               Applicant’s Representation
               The applicant seeks clarification regarding the colour scheme and notes:
               The proposed colour scheme for the trade centre is predominantly white with a green
               understorey/base. This scheme was specifically proposed in the further issues response of 8 May
               2023, to ensure the colour scheme differs from the existing Bunnings Warehouse.
               Condition 7 requires that the colour scheme be “generally consistent with the colour scheme on
               the approved plans”. This indicates that what Bunnings has proposed is acceptable, however the
               condition also requires the colour scheme to:
               (a) be of “muted environmental tones”;
               (b) have no “broad expanses of a single colour”;
               (c) ensure walls are “broken up by varying tones or design elements”.
               Despite the requirement to be generally consistent with the approved plans, the three dot point
               create uncertainty as to whether the colour scheme on the approved plans would satisfy the
               condition. We request that Council delete the dot point above elements from the condition.
               Alternatively wording in the condition needs to be revised to make clear the that the colour scheme
               on the approved plans do satisfy the condition requirements.
               Assessment of Representation
               The proposed colour scheme shown on the approved plans is consistent with the intent of the
               condition as it uses reasonable colours and is varied from the existing Bunnings Warehouse. It is
               therefore agreed to amend the condition to provide clarity.




                                                      Figure 4 – Proposed External Colours


               Condition 15(d) – Street Trees
               15.    The development site must be appropriately landscaped. The works must be undertaken in
                      accordance with an Operational Works approval and the Noosa Plan for that specific area
                      and must include in particular:
                      a.      The works generally shown on the Landscape Concept Plan 155.004.SD001B,
                              155.004.SD002B and 155.004.SD003B prepared by Citicene dated 9.02.2023 except
                              where varied by the conditions of this approval. The landscape plans are to incorporate
                              a three-tiered landscape buffer to the street frontage incorporating the following
                              additional species:
                              •         Corymbia tessellaris



Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Planning Negotiated Report MCU22 0051.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.