Skip to the record
Every meeting, every word.

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

                                 1 Memorial Avenue Tewantin, QLD 4565
                                             Water Supply & Sewerage Reticulation Code



Water Supply & Sewerage Reticulation Code

Water Supply & Sewerage Reticulation Code
Specific Outcomes                           Acceptable Solutions/Probable Solutions              Compliance
Table 14-62 Water supply
14.164 Design and construction (water)
O1 Water supply infrastructure—             S1.1 Water supply infrastructure is designed in      The proposed development
a) meets the needs of the users;            accordance with PSP6 – Engineering Design            works will comply with this
b) is designed to be compatible with        Standards — Water and Sewerage and As                requirement, with the proposed
existing infrastructure; and                Constructed data submitted in accordance with        internal water supply being
c) is designed using materials that are     PSP6 – Engineering Design Standards — Water and      constructed in accordance with
suitable for the use, durable, easy to      Sewerage.                                            AS3500.
maintain and cost effective, taking into                                                         Water reticulation will be
account the whole of life cycle cost and                                                         designed and constructed in
Council’s maintenance inventory.                                                                 accordance with SEQ D & C Code
                                                                                                 and PSP6 Engineering Design
                                                                                                 Standards – Water and Sewerage.
O2 Water supply infrastructure is           S2.1 Water supply infrastructure is constructed in   The proposed development
constructed—                                accordance with PSP6 – Engineering Design            works will comply with this
a) in accordance with appropriate           Standards — Water and Sewerage; AND                  requirement.
engineering standards; and
                                            S2.2 Erosion and sediment control measures are       The proposed development
b) to minimise adverse environmental
                                            designed and implemented in accordance with the      works will comply with this
impacts.
                                            Institution of Engineers Australia (Queensland       requirement and will incorporate
                                            Division) Soil Erosion and Sediment Control -        erosion and sediment control
                                            Guidelines for Queensland Construction Sites.        measures as shown in Appendix
                                                                                                 D. Civil engineering design
                                                                                                 drawings for ESC will be done
                                                                                                 during detailed design stage to

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.