               PLANNING AND ENVIRONMENT COMMITTEE MEETING                                                  7 MAY 2024

               MCU22/0051 REPRESENTATIONS TO DEVELOPMENT APPROVAL FOR MATERIAL
               CHANGE OF USE - HARDWARE & TRADE SUPPLIES AT 178 EUMUNDI NOOSA ROAD,
               NOOSAVILLE
               OCUMENT INFORMATION




               Author                            Coordinator Planning, Nadine Gorton
                                                 Development and Regulation Department
               Index                             ECM/Application/MCU22/0051


               Attachments                       ATTACHMENT 1 – MCU22/0051 – PROPOSED AMENDED / ADDITIONAL
                                                 CONDITIONS
                                                 ATTACHMENT 2 – OFFICER’S REPORT
                                                 ATTACHMENT 3 – PROPOSAL PLANS



                                APPLICATION DETAILS

                                Applicant                        Bunnings Group Limited

                                Development Approval             Development Permit for Material Change of Use - Hardware
                                                                 and trade supplies

                                Representations Received on      4 December 2023

                                Number of Submissions for Not Applicable
                                Original Application


                                PROPERTY DETAILS

                                Property Address                 178 Eumundi Noosa Rd Noosaville

                                RP Description                   Lot 101 SP 279285

                                Land Area                        2.667 Hectares

                                Existing Use of Land             Bunnings Warehouse and vacant land


                                STATUTORY DETAILS

                                SEQRP Designation                Urban Footprint

                                Locality                         Noosaville Local Plan Area

                                Zone                             Medium Impact Industry

                                Overlays                         Land Subject to Acid Sulfate Soils
                                                                 Landslide Hazard Overlay




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024
Full text of the other 13 pages

Page 2

                                                     Regional Infrastructure Overlay

                    Assessment Type                  Representations made to original approval

               EXECUTIVE SUMMARY
               This report considers representations made to a development approval issued by Council for a
               Hardware and Trade supplies store to be constructed on the vacant area of the existing Bunnings
               Warehouse site in Noosaville.
               The applicant has suspended the appeal period and made representations to the development
               approval conditions. The applicant’s representations relate to the required plan amendments and
               conditions and include:
                      •    Amended plans relating to the northern exit driveway design including a 0.5 metre
                           landscaped setback.
                      •    Amended plans reducing the building height to 10.94m consistent with adjoining
                           development to the north (note: plan amendments required a maximum height of 10
                           metres)
                      •    Provision of an eave overhang
                      •    Clarification of conditions relating to use of the site, external colours, street trees,
                           performance bond and acid sulfate soils requirements.
               The proposed amended plans have reduced the building height from 12.14m to 10.94m and made
               provision for a 0.5m landscape strip along the northern driveway and an awning to the building
               façade. While the proposed building still exceeds the code’s acceptable outcome for building height
               of 10m, the proposed height of 10.94m to the roof pitch is compatible with the height of buildings
               in the area and will not visually impact on the streetscape.
               No changes are recommended to conditions regarding the existing Bunnings Warehouse as they
               are considered reasonable.
               Some minor amendments are however recommended to the conditions regarding external colours,
               performance bond, street trees and acid sulfate soils.
               Accordingly, it is recommended that a Negotiated Decision be issued.
               RECOMMENDATION
               That Council note the report by the Coordinator Planning to the Planning & Environment Committee
               Meeting dated 7 May 2024 regarding representations made in relation to Development Approval
               MCU22/0051 for Hardware and Trade Supplies situated at 178 Eumundi Noosa Rd Noosaville and:
               A.     Agree to amend conditions 3, 7, 13,15, 20 and 21 as outlined in Attachment 1.
               B.     Delete conditions 39 & 40.
               C.     Refuse the representations made to conditions 5 for the following reasons:
                      Condition 5
                      The condition is a reasonable requirement given the application was made over 178 Eumundi
                      Noosa Road which includes the existing Bunnings Warehouse. The retention of a significant
                      hardware component and trade sales area within the Bunnings Warehouse is an important
                      consideration in the assessment of the proposed trade supplies store and the original
                      Bunnings Warehouse.
               D.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 3

                       ATTACHMENT 1 – (MCU22/0051) – PROPOSED AMENDED CONDITIONS
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.             Rev.    Plan/Document Name                           Date

                        DA02                 H       Site Plan of Layout Proposed Bulk Trade Yard 05.02.2024
                                                     Undercroft Car Parking prepared by Group 4
                                                     Architects

                        DA03                 H       Site Plan of Layout Proposed Bulk Trade Yard 05.02.2024
                                                     First Floor Level prepared by Group 4 Architects


                        DA04                 F       Site Plan of Layout Proposed Bulk Trade Yard 05.02.2024
                                                     Roof Plan prepared by Group 4 Architects


                        DA05                 G       Site Plan of Layout Proposed Bulk Trade Yard 05.02.2024
                                                     Typical Sections prepared by Group 4 Architects


                        DA06                 I       Site Plan of Layout Proposed Bulk Trade Yard 04.03.2024
                                                     Elevations prepared by Group 4 Architects


                        DA07                 F       Site Plan of Layout Proposed Bulk Trade Yard 06.02.2024
                                                     Gateway Drive Streetscape Elevation
               7.     External colours and finishes must be of muted environmental tones, with broad expanses
                      of a single colour not permitted. Walls must be broken up by varying tones or design elements
                      and be different to the existing Bunnings Warehouse Store on the balance area of the site.
                      External colours and finishes must be generally as shown on the Approved Plans.
               13.    The maximum height of the development must not exceed 10.94 metres above the ground
                      level, including the exposed portion of the external façade of the building where excavation
                      is undertaken.


               LANDSCAPING WORKS
               15. The development site must be appropriately landscaped. The works must be undertaken in
                   accordance with an Operational Works approval and the Noosa Plan for that specific area
                   and must include in particular:
                       a.      The works generally shown on the Landscape Concept Plan 155.004.SD001B,
                               155.004.SD002B and 155.004.SD003B prepared by Citicene dated 9.02.2023
                               except where varied by the conditions of this approval. The landscape plans are to
                               incorporate a three-tiered landscape buffer to the street frontage incorporating the
                               following additional species:
                               •        Corymbia tessellaris
                               •        Eucalyptus intermedia
                               •        Melaleuca quinquenervia
                               •        Banksia integrifolia
                       b.      Vegetated screening of the proposed development from Gateway Drive, designed
                               such that the development is screened at maturity;



Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 4

                      c.      Vegetative screening of any electrical transformers, bin storage areas and the like
                              from the road frontage;
                      d.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
                              (excluding driveways).
                      e.      Landscape or architectural treatments that soften the appearance of the retaining
                              walls and industrial building along the northern boundary.


               20.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on completion of the development subject to satisfactory
                      performance of the conditions of approval at that time less any costs incurred by Council in
                      respect of enforcing performance of this permit. Council reserves the right to call upon the
                      bond or guaranteed sum to effect compliance with conditions.
               21     The disturbance and release of Acid Sulphate Soils must be avoided by:
                             a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
                                National Acid Sulfate Soils Guidance.
                             b. not excavating or otherwise removing soil or sediment containing ASS;
                             c. not permanently or temporarily extracting groundwater that results in the aeration
                                of previously saturated ASS; and
                             d. not undertaking filling on land at or below 5 metres AHD that results in:-
                              i.        actual ASS being moved below the water table; or previously saturated ASS
                                        being aerated.
                      Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
                      accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
                      Certification from a suitably qualified person that all works have been undertaken in
                      accordance with the Acid Sulfate Soil Management Plan must be provided to Council.
                      *(Refer to Advisory Note)




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 5

                              ATTACHMENT 2 – (MCU22/0051) –PLANNING OFFICER’S REPORT


               REPORT
               1.     BACKGROUND
               An application for a Hardware and Trade Supplies store was approved by Council at its Ordinary
               Meeting on 26 October 2023 subject to conditions, including required plan amendments regarding
               the northern exit driveway design, the proposed building’s height, and provision of an awning to
               the front facade.
               The applicant suspended the appeal period and made representations on 4 December 2023 to the
               development approval conditions. The representations are detailed below but primarily relate to
               the required plan amendments.
               Following discussions with the applicant, further plans were subsequently provided to Council on
               4 March 2024, with the time frame for a negotiated decision extended to enable the application to
               be reported back to Council.
               2.     ASSESSMENT
               An assessment in relation to each of the submitted representations is provided below:
               Conditions 3 & 13 – Plan Amendments
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the tables below. The plans must be amended to incorporate
                      the amendments listed within the table below and resubmitted to Council prior to the issue
                      of any Development Permit for Operational Works

                        Plan No.        Rev.   Plan/Document Name                             Date

                        Nil

                      The following plans require amendment.

                        Plan No.        Rev.   Plan/Document Name                             Date

                        DA02            E      Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
                                               Undercroft Car Parking prepared by Group 4
                                               Architects

                        DA03            E      Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
                                               First Floor Level prepared by Group 4 Architects


                        DA04            D      Site Plan of Layout Proposed Bulk Trade Yard 22.08.2023
                                               Roof Plan prepared by Group 4 Architects


                        DA05            E      Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
                                               Typical Sections prepared by Group 4 Architects


                        DA06            E      Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
                                               Elevations prepared by Group 4 Architects




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 6

                                          The exit driveway located along the northern boundary is to be
                          Amendments
                                          relocated off the boundary to provide a garden bed for a length of 15
                                          meters (from the front of the site) with a minimum planting width of 0.5
                                          meters. The plans are to detail landscape and/or architectural
                                          treatments that soften the appearance of the retaining wall and
                                          industrial building of the southern elevation of the adjoining site at 13
                                          Vision Court.

                                          The maximum height of the building is to be reduced such that no part
                                          of the building exceeds 10 metres from natural ground surface levels
                                          and finished levels.
                                          An eave overhang a minimum of 1.2 metres wide must be provided to
                                          the building’s front façade to provide further interest to the street.

                          *(Refer to Advisory Note)
               13.       The maximum height of the development must not exceed 10 metres above the ground level,
                         including the exposed portion of the external façade of the building where excavation is
                         undertaken.
               Applicant’s Representation
               The applicant initially advised that the requirements of conditions 3 and 13 were unworkable and
               would prevent the development proceeding, however following discussions with staff, the applicant
               subsequently lodged revised plans to address the required plan amendments. The applicant
               submitted the following changes and justification:
               •     Reduction of the maximum building height from 12m to 10.94m. This ensures the highest point
                     of the building now sits at RL 20.890.

                     -    This ensures that no part of the building will exceed 10 metres above natural ground level
                          (see extract below).
                     -    This ensures that the proposed building (at its highest point) will be the same level as the
                          highest point of the neighbouring building at 13 Vision Court.




               •     Lowering of the ground surface level to RL 9.950, which is 450mm lower than what was
                     originally approved. This will assist in reducing the overall building height relative to natural
                     ground level, whilst maintaining the required internal clearances. No amendments to internal
                     ramping is required as confirmed by TTM (second attachment).
               •     Bio-detention basin lowered to RL 9.00 in response to the ground surface level being lowered.
                     This change does not result in any amendments being required to the existing SWMP as
                     confirmed by Acor.
               •     Reduce the height of the undercroft by 1m to assist with reducing the overall building height. A
                     2.3m height clearance is now proposed. This ensures compliance is maintained with Council’s
                     car park height clearance requirements, as confirmed by TTM
               •     Provision of a 0.5m landscape strip along the northern boundary.



Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 7

                   -  This landscape strip along the northern boundary has been achieved by adjusting the width
                      of the landscape strip on the southern side of the building.
               •   Natural ground lines have been shown on elevations, to demonstrate the extent of cut and fill.
               •   1.2m eave overhang to the front façade to provide visual interest.

               Assessment of Representation
               The amended plans have reduced the building height from 12.12m down to 10.94m at the roof
               peak from the finished (excavated) ground level and 10m from the existing ground level. This has
               been achieved by a reduction in the height of the building by 1.1 metres, reducing the floor to
               ceiling heights of both levels and increased excavation which will result in the building sitting lower
               on the site at a scale consistent with structures on adjoining and nearby land.
               The overall roof line of the building has also been dropped in the centre of the site from RL22.525
               down to RL20.89.
               The proposed building is considered consistent with the character of the area noting that buildings
               in the area range in height as follows:

               •       Office Works – opposite the site – 10 metres
               •       Existing Bunnings Store - 12 metres from natural ground level and 9.5m from finished ground
                       level
               •       11 to 13 Vision Court - conditioned to 10 metres.
               •       Gateway Drive frontage buildings - 10 metres or less in height.

               The site generally sits lower than 11-13 Vision Court and the existing Bunnings Store noting that
               significant earthworks including filling and excavation and ramping were undertaken to develop
               these surrounding sites. The proposed building is to be set into the site, with a wide landscape
               setback area available to street to undertake planting that will assist it in integrating with the existing
               streetscape. The proposed height is considered acceptable.

               Figure 1 demonstrates the original building with Figure 2 detailing the revised plans and reduced
               level including the natural ground level. Figure 3 illustrates the proposed building compared to
               adjoining development.




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 8

                                        Figure 1 – Original Proposal




                                        Figure 2 – Revised Proposal




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 9

                                        Figure 3 – Revised Proposal – Comparison to adjoining buildings.



               While the proposed cuts to site the building are substantial, ranging from 1m at the building façade
               to approximately 4.3 metres midway along the building on the northern side, the proposed
               earthworks are not unlike the earthworks undertaken to construct the existing Bunnings building to
               the south and would be expected given the industrial zoning. The proposed earthworks are also
               unlikely to significantly impact on the streetscape given the extensive landscaped front setback,
               screening afforded by adjoining development, and by the landscaping now proposed along both
               side boundaries. Condition 15 which relates to landscaping, has also been amended to provide for
               architectural and landscape treatment along the northern boundary.




               The amended plans have also appropriately incorporated a 1.2m overhang to the building’s
               frontage to provide some visual interest to the Gateway Drive frontage. The applicant’s submission
               to amend the conditions to reflect the revised plans is supported.


               Condition 5 – Existing Bunnings Warehouse Store
               5.     The approved Bunning Warehouse Store on the balance area of the site must be operated
                      in accordance with the development approval (07/0256), which includes a significant
                      hardware component and trade sales area
               Applicant’s Representation
               The applicant requested deletion of the condition for reasons detailed below:
               The inclusion of this condition is unnecessary and of no utility given the scope of the development
               application for the trade centre does not encompass the existing Bunnings Warehouse or anything
               relating to the operation of that separate facility. Regardless of this condition Bunnings is bound
               by the requirements of the approval 07/0256. The imposition of this condition will cause an
               administrative burden to Bunnings and Council should it ever be necessary to amend the 07/0256
               approval or should another development approval ever be obtained for redevelopment over that
               other part of the site.


Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 10

               Assessment of Representation
               The condition is a reasonable requirement given the application was made over 178 Eumundi
               Noosa Road which includes the Bunnings Warehouse and the area of the proposed development.
               The retention of a significant hardware component and trade sales area within the original
               Bunnings warehouse was an important consideration in the assessment of the proposed trade
               supplies store. Council in approving the original Bunnings warehouse store, found that the store,
               while containing a significant retail component and nursery, also included a significant hardware
               component and timber sales area which was consistent with the industrial zoning and intent of the
               site.
               The representation is not supported, the condition does not create an unreasonable administrative
               imposition for the applicant and Council in the future.


               Condition 7 – External colours
               7.     External colours and finishes must be of muted environmental tones, with broad expanses
                      of a single colour not permitted. Walls must be broken up by varying tones or design elements
                      and generally consistent with the colour scheme on the approved plans. The proposed colour
                      scheme must be different to the existing Bunnings Warehouse Store on the balance area of
                      the site.




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 11

               Applicant’s Representation
               The applicant seeks clarification regarding the colour scheme and notes:
               The proposed colour scheme for the trade centre is predominantly white with a green
               understorey/base. This scheme was specifically proposed in the further issues response of 8 May
               2023, to ensure the colour scheme differs from the existing Bunnings Warehouse.
               Condition 7 requires that the colour scheme be “generally consistent with the colour scheme on
               the approved plans”. This indicates that what Bunnings has proposed is acceptable, however the
               condition also requires the colour scheme to:
               (a) be of “muted environmental tones”;
               (b) have no “broad expanses of a single colour”;
               (c) ensure walls are “broken up by varying tones or design elements”.
               Despite the requirement to be generally consistent with the approved plans, the three dot point
               create uncertainty as to whether the colour scheme on the approved plans would satisfy the
               condition. We request that Council delete the dot point above elements from the condition.
               Alternatively wording in the condition needs to be revised to make clear the that the colour scheme
               on the approved plans do satisfy the condition requirements.
               Assessment of Representation
               The proposed colour scheme shown on the approved plans is consistent with the intent of the
               condition as it uses reasonable colours and is varied from the existing Bunnings Warehouse. It is
               therefore agreed to amend the condition to provide clarity.




                                                      Figure 4 – Proposed External Colours


               Condition 15(d) – Street Trees
               15.    The development site must be appropriately landscaped. The works must be undertaken in
                      accordance with an Operational Works approval and the Noosa Plan for that specific area
                      and must include in particular:
                      a.      The works generally shown on the Landscape Concept Plan 155.004.SD001B,
                              155.004.SD002B and 155.004.SD003B prepared by Citicene dated 9.02.2023 except
                              where varied by the conditions of this approval. The landscape plans are to incorporate
                              a three-tiered landscape buffer to the street frontage incorporating the following
                              additional species:
                              •         Corymbia tessellaris



Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 12

                              •         Eucalyptus intermedia
                              •         Melaleuca quinquenervia
                              •         Banksia integrifolia
                        b.    Vegetated screening of the proposed development from Gateway Drive, designed such
                              that the development is screened at maturity;
                        c.    Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage;
                        d.    Provision of 1 street tree within the road reserve for every 8 metres of road frontage
                              (excluding driveways).
               Applicant’s Representation
               The applicant seeks clarification regarding the provision of street trees and advises:
               The development has a road frontage of 50 metres to Gateway Drive. The current wording of the
               condition would require the development to provide 7 street trees to that street frontage. The
               condition does not account for the practical road frontage being limited by the width of the entry
               and exit crossovers. The crossovers are a total of approximately 33 metres of the frontage. This
               leaves 17 metres of actual frontage to accommodate street trees, making it not possible to
               accommodate 7 trees.
               An additional two (2) street trees can be accommodated within the road reserve. Accordingly, we
               request that the wording of the condition be amended to require a total of 3 street trees within the
               road reserve opposed to the current provision of 1 per 8 metres of road frontage.
               Assessment of Representation
               The applicants representations are considered reasonable and it is recommended the condition be
               reworded to identify that driveways are excluded from the road frontage calculations.
               Condition 20 – Performance Bond
               20.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
               Applicant’s Representation
               The applicant requests that the condition be deleted as:
               This appears to assume that Bunnings will not comply with the approval, which is contrary to a
               proper legal approach. Further, it is unclear how long the security needs to be maintained given
               that some conditions will need to be maintained over the life of the development (e.g. condition
               16).
               Assessment of Representation
               The condition is consistent with Planning Scheme Policy No. 4 Performance Bonds.
               Notwithstanding this, the condition could be amended to provide clarity that the bond will be
               returned on completion of the development subject to satisfactory performance of the conditions
               of approval at that time.
               Conditions 21, 39 & 40 – Acid Sulfate Soils
               21     The disturbance and release of Acid Sulphate Soils must be avoided by:
                      a.      Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
                              National Acid Sulfate Soils Guidance.
                      b.      not excavating or otherwise removing soil or sediment containing ASS;




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 13

                      c.      not permanently or temporarily extracting groundwater that results in the aeration of
                              previously saturated ASS; and
                      d.      not undertaking filling on land at or below 5 metres AHD that results in:-
                              ii.       actual ASS being moved below the water table; or previously saturated ASS
                                        being aerated.
                      Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
                      accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
                      *(Refer to Advisory Note)
               39.    If earthworks trigger assessment, prepare an Acid Sulfate Soil Investigation Report and if
                      required an Acid Sulfate Soils Management Plan prior to the commencement of works. The
                      reports and analysis are to be undertaken in accordance with the Noosa Plan 2020 and
                      prepared by a suitably qualified person.
               40.    Prior to the commencement of use, provide certification from a suitably qualified person that
                      all works have been undertaken in accordance with the Acid Sulfate Soil Management Plan.
               Applicant’s Representation
               Conditions 21, 39 and 40 relate to carrying out an acid sulfate soils investigation and potential
               preparation of an Acid Sulfate Soils Management Plan if required. There is some overlap in the
               requirements of condition 21 as compared with conditions 39 and 40.
               All requirements with respect to acid sulfate soils should be consolidated into one or two conditions
               contained in one section of the approval. Having requirements with respect to acid sulfate soils
               split across separate sections in the approval, as is currently the case, may lead to confusion.
               Assessment of Representation
               It is agreed that there is repetitiveness in the 3 conditions and therefore it is recommended that
               conditions 39 & 40 be deleted and Condition 21 incorporate the requirement for certification.


               3.     CONCLUSION & REASONS FOR DECISION
               It is concluded that the amended plans satisfactorily address Council’s required amendments to
               the plans of development regarding the northern driveway design, building height, and provision of
               an awning. Amendments are also warranted to provide greater clarity in the wording of conditions
               regarding the required colour scheme, performance bond and acid sulfate soils. However, the
               condition requiring the Bunnings Warehouse to comply with the development approval is
               reasonable and relevant and should be maintained.




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Page 14

               Departments consulted:
                    Office of the CEO, Mayor &                Community Services          Corporate Services
                            Councillors
                     Mayor & Councillors                   Director                    Director
                     Chief Executive Officer               Community Development       Financial Services
                     Executive Officers                    Sport & Active Lifestyles   Fleet
                     Community Engagement                  Arts & Culture              Revenue Services
                     People & Culture                      Community Connection        ICT
                     Governance                            Customer Experience         Commercial Property
                     Strategy & Environment &              Development & Regulation     Infrastructure Services
                     Sustainable Development
                     Director                          x   Director                    Director
                     Strategic Land Use Planning       x   Development Assessment      Infrastructure Planning, Design
                                                                                       and Delivery
                     Economic     Development      &       Local Laws                  Civil and Asset operations
                     Destination Management
                     Environmental Services                Environmental Health        Asset Management
                     Innovation & Digital Hub              Building & Plumbing         Building & Facilities
                                                           Property / Permits          Disaster Management
                                                                                       Waste




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Planning Negotiated Report MCU22 0051.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.