Skip to the record
Beware of cheap imitations.

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

                                   1 Memorial Avenue Tewantin, QLD 4565
                                                  Water Supply & Sewerage Reticulation Code



Water Supply & Sewerage Reticulation Code
Specific Outcomes                                Acceptable Solutions/Probable Solutions                Compliance
                                                                                                        designed and constructed in
                                                                                                        accordance with SEQ D & C Code
                                                                                                        and PSP6 Engineering Design
                                                                                                        Standards – Water and Sewerage.
O11 Sewerage reticulation infrastructure is      No solution provided.                                  The proposed development
provided with all supporting technical                                                                  works will comply with this
documentation.                                                                                          requirement.
O12 Where buildings or other structures          S12.1 The footing of any structure or building is      The proposed development
are developed adjacent to Council’s              located clear of the zone of influence but no closer   works will comply with this
sewerage reticulation infrastructure;            than 1.5m (measured horizontally) from                 requirement.
satisfactory provision is made to protect        infrastructure including sewers, water mains and
the infrastructure from physical damage          stormwater structures; AND
and to allow ongoing maintenance by
                                                 S12.2 A registered easement in favour of Council is    The proposed development
Council.
                                                 created over all underground infrastructure located    works will comply with this
                                                 in private property; AND                               requirement.
                                                 S12.3 The width of the easement is the greater of      The proposed development
                                                 3m or the width of the zone of influence; AND          works will comply with this
                                                                                                        requirement.
                                                 S12.4 The easement is centred over the centreline      The proposed development
                                                 of the infrastructure.                                 works will comply with this
                                                                                                        requirement.
O13 Alignment of sewerage reticulation           S13.1 Infrastructure is constructed on the preferred   The proposed development
infrastructure is to allow for easy access for   alignments in accordance with PSP6 –Engineering        works will comply with this
the ongoing maintenance by Council.              Design Standards — Water and Sewerage.                 requirement.

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.