3.8 of the MUSIC Modelling Guidelines
prepared by Water by Design (2010).

    FLOW            SURFACE
                                    TSS log10 VALUES       TSS log10 VALUES          TSS log10 VALUES
    TYPE              TYPE
                    Commercial        Mean    Std. Dev.      Mean        Std. Dev.     Mean     Std. Dev.

                       Roof           N/A       N/A          N/A           N/A          N/A       N/A
  Baseflow
                       Road           0.78      0.39         -0.60         0.50         0.32       0.3
 Parameters
                     Ground           0.78      0.39         -0.60         0.50         0.32       0.3
                       Roof           1.30      0.38         -0.89         0.34         0.37      0.34
 Stormflow
                       Road           2.43      0.38         -0.30         0.34         0.37      0.34
 Parameters
                     Ground           2.16      0.38         -0.39         0.34         0.37      0.34
      Table 5.3:             Source Node MUSIC Pollutant Export Parameters




A PO Box 26, Carina Q 4152                                                                         9|P a g e
E [email protected]
W www.vtce.com.au

Page 11

                                                                                                                       ENG
                                                       Engineering Report & Stormwater Management Plan
                                               Date:          22/09/2016     Document No.:         16144-ENG-01.Docx

                                                By:              MRS          Revision No.:               A


The parameters used as the MUSIC Rainfall-Runoff Parameters are shown below in Table 5.4, and
were derived from Table 3.7 of the MUSIC Modelling Guidelines prepared by Water by Design
(2010).

                                    PARAMETER                                          COMMERCIAL
                               Rainfall Threshold (mm)                                         1
                              Soil Storage Capacity (mm)                                      18
                              Initial Storage (% Capacity)                                    10
                                 Field Capacity (mm)                                          80
                       Infiltration Capacity Coefficient - a                                  243
                        Infiltration Capacity Exponent – b                                    0.6
                                  Initial Depth (mm)                                          50
                               Daily Recharge Rate (%)                                         0
                               Daily Baseflow Rate (%)                                        31
                             Daily Deep Seepage Rate (%)                                       0
      Table 5.4:             MUSIC Rainfall-Runoff Parameters

Treatment parameters for the in-ground proprietary systems have been provided by the
manufacturer. Refer to Appendix F for the Stormwater360 Operations and Maintenance
Manual.

    Alternative In-Ground Proprietary System
The proposed in-ground proprietary system documented within this report is the
Stormwater360 Stormfilter cartridge system. At the time of preparing this report the
Stormwater360 Stormfilter system was the only system that is approved for use by Noosa
Council. However discussions with council have indicated that an alternative product may be
used if the alternative product does become approved for use. Based on these discussions it is
assumed that subject to their approval, council may accept a change in the proprietary
product used.




A PO Box 26, Carina Q 4152                                                                            10 | P a g e
E [email protected]
W www.vtce.com.au

Page 12

                                                                                                            ENG
                                               Engineering Report & Stormwater Management Plan
                                       Date:          22/09/2016     Document No.:      16144-ENG-01.Docx

                                        By:               MRS         Revision No.:              A


                     d. MUSIC Model Results
Using the MUSIC software the treatment train for the catchment areas was designed to
comply with the water quality objectives (WQO). It was determined that the water quality
objectives for the proposed development where met as shown in the table below:

                                 Pre-       Post-                  Reduction          Complying
  POLLUTANT TYPES
                             Development Development                  (%)             With WQO
 Total Suspended Solids
                                 556               111                80                  
         (kg/yr)
   Total Phosphorus
                                1.24              0.302              75.6                 
         (kg/yr)
  Total Nitrogen (kg/yr)        9.57               4.88               49                  
 Litter/gross pollutants
                              67.5             0              100                         
         (kg/yr)
     Table 5.5:      Stormwater360 Water Quality Treatment Results

As shown by the above results, the proposed stormwater treatment train adopts best practice
stormwater treatment and will achieve the required Water Quality Objectives.

                     e. Stormwater Quantity Management
Noosa Regional Council Policy requires that a development ensure non-worsening of
stormwater flows up to and including Q100 stormwater events. The proposed development
will not have a larger impervious area than the existing developed site and hence will not
require a stormwater detention system to mitigate the effects of any additional runoff.

                     f. Maintenance

    Construction Phase Management Plan
Potential construction phase impacts include the following:
 Sedimentation and erosion
 Management of contaminated soils and materials on the site Construction Material (such
    as cement)

     General
The objective of the Construction Phase Management Plan is to comply with the requirements
of the Queensland Environmental Protection Act 1994 and Environmental Protection (Water)
Policy 2009 so that the environmental values of effected receiving waters are maintained or
enhanced. In essence the purpose of the Plan is to prevent polluted stormwater being
discharged to the local waterways.




A PO Box 26, Carina Q 4152                                                                 11 | P a g e
E [email protected]
W www.vtce.com.au

Page 13

                                                                                                              ENG
                                                  Engineering Report & Stormwater Management Plan
                                          Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                           By:              MRS          Revision No.:              A


    Performance Indicators
The management is not being effective when any of the following occur during the
construction phase of the project.
 The required water quality objectives are not achieved,
 Contaminated water is released off site.

      Construction Phase Management of Sedimentation and Erosion
A sediment and siltation fence will be erected around the property boundary to ensure that
sediment is not washed off site and onto adjacent properties or roads. Entry and exit from
the site will be restricted to a single stabilised location to minimise the rise of onsite transport
of silt sediment or mud. It is anticipated that a layer of crushed rock will provide the
necessary stabilisation of the access route. If required a specific bunded wash down area will
be provided for the cleaning of plant before leaving the site and all wash down waste water
will be collected. In the event that debris or sediment leaves the site it will be cleaned.

    Management of Contaminated Soils Materials
There are no contaminated soils materials fill on the site. The site is not listed on the public
contaminated site’s register.

     Management of Imported Materials
Any material imported to the site including construction materials will be stockpiled in a
location where it cannot contaminate the stormwater system or stormwater runoff.

     Complaint Response
The contractor will erect signage at the entrance to the works with contact information,
including afterhours contact numbers. The contractor will properly deal with all complaints.

      Monitoring and Reporting
All sediment and erosion control devices will be checked daily and after rainfall events by the
construction site supervisor. Defective or full devices will be cleaned and repaired as
required. Regular inspections and maintenance of the storm water system will be carried out
by the property owner. The civil components (structural and erosion) are to be assessed by a
suitably qualified engineer as required.

    Lifecycle cost assessment
There will be no abnormal capital or recurrent costs for the proposed stormwater strategy.




A PO Box 26, Carina Q 4152                                                                   12 | P a g e
E [email protected]
W www.vtce.com.au

Page 14

                                                                                                          ENG
                                              Engineering Report & Stormwater Management Plan
                                      Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                       By:              MRS          Revision No.:              A


 6. Flood Zoning
The proposed site is not in a recognised flood zone according to the Noosa Regional Council
Tewantin and Doonan Natural Hazard : Landslide and Flooding Overlay (Map OM 9.3). See
Figure 6.1 below for Flood map. The map shows that there is no flood zone in close proximity
to the proposed site, therefore flooding issues do not apply to this site.




                SITE




      Figure 6.1: Noosa Regional Council Flood Overlay Map OM9.3




A PO Box 26, Carina Q 4152                                                               13 | P a g e
E [email protected]
W www.vtce.com.au

Page 15

                                                                                                            ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                         By:              MRS          Revision No.:              A


 7. Sewer Reticulation




      Figure 7.1: QUU Sewer and Water DBYD Map

Figure 7.1 shows a sewer main beneath the proposed development site with property
connections to the existing development site as well as to neighbouring sites (Lots 3T16319
and 1RP73080). It is anticipated that this line will be abandoned and a new sewer line will be
installed to Unitywater and SEQwater standards, to service the existing properties plus the
proposed extensions to the RSL of Lot 10SP273411. Please refer to Drawing 16144-P003 of
Appendix B for details.

The new, proposed extensions will comply with the Council’s build over/near sewer
requirements.

Internal house drainage design for this proposed development will be by others.




A PO Box 26, Carina Q 4152                                                                 14 | P a g e
E [email protected]
W www.vtce.com.au

Page 16

                                                                                                            ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                         By:              MRS          Revision No.:              A


 8. Water Reticulation
Figure 7.1 shows the existing water reticulation infrastructure for the proposed site. Hydrants
are situated adjacent to the site in Memorial Avenue and Doonella Street.

A new water connection will be provided from the supply in Memorial Avenue to the
proposed development to Unitywater and SEQwater standards.

The Internal water supply design for this proposed development will be by others.


 9. Electrical and Telecommunication
The electrical supply and communications supply for this proposed development will be by
others.


 10.Development Codes
The following applicable Local and State Codes have been completed to address the proposed
development and are included in Appendix H:
     Driveway and Parking Code
     Earthworks Code
     Water Supply and Sewerage Reticulation Code


 11.Conclusions
vT Consulting Engineers has undertaken a review of civil engineering services required for the
proposed development located at 1 Memorial Avenue, Tewantin QLD 4565.

Based on all the findings outlined in this report, vT Consulting Engineers believes that there are
no significant engineering issues in relation to this development.




A PO Box 26, Carina Q 4152                                                                 15 | P a g e
E [email protected]
W www.vtce.com.au

Page 17

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


 Appendix A - Survey Plan




A PO Box 26, Carina Q 4152                                                      16 | P a g e
E [email protected]
W www.vtce.com.au

Page 18

10




     Statewide


[OCR of page images]
 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
   
 
 
   
 
 
 

 

 

 

 

 

 

 

 

DIAGRAM B an jes | { %» | 26.215 ©. 4 o 4 ta 2, d “Bitumen Carparks a i |
Seale 1:125 ff | 6.277 “ILE16 6 Z 4 + . we 4g 4 oo “ ,
Sheet 3 of 3 a | ‘ 4 A _ g A ‘ Toa aod, Gg brivéway'|
& Garden = | A , 44 A |
\ < 4 4
+ + g A S 4 Z
4 Roof Ridge Roof Ridge ‘ 4 4 a “ a ] | 3
+ J + < J 4 4 L
. = AP eee ey | :
tog va 4 4 4 4 s 8
13 < 4 ° * | S w
~ ow A 4 Z J i. &
eg a } + 4 4 A 8
So . oe elie
N 7 ° A A 4 gv 3 “ | %
3S. SH ol | \ d 5 | 4 , A J ; Garden te
x S| ole A 4 as |
§. SL S |, at 440 4 | 4 8.
8 | a “ p* Edge of Bitumen as as | Ps
& {a ° 1 Back of Kerb —f
g > g . he ee 2 § 6
x a A 7 Bitumen Carp arks, ; | -
Q “  —. | B ——; ¢
S hel . al 4
5 Eave Garden: | : “ g DS |
§ ad | ¢ t | Ss gS | SITE BENCHMARK
“|* = ° ~ 1 Nail in Concrete
= § ¢ L. a
I}. 8] 1 » 4 , g . F RL 7/162m
Qa | Is Two Storey Building (Carpark Under) os §] 8 4 7 A 12
we g Tewantin Noosa RSL & Citizens Memorial Club + 2 *« 4
fee “bo (BlP sy bebo loo ®| |S
| e ; t+ 4 4 ° 23) |x
< * A “gy S
8. | Isl 2 fh
| S 8 4 , 6 3 Weatherboard and Brick
bi 3 * A , | Building
a a A
| - SP 236319 xo ms
8 4426 m? ‘ 4 4 . | Al Ridge &
¢ |g a, : 4 <
o > 4 g + =
x | o / IN 4 q | 4 :
oy A :
oe | yoe | | Building ||, a 4 4 J
@ Mi | | . 7 <
| [4é4 __ SSN! 5 ; 4 t
KN fk aig ae | J
S | Nee ° 502] _é 5 | | | S ° so To Garden Fag, /O i
Poe oT eS © |
~I g 2, S tt {ll © } 40 “ ae | ; ; AS. ack or Kerb foes >
XN & as a4, Kerb 6 700 Fuge of Bitumen, * < =
/ » s 3 g 4a 4 < 0 A A 8
oe S ov SoS . a4 4 4 ° A Ke
3 x 8 4 4g A p QO
Q & Driveway 8 & gS J ; 3 A 4 ad 4 af Concrete Driveway Driveway, | Ra
= u S ‘5 x § I 4 - 4 A 7 ; 4 4 . 4 4 | i
WW | Qs 4 ° “a 4 4 4 ° oh Q
Qyp > a é A v4 A oy 4 rT TN
6.00 Comms Pit 3 D5, Fy tafe 4 . 4s 5 . 47 4 , + |\O
1" | 4 Te, 4% < : o Tt
vl fat 4 + | 9 . 4 A Edge of Bitumen 4
oe | | S Ss a : +
i a = © | 4 “ ie ae ey Back of Kerb | \
| | © | | 4 “A | Oo Back of Kerb Garden, Bed oO pt \ ©
} | ® 7 | * as Edge’ of Bitumen ac. — iF & | 5
| < | 4 4 J A A go, = Garden. 8 | 2 §
< © | | 4 4 , ° 4 A 3 3 x Trees we] & 5
s 6 | g 4 4 A ; A a ?0/25m d | & S
3. | | A ; 4 4 a 4 4m Height & 2 5 9
8 p82 < 44 4 4 , | 4moSpread 1S 7 Bl lo
w * J , 4 4 1 x 4 Y < 4 {4 8 § . &
® | 9 ° “ 4 A “ | e] Sf 8 WG
v Z 4 a 4] | %
ov + Ag 4 AA | pos
5 4 MA 4 44 | ©
S » a gr" A £4 a+ 4 + , £ + a gq A L |
9 A “a 4 + 7 |
Entry toCarpark o 4 4 5a a v4 < SITE BENCHMARK] * |
y ; 4 < “ 404 A “ Nail jn Bitumen
. og Se Bitumen Carparks © sf oa oyaaan of bri
Roof Ridge < a. 4 4 A 4 A 7 J 4 rveway,
4 <4 A A < 1
4 4 a g . “ 44 A g ;
; . g “A ag 4 IF Kerb \ Tree . ao aid 6.
2 2 4 | | 4) 2 20/9 ; in —
y 4 A “ q gol 5m Height | 4 ~ A 9 | ro}
A \¢ | a 4 4 1 1 5m Spread ‘ 4 | \ r
| o 2 / Garden Bed | / A | s |
4 4. < a g ia 4 4 f
A A 4 . 7 OA g | | A v | | & i tT
Watt i / i 4 4 4 | Cun Tree | & | 2
[> IS t + a “ 4 ; ?0/3m J d
6.00 % EMT A | h 1 6G a \/ Kerb A 4 “9 . 4m, Height | 2 | <
5 £ | SP106185 | | WH not fd 4 A A J = z —_ ; 7 "4 | “mn Spregd S | S
| Plotted from DBYD < 0” 4 or Biter’ < 4 Z | | | & lx
——— |. |Position_is Approx only ge_of bitumen . a4 4 : biG | S
i) I | f 2
co | 4 Kerb ap | | |
Garden .Bed | a 4 Oo . 4 oO - | c
S 5 |
5.50 | | C 571018 6.00 Garden | &
; + Change of Grade 270'0' Ay ye eG OF ] 3
> + ee Garden Bed. eee —— le 0h o
ee re Concrete Footpath fal OT eee Ne poo — f x
eS ee ’ go NE Concrete Footpath / XO
SITE. BENCHMARK SS es oe ES So get ae ee ot ot LF
Nail in Kerb Sly p eS ae Pee gate cf
RL 4/744 NSS R= p96? 455 of f Poa 5.00 Back of Kerb 6.50 Back of Kerb Erect Sign i
at 4.50 Kerb 5.00 5.50
Edge of Bitumen Edge of Bitumen
Roundabout in this Area
Scale 1:125 - Lengths are in Metres.
bea ped | | | | | | | | |
DOONELLA 5 0 5 10 15 STREET
(ms plan is prepared for the purpose of Statewide Survey Group hereby grants Sat Amendments we = Chent Project LeveL DATUM AHD der |L.B.
designing new construction on the land and permission for the Local Authority to ate: escription nO) 7 ~ ORIGIN F.B.
should not be used for any other purpose. reproduce all relevant information Plan of Contour Detail Survey a x SCALE
Underground services shown hereon have been contained herein for the purposes stated TEWANTIN NOOSA RSL & Over Lot 10 on SP 236319 PSM no. 27341 .
located by field where possible. Prior to any in the Sustainable Planning Act 2009. > RL: 1/883 1:125
Demaiition, Construction or Excovation on the | if should be noted that the granting of CPNGENS MEMORIAL CLUB Lot 1 on RP 73080 and sys, Al
, i i Dat < QC XQ
for the possible location of further underground this consent by the copyright holder does Lot 3 on T 16319 ~ DN -
services. not sign away copyright approval granted Surveyed Designed
The Real Property Boundaries have not been voce the Commonwealth Copyright Act Associated Consultants Drawn SRP Drawn
defined by this survey and have been compiled : Checked ARH Checked ABN 77 088 374 869
from SP 236319, RP 73080 & T
16319 Exact Bearings, Dimensions and Areas are RUBICON TEWANTIN REFERENCE No. 5357-15
subject to a Cadastral Survey. Check Title for Parish of NOOSA 3/123 Link Road Victoria Point, QLD 416

 

 

ons oreients. County of MARCH PLAN No. Phone: 1300 362 094 Fox:1300 786 094
30/03/2015 NOOSA SHIRE COUNCIL 5 5 5 / a 4 O O _ O 4 Email: [email protected]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 19

    1


3




        Statewide


[OCR of page images]
 

DIAGRAM A _

Seale 1:125 POINCIANA a AVENUE
Sheet 2 of 3

I

Crown oy —
SITE. BENCHMARK “7 OF Rogg ae
O Nail in Kerb ~
RL 9483m

   
 
    
 

  

Edge of Biturmen
Back of Kerb 9.500

 

“4

I 7,
ha
SS
Bus Stop ea Tes

Garden

 

 
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

gy! )
§ —____}- | | Edge of Bitumen oe SITE BENCHMARK
g otack, of Kerb lay | - 300 a a OPM 138576
a - | Comms Pits Ae Kerb re ere RL 81852m
a | Street: Sign Street Si eo oe NN
w Comms Pit u Street-Sig ——, SN
. | a P wh “comms ‘Pit Comms Pity Comms. Pit ON
S| 4 Lo oe ee Ee Line, Plotted tram DBYD RecordsConcrete Footpath gst ‘ | i
y ae Carden : - Position is Approx only [in PA | NY
90°04" go0aN  Drveway WA ; 90°04 ue ete
| F | f 14/082 101064 a “iy § 2 |p z 54919 g | Concrete. | r - , Ny
gBY? recor | | & “ x 7 4 porden Bed ‘ + | Oe Pits \

So g + It \
from | only a 4 1g | ToT G \
ig APP | | iI| | Sg L 8 = bey \

| $ Jos s S | + Lo +e \
Oo + 4 G 6 8 0) \
| Garden & f A § | § ~ le & \
| § +] | < = = ¢ . x .
| ; | - SHES I 8 f |
le [| of : HH |S - spa ® & !
5 \ au I, 8 S pi a |
| r ip \.. 8 , 1 “ “4 alis -. ——— = —— * | |
| | ! § | 5 A & e ¥ + 4 Garden
| | \ a | om ‘ ea Hla “A boo 4 KNWN Roof Ridge 777, |
Joe | os We | : ; |
yee A a A | | 3xPalm Trees |
g . 4 0 Aa hh A ?0/4m |
ck | | a “ | 7m Height | | \
oy tH ; < 3 3m Spread \ \
S ’ 4 4 | |
Ly Bef | pt | : h | © | |
S as | f kf % il | FO
s | | af 0% L - . Al | uy :
eee: A
——> + |
NS | Ridge + | &
x 4 ~ | | A Roof Ridge | ~~
Ss Single Storey Buildi 1 | n
5 ®D PhS ingle Storey Building w 5 6 |
RS Garden iS |i g | Single Storey Building RP 73080 |
t | / Tey y § | “A x Brick Post Office 1 6 9g 2 2 | | |
— S 71: | <=
g s Q
% § , SOS |
x elst a
s § | | oe | , . | Telstra Pit) g ‘| |
s 3 — | eg 8
So 8 f-
c ° | 4 + + 4 $ 8
e ° | | 3 by Single storey Brick 4 g 4 el? | “9? 5 9
S & \ \ N\ - Building 8
2 D> -_ | °
SF Sty s c 7 i : : 8
@ VT 4 r]S|& T 16319 | o. iG | : p 2
|| \ y & lo 4 4 Known Pit 3
A . | 567 m? Jie A | Pit | SITE. BENCHMARK . =
eae
f \ 3 OPM 48612 \. Carden |
Bors | ly res Back of Kerb l RL_&/901m h | @ SITE. BENCHMARK
araen + \ 7 4 Edge of Bitumen oI i , 4 “Z LL : Roof Ridg: ee \ ee 4 Outlets? O Nail in Kerb
& | 7 a “ a Aa g 5 RL 8/361m
—— <=, gio 4 og : s §
“Te.00 Ee v4 g ® =
: oy 42 4 8.50 g
SITE BENCHMARK / | $ + 4 A . : 4 ° “Ss
Nail in Bitumen ® S | | ga - 4 °
RL 8/821m x oe A aoa, : ae 7 4 g
g SZ Ridge 4 4g 9 a J : Ww
& a | v4 Bitumen Carparks . 4 5 F
| | . Z 4 g 4
% [lol | 4 q tog | -\
Ss ONS m « “ :
oe a \ | Palrn Tree A - s a 4 4 a4 4 . s J ~
° | PO/25rA s A ; < “ a “A < |
| 6m, Height et, : : fo ew,
3m Spread J o yg 4 4 fo < 5 . 4 “ Ta A <,
| Concrete SS “Edge of Bitumen “46, 4 A - eo 9 J A |
—__} bel * = Be 1 a 2g
(eo \ |], Gorden Back of Kerb seem S72 BENCHMARK | r
s|| ‘ |
| | S| | , Nail in Kerb
| | 1
| & \| Le | (Concrete RL 8/473m RS
ee — | a | T | $ 3.50 > 7 as
a f S| | | | 850 Lawn . 20/45 8
eo |. 8 [sell | N | | Gum Tree 6m Height | + S
5 g £ | ?0/45m + £ g! ' &
S Ja} || | | + 2 : 12m Spreag + 8 @
x g — | wo, 6m Height Dult/et ‘s
& h | | Building | 18m Sprea . °
o PEE Hy :
T IY I
| oot y bez sV) i Outlet S
, | ; h .
| 90°0 i (a MH SLBA go) gs 800 got eS rs 3 ae a ¢
Z 7 : - “ Tt — 7 5 e VV Hy
6 14/082 COIN sepa Garden Bed On) FIBA I olen oO Fence Mi
x G 4 SRN a Kerb i \
8 & TO ~~ oi : : 5 = \
S s 4 e 3 Gum Tree @ “ Edge pf, Bitumen % Gum. Tree g | 8 |
S & | LH 203m |, 4° (faire At oo. paeeeipie by
‘s 6m Height < o 3m Helg oa i rden| | 8 5
§ 3 a § Building an Spread 4.6m Spread} 4 Garden | eS ©
% v “st g 4 A \ <
dS J “ 4g 4 7. >
|, J 2 A ad A 4 x
& | | J ° 4 4 159 A a A < J . | S
S| J “ g 4 4 _ 4 A J |S
. ZL \AN \ s saa 4 9 | |
| Seale 1:125 — Lengths are in Metres. i Kerb “| 4 XA g 7 ant a 4 J 1 . | |
750 ve 5 os 4 ! ! ! t ! ! ! 7 15 j > — at, gr “ 4a , / ¢ g , Aa tts
: 5 5 < | of dge of Bitumen a . a 49 4 - |
(xs plan is prepared for the purpose, of ; Statewide Survey Group jereby grants sat Amendments on — Client Project LeveL pATUM AHD der |B
esigning new construction on the land an permission for the Local Authority to ate: escription 7 ORIGIN F.B.
should not be used for any other purpose. reproduce all relevant information Plan of Contour Detail Survey PSM 27341 | SCALE
Under ground gomices shown nereon nove been contained herein for the purposes stated TEWANTIN NOOSA RSL & Over Lot 10 on SP 236319, ne. 1:125
ocated by tela where possible. Frior to any in the Sustainable Planning Act 2009. N x N RL: 1|883 .
Demelition, Construction or Excavation on the | it should be noted that the granting of CITIZENS MEMORIAL CLUB | Lot 1 on RP 73080 and ses, @ A
. 4 . . this consent by the copyright holder does Date 2
for she possible location of further underground not sign away copyright approval granted Lot 3 on T 16319 Surveyed DN Designed
The Real Property Boundaries have not been vnger the Commonwealth Copyright Act Associated Consultants Drawn SRP Drawn
defined by this survey and have been compiled : Checked ARH Checked ABN 77 088 374 869
from SP 236319, RP 73080 & T
16319 Exact Bearings, Dimensions and Areas are RUBICON TEWANTIN REFERENCE No 5357-15
subject to a Cadastral Survey. Check Title for Parish of NOOSA 3/123 Link Road Victoria Point, QLD 416
any, caters. County of MARCH PLAN No. - Phone: 1300 362 094 Fox:1500 786 094
30/03/2015 “ L mall [email protected]
/03/2018 NOOSA SHIRE COUNCIL 959 /— 500-02
Cadaatral Srirwevwar Vata

 

 

 

 

 

 

 

 

Page 20

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


Appendix B - Proposed Design Drawings




A PO Box 26, Carina Q 4152                                                      17 | P a g e
E [email protected]
W www.vtce.com.au

Page 21

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING PROPERTY BOUNDARY
                                                                                                      CONSTRUCT 7m WIDE CONCRETE                                                                         PELICAN STREET                                                                                                                                                                                                                                                                                                           EXISTING CONTOUR - MAJOR
                                                                                                        CROSSOVER TYPE B TO IPWEA                                                                        N
                                                                                                       STANDARD DRAWING No. RS-051                                                                                                                                                                                                                                                                                                                                                                                                EXISTING CONTOUR - MINOR
                                                                                                    LOCATED AT GROUND FLOOR LEVEL                                                                                                                                                                                                                                                                                                                                                                                                 EXISTING BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING KERB AND CHANNEL




                                                                                                                                                                                                                                                                                                                                                                                                                                              N
                                                                                                                                                                                                                                                                                                                                                                                                                      N
                                                                                                                                                                                                                                                                                                                                                                                                N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 SW               EXISTING STORMWATER DRAINAGE




                                                                                                                                                                                                                                                                                                                                                                   N
                                                                                                                                                                                                                                                                                                                                               N
                                                                                                                                                                                                                                                                                                                          N
                                                                                                                                                                                                                                                                                              N
                                                                                                                                                                                                                                                                 N
                                                                                                                                                                                                                                         N
                                                             N
                                                     N
                                                                                                       N




                                                 N
                                                                                                                                                                                                                     N
                                             N
                                         N




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 S




                                                                                       N




                                                                                                                           N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING SEWER




                                                                                                                                           N




                                                                                                                                                               N




                                                                                                                                                                                       N
                                                                                                                                                                                                                                                                                     STORMWATER DRAINAGE IN
                                                                                                                                                                                                                                                                                 SUSPENDED SLAB TO BE TAKEN                                                                                                                                                                                                      W                EXISTING WATER
                                                                                                                                                                                                                                                                              DOWN COLUMN TO BASEMENT LEVEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING ELECTRICAL OVERHEAD




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 N
                                                                                                                                                                                                                                                                                TO DISCHARGE TO STORMFILTER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 HV               EXISTING ELECTRICAL HIGH VOLTAGE
                                                                                                                                                                                                                                                                                 CHAMBER IN BASEMENT BELOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 E                EXISTING ELECTRICAL LOW VOLTAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N                                   T                EXISTING COMMUNICATIONS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 G                EXISTING GASLINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         X   X       X   X   X        X   X   X   ABANDON EXISTING SERVICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPERTY BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EASEMENT BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BUILDING




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  KERB AND CHANNEL
                                                                                                                                                                                                                                                                                                    STORMWATER DRAINAGE IN                                                                                                                                                                                                        KERB
                                                                                                                                                                                                                                                                                                    SUSPENDED SLAB LOCATED ON                                                                                                                                                                                                     STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                    GROUND FLOOR LEVEL ABOVE TO                                                                                                                                                                                                   ROOFWATER DRAINAGE
                                                                                                                                                                                                                                                                                                    HYDRAULIC ENGINEERS DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SEWER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  WATER MAIN




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 W               W
                                                                                                                                                                                                                                                                                                                                                                                                                                        STORMWATER 360 STORMFILTER                           CW                  CW               PRIVATE COLD WATER SUPPLY
                                                                                                                                                                                                                                                                                                                                                                                                                                        CHAMBER - SFMH OFFLINE WITH                                  I                        I   SEDIMENT FENCE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         I




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             I

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      I
                                                                                                                                                                                                                                                                                        BASEMENT STORMWATER DRAINAGE                                                                                                                    HIGH FLOW BYPASS AND PRECAST
                                                                                                                                                                                                                                                                                         TO HYDRAULIC ENGINEERS DETAILS                                                                                                                 MANHOLE STORMFILTER. REFER TO                                                             EXISTING SURFACE LEVEL
                                                                                                                                                                                                                                                                                                                                                                                                                                        STORMWATER MANAGEMENT PLAN
                                                         1


                                                                                                                                                                                                                                                                                                                                                                                                                                        FOR DETAILS. INSTALLED TO            N                           RL1.234                  PROPOSED SURFACE LEVEL
                                                                                                                                                                                                                                                                                                                                  NOTE:                                                                                                 MANUFACTURERS SPECIFICATIONS.
                                                                                                                                                                                                                                                                                        FILTER CHAMBER TO BE LOCATED TO
                                                                                                                                                                                                                                                                                                                                                                                                                                         CONSTRUCT 6.2m WIDE CONCRETE
                                                                                                                                                                                                                                                                                           ENSURE BOTH THE CHAMBER AND
                      POINCIANA AVENUE




                                                                                                                                                                                                                                                                                                                                                                                                                                         CROSSOVER TYPE B TO IPWEA
                                                                                                                                                                                                                                                                                                 INLET / OUTLET PIPES MISS
                                                                                                                                                                                                                                                                                                                                                                                                                                         STANDARD DRAWING No. RS-051
                                                                                                                                                                                                                                                                                                    STRUCTURAL FOOTINGS




                                                                                                                                                                                                                                                                                                                                                                                                                                                         DOONELLA STREET

                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                   S           S           S               S               S                 S               S               S               S                 S                    S                 S            S           S           S                S

                                                                                                                                                                                                                                                 X   X   X       X   X   X          X     X         X    X        X   X   X   X    X   X   X   X   X   X   X   X       X   X    X
                                                                                                                                                                                   X   X       X   X    X        X   X   X       X   X   X
                                                                                                                                                                   X   X       X
                                                                                                                                                                                                                                                                                                                                                                                                                                       USIL 3.867
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N




                                                                                                                                                           X




                                                                                                                                                                                                                                                                                                                                                                                    X


                                                                                                                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                                                                                                                     PROPOSED GULLY PIT WITH SOLID TRAFFICABLE LID                                                                                     DSIL 3.775




                                                                                                                                                                                                                                                                                                                                                                                        X
                                                                                                                                                           X
                                                                                                                                                                                                                                                                                                    TO ENSURE NO SURFACE WATER ENTERS. GULLY PIT                                                                                       L = 7.500




                                                                                                                                                                                                                                                                                                                                                                                            X
                                                                                                                                                                                                                                                                                                     TO BE LOCATED TO ENSURE STORMWATER OUTLET




                                                                                                                                                           X
                                                                                                                                                                                                                                                                                                                                                                                                                                       GRADE 1:200




                                                                                                                                                                                                                                                                                                                                                                                                X
                                                                                                                                                                                                                                                                                                       PIPE IS 300 MIN CLEAR OF NEW SEWER MANHOLE                                                                             S                      S
                                                                                                                                   X   X   X   X   X   X   X




                                                                                                                                                                                                                                         10
                                                                                                                               X
                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                                                                                                                                                                                                                                                                                                                       NEW STORMWATER DRAINAGE PIT
                                                                                                                                                                                                                                                                                                                                                                                                                                       KERB INLET TO IPWEA STANDARD


                                                                                                                               X
                                                                                                                                                                                                                                                                                                                                                                                                                                       DRAWING No. DS-063
                                                                                                                               X
                                                                                                                                                                                                                                                                                                                                                                                                                                       SL 5.00
                                                                                                                               X
                                                                                                                                                                                                                                                                                                                                                                                                                                       EXISTING KERB DEMOLISHED FOR
                                                                                                                               X


                                                                                                                                                                                                                                                                                                                                                                                                                                       STORMWATER INSTALLATION
                                                                                                                                                                                                                                                                                                                                                                                                                                       NEW KERB & CHANNEL TO BE BUILT        N
                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                                                                       TO NOOSA SHIRE COUNCIL
                                                                                                                                                                                                                                     EXISTING STORMWATER
                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                                                                       STANDARD DRAWING SD:9001 & 9036
                                                                                                                               X




                                                                                                                                                                                                                                     TO REMAIN UNCHANGED
                                                                                                                               X
                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             N
                                                                                                                                                                                                                                             EXISTING BUILDING
                                                                                                                               X
                                                                                                                               X
                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                                                                          N




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 N
                                                                                                                                                                                                                                                                                                                                                                                                            NN
                                                                                                                                                                                                                                                                                                                                                                                                                                       USIL 3.755
                                                                                                                                                                                                                                                                                                                                                                                                                                       DSIL 3.440
                                                             EXISTING BUILDING                                                                                                                                                                                                                                                                                                                                                         L = 31.500
                                                                                                                                                                                                                                                                                                                                                                                                                                       GRADE 1:100
                                                                  3




                                                                                                                                                                                                                                                                                                                                                                                                    N
                                                                                                                                                                                                                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                                                                                                                                                       EXISTING STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                       PIT KERB INLET




                                                                                                                                                                                                                                                                                                                                                                                            N
                                                                                                                                                                                                                                                                                                                                                                                                                                       SL 4.37




                                                                                                                                                                                                                                                                                                                                                                                                    N
                                                                                                                                                                                                                                                                                                                                                                                                N
                                                                                                                                                                                                                                                                                                          EU
                                                                                                                                                                                                         MEMORIAL AVENUE




                                                                                                                                                                                                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                             EU



                                                                                                                                                                   LAYOUT PLAN
                                                                                                                                                                           SCALE 1:200




                                                                                                                                                                                                                                                                                                        CLIENT:                                                        SCALE:       1:200                          DRAWN:         JC                     PROJECT:                                                                            JOB No.:
                                                                                                                                                                                                                                                                             E: [email protected]




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                TEWANTIN - NOOSA RSL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        16144
                                                                                                                                                                                                                                                                             A: PO Box 26, Carina




                                                                                                                                                                                                                                                                                                                                                                       SHEET SIZE: A1                              DESIGN:        AvT
                                                                                                                                                                                                                                                                             Ph: (07) 3172 8334




                                                                                                                                                                                                                                                                                                                                                                                                                                                                           1 MEMORIAL AVE, TEWANTIN QLD 4565
PLOTTED: 20.09.2016




                                                                                                                                                                                                                                                                             W: vtce.com.au




                                                                                                                                                                                                                                                                                                                                                                       DATUM:       AHD                            CHECKED:       AvT
                                                                                                                                                                                                                                                                                 QLD 4152




                                                                                                            C     21.09.16 STORMWATER 360 FILTERCHAMBER ADDED                                          JC        AvT                                                                                                                                               COPYRIGHT: THIS DOCUMENT IS AND SHALL REMAIN                                          DRAWING TITLE:                                                                      DRAWING No.:          REV.:
                                                                                                                                                                                                                                                                                                                                                                                                                   APPROVED:
                                                                     0    2    4   6       8   10           B     14.07.16 GENERAL REVISIONS                                                           JC        AvT                                                                                                                                               THE PROPERTY OF vT CONSULTING ENGINEERS. THIS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STORMWATER LAYOUT PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       C
                                                                                                                                                                                                                                                                                                                                                                   DOCUMENT MAY ONLY BE USED FOR THE PURPOSE


                                                                     SCALE 1:200
                                                                                                            A     08.07.16 PRELIMINARY ISSUE                                                           JC        AvT                                                                                                                                               FOR WHICH IT WAS COMMISSIONED AND IN
                                                                                                                                                                                                                                                                                                                                                                   ACCORDANCE WITH THE TERMS OF ENGAGEMENT.
                                                                                                                                                                                                                                                                                                                                                                   UNAUTHORISED USE OF THIS DOCUMENT IN ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  P001
                                                                                                           REV.    DATE:                           AMENDMENT:                                          BY:       APP:                                                                                                                                                                                                                                                                                                                       NOT FOR CONSTRUCTION

Page 22

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING PROPERTY BOUNDARY
                                                                                                                                                                                                                                          PELICAN STREET                                                                                                                                                                                                                                                                                          EXISTING CONTOUR - MAJOR
                                                                                                                                                                                                                                          N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING CONTOUR - MINOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING KERB AND CHANNEL




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            N
                                                                                                                                                                                                                                                                                                                                                                                                                                                         N
                                                                                                                                                                                                                                                                                                                                                                                                                                    N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 SW




                                                                                                                                                                                                                                                                                                                                                                                                     N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING STORMWATER DRAINAGE




                                                                                                                                                                                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                                                                  N
                                                                                                                                                                                                                                                                                                                   N
                                                                                                                                                                                                                                                                                      N
                                                                                                                                                                                                                                                           N
                                                             N
                                                     N
                                                                                                           N                          N




                                                 N
                                                                                                                                                                                                                                               N




                                             N
                                         N




                                                                                      N




                                                                                                                                                                                   N




                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 S




                                                                                                                                                                                                                              N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING SEWER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 W                EXISTING WATER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING ELECTRICAL OVERHEAD




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 HV               EXISTING ELECTRICAL HIGH VOLTAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 E                EXISTING ELECTRICAL LOW VOLTAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 T                EXISTING COMMUNICATIONS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 G                EXISTING GASLINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         X   X       X   X   X        X   X   X   ABANDON EXISTING SERVICE
                                                                                                                                                                                                                    SW               SW        SW          SW                                     SW                SW                       SW                SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPERTY BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EASEMENT BOUNDARY
                                                                                                                                                                                                                                              RW          RW                RW                                 RW                       RW                RW                                                                                                                                                                                      BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  KERB AND CHANNEL




                                                                                                                                                                                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  KERB
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SW                  SW               STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             RW                  RW               ROOFWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SEWER




                                                                                                                                                                                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 W               W                WATER MAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             CW                  CW               PRIVATE COLD WATER SUPPLY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     I                        I   SEDIMENT FENCE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         I




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             I

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING SURFACE LEVEL




                                                                                                                                                                                                                                                                                                                                                                               SW
                                                         1                                                                                                                                                                                                                                                                                                                                                                                                                                                               RL1.234                  PROPOSED SURFACE LEVEL
                      POINCIANA AVENUE




                                                                                                                                                                                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                                                                  USIL 3.904
                                                                                                                                                                                                                                                                                                   DSIL 3.571
                                                                                                                                                                                                                                                                                                   L = 60.00




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DOONELLA STREET
                                                                                                                                                                                                                                                                                                 GRADE 1:180
                                                                                                                                                                                                                    SW               SW        SW          SW                                     SW                SW                       SW                SW                          SW                    SW
                                                                                                                  2                           0.60
                                                                                                                  1                                                                                                                                       SEWER LINE 1




                                                                                                                                                                                                                                                                                                                                                                                                                                        SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                             USIL 3.551
                                                                                                                                                                                                                                                                                                                                                          EXISTING SEWER TO BE ABANDONED                                                                     DSIL 3.520
                                                                                                                                                                                                                              EXISTING SEWER TO BE ABANDONED X    X     X     X      X       X     X       X   X       X   X        X    X        X   X   X    X    X   X       X     X    X     X       X   X     X
                                                                                                                                                                                                                    X     X    X   X  X   X  X   X   X  X X                                                                                                                                                                                                  L = 5.600
                                                                                                                                                                                                            X   X




                                                                                                                                                                                                    X




                                                                                                                                                                                                                                                                                                                                                                                                                       X
                                                                                                                                                                                                                                                                                                                                                                                                                                                             GRADE 1:180




                                                                                                                                                                                                                                                                                                                                                                                                                            X




                                                                                                                                                                                                                                                                                                                                                                                                                                              SW
                                                                                                                                                                                                    X




                                                                                                                                                                                                                                                                                                                                                                                                                                X
                                                                                                                                                                                                    X
                                                                                                                       SEWER LINE 1




                                                                                                                                                                                                                                                                                                                                                                                                                                    X
                                                                                                                                                                                                                                                                                                                                                                                                                                                             S                    S
                                                                                                                                                                X              X   X   X   X    X   X




                                                                                                                                                                                                                                                            10
                                                                                                                                          X
                                                                                                                                          X
                                                                                                                                          X




                                                                                                                                                                                                                                                                                                                                                                                                                                                    SW
                                                                                                                                          X
                                                                                                                                          X
                                                                                                                  1.125




                                                                                                                                              EXISTING SEWER TO BE ABANDONED
                                                                                                                                          X




                                                                                                                                                                                                                                                                                                                                                                                                                                                    SW
                                                                                                   USIL 4.161                             X
                                                                                                                                          X
                                                                                                                                          X
                                                                                                                                          X
                                                                                                  DSIL 3.924




                                                                                                                                                                                                                                                                                                                                                                                                                                                    SW
                                                                                                   L = 23.60
                                                                                                                                          X



                                                                                                 GRADE 1:100
                                                                                                                                                                                                                                                                 EXISTING BUILDING
                                                                                                                                          X
                                                                                                                                          X




                                                                                                                                                                                                                                                                                                                                                                                                                                                    SW
                                                                                                                                          X




                                                                                                                                                                                                                                                                                                                                                                                                                                                                     N
                                                                                                                      0.60




                                                                                                                                                                                                                                                                                                                                                                                                                                                   NN
                                                                                                                                                                                                                                                                                                                                                                                                                                                  SW
                                                             EXISTING BUILDING




                                                                                                                                                                                                                                                                                                                                                                                                                                                   SW
                                                                   3




                                                                                                                                                                                                                                                                                                                                                                                                                                         N
                                                                                                                                                                                                                                                                                                                                                                                                                                             N

                                                                                                                                                                                                                                                                                                                                                                                                                                                   SW
                                                                                                                                                                                                                                                                                                                                                                                                                                N
                                                                                                                                                                                                                                                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                                                                                                                                                    N
                                                                                                                                                                                                                                                                                                                           EU
                                                                                                                                                                                                                                          MEMORIAL AVENUE




                                                                                                                                                                                                                                                                                                                                                                                                                            N
                                                                                                                                                                                                                                                                                                                               EU
                                                                                                                                                                                       LAYOUT PLAN
                                                                                                                                                                                               SCALE 1:200




                                                                                                                                                                                                                                                                                                 CLIENT:                                                                    SCALE:         1:200                            DRAWN:           JC                  PROJECT:                                                                                    JOB No.:
                                                                                                                                                                                                                                                                      E: [email protected]




                                                                                                                                                                                                                                                                                                                                                                                                                                                                              TEWANTIN - NOOSA RSL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        16144
                                                                                                                                                                                                                                                                      A: PO Box 26, Carina




                                                                                                                                                                                                                                                                                                                                                                            SHEET SIZE: A1                                  DESIGN:          AvT
                                                                                                                                                                                                                                                                      Ph: (07) 3172 8334




                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1 MEMORIAL AVE, TEWANTIN QLD 4565
PLOTTED: 20.09.2016




                                                                                                                                                                                                                                                                      W: vtce.com.au




                                                                                                                                                                                                                                                                                                                                                                            DATUM:         AHD                              CHECKED:         AvT
                                                                                                                                                                                                                                                                          QLD 4152




                                                                                           C      21.09.16 STORMWATER 360 FILTERCHAMBER ADDED                                                                       JC        AvT                                                                                                                                           COPYRIGHT: THIS DOCUMENT IS AND SHALL REMAIN                                         DRAWING TITLE:                                                                              DRAWING No.:          REV.:
                                                                                                                                                                                                                                                                                                                                                                                                                            APPROVED:
                                                         0    2    4   6   8     10        B      14.07.16 GENERAL REVISIONS                                                                                        JC        AvT                                                                                                                                           THE PROPERTY OF vT CONSULTING ENGINEERS. THIS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SEWER RETICULATION LAYOUT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       C
                                                                                                                                                                                                                                                                                                                                                                            DOCUMENT MAY ONLY BE USED FOR THE PURPOSE


                                                         SCALE 1:200
                                                                                           A      08.07.16 PRELIMINARY ISSUE                                                                                        JC        AvT                                                                                                                                           FOR WHICH IT WAS COMMISSIONED AND IN
                                                                                                                                                                                                                                                                                                                                                                            ACCORDANCE WITH THE TERMS OF ENGAGEMENT.
                                                                                                                                                                                                                                                                                                                                                                            UNAUTHORISED USE OF THIS DOCUMENT IN ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  P003
                                                                                          REV.     DATE:                                      AMENDMENT:                                                            BY:       APP:                                                                                                                                                                                                                                                                                                                          NOT FOR CONSTRUCTION

Page 23

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


Appendix C - Noosa Erosion and Sediment Control Assessment Form




A PO Box 26, Carina Q 4152                                                      18 | P a g e
E [email protected]
W www.vtce.com.au

Page 24

                                                                                                                   Including amendments to 16 September 2013
        SCHEDULE 2—EROSION AND SEDIMENT CONTROL
                     ASSESSMENT




                                                                                                  The Noosa Plan
1.            Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—


•      A better looking, more marketable site;
•      Improved wet weather working conditions;

•      Reduced stockpile losses;

•      Less mud and dust problems;

•      Reduced clean-up costs;

•      Fewer public complaints;

•      Better public image;
•      Cleaner watercourses; and
•      Better fishing and swimming in our nearby watercourses.

2.            Erosion Hazard Assessment Form
Controlling Factors                                                   Points   Score   Checking
                      1
Predominant slope of the whole site, prior to
building works:
• 0 - 3% slope
• >3% - 5% slope
                                                                         0
                                                                         1
                                                                         2
                                                                                 1
• >5% - 10% slope
• >10% - 15% slope                                                       4
• > 15% slope                                                            5
Soil type: (see 1 below)
• Sandy soil/gravel
• Sandy loam
                                                                         0
                                                                         1        2
1
    The term ‘predominant slope’ is defined in Part 2 Section 2.12.



                                                              S2.1

Page 25

                 Including amendments to 16 September 2013




                                                             Controlling Factors                                                 Points         Score         Checking
                                                             • Clay loam                                                             2
                                                                                                                                     2
The Noosa Plan



                                                             • Clay soil
                                                             Anticipated duration of site disturbance: (see 2 below)
                                                             • Duration < 2 weeks                                                     0
                                                             • 2 weeks # Duration < 3 months
                                                             • 3 months # Duration < 6 months
                                                                                                                                      2
                                                                                                                                      4              4
                                                             • Duration > 6 months                                                    5
                                                             Month that works are undertaken: (see 3 below)
                                                             • August, September                                                      0
                                                             • April, May, June, July, November, October
                                                             • March December
                                                                                                                                      1
                                                                                                                                      2              1
                                                             • January February                                                       3
                                                             Offsite sediment control (i.e. down slope of the soil
                                                             disturbance):
                                                             • Score 1 point if there is no purpose built, operational                1
                                                                 and well maintained sediment traps (eg. sediment
                                                                 basin, gross pollutant trap or purpose built wetland)
                                                                 to catch sediment before it enters a water body with
                                                                                                                                                     0
                                                                 environmental values (eg. creek, natural wetland,
                                                                 river or bay) (see 4 below)
                                                             Run-off entering the site:
                                                             • Score 1 point if stormwater run off entering the site is
                                                                 not diverted away from the soil disturbance
                                                                                                                                      1
                                                                                                                                                     0
                                                             Extent of site disturbance:
                                                             • Score 2 points if building work requires reshaping of

                                                                                                                                                     5
                                                                 the ground surface (eg. ‘cut and fill’ works) (see 5                 2
                                                                 below)
                                                             •  Score 5 points if the area to be disturbed is greater                 5
                                                                than 600m²
                                                             Works within environmentally sensitive areas:
                                                             • Score 11 points if the disturbance is within the banks
                                                                of a watercourse (see 6 below)                                        11
                                                             • Score 5 points if the disturbance is within 50m of the
                                                                top of bank of a watercourse                                          5              0
                                                             • Score 2 points if the disturbance is between 50m
                                                                and 100m of the top of bank of a watercourse                          2

                                                             TOTAL SCORE (See 7 & 8 below)
                                                             Notes:
                                                                                                                                                    13
                                                                 1. Where there is more than one type of soil on the site, select the category with the highest point value.
                                                                 2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
                                                                    be fully stabilised (eg. grassing).
                                                                 3. If this time span covers more than one category, select the category with the highest point value.
                                                                    Note that if there is no grass/vegetation cover on the site before building work has started, the time
                                                                    span starts from the time this form is completed.
                                                                 4. If you are not sure, score 1 point.
                                                                 5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
                                                                    wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
                                                                    already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
                                                                 6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
                                                                    intermittently.
                                                                 7. For a high risk site, the total score is ≥ 14 points.
                                                                 8. For a low risk site, the total score is < 14 points.




                                                                                                                      S2.2

Page 26

                                                                                                                  Including amendments to 16 September 2013
3.        Erosion and Sediment Control Methods




                                                                                                 The Noosa Plan
                    Element                                    Solution

Minimise disturbance when excavating      Retain as much grassed area as possible on the
                                          site.
                                          These areas not only improve the appearance
                                          of the site they also filter much of the sediment
                                          from stormwater run-off before it reaches the
                                          drainage system.
Catch drains and perimeter banks          Allow for diversion of up slope stormwater
                                          around the work site and other disturbed
                                          surfaces.
Install a sediment barrier                Install sediment barriers down slope of the
                                          building site to filter coarse sediment before it
                                          can wash into gutters, drains and watercourses.
                                          • Purpose designed geotextile sediment
                                               fabric (i.e. not shadecloth) attached to posts
                                               with the geotextile buried in an upstream
                                               trench; or
                                          • Place turf of a minimum 600mm width along
                                               kerb line; or
                                          • Straw bales, staked in a 100mm (min) deep
                                               trench.
Single gravelled entry-exit               Restrict vehicle access to one entry-exit point.
                                          • Gravelling the access point will allow all
                                               weather access, will reduce the amount of
                                               soil carried off the site by vehicles, and will
                                               provide a permanent base for the driveway.
Early stormwater drainage connection      Connect a temporary or permanent downpipe/s
                                          to the stormwater system before laying the roof
                                          or slow and spread the flow from downpipe/s to
                                          avoid localised erosion. Downpipe/s may be
                                          temporarily removed during wall construction.
                                          All stormwater must discharge in a manner that
                                          does not cause soil erosion.
Concrete waste and washing                Waste concrete and household paint must not
                                          be allowed to wash into the gutters or the street.
Sand and soil stockpiles                  Stockpiles must be placed wholly on the
                                          construction site and behind a sediment barrier.




                                       S2.3

Page 27

                                                                                                         ENG
                                             Engineering Report & Stormwater Management Plan
                                     Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                                      By:              MRS          Revision No.:              A


Appendix D - IECA (Australasia) Standard Drawings

Available from: http://www.austieca.com.au/publications/book-6-standard-drawings




A PO Box 26, Carina Q 4152                                                              19 | P a g e
E [email protected]
W www.vtce.com.au

Page 28

                                                                                                                                                                    Building site                 2 m (min)
                                                               Minimu                                                         Flow control berm incorporated
                                                                     m leng                                                   into the rock pad if the pad
                              40 − 75 mm                                   th 10 m
                                                                                     (min)                                    receives runoff from the building
                              crushed rock                     300 mm (min)
                                                                                                                              site (location may vary)




                                                                                                                                                                                     10 m (min)
                                                 150 − 200 mm                                                                                                                                                   Land slope

                                                                              Width 2.0 m (min)                     da
                                                                                                                         ry                         Kerb
                                                                                                           o   un
                                                                                                        yb
                                                                                             p   er t               Footpath
                              Up-slope runoff directed                                   Pro
                                                                                                                                                                                                              Make safe for
                              to an appropriate                                                                                        Roadway                         Footpath                               pedestrian traffic
                              sediment trap
                                Geotextile filter cloth (mandatory             Make safe for
                                when working on clayey soils)                  pedestrian traffic                                                                                                 ROADWAY

                                                         (a) Rock entry/exit pad for building sites
                                                                                                                                                                    (b) Rock pad sloping away from road
                              CONSTRUCTION NOTES:                         STIFF-BRISTLED BROOM, AND THEN BY A
                                                                          MECHANICAL VACUUM UNIT, IF AVAILABLE.
                              MATERIALS
                                                                          3. IF NECESSARY FOR SAFETY REASONS, THE                                                   Building site                 2 m (min)
                              ROCK: WELL GRADED, HARD, ANGULAR,           ROADWAY SHALL ONLY BE WASHED CLEAN
                              EROSION RESISTANT ROCK, NOMINAL             AFTER ALL REASONABLE EFFORTS HAVE BEEN
                              DIAMETER OF 40 TO 75mm.                     TAKEN TO SHOVEL AND SWEEP THE MATERIAL
                                                                          FROM THE ROADWAY.
                              FOOTPATH STABILISING AGGREGATE: 25 TO                                                                                                                                             Land slope




                                                                                                                                                                                  10 m (min)
                              50mm GRAVEL OR AGGREGATE (IF REQUIRED).     4. WHEN THE VOIDS BETWEEN THE ROCK
                                                                          BECOMES FILLED WITH MATERIAL AND THE
                              GEOTEXTILE FABRIC: HEAVY-DUTY,              EFFECTIVENESS OF THE ROCK PAD IS
                              NEEDLE-PUNCHED, NON-WOVEN FILTER            REDUCED TO A POINT WHERE SEDIMENT IS
                                                                                                                                                                                                              Sediment fence
                              CLOTH (‘BIDIM’ A24 OR EQUIVALENT).          BEING TRACKED OFF THE SITE, A NEW 100mm
                                                                          LAYER OF ROCK MUST BE ADDED AND/OR THE
                              INSTALLATION                                ROCK PAD MUST BE EXTENDED.                                                                                                          Make safe for
                                                                                                                                                                       Footpath
                                                                                                                                                                                                              pedestrian traffic
                              1. INSPECT ALL SITE ENTRY AND EXIT POINTS   5. ENSURE ANY ASSOCIATED DRAINAGE
                              PRIOR TO FORECAST RAIN, DAILY DURING        CONTROL MEASURES (e.g. FLOW CONTROL
                              EXTENDED PERIODS OF RAINFALL, AFTER         BERM) ARE MAINTAINED IN ACCORDANCE
                              RUNOFF-PRODUCING RAINFALL, OR               WITH THEIR DESIRED OPERATIONAL                                                                                          ROADWAY
                              OTHERWISE AT FORTNIGHTLY INTERVALS.         CONDITION.
Catchments & Creeks Pty Ltd




                              2. IF SAND, SOIL, SEDIMENT OR MUD IS        6. DISPOSE OF SEDIMENT AND DEBRIS IN A
                              TRACKED OR WASHED ONTO THE ADJACENT         MANNER THAT WILL NOT CREATE AN EROSION                                                    (c) Rock pad sloping towards the road
                              SEALED ROADWAY, THEN SUCH MUST BE           OR POLLUTION HAZARD.
                              PHYSICALLY REMOVED, FIRST USING A                                                                                Drawn:       Date:
                              SQUARE-EDGED SHOVEL, AND THEN A
                                                                                                                                                 GMW         May-10 Rock Pads for Building Sites                             ESC-01

Page 29

                              MATERIALS                          4. WRAP THE FABRIC AROUND OR           REMOVAL
                                                                 OVER THE STORMWATER INLET              1. WHEN THE UP-SLOPE DRAINAGE
                              FABRIC (LIGHT TRAFFIC AREAS):      GRATE IN SUCH A MANNER THAT            AREA HAS BEEN STABILISED,
                              HEAVY-DUTY, NEEDLE-PUNCHED,        PREVENTS ANY WATER ENTERING            REMOVE ALL MATERIALS INCLUDED
                              NON-WOVEN FILTER CLOTH (‘BIDIM’    THE STORMWATER INLET WITHOUT           DEPOSITED SEDIMENT AND DISPOSE
                              A34 OR EQUIVALENT).                PASSING THROUGH THE FABRIC.            OF IN A SUITABLE MANNER THAT WILL
                                                                                                        NOT CAUSE AN EROSION OR
                              FABRIC (HEAVY TRAFFIC AREAS):      5. ENSURE ALL OTHER FLOW ENTRY         POLLUTION HAZARD.
                              POLY-PROPYLENE, POLYAMIDE,         POINTS ARE COVERED WITH FABRIC
                              NYLON, POLYESTER, OR               SUCH THAT WATER CANNOT ENTER                  Sediment collection pit excavated around inlet
                              POLYETHYLENE WOVEN OR              THE STORMWATER INLET WITHOUT
                              NON-WOVEN REINFORCED FABRIC.       PASSING THROUGH A SUITABLE
                              THE FABRIC WIDTH SHOULD BE AT      FILTER.
                              LEAST 700mm, WITH A MINIMUM UNIT
                              WEIGHT OF 140g/m2. FABRICS         6. TAKE ALL NECESSARY MEASURE
                              SHOULD CONTAIN ULTRAVIOLET         TO MINIMISE SAFETY OR FLOODING
                              INHIBITORS AND STABILISERS TO      RISK CAUSED BY OPERATION OF THE
                              PROVIDE A MINIMUM OF 6 MONTHS      SEDIMENT TRAP.
                              OF USEABLE CONSTRUCTION LIFE
                              (ULTRAVIOLET STABILITY EXCEEDING   MAINTENANCE
                              70%).
                                                                 1. INSPECT THE BARRIER AFTER
                              INSTALLATION                       EACH RUNOFF-PRODUCING
                                                                 RAINFALL EVENT AND MAKE REPAIRS            (a) Fabric wrap drop inlet protection with trench
                              1. REFER TO APPROVED PLANS FOR     AS NEEDED TO THE SEDIMENT TRAP.
                              LOCATION AND DIMENSIONAL                                                                                                               Grate wrapped in non-woven
                              DETAILS. IF THERE ARE QUESTIONS    2. REMOVE COLLECTED SEDIMENT                                                                        filter cloth (woven sediment
                              OR PROBLEMS WITH THE LOCATION,     AND DISPOSE OF IN A SUITABLE                            Sediment collection pit                     fence fabric only used in
                              DIMENSIONS OR METHOD OF            MANNER THAT WILL NOT CAUSE AN                           excavated around inlet                      heavy traffic areas)
                              INSTALLATION CONTACT THE           EROSION OR POLLUTION HAZARD.
                              ENGINEER OR RESPONSIBLE
                              ON-SITE OFFICER FOR ASSISTANCE.    3. REPLACE THE FABRIC IF IT IS TORN
                                                                 OR DAMAGED.
                              2. ENSURE THAT THE INSTALLATION
                              OF THE SEDIMENT TRAP WILL NOT      4. SEDIMENT DEPOSITS SHOULD BE                                                        Stormwater
                              CAUSE UNDESIRABLE SAFETY OR        REMOVED IMMEDIATELY IF THEY                                                           inlet grate
                              FLOODING ISSUES.                   REPRESENT A SAFETY RISK.
Catchments & Creeks Pty Ltd




                              3. SELECT THE APPROPRIATE FABRIC
                              FOR THE SITE CONDITIONS.
                                                                                                       (b) Typical details of excavated sediment collection trench
                                                                                                                Drawn:           Date:
                                                                                                                                                   Grated Stormwater (Field) Inlet
                                                                                                                  GMW             May-10 Sediment Trap                                         ESC-02

Page 30

                              MATERIALS                             (ii) EACH SOCK EXTENDS UP THE          WASHED CLEAN AFTER ALL REASONABLE                    4. ALL SYNTHETIC (PLASTIC) MESH OR
                                                                    CHANNEL BANKS SUCH THAT THE CREST      EFFORTS HAVE BEEN TAKEN TO SHOVEL                    OTHER NON READILY BIODEGRADABLE
                              SOCKS: MINIMUM 200mm DIAMETER                                                                                                     MATERIAL MUST BE REMOVED FROM THE
                                                                    OF THE SOCK AT ITS LOWEST POINT IS     AND SWEEP THE MATERIAL FROM THE
                              SYNTHETIC OR BIODEGRADABLE TUBES                                                                                                  SITE ONCE THE SLOPE OR DRAIN IS
                                                                    LOWER THAN GROUND LEVEL AT EITHER      SURFACE.
                              MANUFACTURED FROM NON-WOVEN OR                                                                                                    STABILISED, OR THE SOCKS HAVE
                                                                    END OF THE SOCK.
                              COMPOSITE FABRIC SUITABLE FOR THE                                                                                                 DETERIORATED TO A POINT WHERE THEY
                                                                                                           3. DISPOSE OF COLLECTED SEDIMENT IN
                              ‘FILTRATION’ OF COARSE SEDIMENTS.                                                                                                 ARE NO LONGER PROVIDING THEIR
                                                                    4. IF STAKES ARE REQUIRED TO ANCHOR    A SUITABLE MANNER THAT WILL NOT
                              FILL MATERIAL: STRAW, CANE MULCH,     THE SOCKS, THEIR SPACING DOES NOT      CAUSE AN EROSION OR POLLUTION                        INTENDED DRAINAGE OR SEDIMENT
                              COMPOSTED MATERIAL (AS4454),          EXCEEDING 1.2m OR SIX TIMES THE        HAZARD.                                              CONTROL FUNCTION.
                              COARSE SAND, OR CLEAN AGGREGATE.      SOCK DIAMETER (WHICHEVER IS THE
                              STAKES: MINIMUM 25 x 25mm TIMBER.     LESSER). A MAXIMUM STAKE SPACING OF           Filter socks overlap
                                                                    0.3m APPLIES WHEN USED TO FORM                onto kerb
                                                                                                                                                  4.0 m (min)
                              INSTALLATION                          CHECK DAMS.
                              1. REFER TO APPROVED PLANS FOR                                                      Sediment
                              LOCATION AND INSTALLATION DETAILS.    MAINTENANCE
                                                                    1. INSPECT ALL FILTER SOCKS PRIOR TO          pond
                              IF THERE ARE QUESTIONS OR PROBLEMS
                              WITH THE LOCATION, DIMENSIONS OR      FORECAST RAIN, DAILY DURING
                              METHOD OF INSTALLATION CONTACT THE    EXTENDED PERIODS OF RAINFALL,
                                                                    AFTER SIGNIFICANT RUNOFF                    Run-off
                              ENGINEER OR RESPONSIBLE ON-SITE                                                                                                   1 m (max) on public roads
                              OFFICER FOR ASSISTANCE.               PRODUCING STORMS OR OTHERWISE AT
                                                                    WEEKLY INTERVALS.
                              2. ENSURE THE SOCKS ARE PLACED
                              INDIVIDUALLY OR COLLECTIVELY (AS A    2. REPAIR OR REPLACE DAMAGED                                               Bypass flow
                              SINGLE SEDIMENT TRAP) SUCH THAT:      SOCKS.
                              (i) LEAKAGE AROUND OR UNDER THE                                                                (a) On-grade kerb inlet sediment trap
                              SOCKS IS MINIMISED;                   3. THE BULK OF THE SEDIMENT
                              (ii) ADJOINING SOCKS ARE TIGHTLY      COLLECTED BEHIND THE FILTER SOCKS                                                            Filter socks may need to fully surround
                              BUTTED OR OVERLAPPED AT LEAST         SHOULD BE REMOVED BY SHOVEL AFTER                         PVC pipe spacers                   the inlet to intercept sediment runoff
                              450mm;                                EACH STORM EVENT.                                                                            from the road and verge
                              (iii) THE SURFACE AREA OF POTENTIAL
                              WATER PONDING UP-SLOPE OF EACH        4. REMOVE COLLECTED SEDIMENT AND
                              SEDIMENT TRAP IS MAXIMISED;           DISPOSE OF IN A SUITABLE MANNER
                              (iv) TO THE MAXIMUM DEGREE            THAT WILL NOT CAUSE AN EROSION OR
                              PRACTICAL, ALL SEDIMENT-LADEN         POLLUTION HAZARD.
                              WATER WILL PASS THROUGH THE
                              FORMED POND BEFORE FLOWING OVER       REMOVAL
                              THE DOWN-SLOPE END OF THE             1. ALL SAND, SOIL, SEDIMENT OR MUD
                              SEDIMENT TRAP.                        MUST BE PHYSICALLY REMOVED FROM                          Filter sock
                                                                    SEALED SURFACES, FIRST USING A
                              3. WHEN PLACED ACROSS THE INVERT      SQUARE-EDGED SHOVEL, AND THEN A            Gully grate wrapped in non-woven filter fabric                 Side inlet remains open
                                                                    STIFF-BRISTLED BROOM, AND THEN BY A
Catchments & Creeks Pty Ltd




                              OF MINOR DRAINS, ENSURE THE SOCKS                                                          (minimum, bidim A34 or equivalent)
                              ARE PLACED SUCH THAT:                 MECHANICAL VACUUM UNIT, IF
                              (i) THE CREST OF THE DOWNSTREAM       AVAILABLE.
                                                                                                                                      (b) Sag inlet sediment trap
                              SOCK IS LEVEL WITH THE CHANNEL
                              INVERT AT THE IMMEDIATE UPSTREAM      2. IF NECESSARY FOR SAFETY REASONS,             Drawn:             Date:
                              SOCK (IF ANY);                        THE SEALED SURFACE SHALL ONLY BE
                                                                                                                      GMW                  Dec-09 Kerb Inlet Sediment Traps                       ESC-03

Page 31

                                                                                                                                                                                              Woven or           2000 mm (max) without
                                                                                                                              Fabric                                                          composite                   support wire
                                                                                                                                                                                  Fabric B    sediment
                                                           2m                                                    Post                                                                         fence fabric                     Post
                                                                                                                             Clean
                                                                       Fabric                  Fabric                        sand or                              Post   Post
                                                                         Post                                                aggregate                             B      A                     200 (min)
                                    Final                                                           Back fill
                                            batter
                                                                                                                                                      Fabric A
                                                                                                          200 mm          300 mm
                                                                                                                                           Fabric to fold around each stake one full turn.
                                                                                                                                           Stake B to be drive tightly against Stake A.
                                                                                                           Soil                            The tops of both stakes to be secured with wire.
                                                                                                                                                                                              Sheet flow
                              (a) Location of fence relative to base of slope              (b) Anchoring base of fabric                           (c) Joining fabric - Method 1
                                                                                                                                                                                                 (d) Installation without backing support

                                                       W                                       Fabric                                                                                                           3000 mm (max) with top wire
                                                                                                                                                                                              Woven or                or wire mesh backing
                                                                                                                Straw bale                              Staple/tack              Fabric B     composite
                                                300 mm (min)                                                                                                                                  sediment                          Post
                                                                                                                                                                                              fence fabric
                                                                                                                        Sediment                          Fabric A                                             1 m (max)
                                                                                                                                                                 Safety cap                     200 (min)     secure fabric
                                                                                                                                                                                                                                       Top wire
                                                                                                                                             Support post option 1                                               to wire
                                                                                                                                                                                                                                       support
                                                                                                                                             1500 mm2 hardwood stake
                                                                                                          200 mm
                                                                                                                                                           Support post option 2
                                                                                                                                                           1.5 kg/m steel star picket

                                             (e) Spill-through weir                   (f) Placement of up-slope straw bale                        (g) Joining fabric - Method 2
                                                                                                                                                                                              Sheet flow


                                 3 m (max) with wire backing,            ‘Returns’ placed at 20 m spacing (max) if fence is located                                                                (h) Installation with top wire support
                                                                         along the contour, otherwise 5 to 10 m depending on slope                       Notes:
                                        otherwise 2 m (max)
                                                                                                                                                         1. Sediment fence to be installed along a line of constant ground elevation
                                Direction of flow                                                                            1.5 m (min)
                                                                                                                                                            wherever practical.
                                                                                                                                                         2. Both end of the sediment fence to extend up the slope at least 1m.
                                                                                                                                                         3. Support post to be spaced a maximum 2m unless the fence is supported
                                                                                                                                                            by a top wire or wire mesh backing, in which case 3m maximum spacing.
Catchments & Creeks Pty Ltd




                                                                                                                                                         4. Fence ‘returns’ shall be installed at maximum 20m spacing if fence is
                                                                                                                                                            installed along the contour, otherwise 5 to 10m maximum spacing.
                                                                                                                All support posts placed
                                  Fabric                                                                        down-slope of fabric                     5. Minimum 4 staples or tie wires per stake.
                                  buried                          Sediment fence fabric,                                                                 Drawn:          Date:
                                  200 mm                          not filter cloth or shade cloth     (i) Installation of sediment fence
                                                                                                                                                            GMW           Dec-09 Sediment Fence                                   ESC-04

Page 32

                              MATERIALS                                   DAM A MINIMUM 1/3 AND MAXIMUM 1/2 FENCE    THE TWO STAKES TIED TOGETHER WITH WIRE;     MAINTENANCE
                                                                          HEIGHT, AND EXTENDING AT LEAST 1.5m UP     OR
                              FABRIC: POLYPROPYLENE, POLYAMIDE,           THE SLOPE.                                 (ii) OVERLAP THE FABRIC TO THE NEXT         1. INSPECT THE SEDIMENT FENCE AT LEAST
                              NYLON, POLYESTER, OR POLYETHYLENE                                                      ADJACENT SUPPORT POST.                      WEEKLY AND AFTER ANY SIGNIFICANT RAIN.
                              WOVEN OR NON-WOVEN FABRIC, AT LEAST         4. ENSURE THE EXTREME ENDS OF THE                                                      MAKE NECESSARY REPAIRS IMMEDIATELY.
                              700mm IN WIDTH AND A MINIMUM UNIT WEIGHT    FENCE ARE TURNED UP THE SLOPE AT LEAST     11. SECURELY ATTACH THE FABRIC TO THE
                              OF 140g/m2. ALL FABRICS TO CONTAIN          1.5m, OR AS NECESSARY, TO MINIMISE WATER   SUPPORT POSTS USING 25 X 12.5mm STAPLES,    2. REPAIR ANY TORN SECTIONS WITH A
                              ULTRAVIOLET INHIBITORS AND STABILISERS      BYPASSING AROUND THE FENCE.                OR TIE WIRE AT MAXIMUM 150mm SPACING.       CONTINUOUS PIECE OF FABRIC FROM POST
                              TO PROVIDE A MINIMUM OF 6 MONTHS OF                                                                                                TO POST.
                              USEABLE CONSTRUCTION LIFE (ULTRAVIOLET      5. ENSURE THE SEDIMENT FENCE IS            12. SECURELY ATTACH THE FABRIC TO THE
                              STABILITY EXCEEDING 70%).                   INSTALLED IN A MANNER THAT AVOIDS THE      SUPPORT WIRE/MESH (IF ANY) AT A MAXIMUM     3. WHEN MAKING REPAIRS, ALWAYS RESTORE
                                                                          CONCENTRATION OF FLOW ALONG THE            SPACING OF 1m.                              THE SYSTEM TO ITS ORIGINAL
                              FABRIC REINFORCEMENT: WIRE OR STEEL         FENCE, AND THE UNDESIRABLE DISCHARGE                                                   CONFIGURATION UNLESS AN AMENDED
                              MESH MINIMUM 14-GAUGE WITH A MAXIMUM        OF WATER AROUND THE ENDS OF THE FENCE.     13. ENSURE THE COMPLETED SEDIMENT           LAYOUT IS REQUIRED OR SPECIFIED.
                              MESH SPACING OF 200mm.                                                                 FENCE IS AT LEAST 450mm, BUT NOT MORE
                                                                          6. IF THE SEDIMENT FENCE IS TO BE          THAN 700mm HIGH. IF A SPILL-THOUGH WEIR     4. IF THE FENCE IS SAGGING BETWEEN
                              SUPPORT POSTS/STAKES: 1500mm2 (MIN)         INSTALLED ALONG THE EDGE OF EXISTING       IS INSTALLED, ENSURE THE CREST OF THE       STAKES, INSTALL ADDITIONAL SUPPORT
                              HARDWOOD, 2500mm2 (MIN) SOFTWOOD, OR        TREES, ENSURE CARE IS TAKEN TO PROTECT     WEIR IS AT LEAST 300mm ABOVE GROUND         POSTS.
                              1.5kg/m (MIN) STEEL STAR PICKETS SUITABLE   THE TREES AND THEIR ROOT SYSTEMS           LEVEL.
                              FOR ATTACHING FABRIC.                       DURING INSTALLATION OF THE FENCE. DO                                                   5. REMOVE ACCUMULATED SEDIMENT IF THE
                                                                          NOT ATTACH THE FABRIC TO THE TREES.        14. BACKFILL THE TRENCH AND TAMP THE FILL   SEDIMENT DEPOSIT EXCEEDS A DEPTH OF 1/3
                              INSTALLATION                                                                           TO FIRMLY ANCHOR THE BOTTOM OF THE          THE HEIGHT OF THE FENCE.
                                                                          7. UNLESS DIRECTED BY THE SITE             FABRIC AND MESH TO PREVENT WATER FROM
                              1. REFER TO APPROVED PLANS FOR LOCATION,    SUPERVISOR OR THE APPROVED PLANS,          FLOWING UNDER THE FENCE.                    6. DISPOSE OF SEDIMENT IN A SUITABLE
                              EXTENT, AND REQUIRED TYPE OF FABRIC (IF     EXCAVATE A 200mm WIDE BY 200mm DEEP                                                    MANNER THAT WILL NOT CAUSE AN EROSION
                              SPECIFIED). IF THERE ARE QUESTIONS OR       TRENCH ALONG THE PROPOSED FENCE LINE,      ADDITIONAL REQUIREMENTS FOR THE             OR POLLUTION HAZARD.
                              PROBLEMS WITH THE LOCATION, EXTENT,         PLACING THE EXCAVATED MATERIAL ON THE      INSTALLATION OF A SPILL-THROUGH WEIR
                              FABRIC TYPE, OR METHOD OF INSTALLATION      UP-SLOPE SIDE OF THE TRENCH.                                                           7. REPLACE THE FABRIC IF THE SERVICE LIFE
                              CONTACT THE ENGINEER OR RESPONSIBLE                                                    1. LOCATE THE SPILL-THROUGH WEIR SUCH       OF THE EXISTING FABRIC EXCEEDS
                              ON-SITE OFFICER FOR ASSISTANCE.             8. ALONG THE LOWER SIDE OF THE TRENCH,     THAT THE WEIR CREST WILL BE LOWER THAN      6-MONTHS.
                                                                          APPROPRIATELY SECURE THE STAKES INTO       THE GROUND LEVEL AT EACH END OF THE
                              2. TO THE MAXIMUM DEGREE PRACTICAL, AND     THE GROUND SPACED NO GREATER THAN 3m       FENCE.                                      REMOVAL
                              WHERE THE PLANS ALLOW, ENSURE THE           IF SUPPORTED BY A TOP SUPPORT WIRE OR
                              FENCE IS LOCATED:                           WEIR MESH BACKING, OTHERWISE NO            2. ENSURE THE CREST OF THE                  1. WHEN DISTURBED AREAS UP-SLOPE OF THE
                              (i) TOTALLY WITHIN THE PROPERTY             GREATER THAN 2m.                           SPILL-THROUGH WEIR IS AT LEAST 300mm THE    SEDIMENT FENCE ARE SUFFICIENTLY
                              BOUNDARIES;                                                                            GROUND ELEVATION.                           STABILISED TO RESTRAIN EROSION, THE
                              (ii) ALONG A LINE OF CONSTANT ELEVATION     9. IF SPECIFIED, SECURELY ATTACH THE                                                   FENCE MUST BE REMOVED.
                              WHEREVER PRACTICAL;                         SUPPORT WIRE OR MESH TO THE UP-SLOPE       3. SECURELY TIE A HORIZONTAL CROSS
                              (iii) AT LEAST 2m FROM THE TOE OF ANY       SIDE OF THE STAKES WITH THE MESH           MEMBER (WEIR) TO THE SUPPORT POSTS/         2. REMOVE MATERIALS AND COLLECTED
                              FILLING OPERATIONS THAT MAY RESULT IN       EXTENDING AT LEAST 200mm INTO THE          STAKES EACH SIDE OF THE WEIR. CUT THE       SEDIMENT AND DISPOSE OF IN A SUITABLE
                              SHIFTING SOIL/FILL DAMAGING THE FENCE.      EXCAVATED TRENCH. ENSURE THE MESH AND      FABRIC DOWN THE SIDE OF EACH POST AND       MANNER THAT WILL NOT CAUSE AN EROSION
                                                                          FABRIC IS ATTACHED TO THE UP-SLOPE SIDE    FOLD THE FABRIC OVER THE CROSS MEMBER       OR POLLUTION HAZARD.
                              3. INSTALL RETURNS WITHIN THE FENCE AT      OF THE STAKES EVEN WHEN DIRECTING A        AND APPROPRIATELY SECURE THE FABRIC.
                              MAXIMUM 20m INTERVALS IF THE FENCE IS       FENCE AROUND A CORNER OR SHARP                                                         3. REHABILITATE/REVEGETATE THE
                              INSTALLED ALONG THE CONTOUR, OR 5 TO        CHANGE OF DIRECTION.                       4. INSTALL A SUITABLE SPLASH PAD AND/OR     DISTURBED GROUND AS NECESSARY TO
                              10m MAXIMUM SPACING (DEPENDING ON                                                      CHUTE IMMEDIATELY DOWN-SLOPE OF THE         MINIMISE THE EROSION HAZARD.
Catchments & Creeks Pty Ltd




                              SLOPE) IF THE FENCE IS INSTALLED AT AN      10. WHEREVER POSSIBLE, CONSTRUCT THE       SPILL-THROUGH WEIR TO CONTROL SOIL
                              ANGLE TO THE CONTOUR. THE ‘RETURNS’         SEDIMENT FENCE FROM A CONTINUOUS ROLL      EROSION AND APPROPRIATELY DISCHARGE
                              SHALL CONSIST OF EITHER:                    OF FABRIC. TO JOIN FABRIC EITHER:          THE CONCENTRATED FLOW PASSING OVER
                              (i) V-SHAPED SECTION EXTENDING AT LEAST     (i) ATTACH EACH END TO TWO OVERLAPPING     THE WEIR.
                              1.5m UP THE SLOPE; OR                       STAKES WITH THE FABRIC FOLDING AROUND                Drawn:       Date:
                              (ii) SANDBAG OR ROCK/AGGREGATE CHECK        THE ASSOCIATED STAKE ONE TURN, AND WITH
                                                                                                                                 GMW         May-10 Sediment Fence                               ESC-05

Page 33

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


Appendix E - State Planning Policy April 2016 – Water Quality development
             assessment code




A PO Box 26, Carina Q 4152                                                      20 | P a g e
E [email protected]
W www.vtce.com.au

Page 34

                                            1 Memorial Avenue Tewantin, QLD 4565
                                                           State Planning Policy April 2016 – Water Quality
                                                      Performance Outcome Criteria and Acceptable Outcomes


    SPP code: Water quality

                  Performance outcomes                                      Acceptable outcomes                                                 Solution

1   PO1                                                      AO1.1                                                       SO1.1
    The development is planned and designed considering      A site stormwater quality management plan (SQMP) is         A site stormwater quality management plan has been
    the land use constraints of the site for achieving       prepared, and:                                              prepared for this development that is consistent with any
    stormwater design objectives.                             a. is consistent with any local area stormwater            local area stormwater management planning and
                                                                    management planning, and                             provides for achievable stormwater quality treatment
                                                              b. provides for achievable stormwater quality              measures.
                                                                    treatment measures meeting design objectives
                                                                    listed below in Table A (construction phase) and
                                                                    Table B (post construction phase), or current best
                                                                    practice environmental management, reflecting
                                                                    land use constraints, such as:
                                                                    • erosive, dispersive and/or saline soil types
                                                                    • landscape features (including landform)
                                                                    • acid sulfate soil and management of nutrients of
                                                                       concern
                                                                    • rainfall erosivity.

                                                             Editor’s note: Local area stormwater management
                                                             planning may include Urban Stormwater Quality
                                                             Management Plans, or Catchment or waterway
                                                             management plans, Healthy Waters Management Plans,
                                                             Water Quality Improvement Plans, Natural Resource
                                                             Management Plans.
2   PO2                                                      AO2.1                                                       SO2.1
    Development does not discharge wastewater to a           A wastewater management plan (WWMP) is prepared by          Not applicable as wastewater is not proposed for this
    waterway or off site unless demonstrated to be best-     a suitably qualified person and addresses:                  development.
    practice environmental management for that site.
                                                             a. wastewater type, and
                                                             b. climatic conditions, and
                                                             c. water quality objectives (WQOs), and
                                                             d. best-practice environmental management, and

Page 35

                                              1 Memorial Avenue Tewantin, QLD 4565
                                                              State Planning Policy April 2016 – Water Quality
                                                         Performance Outcome Criteria and Acceptable Outcomes


                  Performance outcomes                                            Acceptable outcomes                                                    Solution

                                                                  AO2.2
                                                                  The WWMP provides that wastewater is managed in
                                                                  accordance with a waste management hierarchy that:
                                                                  a. avoids wastewater discharges to waterways, or

                                                                  b. if wastewater discharge to waterways cannot
                                                                  practicably be avoided, minimises wastewater discharge
                                                                  to waterways by re-use, recycling, recovery and
                                                                  treatment for disposal to sewer, surface water and
                                                                  groundwater.
3   PO3                                                           AO3.1                                                           SO3.1
    Any non-tidal artificial waterway is located in a way that    If the proposed development involves a non-tidal                Not applicable as a waterway is not proposed for this
    is compatible with the land use constraints of the site for   artificial waterway:                                            development.
    protecting water environmental values in existing natural     a. environmental values in downstream waterways are
    waterways.                                                    protected, and
                                                                  b. any groundwater recharge areas are not affected, and
                                                                  c. the location of the waterway incorporates low lying
                                                                  areas of a catchment connected to an existing waterway,
                                                                  and
                                                                  d. existing areas of ponded water are included, and
                                                                  AO3.2
                                                                  Non-tidal artificial waterways are located:
                                                                  a. outside natural wetlands and any associated buffer
                                                                  areas, and
                                                                  b. to minimise disturbing soils or sediments, and
                                                                  c. to avoid altering the natural hydrologic regime in acid
                                                                  sulfate soil and nutrient hazardous areas.
4   PO4                                                           AO4.1                                                           SO4.1
    Any non-tidal artificial waterway is located in a way that    Where a non-tidal artificial waterway is located adjacent       Not applicable as a waterway is not proposed for this
    is compatible with existing tidal waterways.                  to, or is connected to, a tidal waterway by means of a          development.
                                                                  weir, lock, pumping system or similar:
                                                                  a. there is sufficient flushing or a tidal range of >0.3m, or

Page 36

                                            1 Memorial Avenue Tewantin, QLD 4565
                                                            State Planning Policy April 2016 – Water Quality
                                                       Performance Outcome Criteria and Acceptable Outcomes


                  Performance outcomes                                       Acceptable outcomes                                                 Solution

                                                              b. any tidal flow alteration does not adversely impact on
                                                              the tidal waterway, or
                                                              c. there is no introduction of salt water into freshwater
                                                              environments.
5   PO5                                                       AO5.1                                                       SO5.1
    Stormwater does not discharge directly to a non-tidal     Any non-tidal artificial waterway is designed and           Not applicable as a waterway is not proposed for this
    artificial waterway without treatment to manage           managed for any of the following end-use purposes:          development.
    stormwater quality management.
                                                                 a. amenity including aesthetics, landscaping and
                                                                 recreation, or
                                                                 b. flood management, or
                                                                 c. stormwater harvesting as part of an integrated
                                                                 water cycle management plan, or
                                                                 d. aquatic habitat, and
                                                              AO5.2
                                                              The end-use purpose of any non-tidal artificial waterway
                                                              is designed and operated in a way that protects water
                                                              environmental values.

6   PO6                                                       AO6.1                                                       SO6.1
    Construction activities for the development avoid or      An erosion and sediment control plan (ESCP)                 An erosion and sediment control plan has been prepared
    minimise adverse impacts on stormwater quality.           demonstrates that release of sediment-laden stormwater      for this development that will address the design
                                                              is avoided for the nominated design storm, and              objectives.
                                                              minimised when the nominated design storm is
                                                              exceeded, by addressing design objectives listed below in
                                                              Table A (construction phase) or local equivalent, for:
                                                              a. drainage control, and
                                                              b. erosion control, and
                                                              c. sediment control, and
                                                              d. water quality outcomes, and
                                                              AO6.2
                                                              Erosion and sediment control practices (including any
                                                              proprietary erosion and sediment control products) are

Page 37

                                             1 Memorial Avenue Tewantin, QLD 4565
                                                             State Planning Policy April 2016 – Water Quality
                                                        Performance Outcome Criteria and Acceptable Outcomes


                  Performance outcomes                                          Acceptable outcomes                                                  Solution
                                                                 designed, installed, constructed, operated, monitored
                                                                 and maintained, and any other erosion and sediment
                                                                 control practices are carried out in accordance with local
                                                                 conditions and appropriate recommendations from a
                                                                 suitably qualified person, or
                                                                 AO6.3
                                                                 The ESCP demonstrates how stormwater quality will be
                                                                 managed in accordance with an acceptable regional or
                                                                 local guideline so that target contaminants are treated to
                                                                 a design objective at least equivalent to Acceptable
                                                                 Outcome AO6.1.

7   PO7                                                          AO7.1                                                        SO7.1
    Operational activities for the development avoid or          Development incorporate stormwater flow control              Not applicable as a waterway is not proposed for this
    minimises changes to waterway hydrology from adverse         measure to achieve the design objectives set out below       development.
    impacts of altered stormwater quality and flow.              in and Table B (post construction phase). The operational
                                                                 phases for the development comply with design
                                                                 objectives in Table B (post construction phase), or
                                                                 current best practice environmental management,
                                                                 including management of frequent flows, and peak flows.

8   PO8                                                          AO8.1                                                        SO8.1
    Any treatment and disposal of waste water to                 Implement the WWMP prepared in accordance with               Not applicable as a waterway is not proposed for this
    a waterway accounts for:                                     AO2.1                                                        development.
       the applicable water quality objectives for the
        receiving waters, and
       adverse impact on ecosystem health or receiving
        waters, and
       in waters mapped as being of high ecological value,
        the adverse impacts of such releases and their offset.

9   PO9                                                          AO9.1                                                        SO9.1
    Wastewater discharge to a non-tidal artificial waterway is   Wastewater discharge to non-tidal artificial waterways is    Not applicable as a waterway is not proposed for this
    managed in a way that maintains ecological processes,        managed to avoid or minimise the release of nutrients of

Page 38

                                             1 Memorial Avenue Tewantin, QLD 4565
                                                             State Planning Policy April 2016 – Water Quality
                                                        Performance Outcome Criteria and Acceptable Outcomes


                   Performance outcomes                                        Acceptable outcomes                                                   Solution
     riparian vegetation, waterway integrity, and downstream   concern so as to minimise the occurrence, frequency and        development.
     ecosystem health.                                         intensity of coastal algal blooms, and
                                                               AO9.2
                                                               Development in coastal catchments avoids or minimises
                                                               and appropriately manages soil disturbance or altering
                                                               natural hydrology, and
                                                               AO9.3
                                                               Development in coastal catchments:
                                                               a. avoids lowering groundwater levels where potential or
                                                               actual acid sulfate soils are present, and
                                                               b. manages wastewaters so that
                                                               (i) the pH of any wastewater discharged is    maintained
                                                               between 6.5 and 8.5 to avoid mobilisation of acid, iron,
                                                               aluminium, and metals, and
                                                               (ii) holding times of neutralised wastewaters ensures the
                                                               flocculation and removal of any dissolved iron prior to
                                                               release, and
                                                               (iii) visible iron floc is not present in any discharge, and
                                                               (iv) precipitated iron floc is contained and disposed of,
                                                               and
                                                               (v) wastewater and precipitates that cannot be contained
                                                               and treated for discharge on site are removed and
                                                               disposed of through tradewaste or another lawful
                                                               method.

10   P10                                                       A10.1                                                          S10.1
     Any non-tidal artificial waterway is managed and          Any non-tidal artificial waterway is designed, constructed     Not applicable as a waterway is not proposed for this
     operated by suitably qualified persons to achieve water   and managed under the responsibility of a suitably             development.
     quality objectives in natural waterways.                  qualified registered professional engineer, Queensland
                                                               (RPEQ) with specific experience in establishing and

Page 39

                  1 Memorial Avenue Tewantin, QLD 4565
                            State Planning Policy April 2016 – Water Quality
                       Performance Outcome Criteria and Acceptable Outcomes


Performance outcomes                          Acceptable outcomes                          Solution
                              managing artificial waterways, and
                              A10.2
                              Monitoring and maintenance programs adaptively
                              manage water quality in any non-tidal artificial waterway
                              to achieve relevant water-quality objectives downstream
                              of the waterway, and
                              A10.3
                              Aquatic weeds are managed in any non-tidal artificial
                              waterway to achieve a low percentage of coverage of the
                              water surface area (less than 10%). Pests and vectors
                              (such as mosquitoes) are managed through avoiding
                              stagnant water areas, providing for native fish predators,
                              and any other best practices for monitoring and treating
                              pests, and
                              A10.4
                              Any non-tidal artificial waterway is managed and
                              operated by a responsible entity under agreement for the
                              life of the waterway. The responsible entity is to
                              implement a deed of agreement for the management
                              and operation of the waterway that:
                              a. identifies the waterway, and
                              b. states a period of responsibility for the entity, and
                              c. states a process for any transfer of responsibility for
                              the waterway, and
                              d. states required actions under the agreement for
                              monitoring the water quality of the waterway and
                              receiving waters, and
                              e. states required actions under the agreement for
                              maintaining the waterway to achieve the outcomes of
                              this code and any relevant conditions of a development
                              approval, and

Page 40

                                       1 Memorial Avenue Tewantin, QLD 4565
                                                   State Planning Policy April 2016 – Water Quality
                                              Performance Outcome Criteria and Acceptable Outcomes


                  Performance outcomes                               Acceptable outcomes                                       Solution
                                                     f. identifies funding sources for the above, including
                                                     bonds, headworks charges or levies.




    Table A: Construction phase—stormwater management design objectives
    Application
    Applies to all climatic regions.


         Issue                                                                       Design Objectives
                           Temporary                  1. Design life and design storm for temporary drainage works:
Drainage Control
                           drainage                   • Disturbed area open for <12 months—1 in 2-year ARI event
                           works                      • Disturbed area open for 12–24 months—1 in 5-year ARI event
                                                      • Disturbed area open for > 24 months—1 in 10-year ARI event
                                                      2. Design capacity excludes minimum 150 mm freeboard
                                                      3. Temporary culvert crossing—minimum 1 in 1-year ARI hydraulic capacity
                           Erosion                    1. Minimise exposure of disturbed soils at any time
Erosion Control
                           control measures           2. Divert water run-off from undisturbed areas around disturbed areas
                                                      3. Determine the erosion risk rating using local rainfall erosivity, rainfall depth, soil-loss rate or
                                                      other acceptable methods
                                                      4. Implement erosion control methods corresponding to identified erosion risk rating
                           Sediment control           1. Determine appropriate sediment control measures using:
Sediment Control
                           measures                   • potential soil loss rate, or
                                                      • monthly erosivity, or
                                                      • average monthly rainfall
                                                      2. Collect and drain stormwater from disturbed soils to sediment basin for design storm event:
                                                      • design storm for sediment basin sizing is 80th% five-day event or similar

Page 41

                                      1 Memorial Avenue Tewantin, QLD 4565
                                                    State Planning Policy April 2016 – Water Quality
                                               Performance Outcome Criteria and Acceptable Outcomes

                          Design storm for             3. Site discharge during sediment basin dewatering:
                          sediment                     • TSS < 50 mg/L TSS, and
                          control basins               • Turbidity not >10% receiving waters turbidity, and
                                                       • pH 6.5–8.5
                          Sediment basin
                          dewatering

                          Litter and other waste,      1. Avoid wind-blown litter; remove gross pollutants
Water quality
                          hydrocarbons and other       2. Ensure there is no visible oil or grease sheen on released waters
                          contaminants                 3. Dispose of waste containing contaminants at authorised facilities
                          Changes to the natural       1. For peak flow for the 1-year and 100-year ARI event, use constructed sediment basins to
Waterway stability and
                          waterway hydraulics          attenuate the discharge rate of stormwater from the site
flood flow
                          and hydrology
management



    Table B: Post construction phase—stormwater management design objectives
    Application
    (a) Applies to western Queensland and Cape York/ Far North Queensland, for population centres greater than 25,000 persons, and
    (b) For all other climatic regions with population centres greater than 3000 persons.

    Please refer to water quality objectives table in main report for data applicable to this application. Please refer to Table B of SPP (2014)
    for complete data set.

Page 42

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


Appendix F - Stormwater360 Operations and Maintenance Manuals




A PO Box 26, Carina Q 4152                                                      21 | P a g e
E [email protected]
W www.vtce.com.au

Page 43

  EnviroPod®
Installation Manual


[OCR of page images]
EnviroPod

Installation Manual

Seu)

 

Page 44

Purpose
The purpose of this manual is to indicate the safest and most efficient method in installing the EnviroPod units.

Personal Protective Equipment
The following personal protective equipment is required by staff for installation activities:
   High visibility vest or shirt
   Safety Footwear (Steel cap toe)
   Gloves (leather palmed riggers gloves or similar)
   Safety eyewear whilst drilling, hammering, cutting T section struts and installing tops and cages.
   Hearing protection for drilling, cutting using electric or battery saws and hammering.

Note: Personnel on construction and private sites must also adhere to the specific safety requirements of each
work site.

Tools Required For Installation
    1. Tape measure
    2. Marking Template
    3. Marking spray paint
    4. 8mm masonry drill
    5. 5 mm steel drill
    6. Pop Riveter for 4.8mm rivets
    7. Hammer
    8. Stanley knife
    9. Straight edge
    10. 10mm socket and ratchet
    11. Hacksaw

Pre-Installation Works (to be completed by others)
1. Gully pits shall be clean prior to installation by either a “Gully sucker” or manual methods.
2. All solidified material and debris within the gully pit shall be broken-out and removed.
3. Cleaning shall be carried out up to 1 week immediately prior to installation.
4. Any standing water shall be removed from the gully pit.
5. Any pipe penetrations within the gully pit must cut off flush with pit walls and rendered prior to installation.

Installation
The aim of all EnviroPod installations is to install the largest unit into each pit, without influencing the
hydraulic performance of the pit or drainage system. To provide clarification on certain aspects of the
installation the following tolerances are included:




©2013 Stormwater360 | EnviroPod Installation Manual                                                               2

Page 45

Code         Location                Tolerance                          Description
(Drawing)

A            Between top section     Equal distance between the         The distance is to ensure that any object
             and underside of        unit and the underside of the      entering the pit, through the kerb inlet, will
             grate                   grate to that between the kerb     not cause any blockages
                                     lintel and the gutter invert.

B            Between the cage        A minimum of 70mm. A               This distance is to ensure that unit will not
             walls and the pit       maximum of 300mm (without          cause material to accumulate between the
                                     unit modification)                 pit walls and the cage and that standard
                                                                        plastic sizes can be used.

C            Between the cage        A minimum of 70mm.                 This distance is to ensure that unit will not
             base and the pit                                           cause material to accumulate between the
                                                                        pit base and the cage.

D            Into through flow       Maximum of the top ¼ of the        To ensure that the through pipe is not
             pipe                    pipe can be obstructed by the      obstructed.
                                     cage.




                                                                     Kerb Lintel
                                                                                   A


                                                                             A
                         A
                                                 Or
                                                                         Cage

                        Cage
                                         B Min                           B Min               B Min
                    B Min                70mm                            70mm                70mm
                    70mm                              D - ¼ Diameter
                                 C Min
                                 70mm

                                                          Diameter




©2013 Stormwater360 | EnviroPod Installation Manual                                                                      3

Page 46

Enviropod Installation Procedure – 1 Piece Cage
Strut Installation
    1. Measure the internal dimensions of the pit while marking the center of the pit length, at 150mm down
       from entry of pit (the height where the struts are to be secured).
       Remember to allow for dimension “A”.




    2. Using a unit template mark the position of the holes for the L-brackets, based on the center mark.




    3. Using an 8mm masonry drill bit drill holes for the insertion of the Dyna Bolts.




©2013 Stormwater360 | EnviroPod Installation Manual                                                         4

Page 47

    4. Cut the T sections to length, and pop rivet an L-bracket to one end of the T sections.




    5. Insert the T section, with L-bracket under the lintel and secure L-bracket to the pit wall with an 8mm
       Galvanised Dyna Bolt.




    6. Secure second L-bracket to the opposite pit wall using a Dyna Bolt.

    7. Pop rivet the free side of the T section to the second L-bracket.

    8. Repeat the steps 5-7 for the second T section.




©2013 Stormwater360 | EnviroPod Installation Manual                                                             5

Page 48

Top Section Installation
    1. Measure the internal dimensions of the pit at the height at which the plastic is to sit.




    2. Trim the plastic to fit the internal pit dimensions, adding an extra 20mm to each side to ensure a tight
       fit.




    3. With the plastic bent slightly upwards, lower the Top Section into the pit, guiding the unit so that it
       locates on the T Sections struts.




©2013 Stormwater360 | EnviroPod Installation Manual                                                               6

Page 49

    4. Slide the Top Section along the T Sections until it sits in the center of the pit.




    5. Check unit to ensure a good fit with pit, if the unit does not make a good fit, and that any gaps are less
       than 15mm. If the gaps are larger than 15mm the plastic will need to be replaced by a larger section.

    6. On each strut drill a 5mm hole through the Top Section and the T Struts, and secure the Top Section to
       the struts using a 73AS6-8 pop rivet. NOTE: if the EnviroPod incorporates a cage, step 6 can be
       completed during stage 2 of “Cage Installation”.




    7. Check plastic to ensure that it is bent upwards on all sides, adjusting plastic if required, fill small gaps
       with silicon sealant if required.




©2013 Stormwater360 | EnviroPod Installation Manual                                                                   7

Page 50

Cage Installation
    1. Lower the cage through the Top Section until the lip of the cage sits on the internal lip of the Top
       Section.




    2. Drill a 5mm hole through the Top Section and Cage Lip, and secure with a pop rivet.




    3. Repeat for opposite side.




©2013 Stormwater360 | EnviroPod Installation Manual                                                           8

Page 51

Bag Installation
    1. Thread the filter bag onto the stainless steel support ring.




    2. Lower the bag into the pit ensuring that the lifting loops at the base of the bag or on the outside.




    3. Pull the internal filter mesh downwards to ensure a secure fit with the top section.




©2013 Stormwater360 | EnviroPod Installation Manual                                                           9

Page 52

                    Stormwater360 Australia

        OPERATION AND MAINTENANCE GUIDELINES




                           Enviropod

Prepared by:                Stormwater360

Sydney Office: 4/107 Stephen Road, Botany, NSW 2019 Australia
Telephone: (02) 93169188 Facsimile: (02) 93164204
Email: www.stormwater360.com.au

Page 53

                                                      TABLE OF CONTENTS


1     INTRODUCTION ..................................................................................................................... 4

2     ENVIROPOD HEALTH AND SAFETY .................................................................................... 6
    2.1      PERSONNEL HEALTH AND SAFETY ........................................................................................ 6
    2.2      TRAFFIC CONTROL ............................................................................................................. 7
    2.3      CONFINED SPACES ............................................................................................................. 8
3     OPERATIONS......................................................................................................................... 9
    3.1      STORMWATER PIT COVER REMOVAL .................................................................................. 10
    3.2      CLEANING METHODS......................................................................................................... 14
    3.3      UNIT INSPECTION.............................................................................................................. 18
    3.4      FILTER BAG INSPECTION AND REJUVENATION ...................................................................... 19
    3.5      DISPOSAL OF MATERIAL .................................................................................................... 20
4     EMERGENCY PROCEDURES.............................................................................................. 21
    4.1      SPILL PROCEDURES .......................................................................................................... 21
    4.2      BLOCKAGES ..................................................................................................................... 21
5     MAINTENANCE AND INSPECTION FREQUENCY .............................................................. 22



PLATE 1 VEHICLE POSITIONED NEAR PIT, PREVENTING TRAFFIC FROM PASSING CLOSE TO THE PIT. ............ 7
PLATE 2 HEAD-ON VIEW , INDICATING THE PLACEMENT OF THE VEHICLE NEAR THE PIT. .............................. 8
PLATE 3 HINGED GALVANISED STEEL PIT GRATE ................................................................................. 10
PLATE 4 HEAVY DUTY HINGED GALVANISED STEEL PIT GRATE ............................................................. 10
PLATE 5 HINGED CAST IRON GRATE .................................................................................................. 10
PLATE 6 NON-HINGED HEAVY DUTY GALVANISED STEEL PIT GRATE ....................................................... 10
PLATE 7 NON-HINGED CAST IRON GRATE ........................................................................................... 10
PLATE 8 LIFTING THE GRATE ............................................................................................................ 11
PLATE 9 OPENING GRATE ............................................................................................................... 11
PLATE 10 FULLY OPEN GRATE .......................................................................................................... 11
PLATE 11 LOWING GRATE................................................................................................................ 11
PLATE 12 INSERT HOOK NEAR EDGE OF GRATE .................................................................................. 13
PLATE 13 POSITION EACH LIFTER EITHER SIDE OF THE GRATE.............................................................. 13
PLATE 14 LIFT GRATE AND MOVE GRATE TO ONE SIDE ......................................................................... 13
PLATE 15 LIFT GRATE ABOVE THE SUPPORT FRAME ............................................................................ 13
PLATE 16 REINSTATED NON HINGED GRATE ....................................................................................... 13
PLATE 17 CLEANING AN ENVIROPOD USING THE INDUCTOR METHOD .................................................... 15
PLATE 18 PLACE THE LIFTING HOOKS THROUGH THE BAG LOOPS.......................................................... 17
PLATE 19 LIFT THE BAG FROM THE CAGE AND SUPPORT FRAME ........................................................... 17
PLATE 20 LIFT THE BAG FROM THE STORMWATER PIT ......................................................................... 17
PLATE 21 LIFT THE BAG ONTO THE COLLECTION VEHICLE .................................................................... 17
PLATE 22 GRAB THE BOTTOM LIFTING LOOPS..................................................................................... 17
PLATE 23 LIFTING THE BOTTOM BAG LOOPS EMPTY THE FILTER BAG ..................................................... 17
PLATE 24 COMPLETELY EMPTY THE CONTENTS OF THE FILTER BAG ...................................................... 18
PLATE 25 BRUSH THE PORES FILTER BAG WITH A STIFF BRUSH ............................................................ 18
PLATE 26 REINSTALL FILTER BAG ..................................................................................................... 18
PLATE 27 ENSURE THAT THE UNIT IS POSITIONED CORRECTLY, WITH THE LIFTING LOOPS ON THE INSIDE ... 18
PLATE 28 CORRECTLY INSTALLED FILTER BAG ................................................................................... 18
PLATE 29 INSTALLED FILTER BAG AND SEALED PIT .............................................................................. 18
PLATE 30 CHECK SEALS ARE PUSHED AGAINST THE PIT WALLS ............................................................ 19
PLATE 31 CHECK JOINING RIVETS (TWO PIECE UNIT SHOWN ABOVE) ..................................................... 19
PLATE 32 SLIGHTLY CLOGGED FILTER BAG, INDICATED BY THE BROWN STAIN ON IN THE CENTRE OF THE BAG
    ............................................................................................................................................. 20

Page 54

PLATE 33 A CLEAN USED FILTER BAG ................................................................................................ 20




APPENDICES

APPENDIX A – SERVICE RECEIPT EXAMPLE
APPENDIX B – EXAMPLE MAINTENANCE FORM

Page 55

1   INTRODUCTION

The following report details the recommended methods for cleaning and maintaining the
Enviropod Stormwater Gully Pit Insert. The aspects associated with cleaning included in
this manual are methods for grate removal, filter bag cleaning, unit inspection, filter bag
rejuvenation and the re-installation of the filter bags. This plan should be used in
conjunction with the appropriate traffic management plans and site safety plans produced
for each project. Other Stormwater360 (IES) documents which IES staff should use in
conjunction with this report include the IES Employee Health and Safety Manual. It is
recommend that contractors develop there own health and safety plans for activities to
ensure that the workers are placed in a safe work environment.




                               Enviropod filter in service.

Each stormwater treatment device must be inspected and maintained regularly to ensure it
is working properly throughout the estimated design life. The Enviropod filters require
servicing every 1 - 6 months depending on site characteristics, however the maintenance
requirements are less labour intensive than alternate traditional treatments. During each
inspection and clean, details of the mass, volume and type of material observed should be
record to provide ongoing data for future management plan revisions and the optimisation
of the maintenance frequency. It is essential that maintenance (including inspections,
recording and reporting) be carried out in a systematic manner and is carried out by
qualified and experienced personnel. It is also advisable that the treatment device owner
has a nominated person responsible for overseeing the management process.

Maintenance is an essential component of stormwater management enabling ongoing at
source control of stormwater pollution. Maintenance will also prevent failures such as
structural failure (e.g. prevents blocked outlets) or aesthetic failure (e.g. debris
accumulation). All stormwater treatment devices require maintenance to ensure the
ongoing performance of the system.

Stormwater360 (IES) is a specialised stormwater consultancy with trained and
experienced staff. The company has a comprehensive database with detailed information
on every Enviropod filter sold and serviced by IES (formerly Enviropod), collecting site-
specific data that can be easily accessed and analysed as required.

Page 56

This document consists primarily of the processes and tasks associated with the
hand maintenance and inductor maintenance procedures. It does not include detail
of the traffic management requirements or occupational health and safety
requirements. Contractors or IES staff should utilise their own Employee Health and
Safety Manual, which details the policies and procedures for safe work.

Page 57

2 Enviropod Health and Safety
The following section details some of the considerations which may be required for a
contactor to comply with relevant health and safety regulations regarding the manual
handing activities, hazards associated with the waste material and issues associated with
working on roads.

Cleaning of Enviropod filters is a specialist activity. Material collected can be harmful if not
handled correctly. Sediments may contain heavy metals and carcinogenic substances as
well as harmful objects such as broken glass and syringes. As all of the Enviropod units
are located on roads particular care must be taken due to the potential build up of
hydrocarbon based products and other vehicle based contaminants which may be
carcinogenic or toxic. It is essential that Occupational Safety and Health guidelines are
followed at all times, and that the following steps are carried out to ensure safe and
successful maintenance operations.

In additional to the hazards associated with the cleaning handling of material in the filter
bags, there also hazards associated with traffic at the work site, the removal of the grate,
pedestrians and other non-worker personnel, and general work place hazards associated
with working outdoors.

This section is not intended to address all the safety issues associated with Enviropod
maintenance, providing only information and suggestions on safety aspects associated
with the maintenance procedures. A separate safety plan should be prepared for each
project address the specific requirements of the project.

The procedures indicated in the Operations section of this manual are recommend
as the safest and most efficient manner in conducting the maintenance of
Enviropod Units (Section 3), however contractors and cleaning staff may vary the
procedure in response to the site conditions, varying work practices or general
preferences in the cleaning techniques. Please note that procedures outlined is this
manual are not exhaustive, and that any changes should still comply with general
safe work practices.

2.1   Personnel Health and Safety
All contractors and staff shall comply with all current Health and Safety Legislation and
take all practicable steps to:
 Comply with all applicable laws, regulations and standards.
 Ensure that all employees, contractors and visitors are informed of and understand
    their obligations in respect of current Health and Safety Legislation.
 Ensure that employees understand and accept their responsibility to practice and
    promote a safe and healthy work environment.

All relevant precautions must be taken to prevent contact with sediment and litter when
maintaining filters. The following personal protective equipment (PPE) safety equipment
should be worn:
 Puncture resistant gloves.
 Steel capped safety boots.
 Fluorescent safety vest.
 Overalls or similar skin protection.
 Safety apron. (if necessary)*
 Eye protection. (if necessary)*

Page 58

*Higher personal safety conditions may be required when maintaining units that may
contain more hazardous material, for example pits where syringes have be observed or
pits located in areas associated with such activities.


2.2    Traffic Control
All stormwater collection pits are typically situated either in/on roads and car parks or
adjacent to roads in the footpath or swales. Traffic control requirements at each of these
locations is typically the same, with most of the state and local road authorities requiring
the same controls implemented whether the work is to be conducted on the road or on the
road reserve.

As traffic requirements vary based on the road usage and the specific road configuration,
traffic control plans should be prepared for each site. Given that maintenance is typically a
quick process, the contractor should liaise with the relevant road authority to determine the
specific road safety requirements for each location to ensure that on site workers can
conduct the cleaning operations safely and efficiently, while complying with all laws and
regulations.

NSW RTA working on roads safety manual indicates the signage requirements, placement
of barricades or witches hats and the positioning of traffic control personnel. In addition to
standard safety requirements IES recommends that the maintenance vehicle be used to
increase safety, through shielding the work area from on coming traffic.

Plate 1 indicates the vehicle placed to shield the work area with cones placed around the
vehicle. Plate 2 indicates at head on view, note the vehicle is positioned to allow access to
the drive, whilst still blocking the pit from on-coming traffic. The vehicle has a flashing light
on the roof and the hazard lights switched on.




 Plate 1 Vehicle positioned near pit, preventing traffic from passing close to the pit.

Page 59

      Plate 1 Head-on view, indicating the placement of the vehicle near the pit.


2.3   Confined Spaces

Confined spaces poses a serious safety hazard for all personal, however during the
normal maintenance procedures there should be no reason to enter a confined
space. All maintenance procedures are able to be conducted from the surface.
Confined space entry procedures are not included as part of this manual, for IES
employees confined space entry procedures are included as part of the IES Safety
Manual. It is recommend that all contractors evaluate there own needs for confined space
entry and compliance with Occupation Health and Safety regulations.

When repairs or maintenance activities cannot be conducted from the surface, the
contractor/cleaner should evaluate the need to enter the confined space, considering all
alternative options. Where there is a need to proceed in a confined space, only staff with
current confined space training shall operate in a confined space. Appropriate measures
and controls shall be put in place to meet confined space entry requirements. Safety
equipment must be worn where deemed necessary and where gas or oxygen hazard
occurs, staff trained in its use will only use BA gear. Non-trained staff must not go into
confined spaces.

Page 60

3     Operations

This section details the specific activities required to clean the Enviropod units. Please
note it has been written for use by someone who has never encountered a stormwater pit
or an Enviropod unit, providing a step by step process for each of the cleaning stages.


3.1    Maintenance & Monitoring of Enviropod filters

The maintenance frequency is dependant on several variables, such as catchment area,
surrounding land use, vegetation type, traffic loading and rainfall patterns. IES
recommends that during the first year of operation the units should be monitored monthly,
with maintenance as required.

The ensure that the unit performs optimally, the material collected by the filter bag should
be emptied when the level of material is no more than approximately half to two thirds of
the total bag depth or when there is evidence of material overflow. Although the bag has
greater storage area, it is recommended that it is not left to fill completely prior to empting,
for the following reasons; the bags are capable of retaining a heavy mass of material (in
excess of 50kg); material near the top of the bag can be resuspended during high to
extreme rainfall events; and blockage of the overflow sections can occur, when material is
allowed to build up above the filter bag.

Maintenance frequency should be adjusted to accommodate variable rainfall patterns.
Regions east of the Great Dividing Range typically are dominated by greater rainfall during
summer and Autumn Months, as such more maintenance is typically required during these
periods. It is recommended that biannual inspections be carried out in November and
April, while quarterly inspections should be conducted in February, April, July and
November.

It is also recommended that additional monitoring should be conducted following moderate
to extreme rainfall events, in particular, when preceding months have had little to no
rainfall. This monitoring is considered necessary to accommodate for higher volumes of
runoff generated during major rainfall events, an anticipated greater accumulation of
surface contamination during low rainfall periods and to ensure that the units have not
been damaged due to high pipe velocities.

Attached in Appendix A & B is an example of an Enviropod Service Receipt and Generic
Monitoring Form which is to be completed by the Cleaning Contractor when servicing any
Filters. Relevant information is recorded and forwarded to the client following each
maintenance clean.

                     Table 1: FREQUENCY OF MAINTENANCE ACTIVITY
                                INSPECTION/MINOR                       MAJOR
                            MAINTENANCE (TIMES/YEAR)                MAINTENANCE
                                                                    (TIMES/YEAR)
       Enviropod              12 (and after major storms)       2-6 (except in case of a
                                                                         spill)

Page 61

3.2   Stormwater Pit Cover Removal
There are several different types of stormwater pit covers used throughout Australia.
These grates/lids are constructed of three main materials, cast iron, galvanised steel and
concrete. Stormwater pits covers will either be hinged (lockable) or simply placed on a
recessed frame, with cover which are not hinged are typically heavy, to prevent the grate
being easily knocked open by passing traffic. Each different pit cover requires different
techniques to safely remove the cover to gain access to the Enviropod Unit.




  Plate 2 Hinged galvanised steel pit
                                             Plate 3 Heavy duty hinged galvanised
  grate
                                             steel pit grate




  Plate 4 Hinged cast iron grate             Plate 5 Non-hinged heavy             duty
                                             galvanised steel pit grate




  Plate 6 Non-hinged cast iron grate

Page 62

3.2.1 Hinged Pit Grates
Hinged pit grates are typically either light duty galvanised steel, heavy duty galvanised
steel or two-piece cast iron. Generally hinged pit grates can be opened by one person,
however heavy duty galvanised lids and cast iron lids may require two people. If you are
unclear about the type of grate, always use two people.

To open a hinged pit grate follow the following steps:

    1. Insert the lifting hooks beneath the grate. (Position indicated in Plate 7)
    2. Check hinge point is not damaged and debris is not caught in the hinge area.
    3. Note many cast iron hinges are not hinged securely (to enable the removal of the
       grate). This may result in the pit grate not being able to sit in an open position.
       Additionally the hinge pins may also be damaged or corroded, which may allow for
       the pit grate to fall into pit. Such pit grates can be removed using the method
       indicated below for non-hinged grates.
    4. Fully open pit grate, ensuring that the grate will stay in the open position without
       any external forces applied. Grates which do not remain open without being held
       should be removed or secured during cleaning or maintenance activities. Plate 8
       and Plate 9 indicate the grate being opened and grate resting freely in the open
       position, respectively.




      Plate 7 Lifting the grate                Plate 8 Opening Grate




      Plate 9 Fully open grate                 Plate 10 Lowing grate




To close a open hinged grate

Page 63

   1. Place lifting hooks through grate. (same position to remove grate)
   2. Gently lower grate into position. (Plate 10)
   3. Note some grates have offset hinges points that prevent the grate from falling over,
      such pits require the hinged side of the grate to be lifted while the grate is lowered
      into position. (insert picture)


3.2.2 Non-Hinged Pit Grates
Non hinged pits are typically constructed of cast iron, concrete or heavy duty galvanised
steel. As such the pit grates are generally heavy and difficult to remove, generally requiring
two people to safely remove the lids.

To remove a non-hinged pit grate:
    1. Place lifting hooks beneath grate, where possible in the four corners of the grate
       (Plate 11). Concrete lids may have Gatic lifting points, a key arrangement or holes
       in the lid, as such special equipment, such as Gatic lifters may be required.
    2. Position each person either side of the grate. (Plate 12)
    3. Lift the grate, ensuring that good heavy lifting posture is used at all times.
    4. Place the grate on an angle on the gutter, to allow for the lifting hooks to be
       removed. (Plate 13)
    5. For extremely heavy one piece grates and concrete Gatic covers, insert the lifters
       in place and slide the lids back. Note some lids may still require two people.
       (Picture required)

Page 64

Plate 11 Insert hook near edge of Plate 12 Position each lifter either side
grate                             of the grate




Plate 13 Lift grate and move grate to Plate 14 Lift grate above the support
one side                              frame




Plate 15 Reinstated non hinged grate

To reinstate a non-hinged pit grate
    1. Place lifting hooks though the grate. Note do not place hooks at the very edge of
       the grate, as this will make it difficult to place grate on the support.
    2. Lift the grate into position and lower onto the supporting frame (Plate 14), ensuring
       that the grate sits level with the finished surface. If the grate does not sit securely
       remove the pit cover and check for debris in the pit cover frame, then try to lower
       grate again.
    3. Check final position of the cover, ensuring that the cover sits flush with the surface
       and does not create a trip or traffic hazard. (Plate 15)

Note all grates should be reinstated to the original condition.

Page 65

Care should be taken with old or damaged pit covers and grates. Grates or covers
observed to be in poor condition should be first inspected to determine whether further
damage will occur if an attempt to remove the grate is made. Pits grates which appear to
be severely damaged or appear as though they would break while being removed should
not be removed. Contact the client (and pit owner if not the client) and IES (IES Sydney
office number is 02 9907 1401) to discuss an appropriate action. Pit grates and covers
damaged by the contractor will be repaired at the cost of the contractor, or as part of an
arrangement with the pit owner.


3.2.3 Pits unable to be opened
Pits may be unable to be opened for several reasons, including through corrosion, new
road surfaces covering the pit lid, and foreign material jammed in the lid. The following
steps may assist in opening the pits:
     Chip away new road coverings or concrete/bitumen spills using a pinch bar or
       similar device. Care must be taken not to damage road surfaces.
     Corroded or jammed pits may be loosened from the grate frame by using a
       lubricant such as RP7 and tapping the grate frame and grate. Note if the grate or
       grate frame appears severely corroded, the grate should not be opened and
       IES and the client should be contacted to discuss options.
     Pits which cannot be opened may require a hydraulic lifting arm to fully remove the
       lid.



3.3   Cleaning Methods
One of the following methods of maintenance should be used for the servicing of these
Enviropod Filters:
 Cleaning using Inductor Truck.
 Hand Maintenance.

One of the advantages of the Enviropod units is that it doesn’t require specialised
equipment for maintenance. In certain situations it may be more feasible to maintain the
units using the inductor truck method, while for other projects hand maintenance may be
the preferred option. The cleaning method for the Enviropod units should be evaluated
specifically for each project.


3.3.1   Cleaning using Inductor Truck

The following steps indicate a safe and efficient method to clean the Enviropod using an
Inductor:
   1. Open gully pit. (See Section 3.2)
   2. Place the inductor hose over the material collected in the filter bag and switch on
        the inductor.
   3. Using the inductor hose suck all of the sediment, organic leaf material, litter etc,
        collected in the filter bag
   4. Allow the filter bag to be sucked up into the inductor hose for a few seconds to
        allow for the filter mesh pores to be cleaned. Care is to be taken by the operator
        not to damage the filter, ie ensure that there are no sharp edges on the inductor
        hose.
   5. If material has build up around the overflows, use the inductor hose to clear the
        accumulated material.
   6. Remove filter bag from the pit.

Page 66

   7. Sediment retained in the gully pit grate is to be removed.
   8. Back opening channels are to be cleared of any debris to ensure flow is not
       hindered. Debris can be collected using the inductor truck.
   9. All gully pit waste is to be removed from the pit.
   10. Check the Enviropod unit. (See Section 3.4)
   11. Check filter bag. (See Section 3.5)
   12. Reinstate filter bag and gully pit lids.




              Plate 16 Cleaning an Enviropod using the inductor method

Gully pit sediments under no circumstances are to be backwashed into the gully pit.


3.3.2   Hand Maintenance

Two people are generally preferred to maintain the units by hand. However for shallow
units and units which contain mainly leaf material (low overall accumulated weight), may
be cleaned by one person. Note additional personnel may be required for traffic
management purposes or for general safety.

The following steps indicate a safe and efficient method to clean the Enviropod manually
by hand:
    1. Open gully pit. (See Section 3.2)
    2. Place the lifting hooks in the lifting loops of the filter bag. (See Plate 17)
    3. For extremely heavy and overfilled bags either use a hydraulic lifting arm to lift the
        bag, or remove excess material using a shovel or similar piece of equipment. IES
        prefers the use of a post hole shovel, due to the reduced strain on the back when
        digging and the ability of the shovel to grab material vertically. (Insert Picture)
    4. Lift the bag vertically off the supporting frame, ensuring that no undue pressure is
        placed on the filter bag. (See Plate 18)
    5. Lift the bag clear of the stormwater pit. (See Plate 19)
    6. Position the bag over the truck or other collection vehicle, taking hold of the loops
        at the base of the bag. (See Plate 20 and Plate 21)
    7. Lift and empty the filter bag by holding the bottom lifting loops only. (See Plate 22)
    8. Completely empty the filter bag. (See Plate 23)
    9. Brush the filter bag with a stiff brush to remove bound sediment from the filter
        pores. (See Plate 24)

Page 67

10. Check the filter bag. (See Section 3.5)
11. Check the Enviropod unit. (See Section 3.4)
12. Reinstate filter bag, enuring bag is installed the correct way. (See Plate 25 and
    Plate 26)
13. Reinstate gully pit lids. (See Plate 27 and Plate 28)

Page 68

Plate 17 Place the       lifting   hooks Plate 18 Lift the bag from the cage and
through the bag loops                    support frame




Plate 19 Lift    the    bag   from   the   Plate 20 Lift the    bag   onto   the
stormwater pit                             collection vehicle




Plate 21 Grab the bottom lifting loops     Plate 22 Lifting the bottom bag loops
                                           empty the filter bag

Page 69

Plate 23 Completely empty             the   Plate 24 Brush the pores filter bag
contents of the filter bag                  with a stiff brush




Plate 25 Reinstall filter bag               Plate 26 Ensure that the unit is
                                            positioned correctly, with the lifting
                                            loops on the inside




Plate 27 Correctly installed filter bag     Plate 28 Installed filter bag and sealed
                                            pit




3.4   Unit Inspection
After the Enviropod filter bag is removed, emptied and cleaned, the following should be
checked to ensure that the unit has not been damaged:

Page 70

         All connections and joints should be checked and broken rivets replaced (See
          Plate 29);
         The plastic pit seals should be inspected for unit movement or damage (See Plate
          30); and
         The cage should be inspected for damage or movement (See Plate 31).

The overflow diversion channels, and the area between the Enviropod cage and pit wall
should also be inspected for the accumulation of debris. Any observed debris should be
removed and disposed of off-site. Accumulated material within the outlet pipe may need to
be flushed.

Note: If the units are not cleaned regularly the mobilisation of material collected in the
Enviropod unit may occur, as such cleaning of the units in accordance with this
management plan is required. As this plan is based on observations and data collected
during the monitoring period, ongoing adjustment of the cleaning frequency is generally
required to improve the overall efficiency in the removal of collected material and prevent
material overflow.




Plate 29 Check seals are pushed Plate 30 Check joining rivets (two
against the pit walls           piece unit shown above)




3.5   Filter Bag Inspection and Rejuvenation
Following the emptying and cleaning of the filter bags, the filter bag should be inspected to
evaluate the bag condition. Given the nature of stormwater the filter bag from some
Enviropod units can become considerably clogged with fine sediment. Filters can also be
damaged by various objects in stormwater as well as fauna. Sharp objects such as sticks
combined with high velocity water and a large mass in the filter bag can cause small tears
in the filter material. Animals such as rats have also been known to chew through fine
mesh filter bags located in gully pits near takeaway food outlets.


3.5.1 Clogged Filters
Clogged filter bags can be clean using several different methods. If the bag cleaning
techniques described in the general maintenance sections above are not able to clean the
filter bags the following options should be considered:
      Using a stiff brush and a bucket of soapy water scrub the filter bag surface.

Page 71

         Remove filter bags from the pit and wash the bags using a high pressure water
          spray. Care has to be taken to not transfer the contamination elsewhere. Waste
          water from the process should be collected of and disposed of correctly.
         Remove the filter bags from the pits and the support rings and wash the bags in an
          industrial washing machine.

The final option presented above typically results in the bags appearing like new, with no
visible stain or pore clogging within the filter mesh.




Plate 31 Slightly clogged filter bag, Plate 32 A clean used filter bag
indicated by the brown stain on in the
centre of the bag




3.5.2 Damaged Filters
Damaged filters can often be repaired, provided the damage is small. Small tears in the
fabric may occur do to several reasons, however the overall strength & structure of the
nylon fabric typically prevents small tears becoming much large. Although the bag is
unlikely to tear further care must be used when clean torn bags as not to spill the collected
material into the pit.

Small tears may repaired by either sewing the tear back together, with additional fabric to
increase the strength of the stitching, or by sewing a patch of the filter material onto the
filter bag. The filter bags may need to be replaced if large tears are present, as the filter
bag is no longer able to function as intended.

IES is able to repair bags or replace bags which have been damaged during maintenance.
Please contact IES Sydney office on 02 9907 1401 for details or a quote.

3.6   Disposal of Material
All gully pit wastes from the site are to be taken off site and disposed of at a transfer
station or similar approved disposal site. Stormwater Sediments can contain Lead,
Copper, Zinc, Mercury, hydrocarbons and PCBs, which are harmful to both humans and
the receiving environment. Appropriate sampling and laboratory analysis may be required
to classify the material as suitable for reuse, or disposal under appropriate local guidelines.

Page 72

4     Emergency Procedures

4.1    Spill Procedures

In the event of a spill discharging into any gully pit all sediment is to be extracted and the
filter bags are to be removed and replaced with rejuvenated filter bags. Normal operation
procedures apply to additional cleaning as a result of spills.


4.2   Blockages
In the unlikely event of surface flooding around a gully pit fitted with an Enviropod the
following steps should be carried out:

Check Enviropod over flow bypass. The Enviropod filter has been designed with an
overflow mechanism built into the filter box. If surface flooding still exists check the
overflow slots underneath the rubber seal. If debris is lodged in the overflow slots these
can be easily cleared by hand or steel rod.

If overflow is clear and surface flooding still exists remove Enviropod and check outlet pipe
for blockages.

Removal of the Enviropod may be difficult if the filter is clogged and the Enviropod is
holding water. If the filter is clogged, brush the side walls of the filter with a yard broom or
similar. This will dislodge particles trapped at the interface allowing contained water to
flow through the filter.

If the outlet pipe is blocked, it is likely that a gully sucker truck will be required to unblock it.
Debris should be removed from the Enviropod with the gully sucker truck before removal
of the Enviropod filter.

If a gully sucker truck is not available and the Enviropod needs to be removed by hand,
follow the steps below:
 Remove excess debris by hand or brush the side of the filter.
 Lift and place filter ring through the filter box and into cage.
 Remove Filter box.
 Lift cage containing filter bag and ring out of the pit.
 Unblock outlet pipe.

Page 73

Appendix A
Service Receipt Example


[OCR of page images]
Appendix A
Service Receipt Example

Page 74

Enviropod Service Receipt

Site:                           Job Number:
Contractor:                     Receipt Number:
Location:                       Week Serviced:
Year:

Service Frequency:
Enviropods on Site:

Enviropods Cleaned:
Bags Checked:                          If Damaged, Action:
Frames and Seals Checked:              If Damaged, Action:
Overflows Checked                      If Blocked, Cleaned:
Tonnage:

                  Comments




This service has been performed in accordance with Enviropod Management Plan
(EMP) for above site. Please file this receipt with EMP and keep on site for
compliance inspections.




Signature:


Position:

Page 75

Appendix B
Maintenance Form Example


[OCR of page images]
Appendix B
Maintenance Form Example

Page 76

Enviropod Maintenance Form
Client: Bag: NOTE: See maps for detailed location.
Project: Date:

 

Page 77

                                                                                                 ENG
                                     Engineering Report & Stormwater Management Plan
                             Date:          22/09/2016     Document No.:     16144-ENG-01.Docx

                              By:              MRS          Revision No.:              A


Appendix G – Development Codes




A PO Box 26, Carina Q 4152                                                      22 | P a g e
E [email protected]
W www.vtce.com.au

Page 78

                                         1 Memorial Avenue Tewantin, QLD 4565
                                                               Driveway and Carparking Code



       Driveway and Carparking Code

Driveways and Carparking Code
Specific Outcome                                       Acceptable Solutions/Probable Solutions         Compliance
14.113 General
O1 Vehicular access does not adversely impact on       S1.1 Vehicular access is located and designed   Vehicular access will be located and designed
safety, capacity and operations of the existing or     in accordance with AUSTROADS-Guide to           in accordance with AUSTROADS-Guide to
planned road network, the proposed driveway,           Traffic Engineering Practice requirements for   Traffic Engineering Practice requirements for
cycleways or pedestrian pathway systems.               sight distance and Section 3 of AS2890.1        sight distance and Section 3 of AS2890.1
                                                       Parking Facilities; AND                         Parking Facilities.
                                                       S1.2 Only one footpath crossing is              Only one footpath crossing will be provided in
                                                       provided22; AND                                 each of Doonella, Pelican Street and
                                                                                                       Memorial Avenue (existing) This compares
                                                                                                       with the total of four existing driveways.
                                                       S1.3 Driveways, other than within any           Driveway grade will be in accordance with
                                                       setback have a maximum grade in                 Section 3 of AS/NZS 2890.1.
                                                       accordance with Section 3 of AS/NZS 2890.1
O2 Driveways and crossovers—                           S2.1 Design of the driveway across the          Driveway across the footpath design will be in
a) are suitable and safe for their intended use; and   footpath is in accordance with Council’s        accordance with Council’s Standard Drawings
b) match Council infrastructure.                       Standard Drawings 9002 or 9005 as               9002 or 9005 as appropriate for the particular
                                                       appropriate for the particular type of          type of development as annotated on the
                                                       development as annotated on the drawings;       drawings.
                                                       AND
                                                       S2.2 Driveways are designed and constructed      Driveways will be designed and constructed
                                                       in accordance with Council Standard             in accordance with Council Standard
                                                       Drawings 9014, 9019, 9020, 9021, as             Drawings 9014, 9019, 9020, 9021, as
                                                       appropriate for the particular type of          appropriate for the particular type of
                                                       development as annotated on the drawings;       development as annotated on the drawings.
                                                       AND

The text continues on page 79.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.