PROPOSED BULK EARTHWORKS LEVELS FOLLOWING CARRYING:
E2200 OUT WORKS IN ACCORDANCE WITH THE EARTHWORKS KOTES OW
DRW CO1 INCLUDING STRIPPING, PROOF ROLLING AND FLUNG.

 

BIAK EARTHWORKS TO BURLORNG AREA. ALLOW TO CARRY OUT
THE-WORKS IN ACCORDANCE WITH THE EARTHWORKS NOTES OW
Zp DRW COT IACLUDING STRIPPING, PROOF ROLLING AND FILLING

 

 

 

‘WHR IMPORTED FEL PROVIDE #5 THK SUBBASE {CERES}
ue COMPACTED TO $5% MOOQHED DRY OEXSITY.
2s _prpostn aun cantons comnain

eee ee PROPOSED GIRK EARTHWORKS CONTOUR - TERHEDIATE
penn (0.2m INTERVAL!

EXISTING SURFACE CONTOUR

PROPOSED KERB LIME IREFER 0SB071-CO3 FOR KERB TYPES!

 

 

RI
weap eepdenmenpt RETAWING WALL TO STRUCTURAL ENGMEERS DETAR.

 

 

 

 

 

 

 

 

 

 

 

Ty _TEPORARY SCREW PEER RETABING WALL TO STRUCTURAL
ENGINEERS DETAR.

NOTES

1. EXGSTING EXTERNAL STRUCTURES AND TREES SHOWN ON THESE DRAWINGS FEATURES
EXISTING PRIOR TO AMY SEDIMENT AND DEMOLITION WORKS.

2, SHORT TERM BULK EARTHWORKS SLOPE 10 BE A MAXUM OF tH-TV. CONTRACTOR TO
ALLOW FOR ANY REQUIRED SHORKG OR PROTECTION TO EXISTING SERVKES ANO/OR
ADJACENT PROPERTIES DURING EXCAVATION. CONTRACTOR TO ALLOW TO REINSTATE
OR RECTIFY AMY SERVICES AND/OR ADJACENT PROPERTES DAMAGED DURING
EXCAVATION. .

3. LEVEL ¥ SUPERVISION IS REQUIRED FOR ALL EARTHWORKS OPERATIONS AND
CERTIFICATION {STO BE PROVIDED BY THE NOPSNATED GEOTECHNICAL TESTING.
AUTHORITY FOR THE FOLLOWING ITEMS. °
= CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS Ge. STRIPING PROOF
ROLLING OF SUBGRADE, atc} HAVE BEEN CARRIED OUT 1 ACCORDANCE WITH THE
DRAWINGS AND EARTHWORKS SPECFKATION.
= CERTIFICATION THAT THE CONTROLLED FULL {S SUNTABLE FOR SUPPORT OF

 

 

TIORAL HIGH LEVEL FOOTINGS AND HAS A MINIMUM BEARING CAPACITY OF

 

 

 

 

   

 

 

BULK EARTHWORKS-BUILDING PLATFORM LAYOUT PLAN

SCALE 4: 100

> ; 5
= : z
s x
/
+ 3
12027" 2 at
- 45-098
& <
i
i
1
:

 

 

- ‘CATION THAT THE CONTROLLED FILL MATERIAL tS SUTABLE TO SUPPORT A

t CONVENTIONAL SLAB ON GROUND FLDGR [SLAB LOADS OF WhPa ARE EXPECTED),
= CERTIFICATION THAT FILL NAS BEEN PLACED AND COHPACTED TO THE REQUIRED
HOIPIUM DENSITY ON ACCORDANCE WITH THE DRAWINGS AND EARTHWORKS
SPECIFICATION.
= CERTIFICATION THAT THE QUALITY OF ANTT IMPORTED FILL COMPLES WITH DRAWINGS
AND THE EARTHWORKS SPECIFICATION REGUREMENTS.

4. CONTRACTOR TO PROVIDE AN EARTHWORKS HETHODOLOGY STATEMENT FOR APPROVAL
BY GMCE CONSULTING EXGNEERS PRIR TO COMMENCING WORK GN SITE. THE
METHODOLOGY STATEMENT SHALE DEMONSTRATE THE TREATHENT OF EXISTING FALL,
SITE TRAFFICABILITY AND INCORPORATION OF REGLIRED SEDIMENT AHO EROSION
WORKS. CONTRACTOR TO ALLOW TO ATTEND AN ON SITE PRE-START MEETING AND TO
EXCAVATE TEST PITS AS REQUIRED TO DEMONSTRATE THE APPROPRIATENESS OF THE
METHODOLOGY STATEMENT.

5. CONTRACTOR TO ENSURE PRESERVATION AKD AVOID DIS TURBADCE OF EXISTING
SURVEY BARKS.

4. THE CONTRACTOR TO ENSURE ALL FIRE ANT CONTROLS DR RESTRICTIONS OM THES SITE
ASSOC

REQUIREMENTS HAVE BEEN COMPLIED WITH.
TRIAL ENGINEERS DRGS FOR BULK EARTHWORKS DETAILS FOR PHT
TRICAL ORAWING FOR CONDUITS. CONOUTTS TO BE INSTALLED PRIOR To

 

   

9. THE CONTRACTOR {S TO MAINTAM ALL ACCESS ROADS TO SITE SUCH THAT THEY
REMAIN FREE OF ALL FILL MATERIAL AMD ARE CLEANED AS MECESSARY. REFER ALSO TO
THE EROSION SEDIMENT CONTROL PLAN / PROGRAM.

 

 

Sunshine Coast Regicnal Council
Development Permit Cp-2 2 na Varks Nar Lee? OSE.

RECCHMONCDID FUN ABPTICUA

 

Date: ........---

  

 

 

COPYRIGHT - ALL RIGHTS RESERVED
Copying or repreducing tha whole of part of this document in
any form without the welftes peralxsion of Blakeney Kunis
Consulting Exginenra conalitvtes in infringement at copyright,

   

Craving in
the equivatent revision hard copy issued by Blakeney Hanns,

Conaulting Engineer's.

 

 

CRD BKM BKM

LAWN DESIGNEO. CHECKED.

1 a Yoo ApR 99
SF

BK, UNS RPEQ No. 6469

“cola ae,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

A__ [oP WORKS APPROVAL Gwe
P2 [PRELIMINARY ISSUE ‘Gwe
Pi [PRELIMINARY ISSUE 27.06.09] GWE

 

 

 

 

REV. | AMENDMENT. DATE | tHITLALS|
PROPOSED RESIDENCE

LOT 10 PARK ROAD

NOOSA HEADS

QLD 4567

 

PROJECT

THE PENINISULA AVIATION
TRUST

CLENT

CECILIA BROWN DESIGN

 

 

ARCHITECT

BULK EARTHWORKS-
BUILDING PLATFORM PLAN

 

 

 

DRAWING TITLE

                

 
   

   

BLAKENEY Ed
CONSULTING ENGINEERS

  

ACN 112013 448
BRISBANE OFFICE:
PH 0411 515 480
FAX 07 5479 2675
EMAIL = [email protected]
PO Box 1803
TOOWONG QLD 4066

OFFICES:
BRISBANE AND SUNSHINE COAST

09007 S0.03 A

PROECT Ko. OWG Ko. REV.

  

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0578 - Approved Plans [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.