EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

                              MATERIALS                                   DAM A MINIMUM 1/3 AND MAXIMUM 1/2 FENCE    THE TWO STAKES TIED TOGETHER WITH WIRE;     MAINTENANCE
                                                                          HEIGHT, AND EXTENDING AT LEAST 1.5m UP     OR
                              FABRIC: POLYPROPYLENE, POLYAMIDE,           THE SLOPE.                                 (ii) OVERLAP THE FABRIC TO THE NEXT         1. INSPECT THE SEDIMENT FENCE AT LEAST
                              NYLON, POLYESTER, OR POLYETHYLENE                                                      ADJACENT SUPPORT POST.                      WEEKLY AND AFTER ANY SIGNIFICANT RAIN.
                              WOVEN OR NON-WOVEN FABRIC, AT LEAST         4. ENSURE THE EXTREME ENDS OF THE                                                      MAKE NECESSARY REPAIRS IMMEDIATELY.
                              700mm IN WIDTH AND A MINIMUM UNIT WEIGHT    FENCE ARE TURNED UP THE SLOPE AT LEAST     11. SECURELY ATTACH THE FABRIC TO THE
                              OF 140g/m2. ALL FABRICS TO CONTAIN          1.5m, OR AS NECESSARY, TO MINIMISE WATER   SUPPORT POSTS USING 25 X 12.5mm STAPLES,    2. REPAIR ANY TORN SECTIONS WITH A
                              ULTRAVIOLET INHIBITORS AND STABILISERS      BYPASSING AROUND THE FENCE.                OR TIE WIRE AT MAXIMUM 150mm SPACING.       CONTINUOUS PIECE OF FABRIC FROM POST
                              TO PROVIDE A MINIMUM OF 6 MONTHS OF                                                                                                TO POST.
                              USEABLE CONSTRUCTION LIFE (ULTRAVIOLET      5. ENSURE THE SEDIMENT FENCE IS            12. SECURELY ATTACH THE FABRIC TO THE
                              STABILITY EXCEEDING 70%).                   INSTALLED IN A MANNER THAT AVOIDS THE      SUPPORT WIRE/MESH (IF ANY) AT A MAXIMUM     3. WHEN MAKING REPAIRS, ALWAYS RESTORE
                                                                          CONCENTRATION OF FLOW ALONG THE            SPACING OF 1m.                              THE SYSTEM TO ITS ORIGINAL
                              FABRIC REINFORCEMENT: WIRE OR STEEL         FENCE, AND THE UNDESIRABLE DISCHARGE                                                   CONFIGURATION UNLESS AN AMENDED
                              MESH MINIMUM 14-GAUGE WITH A MAXIMUM        OF WATER AROUND THE ENDS OF THE FENCE.     13. ENSURE THE COMPLETED SEDIMENT           LAYOUT IS REQUIRED OR SPECIFIED.
                              MESH SPACING OF 200mm.                                                                 FENCE IS AT LEAST 450mm, BUT NOT MORE
                                                                          6. IF THE SEDIMENT FENCE IS TO BE          THAN 700mm HIGH. IF A SPILL-THOUGH WEIR     4. IF THE FENCE IS SAGGING BETWEEN
                              SUPPORT POSTS/STAKES: 1500mm2 (MIN)         INSTALLED ALONG THE EDGE OF EXISTING       IS INSTALLED, ENSURE THE CREST OF THE       STAKES, INSTALL ADDITIONAL SUPPORT
                              HARDWOOD, 2500mm2 (MIN) SOFTWOOD, OR        TREES, ENSURE CARE IS TAKEN TO PROTECT     WEIR IS AT LEAST 300mm ABOVE GROUND         POSTS.
                              1.5kg/m (MIN) STEEL STAR PICKETS SUITABLE   THE TREES AND THEIR ROOT SYSTEMS           LEVEL.
                              FOR ATTACHING FABRIC.                       DURING INSTALLATION OF THE FENCE. DO                                                   5. REMOVE ACCUMULATED SEDIMENT IF THE
                                                                          NOT ATTACH THE FABRIC TO THE TREES.        14. BACKFILL THE TRENCH AND TAMP THE FILL   SEDIMENT DEPOSIT EXCEEDS A DEPTH OF 1/3
                              INSTALLATION                                                                           TO FIRMLY ANCHOR THE BOTTOM OF THE          THE HEIGHT OF THE FENCE.
                                                                          7. UNLESS DIRECTED BY THE SITE             FABRIC AND MESH TO PREVENT WATER FROM
                              1. REFER TO APPROVED PLANS FOR LOCATION,    SUPERVISOR OR THE APPROVED PLANS,          FLOWING UNDER THE FENCE.                    6. DISPOSE OF SEDIMENT IN A SUITABLE
                              EXTENT, AND REQUIRED TYPE OF FABRIC (IF     EXCAVATE A 200mm WIDE BY 200mm DEEP                                                    MANNER THAT WILL NOT CAUSE AN EROSION
                              SPECIFIED). IF THERE ARE QUESTIONS OR       TRENCH ALONG THE PROPOSED FENCE LINE,      ADDITIONAL REQUIREMENTS FOR THE             OR POLLUTION HAZARD.
                              PROBLEMS WITH THE LOCATION, EXTENT,         PLACING THE EXCAVATED MATERIAL ON THE      INSTALLATION OF A SPILL-THROUGH WEIR
                              FABRIC TYPE, OR METHOD OF INSTALLATION      UP-SLOPE SIDE OF THE TRENCH.                                                           7. REPLACE THE FABRIC IF THE SERVICE LIFE
                              CONTACT THE ENGINEER OR RESPONSIBLE                                                    1. LOCATE THE SPILL-THROUGH WEIR SUCH       OF THE EXISTING FABRIC EXCEEDS
                              ON-SITE OFFICER FOR ASSISTANCE.             8. ALONG THE LOWER SIDE OF THE TRENCH,     THAT THE WEIR CREST WILL BE LOWER THAN      6-MONTHS.
                                                                          APPROPRIATELY SECURE THE STAKES INTO       THE GROUND LEVEL AT EACH END OF THE
                              2. TO THE MAXIMUM DEGREE PRACTICAL, AND     THE GROUND SPACED NO GREATER THAN 3m       FENCE.                                      REMOVAL
                              WHERE THE PLANS ALLOW, ENSURE THE           IF SUPPORTED BY A TOP SUPPORT WIRE OR
                              FENCE IS LOCATED:                           WEIR MESH BACKING, OTHERWISE NO            2. ENSURE THE CREST OF THE                  1. WHEN DISTURBED AREAS UP-SLOPE OF THE
                              (i) TOTALLY WITHIN THE PROPERTY             GREATER THAN 2m.                           SPILL-THROUGH WEIR IS AT LEAST 300mm THE    SEDIMENT FENCE ARE SUFFICIENTLY
                              BOUNDARIES;                                                                            GROUND ELEVATION.                           STABILISED TO RESTRAIN EROSION, THE
                              (ii) ALONG A LINE OF CONSTANT ELEVATION     9. IF SPECIFIED, SECURELY ATTACH THE                                                   FENCE MUST BE REMOVED.
                              WHEREVER PRACTICAL;                         SUPPORT WIRE OR MESH TO THE UP-SLOPE       3. SECURELY TIE A HORIZONTAL CROSS
                              (iii) AT LEAST 2m FROM THE TOE OF ANY       SIDE OF THE STAKES WITH THE MESH           MEMBER (WEIR) TO THE SUPPORT POSTS/         2. REMOVE MATERIALS AND COLLECTED
                              FILLING OPERATIONS THAT MAY RESULT IN       EXTENDING AT LEAST 200mm INTO THE          STAKES EACH SIDE OF THE WEIR. CUT THE       SEDIMENT AND DISPOSE OF IN A SUITABLE
                              SHIFTING SOIL/FILL DAMAGING THE FENCE.      EXCAVATED TRENCH. ENSURE THE MESH AND      FABRIC DOWN THE SIDE OF EACH POST AND       MANNER THAT WILL NOT CAUSE AN EROSION
                                                                          FABRIC IS ATTACHED TO THE UP-SLOPE SIDE    FOLD THE FABRIC OVER THE CROSS MEMBER       OR POLLUTION HAZARD.
                              3. INSTALL RETURNS WITHIN THE FENCE AT      OF THE STAKES EVEN WHEN DIRECTING A        AND APPROPRIATELY SECURE THE FABRIC.
                              MAXIMUM 20m INTERVALS IF THE FENCE IS       FENCE AROUND A CORNER OR SHARP                                                         3. REHABILITATE/REVEGETATE THE
                              INSTALLED ALONG THE CONTOUR, OR 5 TO        CHANGE OF DIRECTION.                       4. INSTALL A SUITABLE SPLASH PAD AND/OR     DISTURBED GROUND AS NECESSARY TO
                              10m MAXIMUM SPACING (DEPENDING ON                                                      CHUTE IMMEDIATELY DOWN-SLOPE OF THE         MINIMISE THE EROSION HAZARD.
Catchments & Creeks Pty Ltd




                              SLOPE) IF THE FENCE IS INSTALLED AT AN      10. WHEREVER POSSIBLE, CONSTRUCT THE       SPILL-THROUGH WEIR TO CONTROL SOIL
                              ANGLE TO THE CONTOUR. THE ‘RETURNS’         SEDIMENT FENCE FROM A CONTINUOUS ROLL      EROSION AND APPROPRIATELY DISCHARGE
                              SHALL CONSIST OF EITHER:                    OF FABRIC. TO JOIN FABRIC EITHER:          THE CONCENTRATED FLOW PASSING OVER
                              (i) V-SHAPED SECTION EXTENDING AT LEAST     (i) ATTACH EACH END TO TWO OVERLAPPING     THE WEIR.
                              1.5m UP THE SLOPE; OR                       STAKES WITH THE FABRIC FOLDING AROUND                Drawn:       Date:
                              (ii) SANDBAG OR ROCK/AGGREGATE CHECK        THE ASSOCIATED STAKE ONE TURN, AND WITH
                                                                                                                                 GMW         May-10 Sediment Fence                               ESC-05

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.