EngSWMP
Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
Building site 2 m (min)
Minimu Flow control berm incorporated
m leng into the rock pad if the pad
40 − 75 mm th 10 m
(min) receives runoff from the building
crushed rock 300 mm (min)
site (location may vary)
10 m (min)
150 − 200 mm Land slope
Width 2.0 m (min) da
ry Kerb
o un
yb
p er t Footpath
Up-slope runoff directed Pro
Make safe for
to an appropriate Roadway Footpath pedestrian traffic
sediment trap
Geotextile filter cloth (mandatory Make safe for
when working on clayey soils) pedestrian traffic ROADWAY
(a) Rock entry/exit pad for building sites
(b) Rock pad sloping away from road
CONSTRUCTION NOTES: STIFF-BRISTLED BROOM, AND THEN BY A
MECHANICAL VACUUM UNIT, IF AVAILABLE.
MATERIALS
3. IF NECESSARY FOR SAFETY REASONS, THE Building site 2 m (min)
ROCK: WELL GRADED, HARD, ANGULAR, ROADWAY SHALL ONLY BE WASHED CLEAN
EROSION RESISTANT ROCK, NOMINAL AFTER ALL REASONABLE EFFORTS HAVE BEEN
DIAMETER OF 40 TO 75mm. TAKEN TO SHOVEL AND SWEEP THE MATERIAL
FROM THE ROADWAY.
FOOTPATH STABILISING AGGREGATE: 25 TO Land slope
10 m (min)
50mm GRAVEL OR AGGREGATE (IF REQUIRED). 4. WHEN THE VOIDS BETWEEN THE ROCK
BECOMES FILLED WITH MATERIAL AND THE
GEOTEXTILE FABRIC: HEAVY-DUTY, EFFECTIVENESS OF THE ROCK PAD IS
NEEDLE-PUNCHED, NON-WOVEN FILTER REDUCED TO A POINT WHERE SEDIMENT IS
Sediment fence
CLOTH (‘BIDIM’ A24 OR EQUIVALENT). BEING TRACKED OFF THE SITE, A NEW 100mm
LAYER OF ROCK MUST BE ADDED AND/OR THE
INSTALLATION ROCK PAD MUST BE EXTENDED. Make safe for
Footpath
pedestrian traffic
1. INSPECT ALL SITE ENTRY AND EXIT POINTS 5. ENSURE ANY ASSOCIATED DRAINAGE
PRIOR TO FORECAST RAIN, DAILY DURING CONTROL MEASURES (e.g. FLOW CONTROL
EXTENDED PERIODS OF RAINFALL, AFTER BERM) ARE MAINTAINED IN ACCORDANCE
RUNOFF-PRODUCING RAINFALL, OR WITH THEIR DESIRED OPERATIONAL ROADWAY
OTHERWISE AT FORTNIGHTLY INTERVALS. CONDITION.
Catchments & Creeks Pty Ltd
2. IF SAND, SOIL, SEDIMENT OR MUD IS 6. DISPOSE OF SEDIMENT AND DEBRIS IN A
TRACKED OR WASHED ONTO THE ADJACENT MANNER THAT WILL NOT CREATE AN EROSION (c) Rock pad sloping towards the road
SEALED ROADWAY, THEN SUCH MUST BE OR POLLUTION HAZARD.
PHYSICALLY REMOVED, FIRST USING A Drawn: Date:
SQUARE-EDGED SHOVEL, AND THEN A
GMW May-10 Rock Pads for Building Sites ESC-01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.